HomeMy WebLinkAboutAgenda - Item 12-4 - Information Item - Memorandum - FY2017-18 Capital Investment Plan Information UpdatesINFORMATION ITEM
II[4A III° 111 E C kw ll1
Asset II\Aaliageimelit Services
Angel Barnes, Capital Pr(- .)jec:ts Manager
Memo to: Orange County, Board of County Commissioners
From: Angel Barnes, Capital Projects Manager
CC: Jeff Thompson, Director, Asset Management Services
Date: June 19, 2018
RE: FY2017 -18 Capital Investment Plan Information Updates
The Board of Orange County Commissioners appropriated funding for multiple projects for County owned
facilities as part the FY2017 -22 Capital Investment Plan. This memo serves as an update for the projects that
are currently under construction or are anticipated to be under construction very soon.
Sportsplex Field House: (FY2017 -22 CIP page 421) This project is currently under construction and is
anticipated to be complete in the summer of 2018. The building construction is underway, the roof, siding, and
utility connections are currently being installed. County staff is working with the Town of Hillsborough and the
Forest Ridge Subdivision regarding the sidewalk expansion connecting the Sportsplex property to the Forest
Ridge Subdivision. The sidewalk construction is anticipated to start within two weeks and be complete in the
summer of 2018.
Facility Accessibility and Safety Upgrades: (FY2017 -22 CIP page 354) In FY2017 -18 this project includes
renovations to the existing steps in front of the Richard E. Whitted Building A. The current sets of steps are in
need of renovations for access and safety. The proposed design includes removal of the north side parallel
parking spaces, removing the existing ramp and front steps. The proposed plan replaces the front steps with
accessible ramps, new steps, stamped asphalt raised crosswalks, concrete retaining wall, and additional
sidewalk per Attachment A — "1627 Whitted ADA Improvements Drawings ". The design is currently out to bid
with anticipated bid return by June 8, 2018. Staff will be working with the Town of Hillsborough for permit
approvals prior to moving forward with the construction award. In addition to the Whitted facility updates,
attached is the 2017 -18 Annual Report on Orange County Facilities Accessibility (Attachment B).
Government Services Annex: (FY2017 -22 CIP page 356) The Government Services Annex (Board of
Elections) project design is complete. Construction bidding and award is contemplated to occur June, 2018.
The construction is anticipated to begin in early summer to relocate the existing electrical distribution and
replace and relocate the Heating, Ventilation, & Air Conditioning system ( "HVAC ") from the basement to other
areas within the existing facility to mitigate new flood plain elevations that put these systems at risk. Special
attention will be design within the process to ensure continuous services provided by the Board of Elections.
The project should be fully complete during the fall, 2018.
P.O. Box 8181 * 131 West Margaret Lane, 3rd Floor * Hillsborough, North Carolina 27278
Telephone: 919 245 -2628
Fax: 919 - 644 -3001
E -mail : abarnes @orangecountync.gov
Passmore Center Expansion: (FY2017 -22 CIP page 363) This project is currently under construction and is
anticipated to be complete in the late summer of 2018. Site work is largely complete and, like the Sportsplex
Fieldhouse, has endured unusually wet winter and spring weather challenges. The exterior building
construction is largely complete, the roof has been installed, the HVAC unit currently being installed, and the
interior building construction is anticipated to start within the next two weeks.
Southern Campus Expansion: (FY2017 -22 CIP page 367) The Board of County Commissioners awarded a
professional services agreement with Smith Sinnett Architecture on November 2, 2017. The multiple phases of
this project are currently in the schematic design phase. Schematic design includes programming, conceptual
design, as well as thorough technical review by the Town of Chapel Hill planning staff (as governed by the
master plan special use permit). Development design and construction document preparation for Phase 1
project components (roadway straightening, additional parking and related site work, and Seymour Center
improvements) are anticipated to be complete in the winter of 2018. Bidding and construction of Phase 1 is
anticipated to be complete in the late winter, 2019. Development design and construction document
preparation for Phase 2 improvements (meeting facility, Health Department, potential Dental Clinic and
Department of Social Services) is anticipated to begin in the fall of 2018. Construction for Phase 2 is
anticipated to begin in early 2020 and be completed in the spring 2021.
