MINUTES 1 ORANGE UNIFIED TRANSPORTATION BOARD REGULAR MEETING 2 AUGUST 27, 2008 3
4 MEMBERS PRESENT: Sam Lasris, Cedar Grove Township; Nancy Cole Baker, Pedestrian Access Advocate; Jan 5
Grossman, Bicycle Transportation Advocate; Julian (Randy) Marshall, Bingham Township; Bryn Smith, CFE 6
Representative; Paul Guthrie, Chapel Hill Township; Karen Barrows, Little River Township 7
8
9 MEMBERS ABSENT: Al Terry, Transportation Services Board Representative; Pascale Mittendorf, Hillsborough 10
Township; Eric Tillman, EDC Representative; Dawn Brezina, Eno Township; Alice Gordon, Board of County 11
Commissioners; 12
13 STAFF PRESENT: Karen Lincoln, Transportation Planner; Tina Love, Administrative Assistant II 14
15 OTHERS PRESENT: Andy Henry, Durham-Chapel Hill-Carrboro Metropolitan Planning Organization; Felix Nwoko, City 16
Of Durham; Pat Strong, Triangle J. COG 17
18 I. Call to order 19
20
II. Consideration of additions to the agenda 21
22 III. Board Comments/Updates 23
24
Information item: Planning Board Meeting September 10, 2008 which will include Transportation Element. Sam Laris 25
asked for member(s) to volunteer to attend to represent OUTBoard. It was decided that Karen would contact 26
Planning Board Chair to see if it would be helpful to have representation of OUTBoard to attend/answer question. 27
Will email members regarding response. 28
29
Sam Laris updated members in regard to Buckhorn Village. Planning Board denied rezoning by a vote of 5-3. 30
31 IV. Approval of Minutes 32
33
The OUTBoard approved the June 18, 2008, minutes by affirmation. 34
The OUTBoard approved the July 16, 2008, minutes by affirmation 35
36 V. Presentation of 2035 DCHC Long Range Transportation Plan (LTRP) Alternatives 37
38
Sam introduced Andy Henry, Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (MPO), who related 39
that the MPO does the long range planning for all of Durham County and about half or more of Orange County 40
including Hillsborough, Carrboro, and Chapel Hill. He gave a PowerPoint presentation on the 2035 long range 41
transportation plan (LRTP) alternatives and explained the next steps, and then asked for feedback.. He explained 42
that in order to spend federally mandated funds, there must be a Metropolitan Planning Organization (MPO) for all 43
areas having a population exceeding 50,000. The LRTP includes a list of highways, transit and other transportation 44
improvements including pedestrian and bicycle that local jurisdictions plan to implement in the future through the year 45
2035 to address transportation needs and deficiencies. The options are based on the future land use endorsed in 46
the land use plans and policies of the local jurisdictions. With help from staff from the local jurisdictions, the MPO 47
Lead Planning Agency (LPA) develops population and employment projections. The LRTP is fiscally constrained, 48
meaning that the plan must cost out the projects and have reasonable explanation of where the revenue will come 49
from to pay for projects. In order to receive State and Federal funding projects must be in the LRTP. He explained 50
that the Transportation Improvement Program (TIP) is the short range program (7 years) that programs projects and 51
identifies funding to build projects. Implement of the LRTP through the TIP starts with planning studies to produce a 52
Approved 9/27/08
2
feasibility analysis and then environmental studies, right-of-way acquisition, engineering plans follow prior to 53
construction. Nothing can be in the TIP without first being in the LRTP. 54
55
He explained the steps taken by the MPO in the LRTP development process: 56
1. Establish the goals and objectives; 57
2. Obtain the base socioeconomic data (population and employment); 58
3. Forecast the socioeconomic data for the horizon year; 59
4. Model traffic for the future year based on location of population and employment to produce the deficiency 60
analysis; 61
5. Develop alternatives (transportation projects) to alleviate future congestion and model; 62
6. Analyze model results (this the current step, public comment on results will be received until early October); and 63
7. Develop the preferred option (projects perceived to provide the best mobility for future traffic). 64
That (the referred option) is the draft plan that will be released in October. There will be a 2-month public review and 65
comment period. 66
67
The plan must be updated every four years to comply with air quality requirements. 68
69
The TAC will approve the draft of the LRTP in December and then it will go through air quality conformity analysis. 70
There is an emissions budget for each county, and the results of the transportation demand model for the regions is 71
run through an emissions model to make sure the plan, if implemented, will meet ambient air quality standards 72
established by the Environmental Protection Act. The entire process must be completed by June 15, 2009 (the air 73
quality conformity analysis, MPO approval it, and approval by the federal oversight agencies). He also mentioned 74
that products of each step are made available for public review/comment, including review/comment by each 75
jurisdiction, which involves review by agencies such as planning boards, elected boards, transportation boards, 76
