Loading...
HomeMy WebLinkAboutAgenda - 04-19-2005-9dORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 19, 2005 Action Agenda Item No. q-p~ SUBJECT: Contract Approval: Solid Waste Administration Building Architect DEPARTMENT: Purchasing & Central Services/ PUBLIC HEARING: (Y/N) No Solid Waste Management ATTACHMENT(S): Cost Proposal Solid Waste Facility Master Plan Map INFORMATION CONTACT: Pam Jones (919) 245-2652 Gayle Wilson (919) 968-2885 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider approving a contract with Dixon Weinstein Architects for design services associated with the construction of a building in which to locate the administrative offices of the Solid Waste Management Department, BACKGROUND: The University of North Carolina is requiring the Town of Chapel Hill to vacate their current Public Works site on Airport Road at the expiration of the lease on January 1, 2007, That will likewise necessitate the relocation of the County's Solid Waste Management Department, which is currently housed in a modular building at the same location. The proposed building is to be sited on Eubanks Road Landfill property pursuant to the Solid Waste Facilities Master Plan that was approved by resolution of the Board of Commissioners in October 2001, The Board of Commissioners discussed and endorsed the conceptual planning for this facility at their April 12, 2005 meeting, Requests far Proposals were solicited from firms interested in providing design services for the new facility, which is estimated to be sized within an approximate range of 6500-7000 square feet. Three firms submitted proposals: Dixon Weinstein Architects, DTW Architects, and a joint proposal from Alicia Ravetto and Brown and Jones Architects, After all firms were interviewed, the selection panel recommends Dixon Weinstein Architects for the design work, Historically, the Solid Waste Department has placed strong emphasis on environmentally friendly practices, particularly as it respects the use of recycled products, The proposed facility presents unique options in the utilization of the use of recycled building products as well as other sustainable design elements, such as those included in the High Performance Building Standards for Sustainable Design of Public Facilities as developed through Triangle J COG, In keeping with the Board's guidance, materials from deconstructed buildings on County property will to the extent practicable be incorporated in the construction of this facility. The Dixon Weinstein team brings significant body of previous experience in sustainable design, including their work with Orange County on the Skills Development Center and many others. Further, the Board will note that the cost proposal includes a feasibility analysis far using alternative energy (landfill gas) to heat the facility, which is unprecedented in a County building. Commissioners noted at the April12 meeting that with expanded meeting space in this facility that would be on the order of the size of the public meeting room in the Government Services Center in Hillsborough, it would be prudent for this building to be connected to sewer rather than to rely on an on-site septic system or alternative wastewater treatment system. As the parcel on which this building will be constructed is in the Rural Buffer, the Board should formally determine at an appropriate time that this building is an "essential public facility". Under the County's land use regulations, that designation is a specific exception to the general provision that water and sewer utilities are not extended into the Rural Buffer, The Solid Waste Department is aware of the importance of ensuring that any new Eubanks Road waste management facility is in harmony with Rogers Road Neighborhood community standards of appearance, The Solid Waste Management Department will coordinate design and site development issues with the Solid Waste Advisory Board (which includes a member from the neighborhood) and will develop a design and construction process that invites input from the neighborhood at each key phase of the project. FINANCIAL IMPACT: As noted in the accompanying architect's cost proposal, the design fees for this