HomeMy WebLinkAboutAgenda - 05-01-2018 6-b - SPOT 5.0 Update and Recommendations on County Transportation Priorities in TARPOORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 1, 2018
Action Agenda
Item No. 6 -b
1
SUBJECT: SPOT 5.0 Update and Recommendations on County Transportation Priorities in
TARPO
DEPARTMENT: Planning and Inspections
ATTACHMENT(S): INFORMATION CONTACT: (919)
1. Orange County Recommendation for Nishith Trivedi, Transportation Planner
Ranking Projects within TARPO and 245 -2582
Map Tom Altieri, Planner III, 245 -2579
2. Orange County - Preliminary Scores Craig Benedict, Planning Director, 245-
2575
PURPOSE: To receive an update on Strategic Prioritization Office of Transportation (SPOT) 5.0
activities from Orange County Transportation Planning staff and consider the Orange Unified
Transportation Board's (OUTBoard) recommendation for Orange County's priorities within the
Triangle Area Rural Planning Organization ( TARPO).
BACKGROUND:
SPOT 5.0 Update — The North Carolina Department of Transportation ( NCDOT) released its
SPOT 5.0 scores on April 3, 2018. Metropolitan and Rural Planning Organizations (MPO /RPO)
are limited to the number of transportation projects that can be submitted and scored through
the process. Orange County's prioritized transportation projects scored in SPOT 5.0 are now
subject to different MPO /RPO adopted — and NCDOT approved — local input point processes.
Projects receiving local input points will ultimately score higher than those that do not, which
increases likelihood of State funding through the State Transportation Improvement Program
(STIP) FY 2020 -2029. Following are some key aspects of the local input assignment
methodologies from each of the County's applicable transportation planning organizations:
Triangle Area Rural Planning Organization ( TARPO)
• Orange County submitted 6 transportation projects to TARPO of which 3 were scored.
• Its process for assigning local input points incorporates both quantitative data
and briorities from member iurisdictions who must rank their scored aroiects.
• The top two ranked projects scored for each member county (Chatham, Lee, Moore, and
Orange) in TARPO will be given the full 100 local input points.
• Additionally, the 6 next - highest scoring projects within TARPO will also be allocated 100
local input points. These projects will be determined after all counties have submitted
their rankings, which are due to TARPO staff by May 15.
• TARPO staff will conduct a public drop -in session to present the local input assignments
and gather input during late- May /early -June.
No BOCC actions are required at this time for the Durham — Chapel Hill — Carrboro Metropolitan
Planning Organization (DCHC MPO) and Burlington- Graham Metropolitan Planning
Organization (BG MPO). Following is a brief update on their local input point processes for
information.
DCHC MPO
• Orange County submitted 19 transportation projects to DCHC MPO of which 6 were
scored.
• DCHC MPO staff is conducting its quantitative based process and will publish the results
for a 21 -day public review period running from May 14 through June 4.
BG MPO
• Orange County submitted 3 transportation projects to BG MPO, none of which were
scored through SPOT 5.0 due to BG MPO project ranking and selection processing,
which put projects with the highest pre - preliminary scores forward.
• Orange County staff is working with BG MPO staff and staff of other member jurisdictions
to develop a process for SPOT 6.0 that considers more than just pre - preliminary scores
as prerequisite for formal scoring.
Additional specifics on the local input point methodologies of the two MPOs and RPO were
provided as an Information Item to the BOCC at its January 23, 2018 meeting.
OUTBoard Recommendation for Ranking of County Transportation Priorities in TARPO — All
counties within TARPO have been asked to rank their scored transportation projects. At its April
18, 2018 meeting, the OUTBoard recommended the following:
• Orange County Public Transit Purchase of Two Light- Transit Vehicles be ranked as the
County's top project, followed by Old Greensboro Road and Efland -Cedar Grove Road
Modernization and 4' paved shoulder (Attachment 1).
• NC -54 should not be ranked, as it is not identified as a County priority and completion of
the NC 54 Corridor Study remains pending.
• NCDOT should include crosswalks, intersection improvements and bike /pedestrian safety
modifications when doing modernization projects.
