Loading...
HomeMy WebLinkAboutAgenda - 03-01-2005-9cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 1, 2005 Action Agenda Item No. q -~, SUBJECT: Conceptual Plan Approval: Solid Waste Operations Center Building DEPARTMENT: Purchasing and Central Services/ Solid Waste Management PUBLIC HEARING: (Y/N) No ATTACHMENT(S): Memorandum Master Plan Site Drawing INFORMATION CONTACT: Pam .!ones (919) 245-2652 Gayle Wilson (919) 968-2885 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To consider endorsement of the proposed building conceptual plan for administrative offices of the Solid Waste Department. BACKGROUND: The University of North Carolina is requiring the Town of Chapel Hill to vacate their current Public Works site on Airport Road at the expiration of the lease on January 1, 2007, thereby necessitating the relocation of the County's Solid Waste Department, which is currently housed in a modular building at the same location,. The new building is to be sited on Eubanks Road Landfill property, pursuant to the Solid Waste Facilities Master Plan as approved by resolution by the Board in October 2001. Plans for a new administrative building have been included in the enterprise fund's capital improvement plan since 1996. The Town of Chapel Hill intends to vacate their current facilities by the lease expiration date.. This includes dismantling of all existing infrastructure, including structures, paving, parking, utilities, etc, and reverting the property back to as near its original condition as practically feasible, The existing Solid Waste Management administration building is located in the center of the Public Works site. Solid Waste currently also piggybacks onto the Chapel Hill Public Works Department's phone and messaging system. The County's Space Needs work group, which includes Commissioners .lacobs and Halkiotis, reviewed the specific needs for this facility during a meeting in early February 2005, The new building is intended to house full time employees, an intern, and the intermittent temporary/volunteer personnel presently located in the existing modular facility. It is also intended to allow the consolidation of all Solid Waste administrative, enforcement, and supervisory personnel in the department, currently housed in two temporary construction trailers and in the parts room of the maintenance building. The construction trailers do not have sanitary facilities and their inhabitants must drive or walk to the crew building for bathroom and other amenities. Details are provided in the accompanying staff memo, and will be reviewed during a brief staff presentation at this March 1 meeting. The Solid Waste Facilities Master Plan of October 2001 contemplates the construction of a recycled material resale facility on property acquired by the County in 2003 on the north side of Eubanks Road, immediately to the west of the current recycling pad. With development of the new construction & demolition landfill there and resulting siting constraints, it may be prudent to review if there are other opportunities in the same general vicinity to locate a resale facility. FINANCIAL IMPACT: There is no direct financial impact associated with the review and endorsement of the solid waste operations center conceptual plan.. The subsequent submission tc the BOCC of the recommendation tc award the architectural contract will explain anticipated costs related to the planning and construction of the new operations center,. RECOMMENDATION(S): The Manager recommends that the Board consider the proposed solid waste operations center conceptual plan, provide any additicnal guidance for staff, and endorse the plan so that staff can proceed to submit a contract for architectural services for the Board's consideration at a subsequent meeting. Memorandum To: John Link, County Manager From: Gayle Wilson, Solid Waste Director Subject: New Solid Waste Operations Center Date: February 7, 2005 In 2001 the Board of County Commissioners approved a Eubanks Road Solid Waste Facilities Master Plan that was recently reviewed with the BOCC at the February 8 work session. Among the various components of the Plan was the placement of a new Solid Waste Operations Center on a 4-acre parcel directly adjacent to and west of the southern portion of the Orange County Landfill. Architect Selection - In November of 2004 staff' interviewed architectural firms to design the proposed facility. Three firms submitted proposals, Staff hopes to be making a recommendation to and receive approval from the BOCC sometime in March 2005 on a design firm. General Location Issues -The proposed operations center was originally recommended to Ue located on Eubanks Road Uecause it has long been assumed that the Eubanks Road Solid Waste Facility will continue as the central base of operations for county provided solid waste