HomeMy WebLinkAboutAgenda - 03-31-2005-7ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 31, 2005 Action Ager Item No. SUBJECT: School Capital Funding Priorities DEPARTMENT: Manager/Budget PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 3/14/05 OCS Superintendent Letter 3/08/05 CHCGS Staff Memo INFORMATION CONTACT: John Link or Rod Visser, 245-2300 Donna Dean, 245-2151 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To receive reports from the two school systems outlining their anticipated ten year capital funding priorities. BACKGROUND: On several occasions in recent months, and particularly during the annual planning retreat in January 2005, the Board of Commissioners stressed the importance of evaluating proposed County and School capital projects for the 2005-15 Capital Investment Plan (CIP) cycle on the basis of their relative priorities.. The Manager and staff discussed this expectation during regular monthly meetings in January and February 2005 with the School Superintendents and staffs. Bath school systems have developed and transmitted to County staff lists of their capital fianding priorities for the next ten years. Presumably, these priorities will be reflected in the requested CIPs that both school systems will present to the BOCC later in Spring 2005. Those CIPs will be developed based on the ten year estimated capital funding allocations that will be determined after the BOCC reviews and approves an approach for implementing the Board's recently adopted policy related to a 60-40 targeted capital funding split between School and County capital projects. The County's recommended capital funding priorities will be developed based on the Board's consideration and discussion elsewhere on this March 31 agenda of the County's space needs update. Those priorities will be incorporated in the Manager's Recommended 2005-15 CIP, tentatively slated for presentation to the BOCC in April 2005. FINANCIAL IMPACT: There is no direct financial impact associated with this item at this time. However, these priorities will shape the multi-million dollar 2005-15 School Capital Investment Plans that will be developed, presented, and reviewed during the next three months. RECOMMENDATION(S): The Manager recommends that the Board receive the reports for information only at this time. ~,~~°~'~~r~ ®rattge ~ountp ~c~jooi~ 3 200 ~Ea~t 'ding street °~, `~~~ ~il[s6nr0ugtj, ~ttC 27278 ~~~ Dr. Shirley Carraway (919) 732-8126 Telephone Superintendent (919)732-8120 Fax www.orange.kl2.nc.us Mazch 14, 2005 Mr. John Link, County Manager Orange County P.O. Box 8181 Hillsborough, NC 27278 Dear Mr. Link, Attached is the Orange County School's CIP prospective projects for 2005 - 2015. Please note that new facilities, renovations and recurring projects were combined with all prioritized to enable us to ensure that projects that are essential to this district receive funding consideration first. Each project listed has been carefully thought out and is a part of the system's ongoing plan for renewal and upkeep. The Cedaz Ridge High School debt service has been listed for each year through 2010-2011, not a part of