project are quoted at $124,800. This amount includes $14,500 far feasibility analysis of high performance mechanical engineering, wastewater management and alternative energy, The quotation also assumes that the County will connect to nearby OWASA sewer lines, If the County were to pursue an onsite septic system design, the quoted fee would increase by $1,500 to $126,300. The construction budget is estimated at $900,000, which includes the building and site work, but does not include the design fees, Funding for the design and constn~ction will be covered through a combination of existing reserves and debt financing, all of which would be paid through the Solid Waste Enterprise Fund, RECOMMENDATION(S): The Manager recommends that the Board award a contract to Dixon Weinstein Architects in an amount not to exceed $124,800 for the design of the Solid Waste Administration Building to be located on landfill property on Eubanks Road, Chapel Hill; and authorize the Chair to sign a contract on behalf of the Board, subject to final review by staff and the County Attorney, Dare To from Project 4/ 14/05 (Revised) Pam Jones, Director Orange County Purchasing Ken Friedlein, Dixon Weinstein Architects Solid Waste Management Administration Building/ Design Fee Proposal Thank you {or asking Dixon Weinstein Architects for a fee proposal (or archileclural and engineering services associated with the design of the building described in your Request for Qualifications due Aug 12, 2004 and discussed in our interview with you on Aug 26 and in subsequent telephone conversations and emails We are pleased to offer the following regarding design fees for a building of 6,500 -7,000 square feel serving 25-30 people with an anticipated construction cost of $900,000: ARCHITECTURAL DESIGN Programming, basic services, slruclural & basic PME design including sewer lie-in al properly line $73,500 8 0% PME ENGINEERING (High-performance mechanicol system design) CIVIL ENGINEERING Site survey, basic services, water line extension INTEGRATED WATER MANAGEMENT DESIGN Slormwaler and waslewaler monagemenf ALTERNATIVE ENERGY FEASIBILITY Feasibility study and schematic design only Total Design Fees $16, 300 1 8 $23,500 2 6% $ 9, 000 1 3 x.500 0.3% $1 24, 800 14 0 As you suggested, we have removed septic system design from the scope of work and assumed the project will lap on to new sewer extension al the properly line In the even) county does not bring sewer to the project properly, the inlegraled water management design line will increase by $3,000 We would apply $1,500 from the Basic Services Tine to Thal amount, so the net increase in deisgn fee would be $1,500 We have identified design costs associated with waslewaler management and ahernative energy feasibility, which account for approximately $1 1,500 of the fees If These were declined, design fees would Iola) $1 13,300, or 1 2 5% of the construction budge) Also please Hole that This proposal contains provision for a direct driveway connection to Eubanks Road No significant improvements to the existing roadway are anticipated However, should reviewing aulhorilies require upgrades Io the existing road (such as widening and/or addition of a turn Zane, additional engineering and construction funds would be necessary 3 25 The Courtyord d3IW Franklin shoot Chopel HiILNC 27516 9199688333 9r99680473 Fox www dixonwcinsloin com d -rte-- g ~ J w U ~', O ~ m o ~ m ~ ~ ~ ~ ~ ~ ~ ~~~ o W~ p~~ ~~~ ~ na. 0 B a i n 1 ~ 1 i I w U ~ ~ i 1 1 1 ZW I ~~ >~ 1 Z 1 ~~ ~~ om ~ I I ~~ U i ~W ° O- ^ 1 1 1 S ~ 11 Ili W ~ Q I I Men t_ HOUSE ROAD F ~.~: N ~. r fs M O a o 1• - Jh ^ r ~ e I F ~ I r" W 1 1_. 1 r^ I Q 1 a ,, m ~y ° a O 3° = w w 0 ~ ~. N g ~ 0 0 ~ ~ ~ ~ ~ ¢ 7¢ o~ p m O ~ Z 9 w a 0 =C9 0a¢ U ~ > U W o 6 ~~ W ZZ q ` ' V ~ W / Z ~ Q a (7 Z U Y U W m a y' ~ ~\ _ ____ _ 1 ~ 1 F U 1 _ IR3W3+~?DV~E AO'_ _ _ I 1 \`. 1 ~ 1 '.\ Z 1 `~ ` i I I 1 rid" C': r ~ O Ilil : I I r , a ~ W r I 11 i p l~ Ss { 1 ... W ~ p~ . 11 I g a o 8 o'~F~, I it c, x , 1 1 ''Y ~ ~ O V t4 1 1 K ~. I' ~ U U i'I( : I ~ :I: ( i £1~ w ) m~rcC, ill w }sl Ii;l X~ o _ W I~ F `j it;) 2 .. s;n~ j~~: ~ ~ it -- - n 1 in,,ti p ~ 1 ^ __~ III y v II ~' Zil a~-- W Z I m Q t d~N ~ /r ~ (is z LL 1~~ ~i