Loading...
HomeMy WebLinkAboutAgenda - 02-15-2005-5kORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 15, 2005 Action Agenda Item No. ~-~_ SUBJECT: Approval of Permanent Full-Time Parks Conservation Technician Position DEPARTMENT: Recreation and Parks PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Lori N. Taft, Management Director Durham 688-7331 Mebane 336-227-2031 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 PURPOSE: To consider approval of a permanent full time Parks Conservation Technician position in the Recreation and Parks Department, effective March 1, 2005, and authorization of County fianding for the position using monies set-aside in the BOCC approved budget for 2004- 05, BACKGROUND: The Manager's Recommended Budget for 2004-05 included a full time Parks Conservation Technician position in the Recreation and Parks Department effective October 1, 2004, During the BOCC budget work sessions last spring, the Board directed staff to bring back a report on the development of a strategic plan prior to the Board's final decision on the position. As a result, the approved budget reserved funds totaling $23,406 to cover costs of the position effective .)anuary 1, 2005. At the BOCC February 8, 2005 work session the Recreation and Parks Management Director presented a draft strategic plan to the Board, Fallowing presentation of the draft plan, there was consensus from the Board for the position request to be included on the February 15, 2005 regular meeting consent agenda, Needs Addressed Currently, there is one Park Conservation Technician position assigned to general parks (non-Little River), As the number of parks increases, this staffing level is not sufficient to handle the high level of maintenance, conservation and operations that parks require, The following table shows current facilities that require ongoing maintenance and care as well as long deferred special projects: Park/Center Pro'ects Efland-Cheeks Park and Community Correct drainage on walking track Center Install and establish plant materials for stabilization of embankment Run electric service to existing and new picnic shelters Clear dead and dawn limbs, limb up trees, clear undesirable undergrowth and chip behind play area and throughout picnic area. Improve soccer field grade (low area) with gradual top dressing treatment Renovate (replace) infield with contractual assistance Homestead Communit Center Re air Si n Fairview Park Clear and stabilize streams and culverts Stain play structure components Renovate Horseshoe Pits Install parking bumpers Re air and relocate Park Si n Northern Recreation Center and Park Install directional signs Renovate warning track Develop Pottery/Ceramic Studio Clear and chip years of storm debris from existing trails Fill low areas, to dress to level field Central Recreation Center Install and establish plant materials to replace screening Prepare area and facilitate the installation of play apparatus Install curbing and fencing around play area Renovate lantin beds Southern Human Services Center Design and placement of trail signage and kiosk Continue construction and maintenance of trails z The position requested in this abstract would allow the department to address the unmet needs related to the projects outlined in the above table. FINANCIAL IMPACT: Based on a proposed start date of March 1, 2005, funding requirements for fiscal year 2004-05 total $16,547, This amount includes $16,035 for salary and benefits, and $512 in operating and one-time start-up costs, Estimated annual costs of the position for FY 2005-06 is $47,430, which includes $46,505 in salary and benefits, and $925 in operational costs. Funding to cover the costs for the current fiscal year ($16,547) would come from the reserve fund of $23,406 that the Board of Commissioners set aside in the 2004-05 fiscal year budget. The Recreation and Parks Department budget for fiscal year 2005-2006 would include an increase of approximately $47,430 to cover the costs associated with this position. RECOMMENDATION(S): The Manager recommends that the Board: Approve a permanent full time Parks Conservation Technician position in the Recreation and Parks Department, effective March 1, 2005, and • Authorize the release of $16,547 from the budgeted reserve to fund the position effective March 1, 2005.