the number priorities, but as a reminder of the Orange County Board of Education's formal request that the Boazd of County Commissioners reconsider the capital funding policy to finance the debt from unrestricted funding services before the appropriation of funds for county and school capital projects. Thank you for your consideration of our capital needs. Sincerely, Shirley~amaway, Ed,D. Superintendent /pmc ec: Orange County Board of Education ~ G O ~ ~ ~ d. U ~ ~ ~ V ~ .-~ ~ ~ nnO ~ ~ LL o U ~ ~ m ~ ~ ~ ~ 'Q ~ OU T" O Q 0 N ~ 7 qS ~ p~„ y r oo rn ~ '~ N m ~t " U,_, " z o . ~ m -~ vi O Z'`` W '~ ' a /-, U w ! G ~ b-0 ~ _ _ ^ O Q O ~+ ~ ,~ ~ U " T ~ c Y > o 0 0 ti ~ U U Q' N N CUJ y ^ro' U O v] U ~ U T ~ ~. ~ y b ~ ~ ~ U ~ V ~ U .~ c1 N ~ N ~ U ~ N ~ bA ~~ U ~ Q" U .~ U ~ U ~ U i ~r .U U -V > C O ~ U ~ ~ c E ~ ~ ~' N ~ w .> L i ¢ O ~ y c -J F"' G O U Ri R: ..G Ri O c d ti c~ V1 b 'O' ~ '^ .b Q ~ w w ~ w ~ xi C ~ ,~ ~ O O C ~' 'O O O O O N ~ ~ N N E ~ ¢ > U 3 ~ ~ x rx w r.~ H ¢ H U Q a ~ ;,..: y . _ _ . Q ~ ~ ~ W ~n ~ U v ~ ° g Q C ~ w o Q O 3 Q ~ Q ~ o ° ~ a ~ ~ 0 C a b0 5 co :~ .~ O O t, ~U O N C w U O a. T O U h 0 0 0 N 0 h a~ -O 4 0 P, O O .L U w 0 C y G O U .'OJ N U O V N 8 'b C a N m F y 0 O W m b x F4 p~y ~D r, ~ `~ -k r~'7 C),; :. Q, ,,. H ~.. ::-. N m v~ d~ .. ~, Z '. -(. ~, za ~ .~ ~, 6 w. V .~ "' G x Pa O H . ~ ^ N- U ' (S] U ~ ~ N ~ ~ ~~ ^ 'V G O , H ~ ~ ~ N N "~~" ~ C v~ U P. m c p c p a v ~ c c ~ ~ O ~ c~ U ~ r~, -. ~ r~i ~i C ~ cp3 t'J N N T U O p p '~J ,C ~ ~ y 4?, ~ O ~ ~ °' U U r 3 ~ ~ Y ~ C c ~ a !~ ~ x ~ w Q x ~ r E= vpi O w E~ G ~z aO w ~ ~U' U ~ W W c cn W v~ ~ ~n U N ~ ~ ~ ~ _ti ~ U U C] W U H ~ U x Q I~ GI O y h m 00 C 0 c, O ~. Q v U O 0. L c1 T O O U N 0 N O_ O N bA G O ~_ N O bA N V t.. OJ b b E cq 0 a 0 0 ,C U 4J .C.+ O G O G 0 V t p O U N aG+ b C Q, K N F t s N 0 M b N p m C7 m ~n v r - U' , E" N 7 ~`'. W za - w q o . U ~ , , ^ °° r' ~ o ° ,-. ~ ~ Q ~, ~ o U ~ ~ ~ y a -o ~ c y ~ -~ _ O G ~ h ~ O V c0 O C~ „Vy 4.. Cy h G ~ ~ ~ aJ U C ~ R, ~ y ~ ~ O i ~ '. N ~/ W ~ / W ~ .~_ C C C~ ~ I b O O ~ O O _ N i a ~ y ~ U U ~ U ~ ;0 N ~ ~ x ~ N N a 1 1-1 H F~ U ~ H Q Q U ~' O 2 00 C_ ~~ 0 U y V H J ~. T 0 0 U h 0 N O_ O N bA O r N bA N U. ti N c cn 0 a, 0 O U OJ O c 0 y 0 U v 7 O U 'C O, w H O C? m b .`n. ~ ,. ~/7 r ^-- N M '~' 1. . 6 U ~ _ H ~; z ~' z a' w U! i `~ ~', U y ~ P, y C C~ ~ N UJ M U ~ ~ ~ V ~ -. ~ T ~ n ~ U ~ e ~ G O ~ ~ o i Q '~ i ^_ ~ o ~ y ~ ~ ~. .~. w w E- G1 O o H ~U W rn ~' U y ~ x ' x ' +` W C~ Ga , U 0 4 M N y C W G 0 `~ O O u J c U 0 0. _~ O O V u, 0 N O O c ~I bA G v. a~ .G U r c1 bq O G G G u v 0 0 U v O V U 4J 0 v QJ aJ ^J i s F 0 W m b v ~ ~ U W 2 z H z 'a u U ' ~ 0 0 0 ~ °~ Ty . U E ~ cd t'J ~ G ~ w V ~ w. by O O O ' O ~ CG GL~ O ~ R: ~ ~ ~ bA C bA G bA C eCJ (~/ O ~ b9 C ~ O U ~ ~ '~ 'b •-• ~ .-, O bTO O ~ V .O a5 m° w° ~ cJ a, O w h Ga y ¢ ~ U W rn ~ _ ~ U :~ V ~ V :~ ~ U U U ~ Ia Q (~ U, ~' u y b7 C i ~, G J J h J C T O O 0 N O_ O N bq 7 O 0 dq U L h b b r bA O C. O O U n h1 w O c 0 V O U U O U ~_ U a K V H ~, 0 00 (n 'c7 N ~r rV h- dJ U W ~' i ~ _ E" -, N cn -7 ~,; ~i` ~_ z a ~, w U_ W H U; y `~ c o p F.' c c c c :o ~~+ ai U c ~; °~ ~, o_ O o O a> cJ cJ c~ U y U bq o N O N O N o N ~ N ~" U ~i C~ Pw ~+ 4 J r - N ~i T b0 j b-0 C bD C OA C bD C_ CJ U_ U "N~ b-0 C ~ O y [/~ ~ ~ 'O ^- 'U 'O ~-. 