Loading...
HomeMy WebLinkAboutAgenda - 06-05-2018 7-b - Millhouse Road Park Affordable Housing Options Feasibility Update ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 5, 2018 Action Agenda Item No. 7-b SUBJECT: Millhouse Road Park Affordable Housing Options Feasibility Update DEPARTMENT: County Manager’s Office; Asset Management Services (“AMS”); Department of Environment, Agriculture, Parks & Recreation (“DEAPR”); Environmental Health; Housing and Community Development; Planning & Inspections ATTACHMENT(S): 1 – Aerial Site Illustration & Fact Sheet 2 – Civil Consultants Feasibility Summary 3 – Conceptual Land Plans 4 – Infrastructure Limiting Factor Comparison INFORMATION CONTACT: Michael Fiocco, Civil Consultants, 919- 490-1645 Craig Benedict, 919-245-2592 Sherrill Hampton, 919-245-2490 Travis Myren, 919-245-2308 David Stancil, 919-245-2522 Jeff Thompson, 919-245-2658 Phil Vilaro, 919-245-2362 PURPOSE: To: 1) Receive a progress report on the 78 acre Millhouse Road Park site feasibility analysis for a potential affordable housing development; and 2) Provide feedback to the Manager and staff on the analysis and potential next steps. BACKGROUND: At its January 23, 2018 meeting, the Board of Orange County Commissioners requested information regarding the feasibility for the development of affordable housing options on two County owned parcels totaling approximately 78 acres known as the Millhouse Road Park site (note Attachment 1-“Aerial Site Illustration & Fact Sheet”). A staff collaboration has been working on this analysis over the last several weeks, studying the parcels as a potential site for up to a 34 unit manufactured home park, given the growing community challenge with the availability of safe, affordable housing units due to mobile home park redevelopment. For the purpose of this analysis, either permanent or temporary housing units may be considered. The same site feasibility parameters would apply to either temporary or permanent housing units. The potential use of this site for housing would be in addition to the site’s potential use as a soccer park in partnership with the Town of Chapel Hill according to the 2014 Orange County 1 Parks and Recreation Master Plan. The property was acquired in 2004 and 2007 with 2001 Orange County Parks and Open Space bond funds. Staff and Civil Consultants, the Site-Civil Engineering Firm engaged to assist in the feasibility analysis, has examined the physical, land record, land-use, operational, and financial characteristics that would support the dual use. Representatives from Civil Consultants will present summary findings (note Attachment 2 – “Civil Consultants Feasibility Summary”) of the feasibility study to the Board. All primary feasibility reports and analysis can be found at: http://www.orangecountync.gov/Millhouse%20Road%20Park%20Housing%20Options%20Feasi bility%20Information.pdf Transportation Infrastructure, Circulation, and Land Records Assessment. Adequate on- site traffic circulation and off-site transportation infrastructure considerations appear feasible and reasonable for a potential housing development. Land records assessments yielded no findings that would inhibit the proposed development. Environmental Considerations. An extensive set of environmental criteria have been considered in this initial feasibility analysis, and would also apply to any design and operation of a potential development. Initial environmental and cultural/archaeological assessments yielded findings that would not inhibit the proposed development. Soils, Hydrology, Public Water Supply Well, Wastewater, and Storm Water Considerations. The most limiting set of factors emerging from this study involve soils, on-site public well and wastewater capacity and wetlands. The available quantity and quality of on-site soils for sanitary septic compatibility, in addition to the wells and wetlands pose significant challenges to the development of a manufactured home park on this site. Based on a preliminary site evaluation by a licensed soil scientist, there is insufficient area of usable soils for a subsurface wastewater treatment and disposal system of adequate capacity to support the contemplated development. An on-site septic system, if possible, would include a containment lagoon for either a surface drip or surface irrigation system. Delineation of jurisdictional and isolated wetlands onsite introduces considerable site planning challenges and preliminary site grading analysis requires some soil import for site balancing. Although constructing (multiple) public water supply wells is theoretically possible on the site, County environmental health representatives opine that obtaining the flow volume required for the contemplated development (minimum of 7,000 gallons per day for a 28 lot manufactured home park alone) is questionable. The only definitive method for measuring water flow volume is to dig test wells at a cost of approximately $45,000. Moreover, the North Carolina Public Water Supply Section, as well as the Orange County Environmental Health Services Division, must permit public water supply wells. The close availability