• Bridge on Old Greensboro should accommodate pedestrian and vehicular safety.
Transportation Planning Staff Comments — It is clear that Orange County's top two ranked
projects will receive the maximum (100) local input points from TARPO through its methodology.
How many local input points will be allocated to Orange County's third ranked project will not be
known until all member counties submit their prioritized rankings to TARPO staff and they are
scored through its internal methodology for assignment. It is possible that Orange County's
third ranked project may receive less than the maximum amount of local input points.
Additional Background Information on SPOT 5.0 - The preliminary results of Orange County
prioritized transportation projects are presented in Attachment 2. In accordance with State
regulations and in coordination with the NCDOT schedule, MPO /RPO Board approvals of local
input point distribution are scheduled for June, following a 21 -day public review period.
Transportation planning staff will continue to keep the BOCC informed throughout the SPOT 5.0
process.
FINANCIAL IMPACT: There is no immediate financial impact associated with this item.
3
SOCIAL JUSTICE IMPACT: The following Orange Social Justice Goals are applicable to this
agenda item:
• GOAL: ENSURE ECONOMIC SELF - SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
• GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND -USE AND
ENVIRONMENTAL POLICIES
The fair treatment and meaningful involvement of people of all races, cultures, incomes
and educational levels with respect to the development and enforcement of
environmental laws, regulations, policies, and decisions. Fair treatment means that no
group of people should bear a disproportionate share of the negative environmental
consequences resulting from industrial, governmental and commercial operations or
policies.
RECOMMENDATION(S): The Manager recommends the Board consider the OUTBoard
recommendation included in Attachment 1 as the County's ranking for submittal to the TARPO.
Attachment 1
Orange County Recommendations for Ranking Projects within TARPO and Map
N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects
Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool.
1- Modernization projects typically include:
• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety.
• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes.
• Adding turn lanes at multiple intersections along section of roadway.
OUTBoard
Map
Mode
Tier
Description
Total Cost
Submitted By
Ranking
Construction Cost
Right -of -Way Cost
Utilities Cost
Actual Project Cost
Reference
(April 18, 2018)
1
Transit
Division
Orange Public Transit - Purchase two light transit
$ 108,400
TARPO
1
$ 108,400
vehicles.
SR 1005 (Old Greensboro Rd) from SR 1942 (Jones Ferry
2
Highway
Division
Rd) to NC 87 in Alamance County - Modernize' and add
$ 42,500,000
TARPO
2
$ 35,000,000
$ 6,000,000
$ 1,500,000
$ 42,500,000
4- foot paved shoulders.
SR 1004/1357 (Efland -Cedar Grove Road) from SR 1332
3
Highway
Division
(Highland Farm Rd) to NC 86 - Modernization', including
$ 17,500,000
TARPO
3
$ 15,000,000
$ 2,000,000
$ 500,000
$ 17,500,000
turn lanes where appropriate, and addition of 4 -foot
paved shoulders.
NC 54 from SR 1006 (Orange Grove Rd) to SR
A
Highway
Regional
1937/1107 (Old Fayetteville Rd) - Widen to a four -lane
$ 83,000,000
Carryover
N/A
$ 55,500,000
$ 24,500,000
$ 3,000,000
$ 83,000,000
boulevard.
NC 54 from NC 119 to Orange Grove Rd - Widen
8
Highway
Regional
roadway from two -lane undivided to four -lane divided
$ 107,600,000
BGMPO
N/A
$ 79,000,000
$ 25,500,000
$ 3,100,000
$ 107,600,000
roadway.
N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects
Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool.
1- Modernization projects typically include:
• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety.
• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes.
• Adding turn lanes at multiple intersections along section of roadway.
Attac'hmerlt 1
Orange County SPOT 5.0 TARPO Scored Projects
Caswell Co.
I
I
I
Pers n o.
1
I
I
49
�
i
157 i
86
I �
,
i
i
57 i
i86
I
i
I
Mebarl ik
I
_
�?
illsb rough
I
i
70A
�
I
Alamance Co.
70 i
Durham Co.
4
751
I
86
i
,
;
i Durham
t
Lable
Name
I B
l 1
Orange Public Transit, Purchase two lighttransitvehicles.