Heating, Ventilation, and Air Conditioning ( "HVAC ") Projects: (FY2017 -22 CIP page 358) This project
includes HVAC improvements /replacements for the Dickson House, Robert & Pearl Seymour Center units 2
and 7, and all units at 501 Franklin Street, Chapel Hill. The replacement units for the Dickson House and the
Robert & Pearl Seymour center are complete. The design for the HVAC units at 501 W. Franklin Street is
complete, and project has been awarded. The construction is scheduled to start in June 2018 and be complete
by July 2018.
Link Lower Level fit Up: (FY2017 -22 CIP page 359) The John Link Jr. Government Services Center project
design is complete. The construction for the first two phases is complete. The design for phase 3 is complete.
Construction bidding and award for phase 3 is contemplated to occur in June, 2018. The construction is
anticipated to start in June and be complete in mid - Summer 2018 for the Public Defender to relocate from 129
E. King Street to John Link Jr. Government Services Center.
These project updates can be found on the Orange County website
at htt://www.orange2o2ntMc.2ov /departments /asset management services (arms) /car�ital �roiects.�h�.
If you have any questions please do not hesitate to reach me at 919.245.2628 or
at abarnesoran ov at any time.
Thank you.
Angel Barnes
Capital Projects Manager
Orange County Asset Management Services
Attachments:
A - 1627 Whitted ADA Improvements Drawings
B - 2017 -18 Annual Report on Orange County Facilities Accessibility
3
I ❑ - Attachment A
NOTES
- 1) AREAS BY COORDINATES,
2) HORIZONTAL GROUND DISTANCES SHOWN.
UNDERGROUND UTILITIES SHOWN SHOULD BE CONSIDERED
_ APPROXIMATE. CONTRACTORS ARE ADVISED TO HAVE ALL
- -- UNDERGROUND UTILITIES MARKED PRIOR TO ANY EXCAVATION.
- ...... -- -- UNDERGROUND UTILITIES ARE BASED ON FIELD MARKINGS BY
- - -- - - U.L.O.C.O. THERE MAY BE ADDITIONAL UNDERGROUND UTILITIES
BEYOND THOSE SHOWN HEREON,
4) RATIO OF PRECISION— F IR000+.
5) THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A
TITLE REPORT, THEREFORE, THERE MAY BE ENCUMBERANCES
AFFECTING TITLE ON THESE PROPERTIES NOT SHOWN HEREON,
5) TOPOGRAPHIC AND BOUNDARY SURVEY INFORMATION PROVIDED BY
A RILEY SURVEYING, P.A.
P.O. BOX 16459
.. _ '. _... CHAPEL HILL, N C 27516
ph 919- 667 -0742 EY 919- 402 -0234
6) ALL PROPERTIES ARE WITHIN THE TOWN OF HILLSBOROUGH
77 77 777AI F JURISDICTION
N,
NI e
a d
LEGEND
„
sE� 'MAC Nay
1
_
$
Rco
�.
d .....
I / %
.. ..........
" "/
o
�ON S MASON,e
R PIPE SEr l Nay
,,.
, d e I / i
--
•
e
EXI E PIPE
CALCULI —A CEO D POMP
e,2 , e,,,,,,:,,, ,,,,: e,,,
,,;: ,,,, ,,,,,
ELECC METEft
MANHOLE
I
®
WA III "ANICII
WA EEF MANHOLE
WA T"
6
SITE PLAN LEGEND
EIreE R
°
EXISTING
EXISTING
O
cATCR IA—
PossreLE JJUNC ON BOX(LO ON APPROX —O
B
o
,,,,,, „,,,,,,,,,,,,,,,,,,,,,,,,,,,.. PROPERTY LINE
s
T LE ” PEOES�Ai
,s
PE ouNo
'Y
BUILDING
nu P"
om
e„
..,_ .............. _,,,, ,,,,
�
ASPHALT
o
H�
r+ANOmAV aAMV /PArerimc svACE
alCOF BRAIm
.