of Orange Water & Sewer Authority (OWASA) public water (within an estimated 500 feet) may be a negative factor in obtaining the required state permit(s). Alternative Wastewater Treatment Options. Because of the lack of adequate subsurface soil to support a sanitary septic system, pre-treatment surface drip or spray irrigation system with a containment lagoon or a state-approved innovative package sewer system could be considered for this site. Stream discharge, which is required for the innovative package sewer type system, is physically possible, but requires an exhaustive permitting process by the North Carolina 2 Division of Water Resources (“NCDWR”). The proximity of existing sanitary sewer mains (within an estimated 1,200 feet) at the Town of Chapel Hill Town Operations Center would likely be a strong contributing factor against NCDWR issuing a National Pollutant Discharge Elimination System (NPDES) discharge permit for a free-standing innovative package treatment facility on this site. Significant ongoing operation, maintenance, and reporting are required for this type of treatment facility, should such a permit be obtained. Conceptual Land Planning. Attachment 3, ”Conceptual Land Plans”, illustrates two “bubble plan” options for the layout of the site. These illustrations depict areas that would support approximately 28 mobile home park lots, a soccer park area generally contemplated by the Orange County-Town of Chapel Hill partnership, and required development features supporting these uses. Note that the delineated wetlands in plan option 3b would reduce the acreage available for soccer use by approximately 30%. Availability of OWASA Water and Sewer Service. Adequate water and sewer capacity is located on the adjacent parcel east of the County parcel assembly; however, current land use and utility extension policies prohibit the extension of these facilities. Land Use Considerations; Orange County Unified Development Ordinance (“UDO”); Joint Planning Area Assessment. The parcels are located within the Rural Buffer as designated in the Joint Planning Land Use Plan and on the County’s Future Land Use Map and Zoning Atlas. Site-built residential uses in the Rural Buffer must adhere to a minimum lot size of 2 acres per unit. Housing units may be clustered while still adhering to a 2-acre per unit density requirement which would yield up to 34 housing units on the site. Development of a home park will require a rezoning to the Home Park – Conditional Zoning (“HP-CZ”) district and the standards for home parks in section 5.5.4 of the Unified Development Ordinance (“UDO”) will have to be met. The Joint Planning Land Use Plan designates the area in which the parcels are located as the “Joint Courtesy Review Area” which means that the Towns of Chapel Hill and Carrboro must be provided the opportunity to review and comment upon development proposals. Final approval authority rests solely with Orange County. On-site Public Well Water Supply and Wastewater Treatment Limiting Factor Comparison. Note Attachment 4, “Infrastructure Limiting Factor Comparison”. This summary provides a comparative view of the feasibility of the Millhouse Road Park site across four constraining factors for the development of a manufactured home park on this site: 1) community public well water supply; 2) subsurface septic installation; 3) innovative sewer treatment package installation with discharge; and 4) extending OWASA water and sewer services. The comparative illustration also provides estimated timelines for entitlement and construction as well as associated costs. FINANCIAL IMPACT: The feasibility analysis cost to date is $25,700. Conceptual cost estimates for site planning options are illustrated in Attachment 4, with estimated design and construction costs for the home park use within both land planning configurations as well as within both the well/package sewer scenario and OWASA services scenario. Repayment to the Lands Legacy Program for lands repurposed for housing use, based on the original purchase price from Parks Bond funds, would be $18,500 per acre. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: 3 • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONIOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. RECOMMENDATION(S): The Manager recommends the Board: 1) Receive a progress report on the 78 acre Millhouse Road Park site feasibility analysis for a potential affordable housing development; and 2) Provide feedback to the Manager and staff on the analysis and potential next steps. 