HomeMy WebLinkAbout091599 Item 2ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 15, 1999
Action Agenda
Item No. 2
SUBJECT: County /OCS /CHCCS Informational Reports
DEPARTMENT: OCS /CHCCS PUBLIC HEARING: (Y /N) I No
ATTACHMENT(S):
As listed in "Background"
INFORMATION CONTACT:
Randy Bridges, 732 -8126
Neil Pedersen, 967 -8211
TELEPHONE NUMBERS:
Hillsborough
Chapel Hill
Durham
Mebane
732 -8181
968 -4501
688 -7331
336- 227 -2031
PURPOSE: To receive reports from staff /elected officials regarding several school related
issues.
BACKGROUND: This portion of the meeting provides an opportunity for the three elected
boards to receive updates on the topics noted below, and to identify any other topics that staffs
may need to research and bring back as the subject of subsequent reports.
a) Adopted 1999 -2000 School Budgets
The two school staffs will review the budgets adopted by the two school boards for the current
fiscal year and compare those to the spending plans that were presented to the Board of
Commissioners in May 1999. This information was provided to the BOCC for information only
as part of the agenda materials for their August 31 work session.
Attachment 2a -1— OCS Adopted Budget
Attachment 2a -2 — CHCCS Adopted Budget
b) Number of Classrooms /Class Sizes /Capacity of All Schools, and Costs of Newer
Schools
Members of the BOCC indicated an interest in reviewing information related to: the number of
classrooms, current capacity, and student enrollments for each school in both school systems;
average class sizes by garde level groups in both systems; and the costs of constructing newer
schools (all those from New Hope Elementary on).
Attachment 2b -1 OCS Classroom /Capacity /Enrollment Table
Attachment 2b -2 CHCCS Classroom /Capacity /Enrollment Table
2
Attachment 2b -3 OCS Average Class Size
Attachment 2b -4 CHCCS Average Class Size
Attachment 2b -5 OCS Newer School Costs
Attachment 2b -6 CHCCS Newer School Costs
Attachment 2b -7 Extracts from Adopted Elementary, Middle, and High School
Construction Standards
c) Timetables /Progress Reports for Major OCS /CHCCS Capital Projects
School staffs will provide brief updates on the progress of various new school and major
renovation projects that are under construction or in the planning stages.
Attachment 2c -1 OCS Timetables /Progress Reports
FINANCIAL IMPACT: There is no financial impact tied directly to the review /discussion at this
meeting of these reports. However, any discussion is likely to influence future school operating
and capital budgets.
RECOMMENDATION(S): The Manager recommends that the boards receive the reports for
information only.
®range Countp jt3oarb of (Eburaction
RANDY BRIDGES, SUPERINTENDENT
jbillAorougb, PC 27278
BOARD MEMBERS
SUSAN DOVENSARGER, CHAIR
KEITH COOK, VICE CHAIR
ROBERT H. BATEMAN
RICHARD KENNEDY
DAVID KOLBINSKY
DELORES SIMPSON
BRENDA STEPHENS
MEMORANDUM
TO: John Link
FROM: Randy Bridges
RE: 1999 -2000 Budget Information
DATE: August 23, 1999
200 EAST KING STREET
HILLSBOROUGH, NC 27276
TELEPHONE: 919. 732 -8126
FAX: 919- 732 -8120
I have provided the Local and Capital Budget information for the Orange County School
System for the 1999 -2000 school year which was approved by the Orange County Board
of Education at its July 5, 1999 Board Meeting. We have not taken the final resolution to
our Board for approval at this time. We will be doing so in September.
If you need additional information, or have any questions please call me. Thank you.
/ha
Attachment
LOCAL CURRENT EXPENSE 1999 -00
APPROVED BUDGET 1999 -00
Salary Increase 8% Certified; 3% Classified includes all matching
Health Insurance Increase (35% increase)
Utilities
Insurance (Liability)
Charter Schools
TOTAL
REQUESTED
651,672
135,528
47,184
14,500
49,341
898,225
7/5/99
APPROVED
651,672
135,528
47,184
14,500
49,341
898,225
REQUESTED APPROVED
2 Additional Elective Teachers 951818 95,818
.5 Additional Math Teacher 23,955 23,955
Transportation 40,000 40,000
Total Year Round School A.L. Stanback
3 -1
159,773
159,773
LOCAL CURRENT EXPENSE 1999 -00
7/5/99
TOTAL 1,273,856 1 873,790
REQUESTED APPROVED
Clerical Substitutes 4,000 4,000
Custodian Over 10,000 10,000
Vehicle Liability Insurance 2,000 2,000
TOTAL 16,000 16,000
TOTAL DECREASES 16,000 16,000
3 -2
REQUESTED
APPROVED
3 System Wide Spanish Teachers
143,727
-
1 Pre -K Teacher
47,909
-
.5 Intellectually Gifted Coordinator OHS
23,955
23,955
2 Reading Recovery Teachers
95,818
95,818
1 Teacher for students with disabilities CWS
47,909
-
1 Teacher for students with disabilities ALS
47,909
-
1 Physical Therapist Assistant
47,909
-
1 Science Teacher OHS
47,909
47,909
1 AG Teacher 1/2 C.P; 1/2 N.H.
47,909
-
Increase Local Supplement (gross 263,017, benefits 48,606)
311,623
311,623
1 Nurse
47,909
-
1 Additional Custodian ALS
27,925
-
1 Additional Custodian OHS
27,925
-
2 Technology Support Technicians
95,818
95,818
1 Additional Associate Principal 10- Months CWS
60,870
60,870
1 Secretary 1/2 Finance; 1/2 Auxiliary Services
32,388
32,388
.5 Additional Custodian at Central Office /Support Services
13,963
-
CWS Additional Clerical Assistant
22,572
-
OHS School Resource Officer
34,000
34,000
1 School Based Chair Person
47,909
47,909
System Wide Remediation Funding
-
81,000
Grant Writer/Volunteer Coordinator
-
35,000
Additional Month of Employment for Guidance Dept OHS
-
2,500
Local Principal Supplement
-
5,000
TOTAL 1,273,856 1 873,790
REQUESTED APPROVED
Clerical Substitutes 4,000 4,000
Custodian Over 10,000 10,000
Vehicle Liability Insurance 2,000 2,000
TOTAL 16,000 16,000
TOTAL DECREASES 16,000 16,000
3 -2
LOCAL CURRENT EXPENSE 1999 -00
COUNTY APPROPRIATION
County Appropriation /Additional Revenue
TOTAL REVENUE LOCAL 1999 -2000
3 -3
REQUESTED
7/5/99
APPROVED
21315,854 $ 11540,776
375,012
21315,854 1191 5,788
oc,s 1999 -00 Combined Operating Budget
Revenues and Expenditures
State Public
Revenues
State of North Carolina
State Textbook Allocation
Federal
Orange County Appropriation
Special District Tax
Other Local Revenue
Additional Revenue Requested
Total Revenues
Expenses
INSTRUCTIONAL PROGRAMS
Local Fund School Fund Federal Fund Total
27,617,841 27,617,841
306,742
14,451,936
3,348,387
18,107,065
27,617,841
306,742
1,173,564 1,173,564
14,451,936
3,348,387
1,173,564 46,898,470
5100 REGULAR
4,239,958
13,737,794
75,633
18,053,385
5200 SPECIAL
694,241
2,484,140
700,987
3,879,368
5400 CO- CURRICULAR
337,802
70,281
408,083
5800 STUDENT SERVICES
171,960
1,676,057
1,848,017
5900 BENEFITS
1,840,691
3,962,904
182,234
5,985,829
5900 ADDITIONAL PAY
1,851,892
386,863
5,009
2,243,764
5000 TOTAL
991363,544
221247,758
19034,144
32,418,446
SUPPORT SERVICES
6100 PUPIL SUPPORT
1213460
52,020
13,919
187,399
6200 INSTRUCTIONAL SUPPORT
697,909
383,985
29,501
1,111,395
6300 ADMINISTRATIVE SUPPORT
468,387
307,867
34,500
810,754
6400 SCHOOL ADMINISTRATION
879,740
1,347,841
2,227,581
6500 BUSINESS SUPPORT
4,066,143
2,041,688
7,000
6,1.14,831
6600 CENTRAL SUPPORT
385,634
113,353
15,000
513,987
6900 BENEFITS
934,627
950,794
9,000
1,894,421
6920 ADDITIONAL PAY
176,124
172,535
4,000
352,659
6000 TOTAL SUPPORT
797309024
5,3701083
112,920
13,213,027
CONDAUNITY SERVICES
7000 COMMUNITY SCHOOLS
854,929
-
-
854,929
7000 TOTAL COMMUNITY
854,929
-
-
854,929
8000 NON - PROGRAMMED
CONTINGENCY
20,000
20,000
OTHER
365,568
-
26,500
392,068
TOTAL NON - PROGRAM VIED
3853,568
267500
412,068
Total Operating Expense
18,107,065
279617,841
1,1731564
46,898,470
Per pupil expenditure $
2,826 $
4,311 $
183
$ 7,321
ocs Local Fund Revenue Projections
COUNTY APPROPRIATION 11,487,009 12,911,160 14,451,936 1,540,776 11.9%
Per Student County Appropriation 1,889 2,040 2,256 216 10.6%
OTHER REVENUE:
State Textbook Allocation
ACTUAL
BUDGET
PROPOSED INC /(DEC)
% INC /DEC)
Sales Tax Reimbursement
1997 -98
1998 -99
1999 -2000 From 98 -99
from 98 -99
Projected Enrollment
12,111
3,000
3,000
-
State projections less tuition paid
6,050
6,233
6,281
-
Existing Charter School students
10,705
127
156
-
Total Students
6,050
6,360
6,437 77
1.2%
Out of County Tuition Paid Students
31
31
31
81,393
Total Students
6,019
6,329
6,406 77
1.2%
COUNTY APPROPRIATION 11,487,009 12,911,160 14,451,936 1,540,776 11.9%
Per Student County Appropriation 1,889 2,040 2,256 216 10.6%
OTHER REVENUE:
State Textbook Allocation
159,566
278,527
306,742
28,215
Sales Tax Reimbursement
120,000
120,000
Tuition - Regular School
12,111
3,000
3,000
-
Fines & Forfeitures
240,931
180,000
180,000
-
Rental School Property
10,705
5,000
5,000
-
ABC Revenue
21,125
18,700
18,700
-
Interest Earned on Investments
248,265
82,419
163,812
81,393
Miscellaneous Revenue
65,350
5,000
5,000
-
Indirect Cost
23,461
3,000
176,730
173,730
Community Schools
852,927
793,492
830,929
37,437
Appropriated Fund Balance
1,845,215
1,845,215
-
SUBTOTAL OTHER REVENUE
1,634,440
3,214,353
3,655,128
440,775 13.7%
LOCAL REVENUE 13,121,449 16,125,513 18,107,064 1,981,551
TOTAL BUDGET REQUESTED 18,107,064 1,540,776 14.7%
FUNDING DIFFERENCE 440,775
revenueproj2000
ocs
Local Fund Revenue History
Year
Per Student
Increase
1990 -91
$1,175
$118
1991 -92
1,310
135
1992 -93
1,310
0
1993 -94
1,383
53
1994 -95
1,451
88
1995 -96
1,571
120
1996 -97
1,782
211
1997 -98
1,889
107
1998 -99
2,040
151
1999 -00
2,256
216
ocs Local Fund Budget Summary
Approved Budget for 1999 -00
1997 -98
Y BY PURPOSE
INSTRUCTIONAL PROGRAMS
1998 -99 19919 -00
BUDGET PROPOSED CHANGE
5100 REGULAR
2,801,746
3,775,515
4,239,958
12.3%
5200 SPECIAL
161,568
527,319
694,241
31.7%
5400 CO- CURRICULAR
313,982
337,802
337,802
0.0%
5800 STUDENT SERVICES
34,909
159,222
171,960
8.0%
5900 BENEFITS
11028,978
1029262
1,840,691
10.7%
5900 ADDITIONAL PAY
1,439,597
1,304,763
1,851,892
41.9%
5000 TOTAL
517809780
797669883
9,136,544
17.6%
SUPPORT SERVICES
6100 PUPIL SUPPORT
93,073
114,630
1213,460
6.0%
6200 INSTRUCTIONAL SUPPORT
506,625
5992856
697,909
16.3%
6300 ADMINISTRATIVE SUPPORT
3645,593
448,015
468,387
4.5%
6400 SCHOOL ADNMsUSTRATION
344,684
753,605
879,740
16.7%
6500 BUSINESS SUPPORT
3,346,235
3,943,780
4,066,143
3.1%
6600 CENTRAL SUPPORT
267,269
3731085
385,634
3.4%
6900 BENEFITS
463,817
8081,862
934,627
15.5%
6920 ADDITIONAL PAY
138,062
1635078
176,124
8.0%
6000 TOTAL SUPPORT
515249358
71204,911
717309024
7.3%
COMMUNITY SERVICES
7000 COMMUNITY SCHOOLS
7737828
817,492
854,929
4.6%
7000 TOTAL COMEgMTY
7732828
817,492
854,929
4.6%
8000 NON - PROGRAMMED
CONTINGENCY
20,000
20,000
0.0%
OTHER
1981722
316,227
3657568
15.6%
TOTAL NON - PROGRAMMED
1989722
3369227
3859568
14.7%
TOTAL LOCAL FUND BUDGET
12,2777688
161125,513
1891077065
12.3%
loca12000
OCs
Summary of Budget Request
Local Fund Budget
1999 -00
BASE BUDGET EXPANSION:
• The amount to cover a State Legislature 8% certified and 3% classified across the
board salary increase and matching benefits for all Public School Employees. This
amount represents our locally funded employees.
$ 651,672
• The amount to cover a State increase of 35% for health insurance coverage.