'L7 .~ -iJ C u.. O ~ O ,- U .~ ~ P~ Wc W W ~ ~ O u., F' Q y y Q ~ W ~ U ~ ~ U ~ O V U U a" U U C 7 Q LI Q ?^~ O y v -„ xc 0 0 O m h J h U O e, T O O U 0 N O_ O N bd 7 O h U bA GJ U UJ A c O a O 0 v 0 0 O U U N O U U a K F 0 cT1 .b v .~ ~ ~ ~ ~ U O ? F~ ~- ~ c~ m ~ O z ~ ., d ~, w Q F', ~ U' .~'. O O er ~ ~ N V1 O ~ O n y p , 0 0 0 0 ~ w " 7 7 ~ ~ ~ ~ C ~ C ~ .d N "O n ~ ~ ~ ~ ~ ~ r ~ ~ w '~~' n ~ nq K on C op C on C cs U a i (~ ~ on C ° O ~ '-O b b ~ b ~. N (A W W 0.l `~' N„ 4' W E-' qO H ~ ~.. ` U ~ W ~ ~ ~ Pa U :~ v~ H ~. V U O' a W ~ d ,~ W a: .. ~' ~-~ U U U C7 (~ x U Ga (~ >, s 4 y ~D y C C O 4. O J O v c~ C ."', U G O io O O W M b N ~ ~ U ` fU x O d ~' Z, (< W < `r ~';.: ~"' z~ N w . ~ .. p_ per o 0 0 0 ~ ~ ..~ ~ ~, r , c-J cJ cJ ~ U b0 > O > O > G > G Q r = R. 'c7 ~ P: R: t~ Q - GL~ bD n b1 J bA bA bq 0. bf ) ~ G C C C V C O y : 'O "7 'c1 TJ 'U ~ ~- ~ ~ ~ ~ .4 U (L U E"" q ~ O ~ ¢ ~O W d U ~ U ~ U ~ w W 3 , , _ ~ U U U C~ Ca ~I (~ 7- C ~~ c `. J O :! W m .~. v i~ ~ ~ r `r c~ U z 0 --~ N m 7 O '; ~; rH-i a ~, z d W C N V ~ n ~i U ~ W y W N h O H p„ G 0 C 0 C 0 C 0 y a) „~,~ G c~ '~ U F U cJV-J cS ~=J c3 CJ U ~ Cll = U bn > > Y > Q U o .- n ~ N ~ O ~ N ~ N ~ y .c~ ~ O U w ~ T f' on C on C bn C a C o m U ~ on °" _ o ~ _ b b b b -Si U - '-~., T C tri C q C W C ~"1 ~ ~ O GA U x O u- N ;-~ ~O d ~.U ~ W ~ ~ ~ W ~ d ~J ~ ,~ ~ ~ ~ U s U s O ~1 a U W U U C7 ._ ~l O O L~ Ca J Z J ~O U h C W C O O O J J `n U O Q. O 0 m b N ti 13 a m ~ ~, ~ U fT7 z 0 H 0 z ~".".. N Z a N w H ~ .N. G ( 1-; .. U N O 4"-r LU C ~ -~ ti ~ c y ~ -d e~ U Gy ~ .~ ~ ~ U ~ bA ~ ~ v, U G .~ L~ i f1 G ~ U ~ (~+ b1J C V ' a' G' ~ C O 'O b ..~ b U ~ ~ C U U I Z ~_ H ~ ~ V] (J~ U U U .U J ~ O O ¢ J ..a C7 L1 0 oa G ~ ~ ~ ~l i 'r O ar; c x C O R 0 C ,`V v ti V c O O W M N ~_ 8_ps~q ,ocM;Ch. Hill ! C'3YfbQ ro John Link 9i9 969 ?47> _ ~! 'r ~y Chapel Hilt - Carrboro City Schools Lincoln Center, Merritt Mill Road Chapel Nill, NC 27516 Telephone: (919) 967-8211 Fax: (9'19)933-4560 Neit Pedersen, Superintendent Nettie Collins-Hart, Assistant Superintendent for Instructional Services Ray Reitz, Chief Technology Officer Steve Scroggs, Assistant Superintendent for Support Services To: John Link Orange County Manager From: Steve Scroggs Assistant Superintendent for Support Services Re: Proposed Capital Investment Plan Priorities Date: March 8, 2005 Attached you will find the Boazd of Education's prioritized list of Capital Investment Plan projects for the 2005-2015 CIP cycle.. This report has been prepazed in accordance with directions from the Connty Manager's Office. The Boazd of Education approved the proposed listing during the March 17, 2005 regularly scheduled meeting. An electronic copy of this information has been provided for your use as well. Please feel free to contact Steve Scroggs if you have any questions. Thank you for your help and support in this project. 