4 MANORDR MIL L H O U S E R D BRUIN TRL 9871519160 9871607301 OWASA Long-Term Interest Area OWASA Primary Service Area Aerial Site Illustration & Fact Sheet ¯0 300150 Feet 1 in =400 feet Orange County Planning and Inspection BC 5/17/2018 Streams Millhouse Road Park Parcels 2' Contours (NCDOT) Parcels WASMPBA Gravity Sewer Lines Water Lines PIN: 9871519160 PIN: 9871607301 Zoning Jurisdiction Orange County Orange County Zoning Rural Buffer Rural Buffer Future Land Use Rural Buffer Rural Buffer WASMPBA OWASA Long-term Interest AreaOWASA Long-term Interest Area Water Supply Watershed Jordan Lake UnprotectedJordan Lake Unprotected Land Acquisition 12/30/2004 3/12/2007 Size 68.3 acres 9.92 acres 5 1 O • civ i ! consultants LAND DEVELOPMENT CONSULTANTS Property Evaluation Millhouse road Property Chapel Hill, NC May 18, 2018 Project No. 25010 Prepared For: 6-18 Orange County PO Box 8181 Hillsborough, NC 27278 LAND PLANNERS ♦ CIVIL ENGINEERS Property Evaluation Millhouse Road Property Chapel Rill, NC Purpose 7 This report will present summary findings regarding the feasibility of developing two parcels located along the west side of Millhouse Road just west of the railroad crossing at the Town of Chapel Hill Public Works headquarters for a 34 unit rapid re- housing development in the form of a mobile home park use in addition to its original intended use as a soccer park in partnership with the Town of Chapel Hill. The subject parcels are identified as PINs 9871519160, and 9871607301, constituting a total land area of approximately 78 acres. The specific facilities proposed for the subject property include a maximum of 34 mobile home sites on individual lots and associated roadways, recreation, refuse and recycling, and mail facilities and a six field soccer complex with associated parking, concession stand with bathrooms and possible passive recreational facilities. Assumptions and Oualifications This analysis and resulting opinions are based on current Orange County zoning designations and long -range planning documents, applicable land development regulations and policies, typical interpretations relating thereto, mapping and other information provided by others, other available public information, and our substantial experience with other land development projects. The determinations and opinions herein assume that current regulatory conditions will not change in a manner that will adversely affect development of the subject property. Site Physical Conditions The subject property lies along the west side of Millhouse Road just west of the railroad crossing at the Town of Chapel Hill Public Works headquarters. The property has approximately 750 feet of frontage on Millhouse Road. The property presently houses the Parks Operation Center and former temporary refuse and recycling collection center which occupy the areas immediately adjacent to Millhouse Road. The remaining majority of the property is currently in a grassed or brush - covered condition closest to these facilities and wooded beyond moving to the west. A small stream runs north to south along the southern and western portions of the property. There is a pond just off the property along the northern boundary and there is a low area, also 2 offsite, in the south east corner of the site where stormwater is slowed by the drainage pattern of the railroad. The property includes two gently sloping knolls in the front of the property that form several "saddles" which break the drainage patterns to flow to the north, south and east. Steeper slopes are found to the west of the property and generally drain south to the aforementioned stream. No steep slope areas exist on the site. There is an existing access easement and gravel drive running east to west that bisects the 68 acre parcel along the northern boundary of the 10 acre parcel for the purposes of accessing the off -site cell tower facility west of the property from Millhouse Road. There is another access easement and driveway along the north side of the property that provides access from Millhouse Road to the Green Beagle Lodge. Parcel Summary Data The following table summarizes selected information relative to various land development parameters for the subject parcels: Street Address: 6823 Millhouse Road Total Acreage: 78.22 acres Current Land Use: Parks Operation Center ZoninE Jurisdiction: Orange Count Current Zoning: Rural Buffer -Zoning Overlays-._ Jordan Lake Unprotected Future Land Use Designation: Rural Buffer Municipal Services: Outside Urban Services Bounda Environmental Areas: Stream buffer, possible wetlands 100 -Year Flood Plain: None River Basin: Cape Fear (Jordan Lake) Street Authority — Millhouse Road: NCDOT Zonin$ and Development Review The subject parcels are regulated under the planning jurisdiction of Orange County and subject to the Joint Planning Land Use Plan; an agreement between Orange County, Chapel Hill and Carrboro. The Plan designates the area in which the parcels are located as the "Joint Courtesy Review Area" which means the Towns of Chapel Hill and Carrboro must be provided the opportunity to review and comment upon development proposals with final approval authority resting solely with Orange County. Given the density limitation of a minimum two acre lot size per dwelling unit associated with the Rural Buffer zoning designation, a zoning change to Home Park — Conditional Zoning (HP -CZ) is envisioned. While the concept of clustering lots with a minimum size of one acre 3 0 is afforded in other zoning districts, the HP -CZ zoning district provides the unique provision for clustering lots that are less than the one acre size. Lot sizes in this district may be reduced to 5,000 SF and thereby able to be serviced with far