HomeMy WebLinkAboutAgenda- 06-05-2018 12-5 - Information Item - NC-54 West Corridor StudyPLANNING & INSPECTIONS DEPARTMENT
Craig N. Benedict, AICP, Director
Administration
(919) 245-2575
(919) 644-3002 (FAX)
www.orangecountync.gov
131 W. Margaret Lane
Suite 201
P. O. Box 8181
Hillsborough, NC 27278
MEMORANDUM
TO: Board of County Commissioners
CC:
FROM:
Craig Benedict, Orange County Planning Director
Nishith Trivedi, Transportation Planner
Tom Altieri, Comprehensive Planning Supervisor
DATE: June 5, 2018
SUBJECT: Information Item – NC-54 West Corridor Study
This memorandum is to update the Board of County Commissioners (BOCC) on the
status of the NC-54 West Corridor Study, which is being completed by the consulting
firm VHB for the Durham – Chapel Hill – Carrboro Metropolitan Planning Organization
(DCHC MPO). The study area spans from Old Fayetteville Road in Carrboro to the I-
85/I-40 interchange in Graham. The final plan will include a comprehensive analysis and
identify feasible improvements along the corridor. The study’s final recommendations
will serve as feasible projects for consideration through future Strategic Prioritization of
Transportation (SPOT) processes.
VHB recently completed its second round of public workshops, which resulted in greater
turnout and participation than the first set conducted in early May. This set of workshops
focused on proposed recommendations including possible alternatives for the entire
corridor. The consultants explored multiple options concentrating on intersection
improvements and a variety of cross sections as potential strategies along the corridor,
see Attachment 1. VHB is scheduled to complete its study in fall 2018.
All public comments received through the process will be considered for the final NC-54
West Corridor Study scheduled for DCHC MPO consideration in fall 2018. Assuming the
study process unfolds as scheduled, Orange County Transportation Planning staff will
present the final NC-54 Corridor West Study for BOCC comment in fall 2018, prior to
the MPO Board’s consideration.
1
NC 54 West Corridor Study
Carrboro to I-85 in Alamance CountyPUBLICWORKSHOPS –ROUND 2
Presented by
VHB May, 2018
Attachment 1
NC 54 Study Overview
Analyze existing & future transportation & land use
conditions along this 20+ mile corridor between Graham &
Carrboro
Review existing plans & proposed projects
Clarify needs & long-term vision for the corridor
–Safety
–Multimodal options
–Community character & environmental preservation
–Economic viability
Identify & evaluate trade-offs:
–Low cost, low impact, easily implemented near-term solutions
–Longer-term infrastructure improvements
–Supportive land uses & development policies
2
NC 54 Study Background
Funded by the City of Graham, NCDOT Division 7, and the
Durham/Chapel Hill/Carrboro Metropolitan Planning
Organization (DCHC MPO), and administered by DCHC MPO.
Other agency participants:
–Alamance County Planning
–Town of Carrboro
–Orange County Planning
–Burlington-Graham Metropolitan Planning Organization (BGMPO)
–Triangle Area Rural Planning Organization (TARPO)
Other agencies & organizations being contacted as needed:
–Public safety
–Public schools
–UNC-CH
–Others?
–NCDOT Transportation Planning Division
–Bicycle & pedestrian planners/advocates
–Transit providers/planners
–Economic development agencies
NC 54 Planning Jurisdictions
3
NC 54 STIP Projects
Project Schedule
Collect &
Analyze Data
Stakeholder
Outreach
Public
Workshop #1
Develop & Test
Alternatives
Finalize Plans
& Priorities
Public
Workshop #2
Final
Presentation
Sep Octt Novv Dec Jan Feb Marr Aprr May Jun Jul Aug Sep
Finalize Plans
& Priorities
Final
Presentation
Mayy JunJ Jul Aug SepS
4
Public Participation
Project Project
Team
Public
Public
Workshop
#1
Public
Workshop
#2
Final
Presentation
Background
Alternatives
Recommendations
Feedback
Concerns
Suggestions
Feedback
Recommendations
Feedback
Final
Presentation
Project Website
http://www.nc54west.com
5
Project Newsletter #2
Community Meetings Round #2
Orange County
–Tues 5/1, 4:30-6:30PM
•RigmorHouse Event Center
•5501 NC Hwy 54, Chapel Hill, NC
East Corridor
–Wed 5/2, 6:30-8:30PM
•Carrboro Century Center
•100 N Greensboro St, Carrboro, NC
West Corridor
–Thurs 5/3, 6:30-8:30PM
•Graham Civic Center
•503 McGee Street, Graham, NC
Alamance County
–Thurs 5/10, 4:30-6:30PM
•Swepsonville Fire Department
•2736 Swepsonville Road, Graham, NC
6
Review study scope & objectives
Explain potential
improvement options
Gather feedback
–Concerns
–Suggestions
–New information
–Questions
Today’s Goals
Workshop Format
Sign in (to receive updates)
Circulate and interact at segment stations of interest:
–Do you think these options would improve how you use NC 54?