public workshops, etc. They try to get a lot of feedback on the alternatives analysis. Input from the public comment 77
for the alternatives will be used in developing the preferred option, which will be brought back (to this board) in a 78
couple of months for review/comment. 79
80
Andy explained the five transportation alternatives: Comprehensive Transportation System, Intensive Highway, 81
Fixed Guideway, Bus Intensive Transit, and the Moderate Multi-Modal. The transportation alternatives are paired 82
with different land use scenarios (distribution of population and employment) to see how land use may affect traffic 83
patterns. For example, some of the population and employment was redistributed from some TAZs to TAZs 84
containing future transit stations to see how it might help the fixed guideway alternative. 85
86
Questions asked included: 87
88
Paul asked about the funding for a road to the new airport, being considered by the University of North Carolina at 89
Chapel Hill as this may have a major impact on transportation routes. When does it fit in the process when it is not 90
included in the original plan? In other words, what is the process when there is a new major actor that comes on the 91
scene? 92
93
Andy answered that it would go through the development process and at that time the plan would include 94
improvement to existing roads or the possible need of new roads. Also, since it would not be a federal or state road 95
it could still be built. In the example of the Streets at Southpoint, it came about pretty quickly and no real problems 96
occurred with getting access. Bryn pointed out that it was paid for by private funding. When a lot of subdivisions are 97
constructed they also build the roads and then the municipality or state takes over the roads. 98
99
Paul asked if the proposed sets of projects were staff developed and the answer was yes. 100
101
Jan asked if moderate multi-modal is always going to be the preferred option. That none of the other extremes would 102
ever be the preferred option. 103
104
Approved 9/27/08
3
Andy answered that it (Moderate Multimodal transportation system) will be closer to the preferred option. Sam also 105
noted that land use and funding will also be a factor. Andy noted that if one of the nodes really helped then the MPO 106
might go with that option and it would be the job of the MPO to convince the appropriate jurisdiction(s) to change the 107
land use. The base line land use option is based on the current land use policy and the other four land use scenarios 108
are different. 109
110
Sam asked if there is any one performance measure that weights the decision process. 111
112
Andy stated that there are nine performance measures and they never pick just one. It’s the balance of costs and 113
revenue and after that, some of the critical ones are the level of congestion, peak transit ridership, vehicle miles 114
traveled. 115
116
Paul asked about coordination of transit service between other planning districts. Does the process pull in data from 117
other counties? 118
119
Andy answered that the model includes data from outside the MPO planning boundaries. It would be up to the 120
transit provider(s) to determine whether or not to develop the service. There is no transit authority or system in 121
Chatham County. There is talk about additional park and ride service. He would have to look in detail at the transit 122
projects. They do work with Chatham County and surrounding Counties. 123
124
Paul asked about US 15-501 and if they are looking ahead at how it could end up with many stop lights due to 125
expansive growth in Chatham County. 126
127
Andy answered that an example of one the short-term issues of the controls would be the amount of driveways 128
allowed. 129
130
Andy talked about financial plan and the projected revenues and costs of each transportation network. He explained 131
the committed projects and pointed them out on the map. 132
133
Nancy asked about loop projects and if that means a loop around a municipality like a beltwa y? 134
135
Andy answered that the State and Federal funding is based on what they call the equity formula. NCDOT has a 136
formula based on equal share for each area, on population and on the percentage of area miles compared to the 137
number of miles in the state highway network. In addition, in North Carolina has a Highway Trust Fund designated 138
specifically in legislation that assigns funding to a specific list of roads to be upgraded. Loop funds refer to 139
improvements designated in that legislation. 140
141
Sam asked where the funding comes from for the intersection improvements. 142
143
Andy answered that it comes from money allocated by the equity formula, not from loop funding. 144
145
Sam asked when you say 2035, what does it really mean in what time frame? 146
147
Andy answered that is when the work should be completed. 148
149
Sam asked about the western bypass around Hillsborough and the Economic Development around the east of 150
Hillsborough just west of the Durham county line why the map doesn’t show plans for many improvements in those 151
locations. 152
153
Andy answered that it is not in the 2035 plan, Karen interjected that the Hillsborough Western Bypass is in the 2030 154
plan. For the eastern part of Orange County, all alternative transportation systems include express bus on US 70 155