• Liability Insurance Increase
$ 135,528
$ 61,684
• The amount expected to cover growth in Charter Schools. We currently have
enrollment of 156.
$ 49,341
TOTAL BASE BUDGET $ 898,225
NEW INITIATIVES/EXPANSION:
2.5 Teacher Positions /Additional Transportation for Year -Round School (ALS)
The school within a school Year -Round School Program continues to grow. This
year we will have all three grades represented. As these numbers continue to grow,
there is a need to separate the various offerings from the traditional school. These
positions will go toward meeting the elective needs of the year -round students. Each
year our parents request additional transportation for this program. Currently we are
only able to provide transportation for the Hillsborough Elementary. and A. L.
Stanback attendance zones. The additional funds would allow us to assign one bus to
each school to provide transportation outside their attendance zones.
$ 159,773
• 1 School Base Chair
The demands for the Exceptional Children's Program are increasing each year. We
currently have classroom teachers performing their normal duties and facilitating the
IEP meetings for our students. It is extremely difficult to perform both tasks
successfully. We are requesting that a School Base Chairperson be assigned to each
middle school on a half time basis to facilitate IEP meetings and handle the massive
amount of paper work which are required by State/Federal laws.
$ 47,909
• 1/2 AG Gifted Coordinator (OHS)
Our AG Plan also recommends additional services for the high school. This position
would address that need.
$ 23,955
• 2 Reading Recovery Teachers
The Reading Recovery Program has proven to be very successful in all our
elementary schools. We would like to increase the number of students receiving these
services. We intend to use these two teachers in the schools with the'highest needs
for reading intervention.
• 1 Science Teacher (OHS)
The Science Department of all high schools has the largest number of End -Of- Course
tests. As students continue to take more and more of the core subjects to meet
graduation and college entrance requirements, it is imperative that we keep the
student/teacher ratio at a reasonable level. This position would allow us to maintain
our 1:25 teacher /student ratio at the high school.
$ 47,909
• Increase Local Supplement (gross $263,017, benefits $48,606)
The recruitment, selection, development, and retention of quality teachers remain one
of the guiding principles for our system. In order to attract, retain, and be competitive
with surrounding systems in an environment where teachers are becoming more and
more scarce each year, we feel it is absolutely necessary for us to increase our local
supplements.
$ 311,623
2
I Secretary 1/z Finance; 1/2 Auxiliary Services
We are also requesting half -time assistance for the Directors of Auxiliary Services
and Finance, two cabinet level positions in central office.
$ 32,388
• One Associate Principal Middle School (10 months)
This was the top priority of our principals last year, as they wanted two associate
principals in each of our middle schools. We were able to fund one position this year,
and use a Principal Fellows Candidate in the other school. We are requesting that the
second associate principal be added.
$ 60,870
Two Technology Support Technicians
Technology is quickly becoming a powerful instructional tool. There is a need for
constant updating in programs and repair. Our building level technology teachers are
spending more and more time on the maintenance of the equipment, as opposed to
working with teachers and students. It is our hope that these two technology
technicians, along with the one other person, will be able to eliminate some of the
mechanical demands for our building level teachers.
b . •
• 1 Resource Officer (OHS)
We have been able to provide School Resource Officers in our middle/high schools
with grants and some local funding. The high school has over 1600 students, and
there is clearly a need for more than one officer. These officers continue to be a
valuable asset to our schools. Unfortunately, with the events taking place around the
country, their presence has become even more needed as a preventive measure.
$ 34,000
• System Wide Remediation Funding
We have determined that providing sustained remediation assistance to our At -Risk
Students has elevated our proficiency levels in reading and math over the past four
years. We have been limited to providing these services the second half of the school
year. We are adding additional funding to each of our schools so that these services
can be expanded and offered throughout the school year. The program will be offered
both during and after school.
$ 81,000
• Grant WriterNolunteer Coordinator
Currently we don't have any specific person to pursue Grant opportunities for the
system. It is very important that we seek any and all additional funding for our
system. In addition to these responsibilities, the system is also in need of an organizer
to build a pool of school volunteers. It remains very clear that the more external
customers we can involve in the educational process the more successful we will be in
developing the total child.
$ 35,000
Additional Month of Employment for Guidance Dept OHS
Orange High School is currently the only high school in the area that doesn't have the
Guidance Office open year round. As our system continues to grow and with the
number of new /transfer students coming over the summer, we need to register
students and communicate with new parents as they arrive in our system.
$ 2,500
4
• Local Principal Supplement
We currently have two tenured principals whose local supplements have been frozen
for a number of years. These funds will place their local supplement in line with our
other principals who are under contracts.
TOTAL
$ 5,000
$ 873,790
TOTAL NEW INITIATIVES/EXPANSION $1,931,788
SAVINGS
• Savings from Clerical Substitutes $ 4,000
• Savings from Overtime $ 10,000
• Savings for Vehicle Liability Insurance $ 2,000
Decreases from 1998 -99
Grand Total
$16,000
$1,915,788
5
ocs
Summary of Budget Requests
Local Fund Revenue
1999 -00
Projected Student Enrollment 1999 -00
*Budgeted OCH Students (including tuition paid and excluding 6,281
present charter school students)
*Budgeted Charter School students increase to actual this year. 156
*Total students requiring funding 6,437
*Total students requiring funding 6,437
*Less number of tuition paying students (31)
*Total students needing County funding 6,406
Change in Revenue
*County per pupil allocation including an increase of 77 students 1,540,776
Other Revenue
*State Textbooks Warehouse Account 28,215
*Sales Tax Reimbursement 120,000
*Interest Earned. on Investments 81,393
*Indirect Cost 173,730
*Community Schools 37,437
Total Revenue Change 440,775
ORANGE COUNTY PER PUPIL ADM HISTORY 10113198
Increase
County
I Current Expense
I Per Pupil
ADM
%
1993 -94
7,420,172
$
1,363.00
5444
1994 -95
8,099,482
$
1,451.00
5582
9.15%
1995 -96
8,825,533
$
1,571.00
5617
8.96%
1996 -97
10,121,760
$
1,782.00
5680
14:69%
1997 -98
11,487,900
$
19889.00
6081
13.50%
1998 -99
12,911,160
$
2,040.00
6202
12.39 %'
1999 -00
14,451,936
$
2,256.00
6406
11.93%
countyapprop
OCS 1999 -00 State Fund Budget Summary
SUMMARY BY PURPOSE CODE
REVENUES
EXPENSES
INSTRUCTIONAL PROGRAMS
5100 REGULAR
5200 SPECIAL
5800 STUDENT SERVICES
5900 BENEFITS
5900 ADDITIONAL PAY
5000 TOTAL
SUPPORT SERVICES
6100 PUPIL SUPPORT
6200 INSTRUCTIONAL SUPPORT
6300 ADMINISTRATIVE SUPPORT
6400 SCHOOL ADMINISTRATION
6500 BUSINESS SUPPORT
6600 CENTRAL SUPPORT
6900 BENEFITS
6920 ADDITIONAL PAY
6000 TOTAL SUPPORT
COMMUNITY SERVICES
7000 COMMUNITY SCHOOLS
7000 TOTAL COMMUNITY
8000 NON - PROGRAMMED
1997 -98 1998 -99 1999 -00
ACTUAL BUDGET PROPOSED CHANGE
2297217666 259738,356
11,106,217
12,6961,667
21236,906
2,298,000
1,212,079
1,551,905
3,029,266
3,662,573
198,608
377,427
1797839076 209586,572
33,978
51,000
401,774
371,000
225,604
298,900
1,197,778
1,248,001
1,880,225
1,982,222
206,021
110,051
908,585
923,100
84,625
167,510
49938,590 5,1511784
279617,841 7.3%
13,737,794
8.2%
2,484,140
8.1%
1,676,057
8.0%
3,962,904
8.2%
386,863
2.5%
22,2479758
8.1%
52,020
2.0%
383,985
3.5%
307,867
3.0%
1,347,841
8.0%
2,041,688
3.0%
113,353
3.0%
950,794
3.0%
1727535
3.0%
593709083 4.2%
CONTINGENCY
OTHER - - -
TOTAL NON - PROGRAMMED
TOTAL 229721,666 2557389356 27,6173,841 7.3%
* 1999 -00 Projections are based on planning allotments which are subject to change based on the
higher of the first two months ADM. ScaceMO
ocs 1999 -00 Federal Fund Budget Summary
Mild-10 1F.-VAM-1-3110 au 1,32111 _W9010 N
REVENUE
EXPENSES
INSTRUCTIONAL PROGRAMS
5100 REGULAR
5200 SPECIAL
5800 STUDENT SERVICES
5900 BENEFITS
5900 ADDITIONAL PAY
5000 TOTAL
SUPPORT SERVICES
6100 PUPIL SUPPORT
6200 INSTRUCTIONAL SUPPORT
6300 ADMINISTRATIVE SUPPORT
6400 SCHOOL ADMINISTRATION
6500 BUSINESS SUPPORT
6600 CENTRAL SUPPORT
6900 BENEFITS
6920 ADDITIONAL PAY
6000 TOTAL SUPPORT
COMMUNITY SERVICES
7000 COMMUNITY SCHOOLS
7.000 TOTAL COMMUNITY
8000 NON - PROGRAMMED
CONTINGENCY
OTHER
TOTAL NON - PROGRAMMED
TOTAL
feder2000
1997 -98 1998 -99 1999 -00
ACTUAL BUDGET PROPOSED CHANGE
930,391
92,747
589,856
12,468
133,123
5,106
833,300
9,478
27,645
21,524
5,940
1,065
7,978
73,630
23,461
23,461
930,391
11116,386 191739564 5.1%
57,751
75,633
31.0%
663,690
700,987
5.6%
69,507
70,281
1.1%
171,919
182,234
6.0%
4,060
5,009
23.4%
9669927
190349144
7.0%
11,184
13,919
24.5%
19,554
29,501
50.9%
32,023
34,500
7.7%
6,670
7,000
4.9%
13,100
15,000
14.5%
39,168
9,000
-77.0%
31,596
4,000
11.2%
125,295
1129920
-9.9%
24,164
26,500
9.7%
249164
269500
9.7%
111169386
191737564
5.1%
Position Budget Summary
For the Local, State and Federal Funds
STATED IN FULL -TIME EQUIVALENT POSITIONS (FTE)
SUMMARY BY PURPOSE CODE
INSTRUCTION
5100 REGULAR
5200 SPECIAL
5400 Co- Curricular
5800 STUDENT SERVICES
5000 TOTAL
SUPPORT SERVICES
6100 PUPIL SUPPORT
6200 INSTRUCTIONAL SUPPORT
6300 ADMINISTRATIVE SUPPORT
6400 SCHOOL ADMINISTRATION
6500 BUSINESS SUPPORT
6600 CENTRAL SUPPORT
6000 TOTAL SUPPORT
COMMUNITY SERVICES
7000 COMMUNITY SCHOOLS
7000 TOTAL COMMUNITY
TOTAL
Local
Fund
State
Fund
Federal
Fund
I4jaal
IQW
1998 -99
1999 -00
1998 -99
1999 -00
1998 -99
1999 -00
1998 -99 1999 -00
Chg
101
106.5
404
408
505
514.5
9.5
17.5
19
60.73
65.73
26.77
27.77
105
112.5
7.5
coaching supplements
extra duty not positions
2
3
29
29
31
32
1
120.5
128.5
493.73
502.73
26.77
27.77
641
659
18
2
2
1
1
0.5
0
3.5
3
-0.5
11.5
13.5
5
5
1
17.5
18.5
1
3.4
3.4
4.6
4.6
8
8
0
15
16
36
36
51
52
1
130
131
57
57
187
188
1
5
6
5
6
1
166.9
171.9
103.6
103.6
1.5
0
272
275.5
3.5
23
23
23
23
0
23
23
0
0
0
0
23
23
0
310.4
323.4
597.33
606.33
28.27
27.77
936
957.5
21.5
** State and Federal 1999 -00 Budget information is estimated at this time.
OCis
Summary of Changes
Position Budget
1999 -00
Change in State Fund Budget
INCR/(DECR)
* New Classroom Teacher Positions
1
* One Teacher Assistant for grades K -3
1
* Support Position
1
* Vocational Education Position
1
* Special Education Teachers
3
* Special Education Assistants
1
* Willie M Teacher Assistant
1
TOTAL ADDITIONAL STATE POSITIONS
9.0
Changes in Local Fund Budget
* Additional Elective Teachers ALS
2
* Additional Math Teacher ALS
0.5
* Intellectually Gifted Coordinator OHS
0.5
* Reading Recovery Teachers
2
* Science Teacher OHS
1
* 2 Technology Support Technicians
2
* Additional Associate Principal 10- Months CWS
1
* Secretary 1/2 Finance; 1/2 Auxiliary Services
1
* OHS School Resource Officer
1
* School Based Chair Person
1
* Grant WriterNolunteer Coordinator
1
TOTAL ADDITIONAL LOCAL POSITIONS .
13
Changes in Federal Fund Budget
* Drug Free Funds Clerical Position -0.5
TOTAL ADDITIONAL FEDERAL POSITIONS -0.5
TOTAL NEW POSITIONS 21.5
APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7 -3 -99
REQUEST
JUSTIFICATION
FUNDED
CATEGORY I BUILDINGS & GROUNDS
Cameron Park
4.9101.001.524
1. Replace Fire Alarm System
Bring Fire Alarm System up to state code #NFPA #72, to
meet ADA Standards.