–Do the U-turn locations make sense to you/your neighborhood?
–What intersections do you think should have direct access (vs. U-turn)?
–Shared Use Path: North or South side of NC 54?
–Roadway cross sections: curb & gutter or roadside ditch?
–Are your safety concerns addressed?
Provide input: ideas, worries,
new information, questions…
–Write it down
–Tell to staff
7
Existing Conditions
NC 54 West Corridor
Al
a
m
a
n
c
e
C
o
u
n
t
y
Or
a
n
g
e
C
o
u
n
t
y
5050 55 55 4535
8
NC 54 West Corridor Crashes
NC 54 Traffic Volumes
Al
a
m
a
n
c
e
C
o
u
n
t
y
Or
a
n
g
e
C
o
u
n
t
y
Average Annual Daily Traffic (AADT) -2015
Average Annual Daily Traffic (AADT) -2017
+17%+11%+7%
Bicycles Counted
Pedestrians Counted
6,900 16,000
21
,
1
0
0
9
Traffic Levels of Service
Highway Segment Analysis
A-C D E-F LOS*
Al
a
m
a
n
c
e
C
o
u
n
t
y
Or
a
n
g
e
C
o
u
n
t
y
2-lane V/C is typically in 0.5-0.6 range
–Poor LOS is due to high Percent-Time-Spent-Following
–More passing zones? Additional through-lanes?
Bicycle LOS is generally D, with some E east of Dodson Crossroads
–Bicycle LOS is based on comfort & safety, rather than congestion & delay
*Worst case from AM & PM peaks
10
Intersection Analysis
LOS
AM
PM
Count
Bikes
Peds
B
B
2
3
D*
C
0
2
A
A
4
3
SB-F
SB-F
6
0
SB-E
SB-F
11
1
SB-E
SB-D
9
0
B*
A*
24
0
D*
C*
21
48
Al
a
m
a
n
c
e
C
o
u
n
t
y
Or
a
n
g
e
C
o
u
n
t
y
A-C D E-F *Potential queuing problemsLOS^
^Worst case from AM & PM peaks
NC 54 Traffic Volumes
Al
a
m
a
n
c
e
C
o
u
n
t
y
Or
a
n
g
e
C
o
u
n
t
y
+104%+94%+86%
Average Annual Daily Traffic (AADT) -2017
Average Annual Daily Traffic (AADT) –2045
36
,
7
0
0
12,000 27,900
11
Bicycles
Trails & Bike Facilities
12
Land Use / Market Analysis
Land Use Nodes
Economic
•Woody Dr.
•NC 119
•Old Fayetteville Rd.
Heritage/Recreation
•Orange Grove Rd.
•Mt. Willen Rd.
•Mebane Oaks Rd.
•Bethel-Hickory Grove Ch. Rd.
Potential Development Nodes
13
What we have heard so far…
Input from staff, stakeholders, community members and website
Public Engagement –Interactive Map
0
5
10
15
20
25
Bicycle
Bus
Heavy Truck
N/A
Other
Pedestrian
Vehicle
Online map to gather feedback
on project website
Accepting submissions since
November 2017
Comments incorporated into the
analysis
Vehicles represent most of noted
safety issues
More entries for the eastern half of
corridor
Difficulty turning left to/from
NC 54 similar to those at public
meetings
14
Comments received include:
Inadequate pedestrian and
bicycle treatments/facilities
(safety & access suffer)
Difficulty turning left to/from
NC 54 (crashes & delays)
Preserve agriculture,
rural communities, &
natural environments
Reduce intersection
delays & queues
More traffic signals
More passing and turn lanes
Enhance wayfinding
Park & Ride with transit service
Reduce truck traffic
Widen (encourage development?)
Don’t widen (discourage development?)
Better lighting
Potential Solutions
15
Potential Solutions / Improvements
Intersection Configurations (signals, lanes, ped/bike crossings)
–Conventional
–Median U-turn
–Superstreet
–Quadrant
–Roundabout
Cross-section improvements
–# lanes & widths
–Median type & width
–Shoulder width
–On/off-street bicycle facilities
–Sidewalks, shared paths, sidepaths
Priorities to be Addressed
Safety, especially for bicyclists & pedestrians
•Both crossing & along NC 54
Intersection improvements (short-range)
Ultimate cross-sections (long-range)
Transit and other options
Supportive land uses & policies
Environmental protection & mitigation
Implementation phasing
16
Preliminary Assumptions
55-mph speeds, dropping to 45-mph in places
1.5% average annual traffic growth
No dramatic land use changes
Primarily Shared-Use Path (SUP) east of Long Dairy
Road, shown on north side
Primarily sidewalks (both sides) west of NC 119
Cross-Sections
17
12’12’12’12’10’-12’23’
55’ min (assumed 60’)85’ min (assume 90’)
Assume 150’ Right-of Way
ROW ROW
9.5’ min
Not to scale
6’
8’
paved
shoulder
6’
8’
paved
unpaved
10’ to 17.5’ possible
in limited situations
18
2’2’12’12’14’14’10’-12’23’
55’ min (assumed 60’)65’ min (assume 70’)
Assume 130’ Right-of Way
ROW ROW
9.5’ min
Not to scale
10’ to 17.5’ possible
in limited situations
What about 5 lanes with center turn lane?