services into the foreseeable future. Even though the MSW landfill is scheduled to reach capacity and close in 2010, significant other waste management operations will continue, such as the construction & demolition (C&D) landfill, vegetative waste processing, C&D recycling, FIHW collections, electronics recycling, possibly a transfer station, and perhaps even a recyclable materials processing facility. It seems reasonaUle that the administrative and operations huU for such continuing operations would be located in the Eubanks Road area, While there could be some advantages to integrating this operations center with other county facilities in Hillsborough, these advantages seem to be outweighed Uy the need to actually be located physically near solid waste operations. Fundin - It is anticipated that the design costs will be paid from existing FY 2004/05 budget. Construction costs are proposed to Ue debt financed. All previous capital/financial planning has included this facility. The current working assumption of total project cost is approximately $1,000,000 (including design and permitting), however, in-house site grading and the notion of several hundred square feet of unheated storage space should reduce the cost somewhat. Other opportunities to reduce costs will be pursued throughout the design and construction process, The square foot cost seems to be in-line with other recent projects of a similar nature. Utilities -The property has a suitable pero-site for a septic system and, if not located just within the rural buffer (eastern property line is actually the rural buffer Uoundary), could be relatively easily connected to a nearby sewer line. Public water service is available and will be provided to the property. Conceptual S~ce Requirements -The preliminary conceptual space requirements envision approximately 5,500 sq. ft. of heated space and approximately 1,000 sq. ft. of unheated storage space. ~- Fourteen offices of about t 1X12 in size, with three additional offices slightly larger (12X15, 12X14, 12X15) based on demonstrated need for additional space (e.g. Engineer for storage of plans and drawings, and to accommodate drafting table). The fourteen offices are proposed to house existing administrative and supervisory personnel from the department's three divisions, and includes an office for intern/temporary employee use, an office for future expansion, and offices for two Public Works-Sanitation Division supervisors who are being considered for reorganization transfer to Solid Waste. It is expected that the organizational assessment regarding consolidating all solid waste operations into the Solid Waste Management Department should be completed by early spring 2005 and ready for Manager decision. A reception area of about 18X24 would provide space for storage of one weeks worth of curbside bins, a display area for compost bins/rain barrels, space for a waiting area, employee mailboxes, fax and copy machines, etc. A small meeting room/library of about I2X20 would be provided for smaller meetings (6-8 persons) and a repository of solid waste literature, technical texts, historical and research documents, etc. Space could be also used as workspace for public completion of RRMO license/pennit/certification facility applications, accident review committee meetings, disciplinary and other employee counseling discussions, 3-R Fee appeal hearings, employee applicant interviews, etc. A larger training and education room of at least 30X40-sq. ft. is proposed to conduct numerous multi-purpose training functions and meetings such as: • departrnental employee training and instruction • senior staff meetings • division meetings • contractor, waste hauler, hotel/motel, etc. waste reduction and ordinance related workshops • community informational meetings • SWAB meetings • task Force/work groups The new building envisions both men's and women's bathroom facilities and a kitchenette/break room area, An assumption of unusable hallway space and mechanical closet space has also been made. Stora e Based on existing experience the storage utilization of the new operations center would have about 1,000 sq. ft of unheated storage space and about 400 sq. ft. of heated storage, including a janitorial closet. L^xistine Space Utilization Current office space allocation is: • Modular Building - 1,850 sq. ft. • Temporary construction hailer - 224 sq. ft. • Temporary eonsrtvction trailer #2- .320 sq. ft. • Maintenance Building - 400 sq, ft. • County Sanitation Division - 460 sq. ft. Total L^stimated Current Space = 3,254 sq. ft 5 Current unheated storage space allocation is: • Out Building #1 - 160 sq. ft • Out Building #2 - 320 sq. ft. • Out Building #3 - 140 sq. ft. • Maintenance Building - 600 sq. ft. • County Sanitation Division - 225 sq. ft. Total Estimated Current Storage = 1,445 