65,000
4.9102.001.524
2. Intercom System
Upgrade 20 year old Intercom system
40,000
Central Elementary
4.9103.001.524
1. Upgrade Fire Alarm
To bring school Fire Alarm System up to code #NFPA72,
to meet ADA and State Guide Lines
50,000
4.9104.001.529
9. Ceiling Tile
Replace old and spotted ceiling tile in halls
10,000
4.9105.001.523
10. Heating /Cooling
Add one heating and cooling window unit to old lounge
area
5,000
CW STANFORD
4.9106.001.523
1. Chiller 200 Building
Replace a 45 ton unit with a 80 ton unit, this will allow use
to cool the entire 200 building, the present unit is 20+
years old. Currently we can't cool the gym and
classrooms at the same time.
70,000
4.9107.001.529
4. Cafeteria Hood Fire Protectors
Update old hood fire protection system, State Standard
Fire Code
5,000
Efland Cheeks Elementary
4.9108.001.523
1. Heating /Cooling Units
Replace two roof top heating/cooling units, units are 21
years old
40,000
G. A. Brown
4.9109.001.524
1. Heating /Cooling Units
Replace two water source heating /cooling units, units are
20+ years old
35,000
Hillsborough
4.9110.001.523
3. Work Room Vent
Install a vent to move heat built up by equipment used in
workroom
1,000
New Hope
4.9111.001.529
1. Fencing
Replace old fencing around play area, also add 3 gates
6,000
4.9112.001.529
2. Roll Gate Safety Guards
Entrance roll gates to school need to have safety guards
to prevent gates from sliding off rollers and severely
injuring someone.
3,000
4.9113.001.529
3. Fence Gate
Install gate leading to back play area
1,000
SYSTEM WIDE
4.9114.001.529
2. Roof Repairs
Maintain roofs at all buildings systemwide
25,000
4.9245.001.529
13. Bleacher Maintenance
Yearly Inspection and maintenance upkeep on all
1bleachers and basketball backstops.
15,000
APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7 -3 -99
REQUEST
JUSTIFICATION
FUNDED
4.9247.001.529
4. Painting Schools
Continue painting schools on the yearly rotation painting
schedule
20,000
4.9248.001.529
5. Line Painting
Keep our schools parking lots properly lined and painted
10,000
4.9249.001.529
6. Cafeteria Kitchen Hood Cleaning
Semi - Annual cleaning of cafeteria hoods, safety/health
issue
9,000
4.9251.001.529
7. Carpet Cleaning
Yearly carpet cleaning of office areas in the system
10,000
4.9250.001.529
8. Pest Control
Yearly treatments of all the buildings in the system,
health /safety issue.
9,000
4.9252.001.529
16. Bloodborne Paths. Waste Disp.
Conform to OSHA Standards by disposing of science lab
chemicals and medical waste from school health rooms.
6,000
4.9253.001.529
17. Tack Strips /Dustless Board
Replace bulletin boards/tack strips in the school system
3,000
4.9254.001.529
18. Landscaping all schools
Reseed and fertilize all grounds, systemwide, does not
include athletic fields
12,000
4.9115.001.529
19. Driveway Paving
Repair driveways /potholes systemwide
10,000
4.9116.001.529
21. Water Cooler Replacement
Bring all school sites up to date also ADA standards
31,000
4.9117.001.529
22. Mobile Units OHS, ALS,GAB Leased 4 moblle units
22,304
Athletics
4.9233.001.326
Turf and Field Maintenance
15,000
4.9234.001.541
Turf Equipment
15,000
Maintenance
4.9235.001.541
7. Safety Training Equipment
Equipment to be used for the training of personal
systemwide videos /equipment.
3,000
4.9236.001.541
8. (1) Bush Hog
Replace bush hog mower used by Maintenance on school
sites
5,000
4.9237.001.461
9. Safety Training
Safety Training Seminar for systemwide employees to be
conducted by the Orange County Schools Safety
Coordinator.
5,500
Transportation
4.9118.001.529
3. Transportation Roofing
Replace and reseal 10,472 sq. foot of roofing.
16,000
TOTAL CATEGORY I BUILDING & GROUNDS
5727804
Category II Furniture & Equipment
ALS
APPROVED OCS RECURRING CAPITAL BUDGET 1999 -2000 7 -3 -99
REQUEST
JUSTIFICATION
FUNDED
4.9201.001.541.304
ADM Equipment allocation at $32.
Capital Equipment
23,136
Cameron Park
4.9202.001.541.308
ADM Equipment allocation at $32.
Capital Equipment
17,952
Central Elementary
4.9203.001.541.312
ADM Equipment allocation at $32.
Capital Equipment
13,696
CW STANFORD
4.9204.001.541.316
ADM Equipment allocation at $32.
Capital Equipment
23,584
Efland Cheeks Elementary
4.9205.001.541.324
ADM Equipment allocation at $32.
Capital Equipment
16,064
G. A. Brown
4.9206.001.541.328
ADM Equipment allocation at $32.
Capital Equipment
16,928
Hillsborough
4.9209.001.541.329
ADM Equipment allocation at $32.
Capital Equipment
12,768
New Hope
4.9207.001.541.330
ADM Equipment allocation at $32.
Capital Equipment
20,224
Orange High
4.9208.001.541.332
ADM Equipment allocation at $32.
Capital Equipment
57,024
ministrative
4.9216.001.541
Transportation Equipment Allocation
10,000
4.9215.001.541
Maintenance Equipment Allocation
10,000
4.9119.001.523
Mechanical
15,000
4.9210.001.541
Commercial Copiers
60,000
4.9211.001.541
Human Resources Equipment
Allocation
10,000
4.9213.001.541
Instructional Equipment Allocation
10,000
4.9214.001.541
Superintendent Equipment Allocation
10,000
4.9212.001.541
Finance Equipment Allocation
10,000
4.9217.001.541
Start Up for New Classrooms
45,500
ORANGE COUNTYSCHOOLS
CAPITAL INVESTMENT PLAN
1999 -2009
ORANGE COUNTY SCHOOLS - CAPITAL IMPROVEMENT PLAN FOR 1999 -2009
2 -1 -99
Project Title
Through
YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
YEAR 6
YEAR 7
YEAR 8
YEAR 9
YEAR 10
TOTAL
1998 -99
99 -00
00-01
01 -02
02 -03
03 -04
0405
05 -06
06-07
07.08
08 -09
Asbestos Removal
313,100
313,100
Bus Garage
200,000
200,000
Cameron Park Renovation
270,000
270,000
Central Elem. Media
90,000
90,000
CW Stanford Renovation
1,840,000
1,840,000
Efland- Cheeks Gym
450,000
450,000
Electrical SVS, Upgrade
575,000
575,000
Elementary School New
12,737,720
12,737,720
Energy Mgmt, systems
200,000
200,000
100,000
500,000
Enviromental Testing
150,000
150,000
Future Projects Reserve
- 115,285
- 115,285
Grady Brown Renovation
100,000
100,000
Handicapped Accessibility
634,017
35,983
670,000
High School (New)
1,089,788
1,746,074
13,815,302
747,112
2,377,896
2,290,231
1,527,913
1,488,907
2,789,431
2,641,566
2,619,219
33,133,439
Hillsborough Elem. Renovation
1,161,250
1,161,250
Kitchen Projects
405,000
405,000
Maintenance Shop
155,000
155,000
Orange High Renovation
533,000
450,000
125,000
500,000
1,608,000
Parking Lots /Playfields
100,000
265,000
365,000
Planning for Future Projects
- 16,669
- 16,669
Playground Surfacing
140,000
140,000
Re- roofing Projects
456,635
750,000
159,197
1,000,000
1,140,000
250,000
3,755,832
Technology Application
5,700,000
625,000
625,000
625,000
625,000
625,000
625,000
625,000
625,000
625,000
625,000
11,950,000
TOTAL PROJECT EXPENSE
13,975,836
15,794,777
14,665,302
1,872,112
3,752,896
3,074,428
3,152,913
3,253,907
4,119,431
3,531,566
3,244,219
70,437,387
REVENUE PLAN:
County Pay -As- You -Go
8,704,586
1,380,753
1,574,981
1,499,485
2,622,816
2,686,747
2,757,478
2,850,563
3,708,021
3,111,928
2,816,189
33,713,547
Impact Fees
761,250
1,418,864
365,321
372,627
380,080
387,681
395,435
403,344
411,410
419,638
428,030
5,743,680
State Bonds
5,980,160
5,980,160
Local Bonds 92
2,000,000
2,000,000
Local Bonds 98
2,510,000
7,015,000
12,725,000
750,000
23,000,000
Total Revenues
13,975,836
15,794,777
14,665,302
1,872,112
3,752,896
3,074,428
3,152,913
3,253,907
4,119,431
3,531,566
3,244,219
70,437,387
16
CHAPEL HILL - CARRBORO CITY SCH
Lincoln Center, Merritt Mill Road
Chapel Hill, North Carolina 27516 -288
Telephone: (919) 967 -8211
Neil G. Pedersen
Superintendent
r
DS AUG 1 7 1953
Ann Y. Hart, Assistant Superintendent
of Instructional Services
Chester F. Preyar, Assistant Superintendent
of Support Services
TO: John Link, Manager
Orange County
FROM: Neil G. Pederse
Superintendent
RE: Summary of Budget Request for 1999 72000
DATE: August 16, 1999
Sorry you were not able to attend today's Managers' Luncheon. Had hoped to
provide this information to you there.
I have included the information sent to the Board of Education for approval at its
July 15`x' meeting, but I have placed a blue marker denoting the information you specifically
requested.
Let me know if you have questions.
NGP /asb
CHAPEL HILL - CARRBORO CITY SCHOOLS
Lincoln Center, Merritt Mill Road
Chapel Hill, North Carolina 27516
Telephone: (919) 967 -8211
Neil G. Pedersen Ann Hart, Assistant Superintendent
Superintendent For Instructional Services
Chester Preyar, Assistant Superintendent
For Support Services
TO: Board of Education
FROM: Neil G. Pedersen
Superintendent
RE: Recommended Operating and Capital Budgets for 1999 -2000
DATE: June 30, 1999
I am enclosing revenue and expense summary sheets for the 1999 -2000 operating
and capital budgets. The operating budget has been reduced by $660,325 from the Board
of Education's original request to the County Commissioners and projected revenues,
excluding the county appropriation and district tax, have been increased by $270,000.
These recommended revisions make up for the $930,3.'.5 shortfall in the Manager's
Recommended Budget that the County Commissioners approved. The capital budget
summary is identical to what was requested of the County Commissioners. The remainder
of this memorandum pertains to the operating budget only.
Increases in Revenues
Incorporate projected sales tax reimbursements
The original budget request did not include a line item for sales tax reimbursement.
This is the first year that school districts are eligible for these reimbursements and we were
uncertain about how to reflect this item in our budget. The Manager clarified that
reimbursements that we can claim for the 1998 -99 year should be shown as revenue in the
1999 -2000 budget. We estimate that we will receive $70,000 in sales tax reimbursement.
Appropriate a total of $500,000 from fund balance
In our original request, we recommended that $300,000 be appropriated from fund
balance. The Manager and County Commissioners have encouraged us to appropriate
more fund balance to fund recurring expenses such as the lifting of the salary cap on
experienced teachers. We are recommending that an additional $200,000 be appropriated
from fund balance, bringing the total to $500,000. Although this will leave us with a fund
balance of less than 5.5 %, the guideline cited in your policy, our fund balance should still
exceed $1,000,000. This does not cause us an immediate problem. It must be emphasized,
however, that we cannot be assured that next year a similar amount will be available to
appropriate from fund balance. If this is the case, additional funding will be required from
the County Commissioners because we are using fund balance to finance continuing
expenses.
Decreases in Expenses
Reduce four positions and eliminate capital expenditures in the PREP
Academy budget
The PREP Academy budget is being reduced by $115,488. This reduction is
accomplished by reducing the number of teacher assistants in the two academies from eight
to four and by purchasing the computer hardware from Program 69 state dollars from this
year's budget.
Reduce the proposed budget for programs for Limited English Proficient
students by almost $200,000
Funding for the LEP Task Force recommendations is decreased by $198,104;
however, we are anticipating that the Task Force's recommendations very well could be
fully funded and implemented. Non - personnel items are being purchased from 1998 -99
state dollars that must be expended by June 30, 1999 br else they revert back to the state.
We are expecting the General Assembly to double ,the funding available for LEP students.
If this proposed funding is approved, state funding will support the 1.5 additional state
positions received this year and 3 additional positions for next year. With the one teaching
position proposed for next year from local funds, we will increase the number of ESL
teachers by four and be able to implement all of the strategies recommended by the LEP
Task Force for the first year. If our allotment from the final budget approved by the
General Assembly is not sufficient to fund the proposed positions, we could not fully fund
the recommendations in light of the limited funds being reserved in the contingency fund.
Defer initiative- to reduce class size
No funding is recommended for reducing class size this year; therefore, further
consideration will be delayed for one year. Although reducing class size is a high priority
for the Board of Education, there simply,are not sufficient funds to proceed with this
initiative. This will save $217,320.
Reduce the number of technology technician positions from 6.5 to 5 and
decrease the length of their contracts
The original budget request called for 6.5 technology technician positions with 11-
month contracts. This request has been reduced to 5 positions that will work under 10.5
month contracts. This results in savings of $51,583.
Reduce budgeted allocation to charter schools
We have reduced the amount budgeted for charter schools by $27,830.. It is very
difficult to project the payments that the district will be required to, make to charter schools;
however, based on this year's experience and the closing of one charter school and the.
relocation of another to Orange County, we believe that this reduction is feasible. If not,
the district is committed to making these payments to charter schools and funds would need
to be drawn from the contingency account.
Reduce contingency funds by an additional $50,000
The 1998 -99 contingency account was $250,000. Originally, we recommended
that it be reduced to $200,000. In order to fund other high priority projects, we recommend
that this account be reduced by another $50,000 to a total of $150,000. If no major,
unanticipated needs arise next year, this contingency should be sufficient.
