Loading...
HomeMy WebLinkAbout022306 AgendaORANGE COUNTY BOARD OF COMMISSIONERS HILLSBOROUGH BOARD OF COMMISSIONERS AGENDA BOCC/Hillsborough Board of Commissioners Joint Meeting February 23, 2006 Meeting — 7:30 p.m. -10:00 p.m. Government Services Center Hillsborough, NC (7:30— 8:30) 1. Fairview Vision a) b) C) d) e) fl g) h) Park Plans US Highway 70 Redevelopment Project Animal Control Policing Adequate Use of Space at Community Policing Center Habitat for Humanity Project Town Public Works Facility Siting Temporary Solid Waste Convenience Center (8:30 — 9:00) 2. Planning &Inspections a) Courtesy Review/Planning Process b) Eno Mountain Road/Mayo. Street Realignment c) Renovations/Inspections for Historic Structures (9:00 — 9:15) 3. Justice Facilities Update (9:15 — 9:30) 4. Hillsborough Strategic Plan Update (9:30 — 9:40) 5. Mountains to Sea Trail (9:40 — 10:00) 6. Items of Mutual Interest a) Eno River Confluence b) Library Facilities in Hillsborough - -� �1+» kt l 1 ''t•� -t' i �,+��,,�x`UV"!`,,� ^..r, �yY•;'¢i r r� y -�'. mar it 3e cs 31 .'1 t . - .�•n its t- Background Orange County and the Town of Hillsborough own two adjacent tracts (67 acres total), which have long been identified as lands for a Fairview community park in northern Hillsborough. In addition, Orange County owns an adjacent 26 acres that includes the County's Public Works facility. The park site is identified in both the County and Town comprehensive plans. In 2004, the County and Town agreed to work together to create a master plan for the entire 93 -acre site by adopting a Memorandum of Agreement (MOA) along these lines, reflecting both the existing and planned uses on the Public Works site and potential future uses for a park. The MOA may, be found as Appendix 1 to this report. Additional information regarding the site characteristics and history of activity at the Fairview lands may be found in the Challenges and Opportunities report created as part of the Master Plan effort (Appendix 2). In October 2005, an appointed Fairview Public Campus Master Plan Committee began work to develop a proposed Master Plan. Over the next four months the Committee met on four occasions to create this report and plan. Site Analysis / Opportunities & Constraints Report At the initial meeting of the Committee, a report on the aspects of the site in question was presented by staff. This Opportunities and Constraints report evaluated the natural and cultural features present, the history of landholdings and land use pattern, as well as an overview of zoning and other planning issues (please see Appendix 2). The park site (which includes a few existing facilities, such as a playground) lis located in the Fairview community on the north side of Hillsborough. Adjacent land uses include single - family residential lots to the south, west and north. The Orange County Public Works facility is located on the eastern part of the total site, and it is adjacent on the east to lots (some of which are undeveloped) fronting on NC 86. The property is located just outside of the Hillsborough town limits, but within the Town's extraterritorial jurisdiction (ETJ) for planning and permit approval.. The Town's Vision 2010 land use plan identifies the area as "Mixed Use Residential," with a smaller area Institutional Activity Area. The zoning for the property is Office /Institutional (OI), which permits parks, government facilities and a variety of other uses. The Public Works tract does have water and sewer service, although it is primarily sized to serve the existing uses. The site is not in a water supply Committee Meetings and the Design Process In its four meetings, the Master Plan Committee has strived to be efficient and yet diligent in approaching the development of recommendations in a stepwise fashion. Prior to the committee's formation, a preliminary concept plan outlining the general locations of different uses was created to help guide the process. This, in conjunction with the Memorandum of Agreement, was used to create the design parameters. The following table summarizes the activities of the committee meetings. Me of Meeting October 4 Activities Overview of projects and charge, review of Challenges and Opportunities report, preparation for design charrette November 1 Listing of facility preferences and identification of priority facilities. Conduct design charrette with base maps (split into two design groups). Site walk for committee members scheduled and held Dec 2 -3 FridaylSaturda December 8 Review of draft master plans based on charrette, identification of the preferred design, updates on other Fairview matters January 19 Adoption of master plan and report, final thoughts The Fairview Master Plan Committee during the design cnarrette. 3 i"IJU N x L j It A nftu v 101511,2N' PP - �.'w fou 1p g [k."! ��j i yx I 7. all If -Ak ..4 p _0 Y N [ [ (� jI � �I�� "l 3` I[ � (i ! � Ii t!'# +li � 1fi',`[ �IjE(� : r - p%� . ^ �. � � ��cht`�-. � V1 if' [I it v -- - . -- ---- ... . IMID � j}j ^ I � ! � },- 1[, ?7 �,, I ' 1.31 V* Jim. P, 4f F1 IT q 1p. if fill un ��►i �t� , l .' II� `I , , .�jI���1It � [[ # {I fl i �• { ;t� � o �', - ` ' ` � I � � - I f #[ ' 7� t i �� �I ;� � �,. UNZ J ii! i{�r� :►p� kt� I,�t� =i jt [1 I yr' - � . ,•�,t {�! .if x t l ! { f e.+ . - ..z .• � r �i� , t� 1(j1 � �- ; 3 �� !!� r [ Il`i �(j(4i' t • :(;I� -�l i,; ��' �� f! -3 Cs � {� '€ ,1�. -. - � •� � I H� ii r �� i � i��� lllil`,` I y :::..