Loading...
HomeMy WebLinkAboutMeeting 042795ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD HILLSBOROUGH, NOR'T'H CAROLINA 27278 it ,_ P MEMORANDUM Received APR 2 11995 Managers offic. c TO: Stoney Creek Basin Planning Group Members and Alternates PROM: Gene Bell Planner III (;�- -�d SUBJ: Third Meeting of Planning Group on April 27, 1995 DATE: April 20, 1995 Enclosed are the agenda materials for the third meeting of the Stoney Creek Basin Planning Group. Included is a Draft Impact Assessment prepared by the UNC planning students. It is being provided so the Planning Group can begin to understand some of the impacts of the various development strategies. The students will be going through the report at our meeting on the 27th. Please review it beforehand and be prepared to identify areas of concern as well areas needing more elaboration or documentation. The students can address those concerns (as well as those of County staff) in the final document. ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 snl� s/ L� O� b` ♦� +P � fa. 1 AGENDA Stoney Creek Basin Planning Group - Meeting 3 New Hope Elementary School Auditorium Thursday, April 27, 1995 7:30 PM TIME AGENDA ITEM 7:30 1. CALL TO ORDER - Facilitator 7:31 2. MINUTES - Review and approval of minutes from April 6 7:35 3. OPENING COMMENTS - Facilitator 7:40 4. INTRODUCTION - Rick Kos - Existing Conditions - Facts - Design Reminders 7:55 S. ENVIRONMENTAL IMPACTS - Jeff Bowyer 8:20 6. TRANSPORTATION /AIR QUALITY IMPACTS - Jennifer Clinger 8:45 7. PUBLIC SERVICES IMPACTS - Kaoru Oka - Schools - Parks - Public Safety - Water and Sewer 9:10 S. FISCAL IMPACTS - Travis Pollack 9:35 9. CONCLUDING COMMENTS /OTHER BUSINESS 9:50 10. ADJOURNMENT (We need to be out of the auditorium by 10:00 so the custodial staff can lock -up) ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 61� kyj I D1 ::�►11Ti1► I TO: Stoney Creek Basin Planning Group Members and Alternates /0#4v FROM: Gene Bell Planner III SUBJ: Additional Materials for Planning Group Meeting on April 27 DATE: April 25, 1995 Enclosed are the following additional materials for the third meeting of the Stoney Creek Basin Planning Group: 1. Responses to questions and concerns raised at the April 6 Planning Group meeting; 2. "Non- Residential Fiscal Impact Assessment" which was not available when agenda materials were mailed last week; and 3. A revised "Schools" section which is based on an analysis of the carrying capacity of the schools themselves, e.g., maximum enrollment capacity. This is being provided because much of the discussion about schools in Orange County in recent years has focused on the capacity of schools. While increases in the number of teachers as well as school facilities would be expected because of demands generated by new development, these concepts or standards are a little more difficult to understand than school capacity, i.e., number of students. RESPONSES TO QUESTIONS AND CONCERNS RAISED AT THE APRIL 61 1995 PLANNING, GROUP MEETING 1. Local ordinances restricting development in environmentally sensitive areas. Four key County ordinances come into play here. The Flood Damage Prevention Ordinance restricts development in flood hazard areas as defined by the Army Corps of Engineers. Generally no new structures may be built in such areas and land uses are restricted to such activities as general farming, pasture, parking areas, golf courses, tennis courts, parks, and open space and other similar private and public recreational uses. The Orange County Zoning Ordinance in conjunction with the Orange County Subdivision Regulations requires buffers along streams, the protection of existing trees, and larger lots and limitations on impervious surfaces in protected watersheds. Finally, the Orange County Environmental Impact Ordinance, while not restricting development, does require that measures be identified to mitigate the impacts of the proposed development. 2. Soil survey and suitability of soils for septic tanks. The Soil Survey of Orange County, North Carolina prepared by the U.S. Department of Agriculture, Soil Conservation Service in 1977 identifies 22 primary soil types in the county. A series of tables in the survey rates soils as to their suitability for various uses (crop production as well as development). Table 7 - Sanitary Facilities - lists the constraints of each soil type for septic tank absorption fields. Applicable ratings are moderate and severe (there are no soils in the county rated as good for absorption fields). The most common constraint listed in the table is "peres slowly." 3. Clarify distinction between minimum lot size (0.92 acres) permitted by R -1 zoning and 1.85 acre average lot size. With the exception of the Rural Buffer area, the majority of the Stoney Creek Basin is zoned Residential -1 (R -1) . The minimum required lot size is 40,000 square feet (0.92 acre) or approximately one acre. For residential development to take place on a lot this size, there has to be a primary as well as a back -up drainage field for the absorption of septic tank effluent. In addition, there has to be a suitable separation (100 feet) between the absorption field(s) and the well site. Soil characteristics on the site (see question 2) have a direct impact on how much land is needed for drainage field, i.e., sites with poor soils require more land for absorption fields. Thus, even though the ordinance only requires 0.92 acre for a residential lot, soil constraints may result in additional area (1. 