Summary
As the Board of Education has consistently stated throughout the budget process,
every item in our budget request was a very high priority. Any item not funded has a
negative impact on programs and services. Nevertheless, under this budget proposal, we
will be able -to fund most of the programs and enhancements included in our budget
request. The growth in the district will be accommodated without slighting the existing
schools. Non - proficient students will be well served through an expanded summer school
program and intervention programs at the end of the fifth and eighth grades. Although we
anticipate continued difficulties in supporting the effective use of technology in our
schools, we will increase the attractiveness of our technology specialist positions and the
support for our classroom teachers. I am particularly pleased that we will be able to fund
all of the staff compensation requests although I remain concerned about our ability to
compete for the very best teachers. Our supplement schedule will need to be significantly
enhanced in upcoming years.
Coping with the $930,325 shortfall in the revenues approved by the County
Commissioners has not been easy. We benefited greatly by the anticipated doubling of
state allocations for ESL programs. We have deferred high priority items such as the
reduction in class size. We have scaled back programs, including the PREP Academy and
the technology technicians. We also have taken some risks. We've reduced the line item
for allocations to charter schools, increased our appropriated fund balance, and reduced our
contingency fund. We take these responsible risks because we believe that the additional
personnel and other enhancements are critical to the success of the students in this school
district.
RESOLUTION: Be it, therefore, resolved that the Board of Education adopts the
1999 -2000 operating and capital budgets as presented in the attached
documents.
Summary of Budget Request
Local Fund Budget
For 1999 -00
State Mandates
Legislature wage increase
Original Budget
Revised Budget
Growth
297,000
297,000
Opening cost of Mary Scroggs
$9181428
$918,428
Opening cost of ECHHS Additions
4169650
416,650
Increased maintenance cost
1709100
170,100
Local Teacher supplement funds
67,500
67,500
Non - personnel funds for growth
45900
45.900
1,618j578
$1,618o578
State Mandates
Legislature wage increase
$1,2100000
$1,210,000
Health insurance increase
297,000
297,000
Substitute teacher pay increase
44,000
44,000
Special Education Needs
185,824,
185,824
Stipends to cover out of pocket expens,
197369824
$19736,824
Proficiency Standards
PREP Academies $540,000 $424,512
Decentralization of summer school 105,540 105,540
'LEP Task Force recommendations 247,972 49,868
Reduction of Class size 217.320 Q
$ 19110,832 $5799920
Compensation
Increase teacher supplement
112,000
112,000
Removal of cap
151,000
151,000
Fund enhancements recommended
95,000
959000
Reclassification of several admin. pos.
499000
49,000
Stipends to cover out of pocket expens,
5,250
51250
Support for Teacher National Board
15.200
15.200
$427,450
$427,450
Technology
Technology Specialist contract 409596 40,596
Technology Tech nicians(Elem) 119,456 142,531
Mid/High Technicians 74.658 $183,127
. 1 1 $234,710
I
Other
Utility rate
Reduction of one time cost prog.
Reduction of Charter School funding
Reduction of contingency fund
Capital Expenditures
56,400
(130,000)
(50,000)
(40, 000)
(163,600)
56,400
(130, 000)
(2718.30)..
(100,000)
(40,000)
(241,430)
Total Budget Request $ 419649794 $4,304,469
1999 -00 Combined Operating Budget
Revenues and Expenditures
Revenues
State of North Carolina*
State Textbook Allocation*
Federal*
Orange County Appropriation
Special District Tax
Other Local Revenue
Total Revenues
Operating Expenses **
Instructional Programs
Regular
Special
Co- Curricular
Pupil Support
Other
Total Instructional Programs
Support Services
Instructional Staff
Administrative
School Administration
Business Support
Central Support
Other
Total Support Services
Community Services
Charter School Funds
Contingency
Other
Sub -Total
State Textbooks
Total Operating Expenses
State Public
Local Fund School Fund Federal Fund
$ 35,067,111
410,828
$ 2,118,706
$ 20,085,168
9,743,228
1,491,500 - -
$ 31,319,896 $ 35,477,939 $ 2,118,706
Total
$ 35, 067,111
4101828
2,118, 706
20,085,168
9,743,228
1,491,500
$ 68, 916, 541
$ 9,970,206
$ 20,352,221
$ 67,837
$ 30,390,263
2,932,001
2,208,604
695,226
5,835,830
824,021
-
-
824,021
1,965,879
2,505,121
421,659
4,892,659
3,178,557
5,234,483
486,750
8,899,790
18,870,663
30,300,429
1,671,472
50,842,564
791,565
261,714
61,190
1,114,469
272,770
72,876
8,630
354,276
1,415,057
2,000,147
-
3,415,204
6,464,930
1,398,954
-
7,863,884
955,371
94,181
47,600
1,097,152
1,914,361
910,697
118,682
2,943,740
11,814,054
4,7381569
236,102
16,788,725
141054
28,113
-
42,167
471,125
-
-
471,125
150,000
-
-
150,000
-
-
211,132
211,132
$ 31,319,896
$ 35,067,111
$ 2,118,706
$ 68,505,713
-
410,828
-
410,828
$ 31,319,896
$ 35,477,939
$ 2,118,706
$ 68,916,541
Per pupil expenditure $31508 $4,039
*'State and Federal revenues are based on planning budgets.
* * Appendix E contains explanations of expense categories.
2 -1
$241 $7,788
I
Local Fund Revenue Projections
OTHER REVENUE:
Prior Year Special District Tax
73,415
601000
60,000
INCR / '
PERCENT
-
1997 -1998
1998 -1999
1999 -2000
(DECR)
INC /(DEC)
61,000
ACTUAL
BUDGET
PROJECTION
From 98 -99
From 98 -99
Projected enrollment of County Residents:
-
Tuition - Summer School
52,771
45,000
State projection less tuition paid
8317
8441
8760
90,000
150,000
Existing Charter School students
Fines & Forfeitures
143
143
320,000
-
Total County Resident Students
8317
8584
8903
319
Interest Earned on Investments
Out of County Tuition Paid Students
21
27
24
-3
37,478
Total Students
8338
8611
8927
316
40,000
Per Student County Appropriation
$1,889.00
$2,040.00
$2,256.00#
$216.00
10.6%
Per Student Special District Tax est.
880.74
957.25
1,094.3$
137.13
14.3%
Per Student Local Funding
$2,769.74
$2,997.25
$3,350.38
$353.13
11.8%
COUNTY TAXES:
County Appropriation
$ 15,710,819
$ 17,511,360
$ 200085,168
$ 2,573,808
14.7%
Special District Tax
7,507,334
8,217,005
9,743,228
1,526,223
18.6%
SUBTOTAL FROM COUNTY
$ 23,218,153
$ 25,728,365
$ 29,828,396
$ 4,100,031
15.9%
OTHER REVENUE:
Prior Year Special District Tax
73,415
601000
60,000
-
Sales Tax Revenue
-
-
70,000
70,000
State Inventory Tax
-
61,000
62,000
1,000
Tuition - Regular School
57,384
45,000
45,000
-
Tuition - Summer School
52,771
45,000
451000
-
Tuition - Preschool.
120,293
90,000
150,000
60,000
Fines & Forfeitures
317,843
320,000
320,000
-
ABC Revenue
21,655
29,500
29,500
-
Interest Earned on Investments
132,787
150,000
150,000
-
Miscellaneous Revenue
37,478
151000
20,000
5,000
Indirect Cost
105,321
40,000
40,000
-
Appropriated Fund Balance
213,240
431,562
500,000
68,438
SUBTOTAL OTHER REVENUE
$ 1,132,187
$ 1,287,062
$ 1,491,500
$ 204,438 15.9%
LOCAL REVENUES
$ 24,350,340
$ 27,015,427
$ 31,319,896.
$ 4,304,469. 15.9%
2 -2
Local Fund Revenue History
Special District Tax per $100 value
District Tax
$0.1775
$0.1735
$0.1735
$0.1575
$0.1540
$0.1540
$0.1900
$0.1790
$0.1920
$0.2200
For 1999 -00:
A $.01 District Tax increase is estimated to generate $442,874 in additional revenue.
A $.01 County General Fund Property Tax increase is estimated to generate $670,000 in additional revenue
to split between the two school districts in Orange County. CHCCS's share would be $390,000.
* Re- evaluation year of property tax values
2 -3
County Appropriation
Year
Per Student
Increase
1990 -91
$1,175
$118
1991 -92
1,310
135
1992 -93
1,310
.0
1993 -94
1,363
53
1994 -95
1,451
88
1995 -96
1,571
120
1996 -97
1,782
211
1997 -98
1,889
107
1998 -99
2,040
151
1999 -00
2,256
216
Special District Tax per $100 value
District Tax
$0.1775
$0.1735
$0.1735
$0.1575
$0.1540
$0.1540
$0.1900
$0.1790
$0.1920
$0.2200
For 1999 -00:
A $.01 District Tax increase is estimated to generate $442,874 in additional revenue.
A $.01 County General Fund Property Tax increase is estimated to generate $670,000 in additional revenue
to split between the two school districts in Orange County. CHCCS's share would be $390,000.
* Re- evaluation year of property tax values
2 -3
Summary of Budget Requests
Local Fund Revenue
For 1999 -00
Projected Student Enrollment 1999 -00
* Budgeted CHCCS Students (including tuition paid and excluding present
charter school students) 8784
* Bugeted Charter School students (same as 1997 -98 and 1998 -99
ADM). We are anticipating growth in the number of charter 143
* Total students requiring funding 8927
* Total students requiring funding 8927
* less number of tuition paying students -24
* Total students needing County funding 8903
BUDGET
Change in Revenue REQUESTS
• County per student allocation: increase of in- county students of 319 $2,5733,808
• Growth in Special District Tax base 1,526,223
• Total increase from the County Commissioners $4,100,031
Other Revenue:
• Increase in State inventory tax funds
$13000
• Increase in preschool tuition due to growth in program and increase in
60,000
tuition
• State Tax Refund
70,000
• Increase in miscellaneous income
5,000
• Increase in Appropriated Fund Balance
687438
Net Other Income
2041438
TOTAL REVENUE CHANGE $4,3045469
2 -4
Local Fund Budget Summary
Proposed Budget for 1999 -00
SUMMARY BY PURPOSE CODE*
INSTRUCTIONAL
5100 Regular
5200 Special*
5400 Co- Curricular
5810 Education Media
5820 Attendance /Social Work*
5830 Guidance Services*
5840 Health Services
5850 Psychological Services*
5860 Speech Pathology*
5890 Other Pupil Support Services
5900 Employee Benefits
5000 TOTAL INSTRUCT.SERVICES
SUPPORT SERVICES
6210 Improvement of Instruction
6200 Sub -total Instruct. Staff
1997 -98
1998 -99
1999 -00
123,181
ACTUAL-
BUDGET
PROPOSED
CHANGE
114,630
$ 7,583,388
$ 8,303,103
$ 9,970,206
20.1%
2,382,680
2,430,099
2,932,001
20.7%
665,512
775,278
824,021
6.3%
3001618
349,960
448,629
28.2%
130,202
182,523
234,693
28.6%
450,472
405,245
459,405
13.4%
139,169
153,177
181,520
18.5%
87,170
8,189
26,684
225.9%
595,832
486,712
527,968
8.5%
69,561
83,361
86,980
4.3%
2,527,790
2,462,467
3,178,557
29.1%
14,932,394
15,640,113
18,870,663
20.7%
824,094
756,551
791,565
4.6%
824,094
756,551
791,565
4.6%
6310 Board Of Education
96,017
117,931
123,181
4.5%
6320 Executive Administration
109,250
111,608
114,630
2.7%
6390 Other Administrative Support
32,270
54,959
34,959
-36.4%
6300 Sub -Total Admin. Staff
237,537
284,498
272,770
-4.1%
6410 Office of the Principal
985,118
1,330,214
1,415,057
6.4%
6400 Sub -total School Admin.
985,118
1,330,214
1,415,057
6.4%
6510 Support Services
6520 Fiscal Service
6540 Operation of Plant
6550 Transportation
6560 Child Nutrition
6570 internal Services
6580 Maintenance of Plant
6500 Sub -total Business Support
61,060
106,206
108,,954
2.6%
321,616
365,918
376,368
2.9%
2,810,100
3,118,048
3,657,412
17.3%
124,231
305,303
314,506
3.0%
58,908
61,264
63,102
3.0%
283,265
287,854
273,588
-5.0%
1,378,891
1,497,160
1,671,000
11.6%
5,0381071
5,741,753
6,464,930
12.6%
2 -5
Local Fund Budget Summary (con't)
- 250,000
1997 -98
1998 -99
1999 -00
$ 23,903,793 $ 27,015,427_
ACTUAL
BUDGET
PROPOSED
6630 Community Relations
109,277
112,934
116,207
6640 Human Resources
217,082
382,484
502,135
6660 Management Information Service
318,939
368,487
337,029
6600 Sub -total Central Support
645,298
863,905
955,371
6900 Employee Benefits
880,482
1,224,154
1,500,776
6930 Staff Development'"
-
411,555
413,585
6900 Sub -total Other Support
880,482
1,635,709
1,914,361
6000 TOTAL SUPPORT SERVICES
8,610,600
10,612,630
11,814,054
7100 Community Services
3,176
131001
13,241
7910 Employee Benefits
2,811
728
813
7100 COMMUNITY SERVICES
5,987
13,729
14,054
8200 Charter School Funds
354,812
498,955
471,125
2.9%
31.3%
-8.5%
10.6%
22.6%
0.5%
17.0%
11.3%
1.8%
11.7%
2.4%
-5.6%
9990 Contingency
- 250,000
1501000
-40.0%
TOTAL LOCAL FUND BUDGET
$ 23,903,793 $ 27,015,427_
$ 31,319,896
15.9%
*Changes year to year are due to annual placement of staff on state, federal, or local budgets
where best use of funds can be made
* *Staff development was made a separate category for the 1998 -99 school year (all local staff development
is budgeted in 6930)
* * * Appendix E contains explanations of expense categories
2 -6
Summary of Budget Requests
Local Fund Budget
For 1999 -00
Growth
• Opening costs of Mary Scroggs Elementary School in August 1999
(see Appendix C for the details of the budget request).