NCDOT policy not to build TWLTL due to safety concerns
•Especially for Primary/NC Routes
•Especially in higher-speed rural settings
Per NCDOT crash reduction studies, converting from TWLTL to
median
•Reduces fatal crashes 47%
•Reduces head on collisions 47%
•Reduces sideswipe collisions 21%
2004 NCSU Study confirms raised medians are safer than
TWLTL regardless of traffic volume or driveway density
19
5-Lane w/ Center Turn Lane
4-Lane w/ Median
2-Lane Undivided
AASHTO Highway Safety Manual (2010)
AASHTO Highway Safety Manual (2010)
20
Cross-Section1 Capacity Crashes Ped/Bike3 ROWRunoff
2-Lane
(Existing) ---=+4
3-Lane2
(Imbalanced 2/1)+--=-
3-Lane2
(Imbalanced 2/1 + median)+-+--
4-Lane
(Raised median with curb & gutter)+++--
4-Lane
(Raised median with ditches)+++--
4-Lane
(Depressed median with ditches)+++--
2 In limited locations
4 Without upgrade to Best Management Practices
1 3-Lane & 5-Lane with 2-Way Left-Turn Lanes not considered due to safety concerns and NCDOT design preferences.
2-Lane divided determined to be inappropriate.
3 Assumes Shared-Use Path constructed; focus is on crossing issues.
Unconventional
Intersections
21
Superstreet
Median U-Turn
Superstreet
Median U-Turn
22
Unsignalized
Median U-Turn
U-Turn Bulbs
U-Turn
Bulbouts
23
Quadrant
Quadrant
24
25
NC 119 / E Main StTraffic Crashes PedBikeROW
Conventional +-++-
Superstreet +----
Median U-Turn ++++-
Quadrant ++++-
Roundabout ?????
?–Potential back-up problems with school and plant traffic
? -May not be feasible due to physical constraints. >2 lanes required
Old Fayetteville StTraffic Crashes PedBikeROW
Conventional +-++-
Superstreet +----
Median U-Turn ++++-
Quadrant ++++-
Roundabout ?????
26
IntersectionsTraffic Crashes PedBikeROW
Signalized +-++-
Roundabout ++++-
Unsignalized ----=
Left-Over U-Turn ++--=
Right-Turn Only U-Turn ++--=
Corridor Options
27
28
29
30
Main Findings
4 lanes will be needed throughout the corridor
Access management will be critical, especially along
existing 5-lane section
Phasing is feasible (ends middle)
Most likely 23-foot raised grassed median with
ditches east of NC 119
•Potentially narrower median in limited locations
•Curb-&-gutter appropriate in some locations
Next Steps
31
Other Meetings
Community Workshop Round #2
–Rigmor House –Tues 5/1
–Carrboro Century Center –Wed 5/2
–Graham Civic Center –Thurs 5/3
–Swepsonville Fire Department –Thurs 5/10
Refine Plan
Ultimate cross-sections & extents
Near-term & long-range
intersection improvements
Access management/median cuts
Pedestrian & bicycle treatments
Supportive land use policies
Environmental mitigation
Transit considerations
•Park-&-Ride
•Stop & service guidance
Prioritization & phasing
•Intermediate conditions
•Transitions
Documentation & presentation
32
Public Participation
Project Project
Team
Public
Public
Workshop
#1
Public
Workshop
#2
Final
Presentation
Background
Alternatives
Recommendations
Feedback
Concerns
Suggestions
Feedback
groundBackg
Alternatives
Feedback
Concerns
Suggestions
Public
Workshop
#1
Public
Workshop
#2
Project Schedule
Collect &
Analyze Data
Stakeholder
Outreach
Public
Workshop #1
Develop & Test
Alternatives
Finalize Plans
& Priorities
Public
Workshop #2
Final
Presentation
SepOctNovDecJan FebMarApr Mayy Jun Jul Aug Sep
Collect &
Analyze Data
Stakeholder
Outreach
Public
Workshop #1
Develop & Test
Alternatives
Public
Workshop #2
Sep OctOt NovNv DecD JanJ Feb MarMr AprAr MM
33
Thank you!
34