85 acres on average) being required to meet such standards. 4. Park land acquisition: Methods as well as service area boundary and specifications on community park. The Orange County Subdivision Regulations require at least one thirty -fifth (1/35) of an acre is to be dedicated for each dwelling unit proposed in a subdivision plan. If the County Commissioners find that no recreation site has been designated on the adopted comprehensive plan for the property in question, then payment -in. -lieu may be made. The payment shall equal the number of acres required to be dedicated multiplied by the assessed value of the land to be dedicated. The Master Recreation and Parks Plan for Orange County has identified the need for a community park in the vicinity of Old NC 10 and New Hope Church Road. A community park has a service radius of 1 -2 miles, is 25 acres in size, and is designed to serve a population of 10,000 +. A community park generally contains facilities for active recreation such as athletic fields, and tennis, basketball, and volleyball courts. Areas for passive recreation include a lake or some type of water body, trails, and picnic areas. The break down of active to passive acreage is a typical community park is approximately 50% to each type. S. In an open space development, who maintains the common area? Who pays taxes on it? The common area in open space developments can be the responsibility of the homeowners association or a public or non - profit agency. If the homeowners association owns the common area, it is given a value of one dollar ($1.00) to keep it on the records. The value of the open space is transferred to individual lots since property owners own a certain percentage of the undivided interest in open space. 6. For neo- traditional development, what is the density threshold needed to support transit? The Triangle Transit Authority's (TTA) Fixed Guideway Study (FGS) defines transit station areas as areas where additional residential density would be needed to support transit. Four levels of development activity for transit stops are defined. These range from a low of seven units per acre on average to a high of 30 units per acre on average. The area defined for the neotraditional development was given a level 2 development in the TTA study. This translates into an average density of 11 units per acre. However, the overall average residential density for development in the transit corridor is two and one -half (2.5) units per acre. 7. What kind of agreement(s) is (are) in place regarding the future development of this area? The majority of the area was covered by the C o o p e r a t i v e Planning Agreement between Orange County and Hillsborough. However, the Town of Hillsborough withdrew from the agreement on May 9, 1994 because of deliberations regarding the possible annexation of the University Station development. In addition to the Stoney Creek area, the agreement covered other areas adjacent to Hillsborough. Though no longer in effect, the agreement defined Transition (future urban areas) and Open Space Development (rural) Areas and specified that a land use plan be jointly prepared by the Town and County. Upon adoption of the plan, Hillsborough zoning would have been applied in the Transition Areas and development proposals in both the Transition and Open Space Areas would be coordinated between the Town and County. The only other agreement currently affecting any of the Stoney Creek Basin Area is the Joint Planning Agreement (JPA) and it applies only to a small portion of the Rural Buffer in the southern tip of the area (see the Land Use Element map of the Comprehensive Plan mailed after the April 6 meeting for the location of the Rural Buffer) . The area is governed by a three -party agreement among Orange County, Chapel Hill, and Carrboro. The JPA Plan was adopted by all three governments and amendments to it require the approval of all three. The applied zoning district, administered by the County, is Rural Buffer. It is a low- density residential district with a minimum lot size of two acres. Non - Residential Fiscal Impact Assessment Both the Conventional and Neo- Traditional Development options propose non - residential development. While the Conventional Design only includes a 33 acre (359,370 square feet of floor area) tract zoned for commercial use, the Neo - Traditional Design proposes the development of a mixed -use core area containing multi -story office and retail uses totaling 25 acres (650,000 square feet of floor area). In addition, the Neo - Traditional Design includes 15 acres (350,000 square feet of floor area) of office space. The fiscal impact of the approximately 29 acres of civic. space has not been calculated. The distinct difference in these two types of non - residential areas and the difference in size makes comparison between the two designs difficult. Projection of the County government fiscal impacts was conducted using the Bureau of Economic and Business Research template (The results and explanation of the template inputs is attached). Analysis of the results indicate that all of the non - residential development in the Neo - Traditional and Conventional Designs produce a positive balance. The calculations from the Neo - Traditional Design required further manipulation due to the format of the template, which calculates the fiscal impact for one retail building. The results were extrapolated for application to the larger area and the comparison of retail impacts with the Conventional Design. The total square footage of the retail area in the Conventional Design was used in the analysis rather than an example building, because this area will most likely be developed as a community shopping center containing a large chain anchor store and numerous smaller attached retail uses. Because the developments are proposed rather than existing, using the template necessitated making several assumptions. To calculate the real property (market) value of the proposed development, the value of similar uses per square foot in the area were used. The market values of the Neo - Traditional retail and office uses are based on comparable Chapel Hill retail and office buildings. The assessed value of Hillsborough Commons in Hillsborough provided the value per square foot of the likely community retail center in the area zoned commercial in the Conventional Design. The template also requires an estimated sales per square foot. This value was obtained for the retail uses in both designs from the Urban Land Institute's Dollars and Cents of Shopping Centers which provides such data for shopping centers of different types and sizes based on surveys of actual shopping centers. Both retail designs were given the same sales per square foot value. The fiscal impact of office uses assumes a sales per square foot of zero. Other values used in the analysis include tax rates, the inflation rate, and the charges and fees for required inspections and permits. Tables 1 and 2 below display the results of the analysis. While the retail uses in both scenarios produce an annual positive net impact for County Government, the Neo- Traditional Design produces more annual net revenue per square foot ($3.00) than the Conventional Design ($1.00). The office development in the Neo - Traditional Design, according to the analysis, would produce approximately $1.50 annual net revenue per square foot. The total annual net revenue for the retail areas in the Neo - Traditional and Conventional Designs is approximately $1,393,000 and $400,000, respectively. However, due to the difficulty of comparing such different types of development, especially of different sizes, the most important conclusion to draw from this analysis is that the retail and office uses in both designs produces a positive net revenue for the County. :3 ca il_ Il_ c N � >Q rn co a U^ 6 T .W O Z" - a. L O O O O O 00 cy) SS O O' LL O a)CL ca :3 o U) cle) CD LO O ao6q64 a� c ca °O °O O LO O O O r,-- LO RS C � > H-} CL E CO Z O c_ oo (D O7 m cu O O ate, Ea,� x W O' v/ c� c a� •� a) c U ' cz O *� Z O C[ N U) — c CZ .� a O E 6 E > Oo U— O C O c c o �U Z c o M c M N c M O cz a� E O �- U o N Z W J Q O O cz C a) 0 O U k4 O Z " c a a o T O T cei Qo � o c � c ca > > °o° O O co 6 C6 cz LO OccC v- ' oo LL CL c 'O C O U W > = W O a. lz U Q (� O ■ ■ Co >I cz W � O L Q C: O Z Qc co � V Q .0 cz "' -0 c cz C V O ■s �_ ca cz ■ FO- CIO 0 O - cz a) V � Z V/ 4-j E N O W Cl) O W J Z Q I- :3 ca il_ Il_ c N � >Q rn co a U^ 6 T .W O Z" - a. L O O O O O 00 cy) SS O O' LL O a)CL ca :3 o U) cle) CD LO O ao6q64 a� c ca °O °O O LO O O O r,-- LO RS C � > H-} CL E CO Z O c_ oo (D O7 m cu O O ate, Ea,� x W O' v/ c� c a� •� a) c U ' cz O *� Z O C[ N U) — c CZ .� a O E 6 E > Oo U— O C O c c o �U Z c o M c M N c M O cz a� E O �- U o N Z W J Q O O cz C a) 0 O U k4 O Z " c a a o T O T cei Qo � o c � c ca > > °o° O O co 6 C6 cz LO OccC v- ' oo LL CL c 'O C O U W > = W O a. lz U Schools Introduction The Stoney Creek Basin Planning Area is currently served by the New Hope and Cameron Park Elementary Schools, and Orange High School. The area will be served by the new A.L. Stanback Middle School, slated to open in the Fall of 1995. Where school enrollment exceeds capacity, a demand for new school facilities exists. Current school capacity and enrollment data for the Orange County system is shown below. Table 6: Current School Capacities and Enrollments Source: Orange County School Board The existing A.L. Stanback Middle School houses only sixth graders, so the current enrollment is artificially low. The Orange County School Board intends to move all current students and teachers to the new school, along with some from the C.W. Stanford Middle School. However, the School Board has not yet released the actual number that will begin the 1995 school year at the new school. The new A.L. Stanback Middle School will have a capacity of 700 students. Methods To estimate the impacts produced by each development option on the Orange County school system, the following steps were taken: • Determine the number of households. • Determine the total number of school age children. Stoney Creek Basin Area Plan, page B -14 Over( +) or Under( -) School Capacity Enrollment Capacity ELEMENTARY • G.A. Brown 572 513 -59 • Cameron Park 594 636 +42 • Central 506 539 +33 • Efland Cheeks 572 413 -159 • New Hope 594 666 +72 Total - All Schools 2838 2767 -71 MIDDLE 0 A.L. Stanback 506 346 -160 • C.W. Stanford 726 944 +218 Total - All Schools 1232 1290 +58 ORANGE HIGH SCHOOL 1518 1505 -13 TOTAL - ALL SCHOOLS 1 5588 5562 -26 Source: Orange County School Board The existing A.L. Stanback Middle School houses only sixth graders, so the current enrollment is artificially low. The Orange County School Board intends to move all current students and teachers to the new school, along with some from the C.W. Stanford Middle School. However, the School Board has not yet released the actual number that will begin the 1995 school year at the new school. The new A.L. Stanback Middle School will have a capacity of 700 students. Methods To estimate the impacts produced by each development option on the Orange County school system, the following steps were taken: • Determine the number of households. • Determine the total number of school age children. Stoney Creek Basin Area Plan, page B -14 • Determine the number of school age children by school type. • Determine the extent to which current school facilities are capable of handling the projected number of new students. The number of households was obtained from Phase I of this report and multiplied by the number of school age children per household (0.43) . This figure represents the average number of school age children per household in rural portions of the Stoney Creek Planning Area townships (1990 Census). To determine which school type these students would attend, the school attendance data from Table 6 was converted to student generation rates as follows: Household Percent Student School Tape Attendance Generation Elementary 50 % 0.21 Middle 23% 0.10 High School 27% 0.12 Total - All Schools 100% 0.43 By multiplying the student generation rates by the number of households, the projected number of students, by school type, may be obtained. These projections are summarized in Table 7 below. Table 7: Student Generation by Development Option Impacts Table 8 reveals the impacts of the different development scenarios on the Orange County school system. Deficits ( +) and surpluses ( -) in overall capacity were determined by simply adding the projected number of students, by school type, to the current surplus ( -) or deficit ( +). This was done since some deficiencies in school capacity might be handled through adjustment of school attendance zones. Stoney Creek Basin Area Plan, page B 715 Development Option Conventional Design Scenario I Conventional Design Scenario II Density Neutral Neo- Traditional Households 1,629 879 899 3, 307 Students 700 378 387 1,422 Attendance by School Type Elementary 348 188 192 708 Middle 162 88 90 330 High School 190 102 105 3844 Impacts Table 8 reveals the impacts of the different development scenarios on the Orange County school system. Deficits ( +) and surpluses ( -) in overall capacity were determined by simply adding the projected number of students, by school type, to the current surplus ( -) or deficit ( +). This was done since some deficiencies in school capacity might be handled through adjustment of school attendance zones. Stoney Creek Basin Area Plan, page B 715 However, additional school space will be required for all types of schools under each development scenario except two. For the Conventional 1.85 -acre Option and the Density - Neutral Option, no additional middle school space is required. Some of these impacts could be addressed directly. Currently, the County charges a public school impact fee of $750 for each new residential dwelling to pay for a portion of the capital cost of constructing new schools. Studies are currently underway which may result in an increase in this fee as well as implementation of a sliding scale of fees, based on housing type, dwelling size, number of bedrooms or dwelling cost. Based on the current fee ($750) and the projected number of dwelling units in each development option, impact fees as shown below would be obtained. Development Option Conventional Scenario I Scenario II Density - Neutral Neo- Traditional Projected Dwelling Projected Units Impact Fees 1629 $ 1, 221, 750 879 $ 659,250 899 $ 6749250 3307 $ 2,4807250 These fees could be used to either acquire land for school expansion or new school sites, or for construction. Developers also have the option of dedicating land for school expansion or a new school site. In return for such dedication, the developer receives a credit toward impact fee payment based on the market value of the property. Table 8: Impacts on School Capacities 'Includes additional capacity from completion of new A.L. Stanback Middle School (194) less current deficit (58). Stoney Creek Basin Area Plan, page B -16 Current Facilities Over( +) /Under( -) Capacity after Development Capacity Schools Over( +) Conventional Density - Neutral Neo- Design Design Scenario II or Under(-) Traditional Scenario I Elementary -71 +277 +117 +121 +637 Middle' +136 +26 -48 -46 +194 High School -13 +177 +89 +92 +371 'Includes additional capacity from completion of new A.L. Stanback Middle School (194) less current deficit (58). Stoney Creek Basin Area Plan, page B -16