3- 3-^_5; tt.9,M;Ch.. HIII ~ Cdr rboro John Link St9 _o_ 2ai~ e 2/ i Chapel Hill - Carrboro City Schools ' 7 Lincoln Center, Merritt Mill Road Chapel Hill, NC 27516 Telephone: (919) 967-621'1 Fax: (919)933-4560 Neii Pedersen, Superintendent Nettie Collins-Hart, Assistant Superintendent for Instructional Services Ray Reitr, Chief Technology Qfficer Steve Scroggs, Assistant Superintendent for Support Services To: Neil G. Pedersen Superintendent From: Steve Scroggs Assistant Superintendent for Support Services Re: Capital Investment Plan Date: February 23, 2005 We have prepazed a preliminary proposal for the 2005-2015 Capital Investment Plan, prepazed in accordance with directions from the County Manager's Office. The process for submitting the plan has changed from previous years, The initial plan to be submitted is to include items in three categories: ongoing capital projects; major projects at existing facilities; and new facilities and SAPFO required facilities. The maintenance projects are to be prioritized by yeaz and submitted without corresponding budgets.. Each category is explained more fully below. Attached is the Preliminary County Schools CIP and Budget Timeline. The C1P priorities aze due to the Orange County Budget Office by Mazch 15. Discussion by the BOCC will take place on Mazch 22 and funding levels determined. After those discussions, the District will submit a complete CR' by April 25 and present the plan at a BOCC CIP work session on May 5. The Budget adoption, including the C1P is scheduled for June 23, 2005. On-Going Projects This is a category for projects that recur annually.. Some of these are not clearly defined at the beginning of the budget cycle but the needs have been consistent. This list is not prioritized because all of these are necessary ongoing projects. • ADA Requirements funds the needs of handicapped students or staff throughout the District. • Abatement Projects assist in the removal of floor rile and soffits that may contain asbestos. • Indoor Air Quality provides funding for the District's extensive testing program and for remediation efforts when problems are found.. • Mobile Units /Temporary Space projects include mobiles bought by the District for placement at schools and rental space for staff overloads throughout the District. • Technology funds are always required to keep pace with the ever changing world of technology as well as for maintaining the current system, Prioritized Major Projects Previous CIPs have been divided by project type without prioritization across categories, The County Manager has requested that these projects now be prioritized by need. The projects below ue listed in priority order.. The prioritization of these projects is based on health and safety fast, ]earning environment second and other facility needs third.. Throughout the list you will find that fire panels, HVAC, roofs and carpet replacements come before casework and window replacements.. It should be noted that we consider all of these projects important. ~- o-O5:t~+9GIJ.; CIS. 4ill ..zr rooro Jonn ~inH; ,c,o cso ?4,c - 3; SAPFO and Facility Needs / This category addresses new facilities for the District and reviews each project separately. High School no 3 is projected to be bid in March of this year. Present