sq. ft. Public Access The facility would be designed to accommodate the considerable number of citizens that visit our current offices daily to pick up curbside bins, obtain hauler licenses, seeking information of waste reduction and various county programs, submit 3-R Fee appeals, eta If/when the Sanitation Division transfers to Solid Waste landfill permits will be issued from this office. Additionally, the department hopes to offer rain barrels and compost bins for sale that will draw additional citizen riaffia Depardnental employees will also utilize the Operations Center for training and other administrative matters. Green Building (High Performance-Sustainable Building) Concept Historically, the Solid Waste Department has placed strong emphasis on environmentally friendly practices, including the use of recycled products. The proposed facility (and the recommendation of an experienced architectural firnr) presents unique options for the utilization of recycled building products as well as other sustainable design elements such as those included in the High Performance Building Standards for Sustainable Design of Public Facilities (as developed by Triangle .1 Council of Governments). Staff realizes that pursuit of these sustainable design elements must balance long term environmental and financial benefits with up-front cost. Neighborhood Compatibility The So]id Waste Department has previously been made aware of the importance of ensuring that any new Fubanlcs Road waste management facility should be in harmony with Rogers Road Neighborhood community standards of appearance.. Therefore, the department will coordinate design and site development issues with the SWAB (which includes a member from the neighborhood) and will develop a design and construction process that not only allows, but invites input from the neighborhood. Staff has allowed for one additional office for a possible future employee and another to be used by temporary help/interns that could be converted to a separate office in the future. UNC Properiy Lease L^xpiration and Restoration Requirements The property leased by the Town of Chapel Hil] on which the current modular building sets is scheduled to be returned to LTNC by December 31, 2006. The Town currently projects moving into their new facilities in November 2006 and having the site cleared/restored (except the Animal Shelter site) by the Dec..3ldeadline, subject to completion of the new Public Works facilities on schedule and not Finding anything untoward in the cleanup (fuel tank issues, for example). Unlike the Animal Shelter site, the Solid Waste facility is physically integrated with Public Works and cannot reasonable be left free standing/untouched, Miscellaneous Issues • Landfill staff are capable of performing rough grading of the site, saving an as yet undetermined amount of expense. • The building is being planned to accommodate a modest growth in spacial needs by including one extra office space, • The site layout and entranceway would be significantly improved with the acquisition of the adjacent properly, which has previously been available for sale. • Anew, fully integrated phone and messaging system is envisioned to replace the two existing (administrative offices and landfill facilities) systems. The primary phone system is incorporated into the Town of Chapel Hill Public Works system. • L^xisting furniture will be utilized to the extent possible. • Parking for employee's personnel vehicles as well as some county vehicles will be provided. • The building will be wired with high-speed fiber optic cable for computer system.. Capability with the County system. The new Operaions Center will be the hub for all telephones and computer systems that are currently in place and all future expansions to be located at the Eubanks Road facility. This memorandum summarizes the conceptual development plan for the proposed new solid waste operations center. Staff has recently reviewed this plan with Commissioners Halkiotis and Jacobs. Staff awaits BOCC endorsement of the conceptual plan prior to requesting award of the architectural contract. SOLID WASTE FACILITY MASTER PLAN ADOPTED 1 O-D 1 -D 1 SITE LAYOUT i ' _7 EARTH PRODUCTS MANAGEMENT AREA ACCESS ROAD TO C&D\ MAINTENANCE BUILDING\ TEMPORARY RECYCLING PAD DUKE FOREST ~'"~' j ~~tt C&D _,~, t LANDFIL ,~ FUTURE C&D RESALE FACILITY 1 WASTE ~® ®. ENC-IfQEERING, INC. OFFICE AND 'STORAGE COUNTY CONVENIENCE CENTER i LEAC.HATE POND i ~a V P i i i i ~ f i m ~ ~ , i t~qy d j ' ~,}~ /f I~ i. 'i ~ i i~ i R~ " i --- i ~ NEVILLE TRACT i i i i i ~-----~ GaAFF11CYF1E L ~~ LEGEND PAVED ROAA r~ DIRT/GRAVEL ROAD 0 LANDFILL BUFFER STREAM AND BUFFER SEDIMENT BASIN ---- PROPERTY LINE C] STRUCTURE --e---> POWERLINES - - - -- POWERL.INE EASEMENT CO CLOSED LANDFILL COLORED MULCH 1 ' I /METAL & WHITE GOODS TIRE DROP-OFF