• Opening costs of East Chapel Hill High Additions in August 1999 (see
Appendix C for the details of the budget request).
• Increased maintenance costs due to the opening of Mary Scroggs
Elementary School and East Chapel Hill High Additions in August
1999 (see Appendix C for the details of the budget request).
• Local Teacher supplement funds for new state paid teacher positions.
• Non - personnel funds for growth in the number of students and.
teachers. These funds cover instructional supplies, co- curricular, staff
development, etc. allocated to schools on a per student or per teacher
State Mandates
• Legislature wage increase for Teachers and Principals (8 %) and staff
(3 %) for positions established in the local budget.
• Health insurance increase of an estimated 35% to $2,344 per full -time
employee. The employer -paid cost of health insurance has been the
same for seven years.
• Substitute teacher pay increase mandated by the state legislature.
* Special Education Needs:
-One System Level Class preschool autistic teacher
- One -half School Psychologist position
-Two high school Special Education Resource Teachers
- One -half Inclusion Assistant at Glenwood
2 -7
BUDGET
REQUESTS
$918,428
416,650
170,100
67,500
45,900
$1,618,578
$1,210,000
297,000
44,000
49,868
24,934
99,736
11,286
$1,736,824
Proficiency Standards
• PREP Academies - A program to enable non - proficient fifth and eighth
grade students to become proficient in reading, mathematics, and
writing at the appropriate grade level.
• Decentralization of summer school to provide a summer program at the
appropriate grade level
• LEP Task Force recommendations - one system wide ESL teacher
Compensation
• Increase teacher supplement one additional percent for those between 0
and 9 years of experience so that minimums are 7% and 8%
• Removal of cap in Teacher Supplement Program after four consecutive
years of successful teaching experience
• Fund the enhancements recommended by the Supplement Study
Committee. Tuition reimbursement/bonus, relocation assistance, etc.
• Reclassification of several administrative positions was recommended
by a study conducted in 1997 -98. The second phase of funding is
being requested.
• Stipends to cover out of pocket expenses for serving on the CHCCS
School Board have not increased in a number of years. Recommended
that the stipends double to $1,400 per member with an additional $100
for Vice Chair and $600 for Chair.
• Support for Teacher National Board certification and new Teacher
orientation, and materials for performance based licensure portfolio
IN
BUDGET
REQUESTS
$424,512
105,540
49,868
$579,920
$112,000
151,000
95,000
49,000
5,250
15,200
$427,450
"n
BUDGET
REQUESTS
Technology
• Technology Specialist contract extensions to 11 months (elementary $40,596
and middle schools) and 12 months (high schools) to allow more time
for planning and preparation.
• Technology Technicians (five technicians for 10.5 months) to support 142,531
technology maintenance.
$183,127
Other
• Utility rate increases anticipated (3 %) for water and power $56,400
• Reduction of one -time costs and programs: Phoenix Academy startup (130,000)
funds, year -round school study, administrative salary review, prior
year classroom startup funds and duty -free funds.
• Reduction of Charter School funding (27,830)
• Reduction of contingency fund from $250,000 to $150,000 (100,000)
• Capital expenditures moved from the operating budget to the recurring
capital budget (40,000)
($241,430)
Total Budget Requests $4,304,469
2 -9
State Fund Budget Summary
SUMMARY BY PURPOSE CODE
1997 -98
1998 -99
1999 -00
ACTUAL
BUDGET
PROPOSED
CHANGE
Revenue
$ 29,423,543
$
32,520,805
$ 35,067,111
7.8%
State Textbook Revenue
354,532
396,048
410,828
3.7%
Total Revenue
$ 29,778,075
$
32,916,853
$ 35,477,939
7.8%
Expenditures**
INSTRUCTIONAL
5100 Regular
$ 15,959,279
$
18,459,452
$ 20,352,221
10.3%
5200 Special
2,471,998
2,103,432
2,208,604
5.0%
5400 Co- Curricular
-
-
-
5800 Pupil Support
1,459,590
2,363,322
2,505,121
6.0%
5900 Employee Benefits
4,741,802
5,026,272
5,207,222
3.6%
5930 Staff Development
-
27,261
27,261
0.0%
5000 INSTRUCTIONAL SERVICES
24,632,669
27,979,739
30,300,429
8.3%
SUPPORT SERVICES
6200 Instructional Staff
771,982
254,091
261,714
3.0%
6300 Administrative Staff
103,279
701073
72,876
4.0%
6400 School Admin.
1,657,044
1,851,988
2,000,147
8.0%
6500 Business Support
1,387,136
1,358,208
1,398,954
3.0%
6600 Central Support
89,285
91,438
94,181
3.0%
6900 Employee Benefits
757,445
757,445
780,168
3.0%
6930 Staff Development*
-
130,529
130,529
6000 SUPPORT SERVICES
4,766,171
4,513,772
4,738,569
5.0%
7100 Community Services
24,703
27,294
28,113
3.0%
State Textbooks
354,532
396,048
410,828
3.7%
TOTAL
$ 29,778,075
$
32,916,853
$ 35,477,939
7.8%
* State 1999 -00 Budget information is estimated at this time. The summary shown is a
planning allotment and an adjustment will be made after the tenth day of school.
** Staff development was made a separate category for the 1998 -99 school year
* ** Appendix E contains explanations of expense categories.
2 -11
Summary of Changes
State Fund
For 1999 -00
* Fifteen new Teacher positions from the State allotment
* Three new LEP positions from state allotment
* One new Teacher Assistant position from the State allotment
* State pay increases have been estimated in the Budget
2 -12
Federal Fund Budget Summary
SUMMARY BY PURPOSE CODE
1997 -98 1998 -99 1999 -00
ACTUAL BUDGET PROPOSED CHANGE
Revenue $ 1,244,275 $ 2,118,706 $ 2,118,706 0.0%
Expenditures'
INSTRUCTIONAL
5100 Regular $
15,305
$ . 67,837
$ 67,837
5200 Special
787,895
695,226
695,226
5400 Co- Curricular
-
-
-
5600 Innovative Programs
-
-
_
5800 Pupil Support ,
-
421,659
421,659
5910 Employee Benefits
171,500
230,873
230,873
5930 Staff Development
-
255,877
255,877
5000 INSTRUCTIONAL SERVICE
9741700
1,671,472
1,671,472
SUPPORT SERVICES
6200 Instructional Staff
6300 Administrative Staff
6400 School Admin.
6500 Business Support
6600 Central Support
6900 Other Support
6930 Staff Development
6000 SUPPORT SERVICES
7100 Community Services
OTHER
0.0%
190,950
61,190
61,190
-
81630
8,630
-
47,600
47,600
3,095
10,436
10,436
-
108,246
108,246 0.0%
194,045
236,102
236,102 0.0%
75,530
211,132
211,132 0.0%
TOTAL $ 1,244,275 $ 2,118,706 $2,118,706 0.0%
* Federal 1999 -00 Budget information is estimated at this time. The Federal allocation is dependent
on approved federal grants which are submitted and revised throughout the year.
** Staff development was made a separate category for the 1998 -99 school year
* ** Appendix E contains explanations of expense categories.
2 -13
Summary of Changes
Federal Fund Budget
For 1999 -00
At this time, no changes are anticipated.
2 -14
w
Position. Budget Summary
For the Local, State and Federal Funds
STATED IN FULL -TIME EQUIVALENT POSITIONS (FTE)
SUMMARY BY PURPOSE CODE **
* State and Federal 1999 +A4 -00 Budget information is estimated at this time.
** Appendix E contains explanations of expense categories.
2 -15
LOCAL FUND
STATE FUND
FEDERAL FUND
TOTAL
TOTAL
1998 -99
1999 -00
1998 -99
1999 -00
1998 -99 1999 -00
1998 -99
1999 -00
CHG
INSTRUCTIONAL
5100 Regular
158.08
167.08
512.04
531.04
- -
670.12
698.12
28.00
5200 Special
128.75
144.25
56.83
56.83
18.50 18.50
204.08
219.58
15.50
5400 Co- Curricular
2.00
2.00
-
-
- -
2.00
2.00
-
5800 Pupil Support
33.61
44.51
45.16
45.16
10.60 10.60
89.37
100.27
10.90
5000 INSTRUCTIONAL SER
322.44
357.84
614.03
633.03
29.10 29.10
965.57
1,019.97
54.40
SUPPORT SERVICES
6200 Instructional Staff
26.82
28.49
14.00
14.00
- -
40.82
42.49
1.67
6300 Administrative Staff
2.00
2.00
1.00
1.00
- -
3.00
3.00
-
6400 School Admin.
25.67
28.17
45.28
46.78
- -
70.95
74.95
4.00
6500 Business Support
94.92
105.92
83.08
83.08
- -
178.00
189.00
11.00
6600 Central Support
12.25
12.25
-
-
- -
12.25
12.25
-
6000 SUPPORT SERVICES
161.66
176.83
143.36
144.86
- -
305.02
321.69
16.67
7100 Community Services
0.25
0.25
0.50
0.50
- -
0.75
0.75
-
TOTAL
484.35
534.92
757.89
778.39
29.10 29.10
1,271.34
1,342.41
71.07
* State and Federal 1999 +A4 -00 Budget information is estimated at this time.
** Appendix E contains explanations of expense categories.
2 -15
Summary of Changes
Position Budget
For 1999 -00
Change in State Fund Budget INCR/ (DECR)
* New Classroom Teacher positions (growth in student population) 15:00
* One Teacher Assistant for grades K -3 1.00
* Additional Principal for Mary Scroggs Elementary School 1.00
* Additional one -half Assistant Principal for Mary Scroggs Elementary School 0.50
* Three ESL (English as a Second Language) Teacher positions (LEP request) 3.00
TOTAL ADDITIONAL STATE POSITIONS 20.50
Change in Local Fund Budget
* One ESL (English as a Second Language) Teacher position (LEP request)
1.00
* One system level class Preschool Autistic Teacher
1.00
* One -half School Psychologist position
0.50
* Two Special Education Resource Teacher positions
2.00
* One -half Special Education Inclusion Assistant positions
0.50
* Five Technology Technicians
5.00
10.00
OPENING NEW SCHOOLS
* Three district maintenance staff
3.00
EAST CHAPEL HILL HIGH ADDITIONS
* One Assistant Principal
1.00
* One -half Media Specialist
0.50
* Two Clerical positions
2.00
* One -half Theater Manager/Technician
0.50
* Three Custodians
3.00
MARY SCROGGS ELEMENTARY SCHOOL
* Ten Teacher support positions 10.00
* Change in use of positions at Scroggs (2.00)
* One and one -half Special Education positions 1.50
* One Preschool Teacher (supported by tuition) 1.00
* Two Clerical positions 2.00
* One -half Media Assistant and One -half Technician position 1.07
* Three and one -half Teacher Assistants (Exceptional Educ. and Preschool) 3.50
* Five Custodians 5.00
* One new elementary school Principal position added in 1998 -99 (1.00)
* One new elementary school Assistant Principal position added in 1998 -99 (0.50)
* One new elementary school Technology Specialist and Media positions (1.00)
29.57
PREP ACADEMY
* Six Teacher positions and One Family Specilist position 7.00
* Four Teacher Assistant/Tutor positions 4.00
11.00
TOTAL ADDITIONAL LOCAL POSITIONS 50.57
TOTAL NEW POSITIONS 71.07
2 -16'
Local Recurring Capital Outlay Budget
CATEGORY I PROJECTS
Abatement Projects
Site Development
Renovations
Floor Covering Replacement
Roof Replacements
Roof Repairs
TOTAL CATEGORY I PROJECTS
CATEGORY II PROJECTS
Furniture and Equipment
Technology Equipment
New /Relocated Classroom Furnishings
Copier Equipment
Child Nutrition Equipment
Custodial Equipment
Administrative Equipment
Print Shop Equipment
Cafeteria Furniture
Equipment
TOTAL CATEGORY II PROJECTS
CATEGORY III PROJECTS
District Vehicles
Transportation Vehicles
TOTAL CATEGORY III PROJECTS
1998 -1999
1999 -00
PERCENT
BUDGET
PROPOSED
CHANGE
CHANGE
$ 25,000
$ 25,000
-
0.0%
55,000
62,100
7,100
12.9%
174,000
181,300
7,300
4.2%
40,000
401000
-
0.0%
200,000
190,750
(9,250)
-4.6%
70,000 ,
90,000
20,000
28.6%
564,000
589,150
25,150
4.5%
150,000
160,000
10,000
6.7%
60,000
60,000
-
0.0%
20,000
201000
-
0.0%
'60,000
65,000
5,000
8.3%
301000
30,000
-
0.0%
101000
10,000
-
0.0%
66,500
80,657
14,157
21.3%
5,000
7,500
2,500
50.0%
51000
7,500
2,500
50.0%
12,500
12,500
-
0.0%
419,000
453,157
34,157
8.2%
26,000
26,000
-
0.0%
85,000
88,850
3,850
4.5%
111,000
114,850
3,850
3.5%
Contingency Fund 29,000 20,000 (9,000) -31.0%
TOTAL RECURRING CAPITAL
OUTLAY PROPOSED BUDGET $ 1,123,000 $ 1,177,157 $ 54,157 4.8%
OTHER CAPITAL
CELLULAR TOWER LEASE CAPITAL FUNDS
Culbreth Middle School Upgrades $15_7_000
2 -17
1#
Summary of Changes
Local Recurring Capital Outlay Budget
For 1999 -00
Cellular Tower Lease revenue has been added as an additional
source of capital funding and will be used for Culbreth Middle
School upgrades in 1999 -00.
