HomeMy WebLinkAboutOUTBoard minutes 081606
1
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
1
Orange Unified Transportation Board
Meeting Summary
August 16, 2006
Orange County Public Works, Hillsborough, NC
Members Present: Barry Jacobs, BOCC; Nancy Cole Baker; Jan Grossman; Sam
Lasris; Robert Peterson; Sandy Quinn; James Ray; Bryn Smith; Al Terry; Eric Tillman
Staff Present: Karen Lincoln, Transportation Planner; Craig Benedict, Planning
Director; Sherri Ingersoll, Administrative Assistant
Visitors: Pat Strong, Triangle J Council of Governments
I. Call to Order and Roll Call
Karen Lincoln called the meeting to order at approximately 7:20 p.m. She
distributed copies of the Comprehensive Plan Process, a map showing Orange
County 2006-2012 TIP projects and 2007-2013 TIP Priority List projects, the
Development Process and Schedule for the DCHC 2007-2013 Metropolitan
Transportation Improvement Program, the DCHC Public Involvement Policy dated
August 9, 2006.
II. Consideration of Additions to the Agenda
It was unanimously agreed to discuss the Draft Comprehensive Plan Process
following the calendar review.
III. Board Comments
Al Terry discussed the recent news article where he was quoted about a change in
the Chapel Hill-Hillsborough OPT route to exclude certain areas, including the stop
outside of the minimum security prison just south of Hillsborough. This had
previously been a public stop, where prisoners were able to use public transportation
to secure employment or go to school. This had been discussed between OPT and
the prison prior to the route being changed, and it was determined by the prison that
the change would only affect two prisoners, and they would use private
transportation to accommodate that need. It appears that, rather than using their
own van, the prison chose to use a contract service to provide transportation, which
was quite expensive. This choice was not a reflection of OPT service to the prison;
it was the choice made by the prison that was reflected in the article.
Terry mentioned that information regarding General Assembly issues affecting
transportation could be found at www.ncga.state.nc.us
Terry mentioned that the Smart Commute Program started on Monday. Sandy Quinn
noted that she was already enrolled in the program, and that the program was being
widely publicized on TTA. The program does not include Chapel Hill Transit.
2
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
2
Bryn Smith commented that she was able to contact the appropriate Duke persons
responsible for transportation, and was lobbying for a program similar to UNC’s free
ride program for employees, to promote public transportation.
Barry Jacobs said that at a meeting he recently attended, the President of TTA
confirmed that Duke is interested in developing a program for employees.
Jan Grossman questioned the DOT’s desire to add bike lanes on the shoulders
when roads are being repaved. He mentioned that although it is on the bicycle plan,
NC 86 between I-40 and Hillsborough was just repaved without bicycle shoulders,
and now the road is more dangerous for bicyclists, due to the higher edges on the
side of the road. Lincoln said that she spoke with Chuck Edwards at DOT about
this, as comments had been submitted noting the bicycle plan, and DOT did not
have the funding available for extra grading and asphalt. Craig Benedict mentioned
that due to the increase in cost of asphalt, and decrease in funds available, DOT has
had to dramatically cut back on its repaving efforts.
Lincoln mentioned that there was an agenda item for the August 22 BOCC meeting
to formally change the name of this Board, and for the BOCC to approve the Rules
of Procedure.
IV. Approval of Minutes
Lincoln noted some minor revisions she received from Bryn Smith. Eric Tillman
requested an addition on page 4 to Al Terry’s comment to read, “…to the Town as
well, but the Town has rejected the idea to this point.” Terry commented that the
Town has only agreed to the marketing program, but does not have the funds
available to implement the routes. Lincoln commented that the marketing program
needs to be strong to succeed.
Motion by James Ray to approve the minutes as amended. Seconded by Nancy
Cole Baker.
Vote: Unanimous.
V. Approval of Calendar for FY 2006-07
Motion by Robert Peterson to change the December meeting date to Dec. 13.
Seconded by Grossman.
Vote: Unanimous.
VI. Discussion of the Draft Comprehensive Plan Process
Craig Benedict provided a background of the Comprehensive Plan. He said that
following the recent proposed update of the Land Use Element, the BOCC
requested that the Planning Board develop a process to build a consistent and
complete Comprehensive Plan document, which would contain many different
Elements, and to promote input from the public and various Advisory Boards. The
first step is to develop a Data Element to provide consistency among the various
Elements. Baker questioned if parts of the 1981plan had been implemented, and
3
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
3
Benedict stated that the 1981 plan was the basis of the existing land use regulations
and policies that have been implemented through various County ordinances.
Lincoln noted that this Board would be involved in the development of the
Transportation Element.