� ( I�i { 1 t tl�,� •t { � :�� ?[�� � � ( f: I I. I � I �1 � t � : t ► ' : {tt , � I :If � t,�llf? i �. I {Ir# l �t Elf" .:i# t t [j t (� ff i [ tFI, a !li. ff�{ tIq�i '' I [ [ I [lj J 4 � !�I ! [, [ ,�. t �:', [ ! i i Itl +, i� j� . �i ll' [ i�� [lillfi f rr{{ # # jf `i[t llf }� ( ^I [ ii!Ia{ j Ifff t i Jill jilt 4 il . , „ tr [1[ r ! , Ii I! ! i� ( ji fill #I;j i[lj` lslfl�I ��!j � !, . i- �: I1nfI ,i ! l 1t , . h } ,;^�° [T #}�•Iy (� ; S �. it { 1 N+ , i I l �"t{I r , ,ii , f!• !� rf i ( . I ! I ( S j,,j I i iN 11 f � I l I? l{ . ti j•� ' 'I[ l ' lt�` .l t ,l f :'` •tiE 'f j P M111,11 Flit y %n� ! E l; [I , I•{I r. . # i[I#l, # k.1 ri t# �j i ,t. i• [ i 'a :!l i [' ' #�l=1I�� III• ; r il[(: 3 , ? ai 1"if(jli�[# fk l { - � i [ { ` I,;1,I't� I � I I t r ' ,� l. . ig I llli!lt If,!, #, Eiit( # 1 i ,' ;I : I,i f"i, [ iI r, [ ' " [I , r ' H 16- l 3 LD je 'or- 0) 2 AR l '4 fill L j It A nftu Recommendations of the Committee Note: In reviewing the master plan and the following recommendations, it may be useful to think of the master plan for the site as having three sections, or "pods." The "southern pod" includes the majority of proposed park facilities and would be accessed from Torain Street or the connector trail (see below) - or for persons outside of the neighborhood, from the NC 571 NC 86 intersection. The "western pod" is located adjacent to the existing community policing station and is adjacent to Rainey Avenue. The "eastern pod" contains the County Public Works site and future Town Public Works site, along with other planned future County facilities. The reason for the "pod" design approach is explained in the rationale section on page 6. After considering all of the above information and discussing the possibilities, the Committee recommends the following actions as facility improvements for Phase 2 of the park: 1. That the following facilities be constructed as Phase 2 of the Fairview Park as the top priorities (as shown on the attached Master Plan map on page 4). These facilities are listed in priority order, with the understanding that some facilities may need to be deferred based on available funds: • Two hard - surface lighted -basketball courts, located. the "southern pod. " • A full -size ,youth baseball/ softball field, located in the southern part of the site. • Two new playgrounds, one near the new ballfield in the "southern pod, " and a replacement playground in the "western pod "near the existing structure and police station. • A picnic shelter with concessions bay and possible restrooms) located near the new ballfield in the "southern pod" • walking trails of approximately 1/2 mildn total, with a main trail connection between the ballfield ( "southern pod ") and the police station / playground ( "we stern pod "). There would also be a trail around the new ballfield, with spur to the southern parking lot and Torain 5 Street, and a connection to Rainey Avenue at Homemont Avenue. • Three tennis courts, located adjacent to the new ballfield. • A volleyball court, adjacent to the existing ballfield While not a park facility per se, a main parking lot and access road is also proposed from the east and the NC 86 / NC 57 intersection.. A smaller parking lot would be located on Torain Street, and the existing parking at the "western pod" police station /playground would also be retained. 2. It is proposed that the former landfill areas on the northern part of the site be maintained in grass and allowed to be used informally for non - structured activities (dog - walking, open meadow, bird- watching). 3. Opportunities for integrating environmental education and habitats in conjunction with the former landfill should be considered, including signage. 4. Interest exists in both a community room and use of the former landfilled areas for subsequent phases of the park as opportunities arise and Town /County funds permit. 5.. The Town and County may wish to pursue additional funding through grants (Parks and Recreation Trust Fund, US tennis Association, for example) and future bonds, to enable the construction of more facilities at the park. 6. Once the master plan is finalized and a construction schedule is identified, a copy of both should be placed at the Fairview Community Policing Substation for community information. A sign noting "Future Site of Fairview Park" would also be helpful.. 7. The facilities planned for the "ea stern pod" (the Public Works and County Facility portions of the site) have been sketched in D on the master plan, as per the Committee's charge. It is our understanding the exact location of these future activities will be addressed at a subsequent time. Master Plan Rationale As the master plan design unfolded, the Committee became aware that the majority of the proposed activity would need to be located in two "pods" of the park. This was made apparent by the uncertainty surrounding use of the former landfilled areas and the existing plans for the County and municipal future uses on the eastern part (eastern pod) of the site. Therefore, the facilities were designed to avoid these areas, work around the existing stream buffer, and try to protect as much of the mature hardwood forest in the southern part of the site as possible. However, the remaining best usable land was largely located in the "southern pod" near the hardwoods area. The