projections have the school coming in over budget, Recent school construction bids have come in higher than the projected $121.01 per squaze foot projection made by the estimators in 7uly of 2004. The recent Orange County Middle School came in over $130.00 per square foot.. An additional $10,00 per square foot construction cost would add $ 1,622,850 to the budget, Elementazy no. 10 is now scheduled to open in August 2009 and a commitment for funding has been expressed by the County Commissioners and manager. With capacity calculated on the basis of 23 students per class in K-3 and using SAPFO projections for growth, the elementazy capacity will pass the SAPFO linrits in 2008-2009.. The First School, a joint project just entering the concept phase, would be a partnership with Frank Porter Graham Child Development Center for a school starting with three year olds and finishing in second grade. The kindergarten, first and second grade classes would constitute half a school with four projected classrooms at each grade. The District still has a need for a new central office facility. Lincoln Center has outgrown its capacity to house the central office administrators and workers who need to be there. When Lincoln was converted to a central office in 1976, there were only 5,300 students in the District, we now approach 11,000 and the number requires additional central office support, Previously some central office staff could be housed in the schools and some still aze, but overcrowding at the school level has forced most of those people out. In response the District is currently renting three different locations to handle the overflow. The 2004-2014 CIP includes funding below the line (unfunded) for a new office facility. The total included in the unfunded section is $6,297,280. The District has recommended the conversion of Lincoln Center back to a school function in future yeazs, That would have to take place afrer a new central office is completed, Lincoln's central location, in close proximity to the LTNC. campus, Franklin Street, the bus line and student bearing neighborhoods, would make an excellent educational facility for students. The District has experienced two years of enrollment decline at the middle school level and a slowing of growth at the elementary level. Those two factors have pushed the need for new middle school capacity unti12014-15. The CII' should recognize the District's commitment to our older facilities and will strive to keep them technologically up to date as well as providing safe and secure learning environments for our students and staff. Mr. Scroggs and Mr. Mullin will be present to answer any questions you may have, Resolution: Be it, therefore, resolved that the Boazd of Education approves the priorities for ClP projects to be forwarded to the BOCC with the above amendments .