SR 1005 (Old Greensboro Rd) from SR 1942 (Jones Ferry
54
I A
2
Rd) to NC 87 in Alamance County, Modernize' and add 4
r\
foot paved shoulders.
SR 1004/1357 (Efland ?Cedar Grove Road) from SR 1332
C
(Highland Farm Rd) to NC 86, Modernization', including
1
3
turn lanes where appropriate, and addition of 4foot
2
paved shoulders.
NC 54 from SR 1006 (Orange Grove Rd) to SR 1937/1107
A
(Old Fayetteville Rd), Widen to a four lane boulevard.
_ —
NC 54 from NC 119 to Orange Grove Rd, Widen roadway
B
from two lane undivided to four ?lane divided roadway.
County Priorities TARPO Boundary
hatham Co.
MPO /RPO DCHC MPO Boundary
s N
f'�-�g \5 tin = Smiles
Ir i I 0 1
TAR PO B -G MPO Boundary
L' Miles
Municipal Boundaries
P
Orange County Planning and Inspections Nishith Trivedi (04/19/2018)
Attachment 2
SPOT P5.0 Transportation Project Prioritization Process (STIP 2020 — 2029) — TARPO
Inkfal Projed Ust
100% Data Driven 70% Data Driven, 15% MPO /RPO Input, 15% Division Input
—MiRF:Adiii/july 2018
Old Greensboro Road Modernize
_ and add 4' Paved Shoulders
0
Updated By: Nishith Trivedi, Orange
County Transportation Planner
Wslon N s
50% Data Driven, 25% MP0 /RP0 Input, 25% Division Input
♦ Old Greensboro Road Modernize
and add 4' Paved Shoulders 1
22.36150 (Division)
-'
/ — — — — — — — — — — — — —
Efland -Cedar Grove Road / Efland -Cedar Grove Road I
Modernization, includingturn lanes Modernization, including turn lanes
W where appropriate and add 4' paved i where appropriate and add 4' paved
shoulders: t shoulders:
14.63 150 (Division)
Deviated Fixed Route Orange Public
Transit - Purchase two light transit
-0-3 vehicles.
Carryover projects from previous SPOT processes
NC -54 from SR 1006 (Orange Grove Road) NC -54 Orange Grove Road to 1
w to SR 1937/1107 (Old Fayetteville Rd) - Old Fayetteville widen to 4 1
widen to 4 lane boulevard lane boulevard 1
/ 46.80170 (Region)
Submitted by BG MPO, not an Orange County Priority ♦ — — — — — — — — — — — —
Project, awaiting NC -54 West Corridor Study / — — — — — — — — — — — —
NC- 54fvom NC -119 to SR 1006 ! NC -54 from NC -119 to SR
tik; (Orange Grove Road) widen to 4 1006 (Orange Grove Road)
lane boulevard widen to 4 lane boulevard
38.35170 (Region) 1
-- — — — — — — — — — — — I
+F Orange Grove Road Paved Shoulder Not Carried Forward
(:i)"
Not Carried Forward
Dairyland Road Paved Shoulders
Orange Grove Road /Dodsons ♦rt Not Carried Forward
Crossroads Paved Shoulders
— — — — — — — — — — — — — I
Purchase two light transit vehicles.
24.81150 (Division)
♦ _ _ _ _ _ _ _ _ _ _ _ _ _ I
♦ — — — — — — — — — — — — —
NC -54 Orange Grove Road to
Old Fayetteville widen to 4
lane boulevard 1
36.58150 (Division)
♦ — — — — — — — — — — — — !
—/ NC -54 from NC -119 to SR
1006 (Orange Grove Road)
widen to 4 lane boulevard
31.42 150 (Division) I
-- — — — — — — — — — —I
SPOT P5.0 Transportation Project Prioritization Process (STIP 2020 — 2029) — B -G MPO
Initial Proled fist Stotewidw Regional laps r
100% Data Driven 70% Data Driven, 15% MPO /RPO Input, 15% Division Input
—fil _C ?" -C �drlr X1:'1 X1111 l._ � 7,
Mattress
Factory Road
Interchange
�ft Not Carried Forward
Mattress
Factory Road
� Not Carried Forward
Extension to
U.S. 70
Buckhorn Road
SR 1114
Widening
vv Not Carried Forward
Not carried forward due to BG MPO project ranking and selection process which only submitted
projects with highest pre - preliminary scores.