Sam Lasris reiterated that this is a proposed process designed by the Planning
Board to provide full disclosure and input with other Boards. He said that Sections 3
and 4 of the proposed process are the ‘meat’ of the document, and noted when
other boards will be actively involved. Smith said that this had been discussed in
detail at the recent Commission for the Environment meeting, and comments will be
provided. Benedict suggested that at a future Board meeting, the excerpts of the
1981 plan related to transportation be reviewed. Peterson asked if the goal of
updating the 1981 plan was to see if it had been implemented, and Lasris agreed
that the update would help to identify both the successes of the 1981 plan and areas
that need more work. Grossman asked if the metropolitan areas were included.
Lincoln responded that the Comprehensive Plan covers the County area, and
Benedict added that many areas overlap and the municipalities will have an effect on
the County’s Comprehensive Plan. He said that an inter-governmental coordination
Element has been proposed to incorporate working with other jurisdictions and the
State. Lasris mentioned that the current draft process is lacking a timeframe, which
needs to be established. Benedict encouraged Board members to attend the August
28 BOCC Work Session. Jacobs said that comments would be accepted at any
time, not just at the work session.
VII. Prioritization of OUTBOARD Discussion Topics
Lincoln noted the status assigned to each item reflected the time the board should
initiate discussion in order to make a recommendation within the time allotted for
commenting on that topic.
2007-2013 TIP and MTIP Comments -– Lincoln stated that Orange County
submits two sets of comments on the State Transportation Improvement Program
(STIP) –
1. Comments to the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan
Planning Organization (MPO) Transportation Advisory Committee (TAC)
regarding the Metropolitan TIP (MTIP); and
2. Comments to the Triangle Area Rural Planning Organization (TARPO) TAC
(RTAC) regarding the TIP projects outside the Metropolitan Area Boundary.
NCDOT has delayed the release of the 2007-2013 STIP until early September,
so we do not have it for comment. Orange County’s priority list for inclusion in
the 2007-2013 TIP is included in the agenda materials for comparison with the
draft TIP.
DCHC Long-Range Transportation Plan (LRTP) – Lincoln noted that the
DCHC MPO Public Involvement Policy that she handed out earlier states the
methods the MPO will use to involve the public in transportation decisions. The
4
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
4
TAC has released amendments to the Public Involvement Policy for public
comment. Federal regulations require MPOs to document public involvement for
all transportation programs. In addition to mailings, community group notification,
and advertising, the TAC directed that a standing Citizen Advisory Committee
(CAC) should be formed to comment on transportation programs. The
Transportation Advisory Committee (of the DCHC MPO), at its last meeting,
decided to go with the recommendation of the Technical Coordinating Committee
(staff) and use existing local government citizen transportation advisory groups
for public input instead of creating an additional regional Citizens Advisory
Committee (CAC) that would include 41 members from the MPO member
jurisdictions. Chapel Hill, Carrboro and Orange County all have such citizen
boards and Durham has citizen advisory boards for bicycle and pedestrian issues
and transit issues. Durham could also use its intra-neighborhood councils. The
OUTBoard will serve the MPO in that capacity.
The DCHC MPO (Triangle Ozone Nonattainment Area) must adopt a LRTP for
air quality conformity by June 2009. North Carolina Department of Environment
and Natural Resources Division of Air Quality has decided to submit a
maintenance plan for the State rather than a conformity plan since the State met
the new 8-hour ozone standards in 2005 and appears to be meeting those
standards this year. Attainment of the ozone standards for this year will not be
known until after the end of ozone monitoring period (April through October).
Lasris and Peterson wanted to know what this board’s role would be in
commenting on the LRTP, and what the time schedule is. Lincoln state that
there is complex time line for various tasks. Currently, data is being collected to
update the Regional Transportation Model that is used to project future vehicle
miles traveled that is needed for the air quality model. This Board will review the
base year data and projections for population and employment.
Downtown Hillsborough Parking – Benedict stated that there has been a report
prepared outlining the issues, but that no decisions had been made yet. Tillman
questioned if an OPT shuttle service was assumed, and Benedict responded that
it hasn’t been decided yet, but that OPT will have some role. Jacobs stated that
there are two concerns to be addressed, both short term during the construction
of the justice facilities, and long term. The program will need to include
transportation alternatives for both court patrons and employees, and alternatives
are still being reviewed. Grossman questioned why this Board would be
involved, rather than it being a Hillsborough situation. Lincoln responded that
since the Court facilities are County-owned, and OPT is operated by the County,
it is a consideration. Jacobs mentioned that OPT is not the only consideration,
and that an RFP for other vendors may be done. Tillman requested that the
private sector be contacted, as it may be more economical, and Terry agreed
that there are opportunities for the public and private sectors to work together.