Approved 9/27/08
4
from Hillsborough to I-85 near the Orange/Durham County line. If there is sufficient ridership in the Economic 156
Development District, there will be a bus stop. 157
158
Jan asked about when current big projects would be considered in the process. For example, there is going to be a 159
new solid waste transfer station; so there will be a need for road improvements due to large 18 wheelers, possibly 160
bike lanes, etc. 161
162
Andy stated that it all depends who funds the projects. 163
164
Andy talked about the next steps in the process, they are going to get the public feedback and then develop the 165
preferred option. He will return with that option for the board’s review and comment. Andy explained that comments 166
should be focused on looking at all the details and then deciding where to focus funding for transportation 167
investments: more on transit or roadways? If the decision is to invest more on roadways, should those 168
improvements be for widening, new alignments, or hot spot type improvement? If the decision is to invest more in 169
transit, should there be more local service, express bus service, or do we need fixed quideway here in the triangle? 170
If the feedback received includes a lot of transit, then it will get emphasized in the plan. 171
172
Paul asked about new grids/alignments for new projects, for example, the easiest right of way to obtain is where the 173
major electric lines are, they tend to be straight and direct and owned by one organization. They are leased but what 174
if that system is no longer valid. A lot of railroad systems were done that way. Are there other ways to draw these 175
lines? Most of the high tension lines are probably not leased. They may be easements or not. 176
177
Andy answered that he has never known anyone to look at utility rights-of-way as a possible road right-of-way. There 178
are five rail corridors in the long range plan for preservation. 179
180
Karen Lincoln interjected that new road alignments require more environmental disturbance and the costs for 181
acquiring right-of-way would be greater. 182
183
Sam asked about the bike paths and how those are provisioned, and how costs are determined. 184
185
Andy stated that in the past, costs were calculated by taking into account right of ways, etc., and by assuming 186
construction of bike lanes in the urban areas and wider outside lanes, additional pavement for facilities outside urban 187
areas. 188
189
Nancy noted that there are no off road bicycle facilities near Hillsborough and asked how to remedy that. 190
191
Karen Lincoln informed her that there is nothing in the plan for them. Hillsborough does have Riverwalk, but there is 192
no bicycle plan that includes off road bicycle facilities. 193
194
Nancy asked if they could come up with a plan, would it then go into the (regional long range transportation) plan and 195
was told yes. 196
197
Discussion followed in regard to intersections and interchanges in the plan. Andy informed that the Federal Highway 198
Administration wants a least one mile between interchanges. 199
200
Andy stated that he had already heard from the OUTBoard a lot of concerns and a lot of things that need to be 201
looked into further and he thinks that is a good start on recommendations. 202
203
Discussion about recommendations followed. Karen Lincoln let the members know that part of its recommendations 204
could be to consider how it (the plan) would be funded, i.e. comments on the potential revenue sources. Paul noted 205
that the plan in itself will create development and change and the more you go to high investment projects that will 206
Approved 9/27/08
5
change the development focus. Bike lanes, pedestrian walkways, parking space limits, and land uses were 207
discussed. 208
209
Sam and the board thanked Andy for the presentation and his time. 210
211
VI. Orange County Priority List for the 2011-2017 TIP 212
213
Jan noted that Eubanks road in particular will need to be improved due to the multiple new large facilities located 214
there. It is an artery between NC 86 and Old NC 86. In particular, the intersection at Old NC 86 and Eubanks Road 215
is problematic. There is also a need for a bike lane there. 216
217
Karen Lincoln explained a handout of the ranking methodology for priority projects for the DCHC MPO and revisions 218
to the criteria and scoring. She noted the addition of a category for regional connectivity for bike projects, and called 219
the board’s attention to page 2 of the handout, screening criteria for local priority projects (how well the project meets 220
adopted regional goals, cost effectiveness of the project and if timing is critical for the project). She also noted a 221
handout of “NCDOT General Guidance - TIP Project Priority Rating System” defining key aspects of an ideal 222
transportation system as mobility, accessibility, safety, environmental preservation, multi-modal connectivity, 223
economic vitality, and the preservation of existing systems, and noted that these aspects are some of the goals the 224
OUTBoard proposed in the Transportation Element of the Comprehensive Plan. Something else you might find 225
interesting, this is Orange County priority list from 1994 for the 1996-2002 TIP. The number 1 project was 226