greater infrastructure efficiency. In addition to zoning entitlement, detailed plans for development of site infrastructure will require review and approval under typical County and NCDOT procedures and requirements. As noted in the Water and Sewer sections below, possible infrastructure extensions crossing the railroad will also require review and approval by the railroad. Water Service Given the estimated potable water demands associated with the project program, County environmental health representatives believe it is unlikely on site wells will be able to fulfill the demand. To determine the actual capacity and potential for on -site wells which meet the public water supply standards to serve the project requires the wells be drilled. Typical cost of a test well is in the range of $15,000.00 per well and is beyond the budget for this feasibility study. An alternative to on -site potable water supply is the extension of public water mains from OWASA's water system currently proximate to the site and presently serving the Town of Chapel Hill's Public Works facility across the railroad and Millhouse Road. Sanitary Sewer Service On site soils analysis was performed by S&EC. Their findings indicate that on -site soils are not suitable for conventional subsurface septic systems and some areas are generally usable for and have potential for drip and /or pre - treatment low pressure pipe septic systems. Those soils however are present in the areas most conducive to construction of the soccer fields which would displace and render the soils unsuitable. Other soils located in the western portion of the site in steeper areas provide limited soil depths and have potential for pretreatment surface drip and /or pre- treatment low pressure spray irrigation systems. Additional soils characteristics analysis is required to determine the soil's suitability for the estimated flows from the project. Preliminary estimates of flow and these preliminary findings indicate a low probability of adequate treatment capacity. If however the systems mentioned above are practicable they are likely to require a 90 day storage capacity ( -1 million gallons) which is most cost effectively accommodated with a lagoon. Alternatives to on -site septic treatment include on -site and off -site options. On -site options include several innovative systems (package plants) that have been developed and accepted for use within North Carolina that treat effluent to a re -use standard that can be discharged to the on -site stream. El 10 Offsite options include public sewer extension from OWASA's sewer system currently proximate to the site and presently serving the Town of Chapel Hill's Public Works facility across the railroad and Millhouse Road. Both of these options for sewer service, and the option mentioned above regarding water service, require additional research and include extensive permitting considerations and potential County policy modifications to serve this property /project located in the Rural Buffer. Driveway Access and Roadway Improvements The NC Department of Transportation will control vehicular access to the subject property from Millhouse Road. NCDOT will require a Transportation Impact Analysis to be prepared for development of the project. Meetings with the NCDOT have indicated that driveway access for the intended uses is feasible and that roadway improvements to Millhouse Road are expected in order to serve the soccer complex. Scheme A includes a roundabout as a means to manage the traffic volumes associated with the soccer facilities but other more traditional means may be acceptable such as left and right turn lanes. This proposed driveway alignment utilizes (shares) and preserves the existing access easement to an off site cell tower and provides a single driveway access to the property. Scheme B proposes to separate the driveway access to the different facilities. One is proposed in the current driveway location of the existing Parks Operation Center to serve the soccer complex and the other proposes to utilize, and share, the driveway currently serving the Green Beagle Lodge in order to serve the residential area. This proposed driveway alignments includes relocation of the access easement serving the off -site cell tower. Environmental Considerations The existing stream on the property has been reviewed by S &EC and the County and has been determined to be a buffered stream. Initial slopes analysis indicate the buffer width is likely to extend 65' on each side of the stream. S &EC also identified three other features that have also been reviewed by the USACE and determined to be wetlands. One feature is along the south side of the pond mentioned to be offsite along the northern boundary. This wetland is jurisdictional, meaning under the jurisdiction of the USAGE, and includes an Orange County buffer. Another jurisdictional wetland was identified in the south -east corner previously described as a low area along the railroad. This wetland is also jurisdictional and a buffered feature. The third wetland on site is located along the "saddle" previously described and it occupies the area