❑l
11-1 �aANSroaMEre
f
TEMPORARY ASPHALT
ce _ EocE
'... J
INBEacao1NB IAS — APPR1 -1 11—ON)
_N',AO mam L—H)
CONCRETE
"'T 0' WAY
oe o.
ooERPEAB ELEmRIC LINEIS)
CURB AND GUTTER
ecwcomB ELE—C
T
SREE BE c N
r
d CROSSWALK
n
sANiler scwcre PIPE
c AINL K FENCE
WIFE EN
S(]E BENCHMARK
( 7K ,
TREES
SPLIT RAIL EENII
OVEftNANG
SOP OF CONCRETE MO"MEM W BRASS CAP
ELEVA TION 563.67
�
fil/i' WIRE
ii
DEMOLITION
MARY LBERTER
[
Pm Aee< es cSSO
SPOT ELEVS
mom
NEW
CO
PROPOSED
ra
0
g
ASPHALT
U
TEMPORARY ASPHALT
CONCRETE
R �
LL is
— — CURB AND GUTTER
— —
%% <, CROSSWALK
TREES
0
DEMOLITION
�� R
°67 or RAMP
569.00
�
/
p
g;
569.0
Slte
E
a
b�
m
STE S TO BE
M
REMOVED
rovexr socwa�r
r
/
DY
,ASPHALT
TO BE
ORB AND GUTTER
ASPHALT TO BE
RATE RAMP
�
REMOVED R
0
G
REMOVED
AND RAILING TO BE
TO BE REMOVED
/
REMOVED
O
SITE PLAN LEGEND
NEW
CO
PROPOSED
ra
0
g
ASPHALT
U
TEMPORARY ASPHALT
CONCRETE
R �
LL is
— — CURB AND GUTTER
— —
%% <, CROSSWALK
TREES
0
DEMOLITION
�� R
°67 or RAMP
569.00
�
/
p
A
569.0
E
SITE PLAN LEGEND
EXISTING
PROPOSED
PROPERTY LINE
BUILDING
ASPHALT
TEMPORARY ASPHALT
CONCRETE
— — CURB AND GUTTER
— —
%% <, CROSSWALK
TREES
0
DEMOLITION
569.00
vm sesa es s�so
SCALE: 1" = 20' -0"
20 10 0 20 40
NOTE, .
I. NO PORTION OF THE SITE IS WITHIN THE 100 YEAR FLOOD
ELEVATION
2 TOPOGRAPHIC AND BOUNDARY SURVEY INFORMATION PROVIDED
BY RILEY SURVEYING, P.A.; PHONE: 818.6670742.
3 PRIOR TO B /DOING ON WORK AT THE SITE, THE CONTRACTOR
MUST VISIT THE SITE TO FIELD VERIFY THE EXISTING CONDITIONS
4. NO WORK SHALL TAKE PLACE ON SITE UNTIL THE CONTRACTOR
HAS CONTACTED NORTH CAROLINA ONE —CALL CENTER TO LOCATE
ALL
EXISTING UNDERGROUND UTILITIES,
F ANY INTERRUPTION OF UTILITY SERVICE MUST BE APPROVED
AT LEAST 48 HOURS PRIOR TO WORK IN THAT AREA.
6. ANY SIGNIFICANT CHANGES SO ACTUAL SITE CONDITIONS FROM
THOSE
SHOWN ON THE PLANS MUST BE BROUGHT TO THE ATTENTION OF
THE ENGINEER.