Homestead Rd. improvements, which is still on the current list. The list also provides comments on the I-85 widening 227
project that the County continues to provide. Some of the countywide transportation issues mentioned have just 228
recently been funded such as intersection improvements at NC 54 and Southern Drive and other projects are still 229
currently needed such as intersection improvements at NC 86 and US 70 bypass. The priority list also included a 230
request for a feasibility study for am AMTRAK station in Hillsborough. 231
232
Karen went over attachment s 5 and 6, Orange County’s Priority Lists submitted to the MPO for the 2009-2015 MTIP 233
and to the RPO for the 2009-2015 STIP. She noted that Commissioner Jacobs, at the Board of County 234
Commissioners meeting at which the commissioners approved those lists, had requested several changes to be 235
considered for the next priority list. One change would be to change the description in the request to widen NC 86 236
north of Hillsborough to stop the project at NC 57. She explained that the original request was to widen NC 86 from 237
US 70 Bypass to NC 57, and the description was changed at the MPO level to continue the widening to the 238
Metropolitan Area Boundary. Orange County does not want that road widened beyond NC 57 due to the inability for 239
the road to handle more traffic through the intersection at US 70 and through Hillsborough to get to I-85. Sam stated 240
that he opposed changing the description because the road is the major regional route in the northern Orange 241
County and has a lot of traffic. It should be improved. 242
243
There was discussion on Elizabeth Brady extension and why it isn’t on the list. Karen related that the project is fully 244
funded in the current TIP and has advanced this far because the Town Board has consistently requested it as its 245
number one priority since 1996, when Hillsborough requested it for the 2004-2010 TIP. In 2001 a joint (Hillsborough 246
and Orange County) economic development transportation group developed a consensus that the project was 247
needed and both Orange County and Hillsborough adopted the groups recommendations. Orange County joined 248
Hillsborough to request the project, with many comments regarding its construction, as its number one priority for the 249
2004/2010 TIP. That is the only time Orange County has included it on the TIP. 250
251
The board discussed the western bypass and was informed that it has been in the TIP for many years as an 252
unfunded project and there has not yet been a feasibility study. Jan pointed that this route would use an existing 253
bridge over the Eno but would be on the other side of Hillsborough. Pat Strong noted that on the 2004/2010 TIP that 254
project may have actually been allocated some funding for right of way but that funding has been removed since 255
then. Sam asked if it there was a need to put it on the TIP priority list. The response was that there is nothing to 256
support the project. 257
258
Approved 9/27/08
6
Randy asked about Homestead Road, part of the widening has been done. The description needs to be rewritten to 259
connect previously constructed portions of this. Karen stated that another of Commissioner Jacobs’ request was to 260
revise the description of the Homestead Road project to include the entire road from Old NC 86 to NC 86 (Carrboro 261
has requested a project to take Homestead Rd. all the way over to Old NC 86 that would include bike lanes and 262
sidewalks. 263
264
Jan stated that bicycle lanes are need on Eubanks Road from Old NC 86 to NC 86. The board agreed to add 265
Eubanks Rd. including bike lanes and sidewalk s from Old NC 86 to New 86. Bryn related that a public works 266
employee who rides a bike was almost hit on Eubanks and since there are so many large trucks on that road the 267
need is especially great to provide safe passage for pedestrian and bicyclist. Paul suggested that there should be an 268
off road bicycle trail running parallel to the railroad tracks all the way into town. The board agreed that an off road 269
facility would be optimal. 270
271
Karen asked for feedback regarding Commissioner Jacobs’ request to consider an eastbound entrance to the I-272
85/US 70 connector instead of improvements and realignment of Efland-Cedar Grove Road to Mt. Willing Road to 273
make a more direct connection to I-85. NCDOT has made some improvements to Cedar Grove Road. One of the 274
recommendations from the Efland/Mebane Small Area Plan was either to consider the Efland-Cedar Grove 275
realignment to Mt. Willing Road or to consider creating an access from US 70E to the I-85/US 70 connector. The 276
comment was to consider which of the two projects would be better. Discussion included current conditions and 277
layout of the connector. The board agreed to continue this discussion at the next meeting at which time it will 278
endorse projects to recommend to the BOCC for the priority list. 279
280 VII. Future Agenda Items 281
282
Sam asked about Safe Routes to Schools grant. Karen distributed the official letter of notification from Leza Mundt, 283
NCDOT Safe Routes to School Coordinator. The next step is to request a Community Workshop. 284
285 VIII. Adjournment 286
_________________________________
Sam Lasris, Chair