master plan sites most of the facilities of the park in this area, while preserving a block of the hardwoods. The design attempts to keep as much of this area intact as possible, and sites only a picnic shelter and playground (which can be nestled among the trees). The larger facilities are located to the north and west of the best part of the hardwoods. Specimen trees of large caliper or age were also protected. The retention of this forested area will also serve as a buffer for residents along Torain Street. The Town of Hillsborough plans to construct a 10,000 to 12,000 square foot Public Works /Motor Pool facility on its designated site (generally the southwest corner of the County Public Works property, which would be transferred to the Town). Also to be included on the site is 7,000 to 8,000 square feet of covered storage facilities. The Town plans to locate its facilities on the western portion of the site with the intent to leave enough acreage for potential future expansion. The second pod of activity is smaller and would be located near the existing Hillsborough Community Policing Station. The group recognized that there is an arbor and history of using this area, termed the "western pod ", as a gathering spot, and while the available or usable land is limited, some facilities would be retained here. These facilities are also easily accessed from Rainey Avenue. To facilitate greater accessibility between the two pods of park activity, a connector trail is proposed that offers a direct way of moving from the "western pod" (police station /picnic /playground area) to the "southern pod" (ballfield and other facilities). This 1000 -foot trail also allows persons entering the park from either Torain Street or Rainey Avenue to access the other portion of the park. In addition to this trail, trails around the ballfiield and a connector trail to the intersection of Rainey and Homemont Avenue are also reflected. Thus, pedestrians could enter the park from Rainey Avenue, Torain Street or Homemont Avenue, as well as from other intersections with Rainey Avenue. %/ Access for non - pedestrians would come via three possibilities. The primary entrance for persons coming to the park from outside of Fairview would be via an extension of the existing Public Works Drive. This road would be continued west and then curve northwest into the main parking area of the park (adjacent to the ballfield and large "southern pod "). This will discourage park traffic from outside of the neighborhood from putting more vehicles on community streets to reach the park. For persons driving from within Fairview, there are two parking opportunities — the existing lot off Rainey Avenue at the "western pod," and a new small lot along Torain Street near the ballfield and If pod." The committee remains interested in the future possibilities for the northern (former landfilled) portion of the site, but understands that addressing the actions needed to make this area usable might siphon away some or all of the funds to build the park. The focus of the master plan is thus to create a design that provides for good pedestrian and vehicular access to the park, using the best areas for facilities and leaving the uncertain open areas for future consideration. It is proposed that the former landfill areas (shown as open lands on the master plan) be planted in grass for now, to provide an open meadow area, with birdboxes and areas for unstructured activities (such as dog - walking, bird - viewing and other non - facility use). In designing the park, the group developed a list of possible facilities and then selected preferred facilities based on community needs and interests, as well as cost estimates for the facilities. The cost estimates used in this effort, and the priority listing, are shown as Appendix 3. The budget for the park is $850,000, and the Committee attempted to design a park in this range. CONCLUSION Citizens in Fairview have looked forward to the creation of the community park at this site for many years. The Committee has attempted to design a park within the parameters of the group's charge. There were a number of limitations that affected the flexibility for park design, largely due to the former landfilled areas and the challenges of retaining the needed lands for future County /Town use and protecting the mature hardwood areas and a buffer along the southern boundary. Given these constraints, and the stream buffer, the areas that remained for potential park use were limited and led to the "pod" design approach - to attempt to make the most out of the areas of the site that were usable. The pod design also helps promote pedestrian access to different portions of the site, and directs traffic to the park away from the residential streets in Fairview. 0 The Committee thanks the Orange County and Town of Hillsborough Boards of Commissioners for the opportunity to develop this master plan design, and eagerly looks forward to seeing Fairview Park come to fruition. In this spirit, the Fairview Master Plan Committee commends this report to the Town and County Boards of Commissioners. APPENDICES Appendix 1 — Memorandum of Agreement Appendix 2 - Opportunities and Constraints Report Appendix 3 — Cost Estimates and Priority Facility Listings 9 Fairviemr+► public Campus ; t° 200 0 200 400 Feet ginPCriYY M cnn�a.nt taa:io� Cs.a..l�npPiwn/ 10