ALL EXISTING WALKS, PAVEMENT, CURB, ETC WHICH ARE
DAMAGED
DURING CONSTRUCTION SHALL BE SAWCUT AND REPLACED TO
MATCH
EXISTING CONDITIONS
8. ALL 0/MENSIONS ARE TO THE HACK OF CURB, UNLESS OTHERWISE
NGTED.
ALL RADII ARE 5 FT., UNLESS OTHERWISE NOTED,
1
10. PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITIES ON THE
SITE THE APPLICANT WILL HOLD APRE— CONSTRUCT /ON
CONFERENCE
WITH THE TOWN OF HILLSBOROUGH STAFF
11 ACCESS TO THE DUMPSTER AREA WILL BE ON ALL WEATHER,
HEAVY
DUTY PAVEMENT.
12. ADJUST ALL EXISTING UTILITIES TO BE FLUSH WITH FINAL GRADES.
TOR
REN H CDA R
K OVER GUT TER
/ STAMPED CSPHALT
( RASED CROSSWALK
Gs46 ,z- wrua TRENCH COVER -
_.
DOLL GAS 3 E '
STAMPED ASPHALT
RASED CROSSWALK PARALLEL PARKING
SPACES 8 x 23 -- —
0
SITE BENGYIMARK ; ��
TOP OF L12NCRETE MOANMENT W/@RASS GP
ELEVRT /ON
MARY ALHERTER
1117 11 117
5
SITE PLAN LEGEND
EXISTING
PROPOSED
PROPERTY LINE
BUILDING
ASPHALT
TEMPORARY ASPHALT
CONCRETE
- - CURE AND GUTTER
- --
/Cll CROSSWALK
,,.
TREES
0
DEMOLITION
569.00
SPOT ELEVS
SCALE: T = 20' -0"
20 10 0 20 40
new
MBO me
n w �Ianti - ng bed
MM am MMMM,=
iiimiii imi
Fifffff I Mfff I JIM) 10
LM", ffm um ffm I= am no Em I= as WA EM M No Mo
am no mm um an
new crosswalk
W
L concrete . . .. ... .............
lAttachment 7
ON% Of
IWOIVII . . ... El" r T
ryrI
R,7117 14 C".`WA I NA
111111111; 1� 111 ppi!
,Accessibility of Orange County facilities.
Since the final Comprehensive Facilities Accessibility Self-Assessment report was delivered in
May of 2017, AMS has been working to address the action items identified. The County's
Capital Projects Manager, Angel Barnes, has met weekly with the Sustainability Coordinator to
identify and address action items from the Accessibility Self-Assessment that have been or
could be addressed in ongoing Capital Projects.
Throughout this year, all • the highest priority items identified in the assessment have been
addressed, including 22 action areas (e.g.- ADA parking signs, sidewalk expansion
joints, etc).
In addition, 8 further areas of concern (e.g. - entrance mats, stall door closers, etc)
have been
investigated and adjusted across all facilities when necessary.
Priority Level (5 is highest)
Improvement Item Type
Door (width, hardware, auto-closing, etc)
. 110191511 WE 1 1,
Parking (# s aces reserved, width, slope, etc.)
M,..,Jr4,,Vp I nom � In I w
VI'MIII I 1 1 IN in. 11,110011111111M
Restroom (grab bars, fixture heights, stall widths, etc)
Sign (parking, restrooms, wayfinding, entrances, etc)
Other (Non-ADA potential safety or accessibility items)
Total Remaining
E
510 of Total
MIN
P.O. Box 8181 * 131 West Margaret Lane, 3rd Floor * Hillsborough, North Carolina 27278
Telephone: (919)245-2626
E-mail: bbouma@orangecountync.gov
of Accessibility on a new ADA parking space at Fairview P below
following -the direction of the d in October of 2016.
Asset Management Services remains committed to maintaining the highest feasible level of
accessibility for Orange County facilities, now and in the future.