- 2-~>i 11:1®4M: Ch.. Hill ~ C'd YYbOfO JOhl1 Llltk :9th 98e "c~~^ CHAPEL HILL - CARRBORO CITY SCHOOLS CAPITAL INVESTMENT PLAN NEW FACILITIES New school facilities are required by SAPFO to accommodate student growth projections. Listed below are the required new schools and other district facility needs, Year Capital Project 2005-06 2006-07 2007-08 High School #3 Opens 2008-09 2009-10 Elementary School #10/First School Opens 2010-11 New Central Office 2011-12 Conversion of Lincoln Center to an Educational Facility 2012-13 2013-14 2014-15 Middle School #5 Opens _- 5-O5:tt t4AM:Ch. HIII i Cdr rooro John link ,~t9 96°_ 2»7, CHAPEL HILL - CARRBORO CITY SCHOOLS CAPITAL INVESTMENT PLAN ONGOING CAPITAL PROJECTS Ongoing Capital Projects are required each year. Year Capital Project All Years ADA Compliance Abatement Projects Indoor Air Quality Improvements Mobile Classrooms Technology [g 5/ , ~- o-O5:>> i9=i~n:Cn. Nisi i Car rnoro JOnn L~ni< 9~9 969 2z~= CHAPEL HILL • CARRBARO CITY SCHAOLS CAPITAL INVESTMENT PLAN MAJOR CAPITAL PROJECTS -PRIORITY ARDER Renovations and maintenance of existing facilities to maintain safe and efficient buildings. Year Capital Protect 2005-06 Phlllips: HVAC Replacements and EMS Seawall: Bathroom Heat and Hot Water FP Graham: Roof Replacement Kitchen AC Systems: 5 remaining schools Security System Enhancements at Schools Elementary School Playgrounds: 4 schools FP Graham: Boiler Replacement Elementary Schools Classroom Garpet Replacement FP Graham: Classroom Casework Phlllips: Support Area Improvements Estes Hills: Campus Ganopies, Doors, Hardware Seawall: Replace Windows-Classroom antl General Areas Phillips: Replace W IndowsClassroom and General Areas CHHS: Doors/Hardware Replacements CHHS: Window Replacements 2006-07 CHHS: Roof Replacements - CA Bld Ephesus: Update Fire Panel CHHS: Electrical Upgrades and Increased Dlst. Phlllips: Increase Electrical Distribution Ephesus: Media Center Improvements Culbrelh: Replace Windows-Classroom and General Areas FP Graham: Bathroom renovations Culbreth: Furniture Replacement Phillips: Doors and Hardware CHHS: Repair/Pave Student and Teacher lots McDougle Middle: Tennis Ccurts, Basketball Goals 2007.08 Phlllips: Roof replacement - New W Ing/Auditorium CHHS: C.A Bld. replace electric heat CHHS: Cultural Arts Building-Lobby, Restroom Imp Seawall: Repair/Pave Driveways and Lots CHHS: Field Imp., Bleachers, Gym Flr, Field Lights Culbreth:Track Resurtace, Bleachers. Gym Flaor 2008-09 Estes Hills: Roof Replacement McDougle Middle: Roof Seals and Repairs Lincoln Center: Warehouse Roof Ephesus; Repair/Pave Ddveway and Lots Phillips/Smith: Gym Acoustical Improvements CHHS: Dance and Weight Room Floor Replacements 2009-10 Glenwood: Root Replacement Primary Building ECHHS: Roof Seals and Repairs CHHS: Replace Light FiMUres Gulbreth: Doors end Hardware ECHHS: Field Improvements ~- e-O5, tt t9<.fv1;Ch HIII / Cd rrbOrb 2010-11 Phillips: Replace Light Fixtures Seaweil: Replace Light Fixtures FP Graham: Replace Light Fixtures Phlliips: Gymnasium Bleachers and Floor McDougle Campus: Repair/Pave Driveways & Lots McDougle Middle: Auditorium Addition 2011-12 Culbreth: Replace Light Fixtures Scroggs: Field Improvements 2012.13 Seaweil: Roof Replacements Ephesus: Replace Light Fixtures Culbreth: Science Lab Renovation/Addltion 2013-14 Field Bathrooms: Culbreth, McDougle, Phillips 2014.15 Smith/CHHS: Flsid Bathroom/Concession John Llnk ;9t9 969 2-7= = i, i a~