Other changes are as noted.
2 -18
Child Nutrition Fund Budget Summary
$ 1,735,548 $ 1,730,645 $ 1,878,000 9.5%
OPERATING EXPENSES
Food
1997 -98
1998 -99
1999 -00
657,645
$
ACTUAL
BUDGET
PROPOSED
CHANGE
991,030
939,000
REVENUE
1,009,000
7.5%
Supplies
Sales of meals and supplemental sales
$ 906,370
$ 865,000
$ 940,000
8.7%
Federal reimbursements
506,791
498,000
545,000
9.4%
Catering and miscellaneous
2761371
329,645
345,000
4.7%
Summer Program
46,016
38,000
48,000
26.3%
$ 1,735,548 $ 1,730,645 $ 1,878,000 9.5%
OPERATING EXPENSES
Food
$
634,552
$
657,645
$
725,000
10.2%
Salaries, wages and benefits
991,030
939,000
1,009,000
7.5%
Supplies
61,012
581393
61,300
5.0%
Miscellaneous
119,042
1381000
144,900
5.0%
Depreciation
-
3,000
-
- 100.0%
TOTAL OPERATING EXPENSES
$
1,805,636
$
1,796,038
$
1,940,200
8.0%
Profit (Loss) Before State support and
Marriott Guarantee.
$
(70,088)
$
(65,393)
$
(62,200)
Marriott Guarantee
11,180
4,569
0
- 100.0%
Director Support from other funds
58,908
60,824
62,648
3.0%
NET PROFIT (LOSS)
$
-
$
-
$
448
2 -19
Summary of Changes
Child Nutrition Services Fund
For 1999 -00
Changes -in Revenue
* Increase in participation
* Anticipated rate increase
Changes -in Expenses
* Increase in wages as mandated by the State
* Addition of kitchen staff at Mary Scroggs Elementary School
* Increase in food and supply costs
2 -20
Community Schools Fund Budget Summary
1997 -98 1998 -99 1999 -00 Percent
ACTUAL BUDGET PROPOSED - Change
REVENUE
After - school program
$ 875,675
$ 893,765
$ 956,125
7.0%
Summer Camp
146,030
156,200
202,900
29.9%
Summer Youth Enrichment
51,475
52,000
46,000
-11.5%
District tuition assistance
11,761
11,588
11,761
1.5%
Facility rental
96,714
75,000
90,000
20.0%
Fund Balance Appropriated
-
91,000
93,018
2.2%
Total Revenue
$1,181,655
$1,279,553
$1,399,804
9.4%
OPERATING EXPENSES
Salaries, wages and benefits
$ 9080351
$1,008,141
$1,071,755
6.3%
Supplies
59,301
61,673
92,770
50.4%
Food
73,134
74,090
80,008
8.0%
Purchased services /activities
108,526
135,649
155,271
14.5%
Total Expenses
$1,149,312
$1,279,553
$1,399,804
9.4%
Net Profit (Loss)
$ 32,343
$ -
$ -
After - school program enrollment
715
730
780
6.8%
2 -21
1i
Summary of Changes
Community Schools Fund
As Compared to 1997 -98
Changes in Revenue
* Increased participation
Changes in Expenses
* Increases in general costs: food, salaries, space sharing, supplies and
equipment
2 -22
Capital Investment
Plan
1999 -2009
CHAPEL HILL - CARRBORO CITY SCHOOLS
CAPITAL INVESTMENT PLAN 1999 - 2009
PRIOR
PRn_IFC.T TITI F YEARS
March 4, 1999
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TEWYEAR PROJECT r
1999 -00 2000 -01 2001 -02 2002 -03 2003 -04 2004 -05 2005 -06 2006 -07 201)7-OR 200R -0q TOTAI TnTAI
ADA Requirements
138,150
25,000
25,000
25,000
25,000
13,058,817 13,364,001
3,700,0211
4,004,782
1 4,359,543 1
4,679,740
100,000
238,150
Athletic Facilities
334,000
785,000
188,387
1,563,464
1,190,000
2,753,464
50,000
1,821,817
1,237,000
3,058,817
181,948
311,696
2,693,782
1,311,000
4,004,782
3,022,323
1,337,220
4,359,543
3,315,470
1,364,000
4,679,740
1,517,031
1,851.031
Energy Efficiency Improvements
-
125,000
245,753
390,000
280,000
147,592
45,386,950
1.188,345
1,188,345
Fire /Safety /Security
21,800
152,600
81,750
234,350
256.150
Mechanical Systems
720,490
275,000
375,000
110,000
464,079
1,396,525
283,141
2,903,745
3.624,235
Mobile Classrooms
78,480
125,000
125,060
203.480
Paving /Parking Lots
264,690
375,000
224,900
96,679
265,000
150,000
307,389
1,418,968
1,683,658
Planning for Future Projects
808,146
50,000
81,601
131,601
939,747
Roofing
354,563
230,000
354,063
290,763
262,619
418,971
641,800
329,000
2,527,216
2,881,779
Technology
4,282,502
750,000
800,000
900,000
900,000
1,000,000
1,000,000
1,200,000
1,200,000
1,300,000
1,300.000
10,350,000
14,632,502
RENOVATION PROJECTS:
CHHS Cultural Arts Building
988,882
40,000
40,000
1,028,882
CHHS: Doors, Major Renovation
75,000
46,200
1,885,252
2,098,318
4,104,770
4,104,770
Culbreth: Labs, Gym, Auditorium
100,000
500,000
1,689,870
2,289,870
2,289,870
Ephesus Multi- Purpose Room
67,305
67,305
#VALUE!
Estes Hills: Major Renovation
1,500,000
-
1,500.000
Glenwood: Major Renovation
500,000
1,000,000
45,000
1,045,000
1,545,000
Phillips: Labs, Doors, Lockers
140,000
1,689,870
1,829,870
#VALUE[
Transportation Center Expansion
375,000
375,000
375,000
Carrboro\FPG \Ephesus \Seawell \LinCtr
1,036,287
1,028,175
1,917,053
961,225
4,942,740
4,942,740
Recurring Capital
179,436
1
-
179,436
Reserve for Future Projects
25,000
-
1 25.000
TOTAL
10,196,139 I
3,664,905
12,844,953 1
2,753,464 12,7150,585
13,058,817 13,364,001
3,700,0211
4,004,782
1 4,359,543 1
4,679,740
35,190,811
#VALUEI
COUNTY SALES TAX
BUDGETED IMPACT FEES
BOND REVENUES
SAVINGS ON CONSTRUCTION BID
TOTAL FUNDS AVAILABLE
7,196,139
2,250,000
750,000
10,196,139
1,914,905
750,000
1,000,000
3,664,905
1,677,953
1,167,000
2,844,953
1,563,464
1,190,000
2,753,464
1,547,585
1,213,000
2,760,585
1,821,817
1,237,000
3,058,817
2,104,001
1,260,000
3,364,001
2,415,021
1,285,000
3,700,021
2,693,782
1,311,000
4,004,782
3,022,323
1,337,220
4,359,543
3,315,470
1,364,000
4,679,740
22,076,321
29,272,460
11,364,220
11,364,220
750,000
3,000,000
1,000,000
1,750,000
35,190,811
45,386,950
Page 1
PRIOR Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TEN YEAR PROJECT
PROJECT TITLE YEARS 1999 -00 2000 -01 2001 -02 2002 -03 2003 -04 2004 -05 2005 -06 2006 -07 2007 -08 2008 -09 TOTAL TO'TAI.
PROJECTS FUNDED DIRECTLY BY ORANGE COUNTY. STATE BOND AND IMPACT FEES USED BY OC r
Scroggs Elementary Building Funds
13,350,000
(250,000)
(250,000)
13,100.000
East CH High Addition Stale Bond
10,995,840
-
10.995.840
East CH High Addition Impact Fees
804,160
-
804,160
East CH High Addition Bond
3,000,000
(750,000)
(750,000)
2,250,000
Smith Middle School Building Funds
5,300,000
11,400,000
3,100,000
14,500,000
19,800,000
TOTAL
331450,000
10,400,000
3,100,000
-
-
-
-
-
-
-
-
13,500,000
46,950,000
rAPITAI INVESTMENT PROJECTS BEING CLOSED OUT
Abatement Projects
98,785
-
98,785
CHHS Phase II
1,645,659
-
1,645,659
East Chapel Hill High School 1996
22,777,208
-
22,777,208
Ephesus Restrooms
75,000
1
-
75.000
Glenwood Media Center Renovation
100,000
-
100.000
McDougle Elementary School
11,790,904
-
11.790,904
Phillips: Auditorium
200,000
-
200,000
Renovations /Site Impr prior to 1997-
1,236,121
-
1,236,121
Seawell HVAC
244,747
-
244,747
TOTAL PROJECT CLOSINGS 38,16B,424
-
38,168,424
Page 2
CHAPEL HILL' CARRBORO CITY SCHOOLS
1999 -00 CLASSROOMS and CAPACITY CALCULATIONS
K -3
Elementary Schools ( @23)
Classrooms
State
4-8 self contained Capacity
Mobile
Classrooms
( @26) (G 10) Calculation (excl. from capacity)
10th Day
Enrollment
8/31199
Carrboro Elementary
15
8
1
563
1
479
Ephesus Elementary
12
6
4
472
7
558
Estes Hills Elementary
11
11
1
549
1
550
FP Graham Elementary
16
7
2
570
2
529
Glenwood Elementary
11
7
1
445
4
397
McDougle Elementary
16
8
2
596
0
646
Scroggs Elementary
25
1,520
1
510
0
411
Seawell Elementary
16
5
0
498
6
574
ELEMENTARY SCHOOL TOTALS
174
12
4203
21
4104
Middle Schools
Culbreth Middle 25
2
670
0
633
McDougle Middle 27
3
732
2
810
Phillips Middle 26
3
706
0
719
MIDDLE SCHOOL TOTALS 78
8
2108
2
2162
Classrooms
Reg. Voc. Ed.
Other
High Schools ( @20)
( @10 -25)
Chapel Hill High School 64 9
6
1,520
6
1476
(Phoenix Academy)
2
1166
East Chapel Hill High School 65 8
5
1,515
HIGH SCHOOL TOTALS 129 17
11
31035
8
2642
' Scro s capacity of 510 is based on. 25 classroom at 20 students per
g9 p y
room plus one
self contained room.
Application of state formula equates to a capacity of 609.
.
ORANGE COUNTY SCHOOLS
ENROLLMENT CLASS /RATIO
1999 -2000
School
K
1
2
3
4
5
6
7
8
9
10
11
12
EC S
TOTAL
Cameron Park
105
90
89
121
90
103
598
Classes
5
4
4
5
4
5
Class Size
21.0
22.5
22.3
24.2
22.5
20.6
Central
50
76
76
77
78
77
434
Classes
3
4
3
4
4
3
Class Size
16.7
19.0
25.3
19.3
19.5
25.7
Efland- Cheeks
91
75
89
95
103
87
540
Classes
4
4
4
4
4
4
Class Size
22.8
18.8
22.3
23.8
25.8
21.8
Grady Brown
96
73
88
86
105
80
528
Classes
4
4
5
4
4
4
Class Size
24.0
18.3
17.6
21.5
26.3
20.0
Hillsborough Elem.
67
69
61
70
69
62
398
Classes
3
3
3
3
3
3
Class Size
22.3
23.0
20.3
23.3
23.0
20.7
New Hope
84
104
95
117
126
94
620
Classes
5
5
4
5
6
4
Class Size
16.8
20.8
23.8
23.4
21.0
23.5
A.L. Stanback
247
238
223
708
Class Size
25
25
25
C.W. Stanford
231
270
250
751
Class Size
25
25
25
Orange High
1
1
576
445
347
297
1665
Class Size
251
25
25
25
TOTAL
640.6
633.3
652.52
726.4
734
658.2
528
558
523
576
445
347
297
0
6242
UIJ
ORANGE COUNTY SCHOOLS
1999 -00 CLASSROOMS and CAPACITY CALCULATIONS
10th Day
Enrollment
Classrooms
Capacity
8/31/99
Elementary Schools
* Cameron Park
29
598
601
Central
21
483
436
* Efland Cheeks
30
529
540
Grady Brown
29
575
529
Hillsborough
20
414
398
* New Hope
31
621
622
ELEMENTARY SCHOOL TOTALS
160
3220
3126
Middle Schools
A.L. Stanback
47
800
712
* C.W. Stanford
42
722
751
MIDDLE SCHOOL TOTALS
89
1522
1463
High School
*
Orange High School
74
1520
1665
u
HIGH SCHOOL TOTAL
74
1520
1665
.
* OVER CAPACITY
a
v
1
CHAPEL HILL - CARRBORO CITY SCHOOLS
Class Size Calculations: K -5
September 9,1999
V ICL-00 VIGG. I-M-.1
Grade
11G111Lul Y vv.........
Carrboro
Ephesus Estes FPG
Glenw'd
McDougle
Seawell
Scroggs Class
Size
K
K
k
23
23
22
17 24 23
17 25 24
17 24 24
18
19
20
23
23
23
19
21
21
21
20
k
18
23
22
k/1
21
22
k/1
21
23
kl1
21
k/1
21
1st
23
23 24 23
21
22
24
18
1st
23
23 23 24
22
23
24
17
1 st
1 s
23 23 21
24 22 22
22
19
17
1 st /2nd
19
2nd
19
22 25 22
23
25
23
•19
2nd
22
20 24 22
24
24
25
20
2nd
18
23 25 23
25
26
20
2nd
21
24
25
2nd /3rd
22
24 22
20
19
2nd /3rd
22
3rd
26
23 26 25
24
25
25
19
3rd
25
22 26 24
24
24
21
21
3rd
22 26 24
25
25
21
3rd
23
22
19
20
3rd
25
25
3rd /4th
25
Class size k -3
22.29
4th
21
21 28 26
23
29
22
21
4th
21
20 28 26
24
27
16
20
4th
21 27 27
18
26
19
22
4th
22 28
28
18
4th /5th
25
25
4th /5th
21
4th /5th
25
4th /5th
27
5th
24
23 25 21
24
27
23
20
5th
6th
24 24 25
22 24 24
17
26
26
27
22
20
20
5th
23 25 22
27
22
5th
23
24
Class size 4 -5
23.05
* total
474
537 547 522
391
595
575
417
*- excludes self- contained ex ed students
H. Gibbs
9/1 0/99
Orange County Schools Bond A.L. Stanback Middle School
512,674.50
$14,000,000.