5
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
5
OPT Service Improvements – Continuing discussion of OPT’s role in the
Hillsborough Downtown Parking Study, Lincoln noted that the NCDOT and
Orange County have worked out the STIP scheduling problems for the
Congestion Mitigation and Air Quality (CMAQ) grant-funded project for a park
and ride lot at the Durham Technical Community College Orange Campus and 3-
years operating assistance for a new OPT intra-Hillsborough transit route. Baker
questioned if the projects are prioritized in the STIP, and Lincoln responded that
they are just listed without prioritization. Lincoln said there is a lot of interest in
transit services and that the Board should have a session devoted to discussion
of transit issues. She suggested that the Board’s October meeting may be a
good time for discussion of these issues.
Terry stated that there is a January deadline for this Board to develop a status report
on these priorities for the BOCC retreat, and that specifics are not necessary, but
should identify where the Board is in the process.
The group decided to end discussion of topic priorities because of time constraints
and continue with the remaining business items.
VIII. 2007-2013 TIP and MTIP Comments - Lincoln stated that the TIP is a fiscally
constrained, minimum 4-year investment program that schedules and funds major
transportation projects. The program is updated every two years. Lasris asked for
clarification of the MPO boundary lines, and Smith noted that the lines were based
on census data. Jacobs said that the boundaries for the MPO are flexible, and that
the BOCC would like to keep the RPO projects separate from the MPO, since there
are different competing needs. Lasris questioned the funding for the MPO projects,
and Lincoln said that Lincoln said that funding is by NCDOT districts. Orange
County is in District 7 and does not compete for MTIP funding with Durham County
in Division 5, or Chatham County in Division 8. Baker questioned how the priority
list was developed. Lincoln responded that potential projects came from previous
Priority Project Lists, approved plans and recommendations from transportation
studies that had been approved by the Board of Commissioners. The last priority
list had received input from the Planning Board, the Commission for the
Environment and the Economic Development Commission before being adopted by
the Board of County Commissioners. Benedict added that a difficulty with the MPO
priority list is combining our requests with those of other jurisdictions, as the
competition for funded projects is very tough. Grossman questioned the actual
success of Orange County projects being completed, and Lincoln said that it took
many years, sometimes 10-20 years or longer, to get a project in the TIP and
through the process. Jacobs indicated that, especially with the current lack of
funding, the County needs to look at projects differently, such as requiring turn
lanes with subdivisions to maintain adequate capacity of secondary roads in the
county. Some of these solutions can be implemented at the County/Staff level.
DOT has positively cooperated with this in the past. The County has had good
success in getting projects funded through other NCDOT funding programs.
6
T:\Advisory Boards\Orange Unified Transportation Board\Minutes\2006\OutboardMinutes8-16-06.doc
6
Lincoln added that the MTIP must be consistent with the regional Long-Term
Transportation Plan (LRTP) approved to meet air quality goals of the State
Implementation Plan (SIP).
IX. Draft TARPO 2009-2105 State Transportation Improvement Program (STIP)
Update Process
Pat Strong distributed handouts for a Powerpoint presentation, STIP background
information, and NCDOT General Guidance – TIP project priority rating system, and
the 2007-2013 TARPO TIP project requests dated October 3, 2005.
Strong said that one of the difficulties with the TARPO priority lists is finding common
ground among the four counties involved. Orange County is the only County entirely
in Division 7, which is beneficial.
Items #3-5 of the slide presentation (Project needs evaluation, supplemental project
documentation and preparation of regional needs prioritization lists) are all done
concurrently and involve Orange County staff, Triangle J, the RPO and TAC.
Grossman questioned if there is a preference over determining factors, and Strong
responded that no, the factors are evenly considered, and that in the past, attempts
to rank projects has been problematic. Lincoln indicated that working with our Board
of Transportation representative has proven to be most helpful. Strong said that
since different sources of funds are used, the priorities of the Board of
Transportation can vary, and they base their decisions on safety issues.
Benedict added that there are other funding methods that can be used, and Lincoln
said that information on funding sources will be included at the next meeting.
Lincoln stated that the next meeting will be at the Chapel Hill Library.
She mentioned that one of the Board’s discussion topics is an ongoing identification
of safety concerns in the County. She mentioned that the quarterly meeting with
DOT is coming up on August 29, and that if the Board members have any immediate
concerns, to notify her as soon as possible so that she could get it on the agenda.
Also, she asked that if Board members feel that repair work being done is
inadequate, please let her know of the specific locations.
Grossman questioned if and how the Board could find out more about the projects,
and how projects were funded. Special attention was made to an improvement on
Old NC 86 at Deer Ridge Road. Jacobs said that the County did not request the
improvements, there were safety concerns.
X. Adjournment
Motion by Peterson to adjourn. Seconded by Smith.
Vote: Unanimous.