7
Updated By: Nishith Trivedi, Orange
County Transportation Planner
Diirlsion Nwawds
50% Data Driven, 25% MPO /RPO Input, 25% Division Input
C�CC I iii �i j k_tl_ai r -fit; %ti�l_1
SPOT P5.0 Transportation Project Prioritization Process (STIP 2020 — 2029) — DCHC MPO
Initial Proled Ust -
100% Data Driven 70% Data Driven, 15% MPO /RPO Input, 15% Division Input
1 T 1 1 -85 /NC 86 Interchange improvements
f l ! INC 86 Improvements North of Hillsborough
Eno Mountain Rd /Mayo Street at Orange Grove Rd
4 U.S. 70 East /I- 85/I -40 Connector
Orange Grove Road Widening with Bicycle and
Pedestrian Improvements
Calvander Roundabout
Q --
* South Churton Street (bill NC 86 rom I -40 to Eno
River Improvements
I-40 Widening from 1- 40/1 -85 interchange to NC 86
1 -40 Widening from NC -86 to U.S. 15 -501
Orange County Public Transportation Circulator II
Vehicles
Dimmocks Mill Rail Trestle Improvements
Q, Exchange Park Lane Rail Trestle Improvements
1 Old INC 86 Bike Lanes - Homestead to Farmhouse
04 Homestead Road Bike Lanes and Sidewalks
12 Eubanks Road Bike Lanes
'PFt_Ca�meiC u'h rc�i�adBike /Pedestrian I
13 Improvements l
.14 Orange High School oa aro Latta Road Si ewa
Improvements
Orange Grove Road /1 -40 Pedestrian Bridge
1 -85 Pedestrian Bridge
Dairyland Road Paved Shoulders
1 g Trail Connection from English Hill Lane to Buttonwood
Drive
Trai Connection rom Patriots Pointe to Tim ers
1'9 Drive
' �/i li i`Jlil "]1,1,, )'k t
FUNDED!
I -85 /NC 86 Interchange Improvements
#6 Not Carried Forward
wo Not Carried Forward
FUNDED] South Churton Street (Old NC 86) from I -40 to
Eno.River Improvements
FUNDED!
I -40 Widening from I -85 to 15/501
`y Not Carried Forward
V Not Carried Forward
Updated By: Nishith Trivedi, Orange
County Transportation Planner
DMsion Nis
50% Data Driven, 25% MPO /RPO Input, 25% Division Input
�#. I (I�_1!f =1 /�'_� ?'i:(sJii�1�1 -Vi' I�� -�� _ �• �j�- �(= J_I.1L?l� �;�)'.[�_!�IrJ f:��7i �.)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ 7
— — — — — — — — — — — — — — 1 NC 86 Improvements North of Hillsborough
Q NC 86 Improvements North of Hillsborough !��^, 27.42 1 50 (Division) !
_36.02170 (Region _ _ _ _ � _ _ _ _ _ _ _ _ _ _ _ _ _ _ —
Eno Mountain Rd /Mayo Street at Orange Grove Rd !
_ _ _ _ _ _ _ _ _ _ _ _ _ _ � _ _ _ _ _ 14.36150 (DivisioJ_
Q' U.S. 70 East /1- 85/1 -40 Connector
U.S. 70 East /I- 85/I -40 Connector
_18.43 1 70 (Region _ _ _ _ •�� _ _ _ _ 13.03150 (Division)
V„ Not Carried Forward _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Old NC 86 Bike Lanes- Homestead to Farmhouse !
19.20150 (Division) _ _ _ _ _ !
Not Carried Forward
Not Carried Forward
Mt. Carmel Church Road Bike /Ped Improvements !
23.01150(Division)_ _ _ _ _ !
Not Carried Forward
Not Carried Forward
Not Carried Forward
Not Carried Forward
Not Carried Forward
A
Not Carried Forward * Carryover projects from SPOT 4.0