35,910.00
Freelon Trafalgar Trinagle Paving Southern Piping Port City
Burlington Mech.
General Site HVAL Electrical
Plumbing
Miscellanec
DATE -Architect Contract Improvement Contract Contract
Contract
it.
60,000.00
6/23/93 32,768.54
survey, test boar
9/13/93
water /sewer
1/21/94 362,035.46
soil boaring
4/12/94 101,754.05
ads, fees, etc
6!11/94 99,851.76
engineering, legal
1,307.00)
512,674.50
820.80
35,910.00
9,935.64 Field Engineering
1,486.00
831,205.00
62,560.80
20,340.00
39,751.11 gas line, legal field engin.
60,000.00
i,742.00
717,848.00
135,378.00
15,120.00
15,070.83 intercom engineering
!,734.00
699;988.00
$ 174,320.10
36,090.00
19,419.28 ,
$
59,237.00
603,487.00
$ 157,098.60
74,700.00
29,307.66 field engineering
,485.00
386,206.60
61,560.90
77,355.00
20,532.24
,178.00
416,863.00
117,548.10
38,520.00
36,444.15
,744.00
403,539.00
62,406.90
206,995.00
11,175.12 intercom bid
,421.35
457,583.00
60,000.00
80,000.00
32,364.09 engineering
356.00
$
258,361.00
504,122.40
$ - 148,522.95
58,342.35
67,706.00
20,000.00
18,937.80 vo tech casework
48,142.88 water/sewer
8115/96
Mlsc Amt. Land $1 million 700 thousand Total
Miscl Technology Furniture
1
6.
1
,064,788.48
891,958.83!
,031,788.38
864 6
557,139.74
616e
secumy Sys
field. engineering
� �F,JCO. 10 f
767.00
board fence
/26195 18,810.25 280,094.00 76,157.00 $ 10,143.00 11,700.00 kitchen equip
9,793.92
6,503.10 232,402.43 654,778.75
intercomn
$ 18,128.97
extra Wj
$ 840.00 -
Orange County Schools Bond A.L. Stanback Middle School
$14,000,000.
Freelon Trafalqar Trinaole Pavine Seuthem Pinino Pont City Burlinotnn Morh
8/15196
DATE
Architect
General
Contract
Site
Improvement
tract
Electrical
Contract
Plumbing
Contract
Miscellaneous
Mlsc Amt.
Land
Miscl
$1 million
Technology
700thousand
Furniture
Total
12/19/95
12,256.00
$ 103,239.50
EHVAL
,532.60
30,000.00
4,912.21
176,940.3'
2/9/96
6,504.41
alarm system 5,680.00
$ 67,526.73
269,011.7E
window blinds 7,682.08
storage building-. 7,900.00
water /sewer 73,468.54
field engineering 2,250.00
4/29/96
$ 194,436.00
intercom • 13,366.83
19,653.79
227,933.6
clover elev 477.00
4/30/96
157,861:19
157,861.1 �
6/26/96
20000
34911.58
taylor nursery 265.00
43,504.47
$ 12,345.19
112,468.9(
chandler concrete 592.66
JMR landscaping 850.00
6/30/96
State Textbooks
2,653.38
83.01
$ 2,736.3E
6/30/96
5609
1,100.00
6,709.00
TOTAL
740,335.72
$7,313,220.00
413,821.00
1,159,988.00
781,868.00
$ 363,841.00
$ - $ 492,180.32
722,190.00
290,168.97
658,083.72
12,935,696.73
contract
G , � 23� 2 J 27
14,000,000.00
4mount
717,825.00
7,595,343.50
1,535,732.00
$1,204,389.00
$ 781,869.00
363,841.00
1,064,303.27
3alance
(22,510.72)
282,123.50
1,121,911.00
$ 44,401.00
1.00
0.00
717,778.77
$ (100,000.00;
etainage
$ 4,307.00
$ 192,654.00
$ 50,000.00
$ (4,307.00)
613,471.77
-Te -Ir"t 95_1(, .Y?I. 2S
Page 2
CHAPEL HILL - CARRBORO CITY SCHOOLS
NEW SCHOOL CONSTRUCTION PROJECTS
.a a
Z
n;
911/99
f
East Chapel Hill HS
East Chapel Hill HS
McDougle Middle School
McDougle Elementary
Phase I
Phase I)
Scroggs Elementary
Project:
opened 1993
opened 1996
opened 1996
opened 1999
opened 1999
Latest Estimates
Latest Estimates
Building Area
136,221 square feet
98,000 square feet
170,200 square feet
85,748 square feet
90,980 square feet
Site (Acres)
28.28 acres
11.7 acres
74.8 acres
existing
13.05 acres
Breakdown of costs:
Land Cast
90Q,050
owned
1,850,000
owned
donated
Site Development/Prep
1,994,111
inc. in construction
432,128
'!
inc. in construction
12,365,400
815,000
9,400,000
Construction
9,527,177
345,974
10,111,800
213,993
$,089,416
795,389
350,000
480,000
Furniture/Equipment
Technology
850,000
800,000
793,000
170,000
832,500
Start -Up Cost
200,000
287,674
812,813
160,500
1,625,599
300,000
864,600
370,000
950,000
Planning/Architects/Eng.
1,190,570
Sub -total
15,007,882
12,226,280
23,746,032
14,050,000
12,847,500
Rebates/ Reimbursements/
(40,000)
(154,240)
(93,934)
-
(119,500)
Sales Tax Refunds
PROJECT COST
14,967,882
12,072,040
23,652,098
14,050,000
12,728,000
.a a
Z
n;
911/99
f
Elementary School
Capacity 600 Students
Classrooms and Associated Storage
Regular Classrooms (25)
Small Project Rooms (Grades 4 & 5) (2)
Science Project Room (1)
Pre - School Area (1)
Special /Exceptional Children/Speech
Language (7 rooms)
Art Education and Music
Physical Education
Media Center
Small Group Resource Rooms
Administration
Student Support Areas
Health
Counseling
Staff Support Area
Teachers' Offices /Workrooms
Conference Rooms
General Conference Room
Speech/Language Conference Room
Teachers' Lounge/Workarea
Itinerant Support
Cafeteria /Food Service
Miscellaneous /Commons
Custodial General Storage
Book Storage
Student Commons
Additional Toilets above those
Calculated as part of "Circulation"
Subtotal
Circulation at 33% of Subtotal
Total Square Footage
Basic Additions to Basic School Total
School Tier A Tier B
34,100
1,200
47650
39,950
26,400
1,200
3,400
31,000
400
400
1,200
1,200
1,700
1,700
4,800
850
5,650
2,400
450
2,850
59050
200
5,250
41200
4,200
1,350
1,350
1,650
300
11950
1,100
100
1,200
200
100
300
900
900
5,600
1,400
7,000
4,300
300
4,600
500
500
200
200
400
400
1,000
1,000
300
300
41500
200
4,700
11300
-
1,855
3,155
500
500
800
800
1,000
1,000
U I�M-01
61,250 1 1,4001 81955 1 719605
20,213
462
2,955
23,630
81,463
19862
119910
959235
fA +
rL6��"l-I
a� °7 -
Middle School
Capacity 700 students
Basic
Additions
to Basic School
Tier A
Tier B
Total
School
Classrooms and Associated Storage
32,500
2,550
35,050
Regular Classrooms (22)
22,000
300
22,300
Science Classrooms (6)
7,200
7,200
Exceptional Education Classroom
(1) /Resource Rooms (4)
3,300
3,300
Student Project Rooms (3)
2,250
2,250
Art Education and Music (Cultural Arts)
9,600
1,130
10,730
Exploratories
9,000
1,000
10,000
Foreign Language Classroom
2,000
2,000
Career Explorations Lab and Resource
Room
1,000
1,000
Applied Technology Lab and Resource
Room
3,500
3,500
Consumer Education Lab and Resource
Room
1,500
1,500
Computer Lab and Resource Room
1,000
1,000
Video Production Lab
1,000
1,000
Physical Education
12,000
1,200
500
13,700
Media Center
5,640
60
5,700
Parent /Community Center
400
400
Administration
1,800
50
1,850
Student Support Areas
1,000
1,450
2,450
Health
200
500
700
Counseling /Guidance
800
950
1,750
Staff Support Area
3,800.
2,000
5,800
Teachers' Offices /Workrooms
3,350
1,250
4,600
Conference Rooms (one per grade level)
750
750
Teachers' Lounge /Workarea
450
450
Cafeteria /Food Service
5,240
5,240
Miscellaneous /Commons
3,400
3,600
7,000
Receiving Area
200
200
Book Storage /Central Supply Storage
1,700
100
1,800
Student Commons
1,500
1,500
Activities Lobby
500
500
Academic House Centrums (3 @1000 sq.ft
each)
3,000
3,000
Subtotal
83,980
1,200
12,740
97,920
Circulation at 35% of Subtotal
29,393
420
4,459
34,272
Total Square Footage
113,373
1,620
17,199
132,192
17
Estimated Cost of New Facilities
Elementary School Capacity = 600 students
Middle School Capacity = 700 students
Square Ft. per Student
Construction Cost
Cost Per Square Foot
Site Acquisition
Acres:
$ 90
Average Cost Per Acre:
Site Development
As a percentage of Construction Cost
Fees
As a percentage of Construction Costs and Site Development
Moveable Equipment
As a percentage of Construction Cost
Technology
Cost per square foot
(includes cabling and equipment for voice, video and data distribution systems)
Construction Contingency As a percentage of Construction Cost and Site Development
Start-Up Costs
Non Personnel One time start-up costs
Middle School Capacity = 700 students
pil
Square Footage
Square Ft. per Student
Construction Cost
Cost Per Square Foot
Site Acquisition
Acres:
$ 90
Average Cost Per Acre
Site Development
As a percentage of Construction Cost
Fees
As a percentage of Construction Costs and Site Development
Moveable Equipment
As a percentage of Construction Cost
Technology
Cost per square foot
(includes cabling and equipment for voice, video and data distribution systems)
Construction Contingency As a percentage of Construction Cost and Site Development
Start-Up Costs
Non Personnel Start Up - one time
pil
Square Footage
959225
158.7
$ 90
$
8,570,250
16
25,000
$
400,000
10%
$
857,025
10%
942,728
5%
$
428,513
$ 8.25
$
785,606
5%
$
471,364
$
330,000
Total
$
12,7859485
Square Footage
1329192
188.8
$ 95
$
12,558,240
22
25,000
$
550,000
10%
$
1,255,824
10%
1,381,406
5%
$
627,912
$ 8.25
$
1,090,584
5% $ 690,703
$ 350,000
Total $ 18,504,670
fy i
10
High School Construction Standards Appendix
A
Space Allocation /Square Footage Assignments (1,000 Student Capacity
1000 student cap acity
-Square
Footage
Total Square
Ft
From
To
#rooms
From
To
Classrooms
Regular classroom with 5 computers
8501
950
1
221
18,700
20,900
Science Labs, Prep and Storage
Physical Science
1,200
1,200
1
1,200
1,200
Biology
1,200
1,200
2
2,400
2,400
Physics
1,200
1,200
1
1,200
1,200
Earth Science
1,400
1,400
1
1,400
1,400
Chemistry.
1,500
1,500
1
1,500
1,500
Storage /Prep Rooms (Biology, Chemistry, Physics)
250
per 2 labs
2
500
500
Remediation & resource labs
450 ,
. .450
1
450
450
Exceptional Children
Exceptional Children Self- Contained (8 to 12 student cap
800
1,200
1
800
1,200
Exce tional Education Resource Room (for groups up to,j
450
450
1
450
450
Arts Education
Instrumental Classroom w/ lockers
1,800
2)100
1
1,800
2,100
Vocal Classroom
1)000
1,500
1
1,000
1,500
Instrument storage room
400
600
1
400
600
Music Library
200
200
1
200
200
Instrument Repair
150
150
1
150
150
Office (each)
150
150
1
150
150
Uniform Storage
400
600
1
400
600
Practice Room
55
60
1
55
60
Ensemble Practice Room
150
200
1
150
200
Visual Arts Classroom
1,200
1,500
1
1,200
1,500
Kiln /Clay Storage
40
60
1
40
60
Art Material Storage
80
150
1
80
150
Theater Arts Classroom
1,800
2,000
1
1,800
2,000
Theater Arts Auditorium
8 /seat; capacity 1/3
to 1/2
ADM
333 to 500 seats
2,667
4,000
Stage, Storage & Dressing Rooms
3,000
5,000
1
3,000
5,000
Light, Lock Vestibule, Lobby, Concession
800
2,000
1
800
2,000
Dance Classroom (including storage)
1,800
2,000 1
11
1,800 1
.2,000
c) -7-
High School Construction Standards Appendix A
Space Allocation /Square Footage Assignments (1,000 Student Capacity
1000 student cap
Square Footage
From To # rooms
acity
Total Square
From
11
Ft
To
Workforce Development
Agricultural Education
2,500 3,000
1
2,500
3,000
Business Education
1,200 1,400
1
1,200
1,400
Family and Consumer Sciences Education
1,400 2,000
1
1,400
2,000
Health Occupations
27000 2,500
1
21000
2,500
Marketing Education (including store)
1,500 2,000
1
1,500
2,000
Technology Education
1,300 2,200
1
1,300
2,200
Trade and Industrial Education
850 31000
1
850
3,000
Media Center
Main Room
5 sq ft per ADM
1
5,000
5,000
Support Areas
2,000 2,000
1
2,000
2,000
Video Studio
400 400
1
400
400
Control /Editing
260 260
1
260
_ 260
Equipment Storage
80 80
1
80
80
Physcial Education
Gymnasium Play Area
2 play courts 62 x 100 court
12,400
12,400
Spectator Seating
400 per 500 per
100 seats 100 seats
4,000
5,000
Gymnasium Dressing, Shower, Storage, Lobby
3,000
3,000
Wrestling (competitive) .