at the apex of the saddle where the slopes are very slight. This wetland has been determined by the USACE to be an isolated wetland and therefore not a jurisdictional feature. Given the State's jurisdiction on isolated wetlands that are determined to be basins or bogs, S &EC has revisited the site and demarked an area approximately 17,000 SF in area as a qualifying basin or bog. A site visit by NCDWR is required to confirm or modify S &EC's findings for an official jurisdictional determination. It is anticipated this site visit is likely to occur in June. 5 11 The area of the jurisdictional feature is important in that below certain thresholds, general permit authorization is granted for impacting such features. Less than a % acre impact to a basin or bog is covered under such a permit and would thereby be eligible for removal. Change County buffer regulations also apply to these features and may be the ultimate standard to determine eligibility for impact. This feature poses a significant consideration for the development potential of the site locating six soccer fields in the areas of the site most conducive to the grading demands of such facilities. Scheme A proposes (assumes) eligibility for and removal of the feature whereas Scheme B avoids removal of the feature but requires minor impacts to the associated County buffers. Conclusions Based upon our research of various matters relating to property development, the summary findings described above, conceptual design work performed to date, and coordination with various regulatory agencies having jurisdiction, we believe the site has a high potential to accommodate the project program with the resolution of some key components including the resolution of the jurisdictional status of the isolated wetlands, the County's buffer standards on non - jurisdictional features, and most importantly the provision of adequate water and sewer infrastructure. End Co, Attachment 3 O PARKING ----- - - - --� I I EL 1 .TTTRTSDTCTIONAL _ D II II II \I \ ASSIVE PARK ; \ \I o ■ II w jl x ■ a 12 x a Q WG a � 0 x a — a E%ISTNG ACCESS EASEMENT ` 1 ■ I alla` ��7/7 � ■ I r- - - - I I w �� ■ rD RESIDENTIAL AREAT (� o i eo i . II U ----- - - - --� I I EL 1 .TTTRTSDTCTIONAL _ D II II II \I \ ASSIVE PARK ; \ \I o ■ II w jl x ■ a 12 x a Q WG a � 0 x a — a E%ISTNG ACCESS EASEMENT ` 1 ■ I alla` ��7/7 � ■ I r- - - - I I w �� ■ rD RESIDENTIAL AREAT (� o 5 _rn � "g S U� n 3 C! �E 1� z o - x z wF W W xV) �cr W d 0 SHEET NO Exh eo o a E- . II U � ■ i � F II I I ` _ _ _ wil 11 li J� Kno eCallbefore you dig. 1 1 � IwceIL 1�BNF632J819i PRELIMINARY DO NOT USE FOR CONSTRUCTION 5 _rn � "g S U� n 3 C! �E 1� z o - x z wF W W xV) �cr W d 0 SHEET NO Exh �\ E - - - - - - - - - -- I I DEXISTING 0�� 1 RISDICTIOn -NAL WETLAND \ `j – ' _ _ — ��� ♦♦ I I� I � 1 / �jj„ I �;I I II /I II II 11 AA PARKING ` POSSIBLE BASIN �� OR BOG ♦ \\ ♦ O � II a d 13 U� n 3 C! �E 14� C i d o i SOCCER ; q p R 3 � �� P. I (Y. W � p - - - - - - - - - -- I I DEXISTING 0�� 1 RISDICTIOn -NAL WETLAND \ `j – ' _ _ — ��� ♦♦ I I� I � 1 / �jj„ I �;I I II /I II II 11 AA PARKING ` POSSIBLE BASIN �� OR BOG ♦ \\ ♦ O � II a d 13 U� n 3 C! �E 14� C d o SOCCER ; q p R 3 � �� P. I (Y. W � p zz z z o ° w F w x- xUD FIELD AREA � W z �� II SOCCER ; p FIELD AREA �� II •� II I I I E. � .. .. .. ■i ... .. r.. .. .. II II III ! o ------------ ------------- - - - - -- _� II li i II I]I VA J � � l� Knowwharsbelow. 0011 before you dig. lo.me �.eoo-s3zASasi GTH1,C ScaLE PRELIMINARY DO NOT USE FOR SHEET NO E X h j p m CONSTRUCTION Housing Unit Development Cost Comparison: 14 Lot Development — $2.046M — $1.838M -Plan B has significantly less - Earthwork grading for the buildable lots due to - Roadway its linear design and its relationship -Site Infrastructure to the existing topography - Stormwater -Storm water design within Plan B -Home Placement is much less invasive regarding - Permitting /Design grading and site disturbance -10% Contingency Well /Package Sewer —$820K —$820K Total -Well /Package Sewer — 2.866M — $2.658M Per Lot Cost (28 lots) —$102K per lot —$95K per lot OWASA Services - Water /Sewer Extensions —$443K —$453K - Railroad Crossing Total — OWASA Services — $2.489M $2.291 M Per Lot Cost (28 lots) —$89K —$82K Utility Infrastructure Key Factors Comparison: Challenges Costs Entitlement /Permit Process Duration Site Plan and Operational Impacts - Required flows unlikely; - Proximity to OWASA services --$45K test well; - -$120K design /construct -2 months for test well; -r4 -8 months for testing, permitting; -well location impact on site plan; - ongoing operations costs - Inadequate soils; -May need on -site pre- treatment lagoon; - Proximity to OWASA services from a permitting standpoint Physical Unknown No Feasibility - Extensive permitting; - Proximity to OWASA services from a permitting standpoint -$700K design /construct; - $40 -50K ann. operating cost -8 -14 months; -6 months for re- zoning after design - extensive ongoing service and reporting Yes - Necessary WASMPBA amendments; - requirement of five governmental entity approval -r$280K design /construct -12 -15 months WASMPBA; -9 -12 months permitting Yes