3,000 3,000
1
3,000
3,000
Resistive Exercise (weight lifting)
2,000 3,000
1
2,000
3,000
Auxilliary Gymnasium
recommended for high schools with 1,200 or more students
Administration
Principal's Office
200 200
1
200
2 C C.
Assistant Principal (each)
150 150
2
300
300
Reception Area
400 400
1
400
40C
Secretary
150 150
2
300
3CC
SIMS 9 -12
200 200
1
200
? �C
Other Student Services
200 200
1
200
2 c
Workroom/Storage
200 200
1
200
200
Conference Room
200 200
1
200
200
Record Storage
100 100
1
100
10C
General Storage
100 100
1
100
1 CC
High School Construction Standards Appendix A
Space Allocation /Square Footage Assignments (1,000 Student Capacity
1000 student ca
Square Footage
From To # rooms
Student Support Areas
Guidance
Reception /Career Center
Counselor Office
Other Student Services
Health Room & Toilet
Staff Support Areas
Group Teacher Office /Planning (per teacher)
Special Assistant /Itinerant Teacher Office /Workspace (per
Workroom
T
300
100
300
400
From
400
150
300
150
200
3 450
200
200
200
200
12
Tacit
100
Total Square
Ft
From
To
1 300
300
1 400
400
3 450
450
1 200
200
1 200
200
80
100
45
3,600
4,500
80
.100
7
560
700
300
800
1
300
800
300
1,333
1
300
1,333
Cafeteria /Food Service
Dining Room Seating Area (square feet per pupil) assumes 3
seatings 14 20 333 4,667 6,667
Serving (20% - 25% of dining area) 933 1,667
Kitchen (assumes 1,500 lunches served for 1,000 capacity) 2,880 2,880 1 2,880 2,880
Total Assigned Space
Commons /Circulation/Entries /Building Support 45% 46,877 56,703
Total Building Area
Total Square Feet per Student
Q
104,172
126,007
46,877
56,703
151,049
1825710
151
183
High School Construction Standards Appendix B
Space Allocation /Square Footage Assignments (1,500 Student Capacity)
1 11 1500 student ca acit
Total Square Ft
From To
40 33,575 37,525
Classrooms
Regular classroom with 5 computers
Science Labs, Prep and Storage
Physical Science
Biology
Physics
Earth Science
Chemistry
Storage /Prep Rooms (Biology, Chemistry, Physics)
Remediation & resource labs
Exceptional Children
Exceptional Children Self - Contained (8 to 12 student cap
Exceptional Education Resource Room (for groups up to
its Education
Instrumental Classroom w/ lockers
Vocal Classroom
Instrument storage room
Music Library
Instrument Repair
Office (each)
Uniform Storage
Practice Room
Ensemble Practice Room
Visual Arts Classroom
Kiln /Clay Storage
Art Material Storage
Theater Arts Classroom
Theater Arts Auditorium
Stage, Storage & Dressing Rooms
Light, Lock Vestibule, Lobby, Concession
Dance Classroom (includine storage)
9
Square Footage
From To
850 950
# rooms
D6 -7-"-7
13
1,200
1,200
3
3,000
3,000
1,200
1,200
4
4,200
4,200
1,200
1,200
1
1,200
1,200
1,400
1,400
1
1,400
1,400
1,500
1,500
3
3,750
3,750
250
per 2 labs
4
875
875
450 1 450 1. 41 . 1,800 1,800
800 1,200 I 21 1, 600 I 2,400
450 450 2 900 900
1,800
2,100
1
1,800
2,100
1,000
1,500
1
1,000
1,500
400
600
1
400
600
200
200
1
200
200
150
150
1
150
150
150
150
1
150
150
400
600
1
400
600
55
60
1
55
60
150
200
1
150
200
1,200
1,500
1
1,200
1,500
40
60
1
40
60
80
150
1
80
150
1,800
2,000
1
1,800
2,000
8 /seat; capacity
1/3
to 1/2
ADM
500 to 750 seats
4,000
6,000
3,000
5,000
1
3,000
5,000
800
2,000
1
800
2,000
1,800.
2,000
1
1,800
2,000
High School Construction Standards Appendix B
Space Allocation /Square Footage Assignments (1,500 Student Capaci
Workforce Development
Agricultural Education
Business Education
Family and Consumer Sciences Education
Health Occupations
Marketing Education (including store)
Technology Education
Trade and Industrial Education
Media Center
Main Room
Support Areas
Video Studio
Control /Editing
Equipment Storage
Physcial Education
Gymnasium Play Area
Spectator Seating
Gymnasium Dressing, Shower, Storage, Lobby
Wrestling (competitive)
Resistive Exercise (weight lifting)
Auxilliary Gymnasium
Administration
Principal's Office
Assistant Principal (each)
Reception Area
Secretary
SIMS 9 -12
Other Student Services
Workroom/Storage
Conference Room
Record Storage
General Storage
10
1500 student ca
Square Footage
From
To
200
Total Square
2,500
3,000
1,200
1,400
1,400
2,000
2,000
2,500
1,500
2,000
1,300
2,200
850
3,000
sq ft per ADM
2,000 2,000
400 400
260 260
80 80
2 play courts
400 per 500 p
100 seats 100 se-.
3,000
2,000
6,500
200
150
400
150
200
200
200
200
100
100
3,000
3,000
6,500
# rooms
`�
14
)ad
1
200
200
Total Square
Ft
450
From
To
1
2,500
3,000
1
1,200
1,400
1
1,400
2,000
1
2,000
2,500
1
1,500
2,000
1
1,300
2,200
1
850
3,000
1
6,000
6,000
1
2,000
2,000.
1
400
400
1
260
260
1
80
80
62 x 100 court) 12,400
6,000
4,000
1 3,000
1 2,000
1 6,500
12,400
7,500
4,000
3,000
3,000
6,500
200
1
200
200
150
3
450
450
400
1
400
400
150
2
300
300
200
1
200
20
200
1
200
2"
200
1
200
200
200
1
200
200
100
1
100
100
100
1
100
10
15
High School Construction Standards Appendix B
Space Allocation /Square Footage Assignments (1,50
Student Support Areas
Guidance
Reception /Career Center
Counselor Office
Other Student Services
Health Room & Toilet
Staff Support Areas
Group Teacher Office /Planning (per teacher)
Special Assistant /Itinerant Teacher Office /Workspace (per i
Workroom
Lounge 1111,11!1111: ii ii 5:00
Cafeteria /Food Service
Dining Room Seating Area (square feet per pupil) assumes 3
seatings
Serving (20% - 25% of dining area)
Kitchen (assumes 2,000 lunches served for 1,500 capacity)
0 Student Capaci
1500 student capacity
Square
Foota e
# rooms
Total Square Ft
From
To
From
To
300
300
1
300
300
400
400
1
400
400
150
150
5
750
750
200
200
1
200
200
200
200
1
200
200
80
100
65,634
45
3,600
4,500
80
100
168
10
800
1,000
300
800
2
600
1,600
300
1,333
1
300
1,333
14
20
550
7,700
11,000
1,540
2,750
4,398
4,398
1
4,398
4,398
Total Assigned Space
Commons/Circulation /Entries /Buildin Support 45% 65,634 78,004
Total Building Area
Total Square Feet per Student
11
145,853
173,341
65,634
78,004
211,487
1 251,345
141
168
Q-01 -7- i
16
High School Construction Standards Appendix C
Estimated Cost of New High School
Student Capacity
Total Square Footage
1000
1500
Total Square Ft
Total Square Ft
From
To
From
To
151,049
182,710
211,487
251,345
Construction Cost
Cost Per Square Foot
$110
$16,615,381
$20,098,063
$23,263,554
$27,647,943
Site Acquisition
Acres
40
50
45
60
Average Cost Per Acre
$30,000
$1,200,000
$1,500,000
$1,350,000
$1,800,000
Site Development
As a percentage of Construction
Cost
10%
$11661,538
$2,009,806
$2,326,355
$2,764,794
Fees
As a percentage of Construction
Cost and Site Development
10%
$1,827,692
$2,210,787
$2,558,991
$3,041,274
Moveable Equipment
As a percentage of Construction
Cost
5%
$830,769
$1,004,903
$1,163,178
$1,382,397
Technology Cost Per Square foot $8.25 $1,246,154
(includes scaling and equipment for voice, video : and data distribution systems)
$1,507,355
$1,744,767
$2,073,596
Construction Contingency
As a percentage of Construction
Cost and Site Development
5%
$913,846
$1,105,393
$1,279,495
$1,520,637
Start-Up Costs
Non - personnel; one time start-up
costs
$399,927
$483,754
$559,946
$665,477
Total Estimated Cost
$24,695,346
$29,920,112
$34,246,330
$40,896,177
12
�rarige Countp Jkarb of (9bucatiott
RANDY BRIDGES, SUPERINTENDENT
Jbill0orougb, PC 2727$
BOARD MEMBERS
SUSAN DOVENBARGER, CHAIR
KEITH COOK, VICE CHAIR
ROBERT H. BATEMAN
RICHARD KENNEDY
DAVID KOLBINSKY
DELORES SIMPSON
BRENDA STEPHENS
MEMORANDUM
TO: Rod Visser
FROM: Randy Bridges
RE: Information requested from the 8/24/99 meeting
DATE: September 7, 1999
200 EAST KING STREET
HILLSBOROUGH, NC 27278
TELEPHONE: 919- 732 -8126
FAX: 919- 732 -8120
Please find below the information we discussed last week during our monthly meeting. If you need
additional information please let me know.
1. Identify all CIP Projects including supporting information.
• As you are aware we have obligated the majority of our CIP to the construction of the new high
school. We do have some other projects outside the high school construction, and I have enclosed
a copy of the projects and their completion dates. Again, there are no new projects, and the work
is ongoing.
2. Status on new elementary and high school.
• New Elementary School — This school is scheduled to open August 2000. The site has been
cleared and the building pad could go down in. a few weeks. You have a cash flow sheet on this
project, and there have been no major changes. I have enclosed the sheet on the high school and
the elementary school for your information.
• New High School — We have closed on the land purchase, approximately 66 acres across the street
from Grady Brown Elementary. Our plan is to open this school August 2002. We will begin
clearing the site by selling -the timber over the next few months. There have been some
preliminary meetings with internal groups about the design and program requirements. This
school will be constructed to accommodate 1000 students.
3. The construction cost for A. L. Stanback is included on a separate spreadsheet.
4. The construction cost of New Hope Elementary is listed below; however, we are unable to
itemize information about the construction cost:
• Bond
$5,991,000.00
• IBM
$1,000,000.00
• Triangle J. Council
$ 250,000.00
• Public School Building Fund
$2,220,351.00
• Pay As You Go Funds
$ 642,158.00
Total
$10,103,509.00
J-
Timetables/Progress Reports for Major OCS Capital Pr._ ojects
9 -6 -99
Cameron Park Renovation _1997 Bonds $270,000
Completed
1. Dropped Ceilings
2. Replaced Light Fixtures
3. Upgraded HVAC
Central Elementary Media Center 1997 Bonds $ 90,000
Will be completed in summer of 99
1. Renovate present space adjacent to the media center for a computer lab & Video station as well as the
production and work areas of the media center.
2. Upgrade Carpeting and shelving displays
3. Add New Circulation area
C.W. Stanford Refurbishment 1997 Bonds $200,000 CIP Sales Tax $1,640,000 Total $1,840,000
Project is scheduled for complete summer of 99
1. Installed a gas fired hot water heating system
2. Modified the air condition system
3. Installed new ceiling tiles and ceiling insulation
4. Renovated bathrooms and modified for handicapped accessibility
5. New Furniture & Equipment
6. New Carpet and floor tiles
7. New Thermal windows
8. Restructured offices, media center and special education classrooms
9. Installed cooling system in gymnasium and dressing areas
10. Installed new soffits and gable ends
11. Added addition to the main gym and upgraded the football/soccer field area
12. Upgrade for handicapped accessibly
Efland Cheeks Gvmnasium 1997 Bonds $85,000 CIP Sales Tax $365,000 Total $450,000
Project is scheduled for completion summer of 99
1. Add Storage for indoor and outdoor physical education equipment
2. Add a small office for the physical education teacher and after school care
3. Complete renovation of the gym area to include air conditioning
Grady Brown Renovation 1997 Bonds $100,000
Project scheduled for completion during summer 99
1. Make campus handicapped accessible; add automatic door openers
2. Replace gym floor
3. Additional work for playground safety
Orange High Renovation 1997 Bonds 1997 Bonds 150,000 CIP Sales Tax 383,000 Total $533,000
1. Tennis courts and gym floors - completed
2. Design for field house and D Wing Basement - In progress
3. Filed House and D Wing and Science Laboratories - Scheduled to be complete in 1999 -2000
?-C - 1 -,3
4. Design for Auditorium - will be completed by 2000 -2001
5. Auditorium Renovations - scheduled to be completed in 2001 -2002