HomeMy WebLinkAboutOUTBoard agenda 082014AGENDA
Orange Unified Transportation Board
August 20, 2014
7:00p.m.
You can bring your laptops/tabletsif you would like to use them.
Conference Room 004 (LowerFloor) Orange County West Campus
131 West Margaret Lane, Hillsborough
Time Item Title
7:00 1.Call to Order and Roll Call
7:05
7:08
7:10
8:00
8:20
8:40
8:50
9:00
2.
3.
4.
5.
6.
7.
8.
Approval of Minutes
Minutes from April 16, 2014
Consideration of Additions to the Agenda
Regular Agenda
a. Draft Parks and Recreation Master Plan 2030 – Presentation by Orange County
Department of Environment, Agriculture, Parks and Recreation (DEAPR)staff. Pursuant
tothe OUTBoard’s recommendation at its April 2014 meeting regarding emergency
access for trail systems, Planning staff has held discussionswith DEAPR staff regarding
thedevelopment of emergency access goals and objectives being included in the
Master Plan. Attachedis a copy of the presentation and draft Goals and Objectives for
Emergency Access to Trail Systems at Orange County Parks for the OUTBoard’s
consideration (Attachment 1, pages11 - 24).
OUTBoard Action: Receive information and provide input.
b. Bicycle Safety – OUTBoard Vice Chair, Jeff Charles requested that thisitem be added to
the agenda. Attached for informational purposes is related information and a history of
prior discussions of bicycle safety asrelated to the OUTBoard since 2011 (Attachment
2, pages25 - 50).
OUTBoard Action: Receive information and discuss.
Staff Updates
a. Safe Routes to School (SRTS) Action Planimplementation actions
b. Protection options for Old NC 10 road corridor
c. Review of selected private road and access standards
d. Buckhorn EDD environmental and transportation contracts
e. OUTBoard vacancies
OUTBoard Action: Receive updates
Board Comments
OUTBoard Action: Receive comments
Upcoming Agenda Items of Interest on Other Regional Transportation Related Board
Agendas
OUTBoard Action: Receive information
Adjournment -The OUTBoard’s next meeting will be September 17, 2014
1
2
D R A F T
MINUTES1
ORANGE UNIFIED TRANSPORTATION BOARD2
APRIL 16,20143
4
5
MEMBERS PRESENT: Paul Guthrie, Chapel Hill TownshipRepresentative;Jeff Charles, Bicycle Advocate6
Representative;Alex Castro, Bingham TownshipRepresentative;Ted Triebel, Little River TownshipRepresentative;7
Amy Cole, Transit Advocate; Gary Saunders, CFE Representative;Brantley Wells,Hillsborough Township8
Representative9
10
11
MEMBERS ABSENT: Don Wollum, Eno TownshipRepresentative; Sam Lasris, Cedar Grove TownshipRepresentative;12
Pedestrian Access & Safety Advocate - Vacant;Cheeks TownshipRepresentative- Vacant;Economic Development 13
Commission - Vacant;Planning Board Representative – Vacant;14
15
16
STAFF PRESENT:Abigaile Pittman, Transportation/Land UsePlanner;Tina Love, Administrative Assistant II17
18
19
OTHERS PRESENT:Chuck Edwards, NCDOT; Ed Lewis, NCDOT; Elizabeth Gregory, Orange County Assistant Fire 20
Marshall; Matthew Day, TARPO; 21
22
23
AGENDA ITEM I: CALL TO ORDER AND ROLL CALL24
25
26
AGENDA ITEM II: APPROVAL OF MINUTES FOR FEBRUARY 19,201427
28
Alex Castro: Line 266 should read, “This has great implications for the County”.29
30
TheFebruary 19, 2014OUTBoard Minutes were approvedwith correctionby consensus.31
32
33
AGENDA ITEM III: CONSIDERATIONS OF ADDITIONS TO THE AGENDA34
35
Paul Guthrie: I have tried to let the committee have a free handin how we conduct business. We have made it 36
difficult to let the presenter finish the presentation. If you have a burning question, get an authorization from me to 37
interrupt. We will always have a question/answer time after the presentation. 38
39
40
AGENDA ITEM IV: REGULAR AGENDA41
a.Board discussion with NCDOT to include the following topics: 42
i.Issues with some bike and pedestrian projects within the county (i.e. the quality 43
of the two-foot widening on Dairyland, prioritizing the widening of Old NC 86 at 44
Calvander, and the destruction of road surfaces during the gas line construction 45
on Mt. Sinai and other connecting roads, and opportunities for improved 46
coordination with, or oversight of state contractors during project construction).47
48
ii.The status ofany state discussions/projects related to the feasibility of using 49
existing triangle region railway infrastructure for commuter rail purposes as part 50
of a multi-modal transportation system.51
52
iii.Issues related to private street conversions for acceptance intothe state 53
maintained system.54
55
3
D R A F T
iv.Available resources for minor improvements at problem sites/intersections within 56
the county.57
58
v.Pedestrian safety concerns on (new) Hwy 86/I-40 bridge overpass.59
60
vi.Other topics as raised by the Board.61
62
OUTBoard Action:Receive information and participate in discussion.63
64
b.Review of selected private road and access standards from the Unified Development 65
Ordinance (UDO) Section 7.8 Access and Roadways.66
67
OUTBoard Action:Review selected standards and recommend to the BOCC that 68
planning staff review/revise and develop amendments.69
70
71
Abigaile Pittman had Jeff Charles describe photos. 72
73
Jeff Charles: I am the bicycling advocate for the Boardand I am also on the Chapel Hill Bike Ped Board andI’ve 74
been appointed to the new TARPO bike planningthat is coming up. Dairyland is a key bicycling route in the county. I 75
would like to give credit to the fine jobdone onNC 10 and that was our expectation as to what would happen on 76
Dairyland. I went to the intersection of Union Grove Road and Dairyland and drove up to Maple View Ice Cream 77
Store. Most of these photosare on the right side of the road going toward Maple View. (Displayed photos).78
79
Chuck Edwards: The issues with the PSNC gas lines goingin. Public Service gas has a large comprehensive 80
project to put in new gas lines and they are affecting a lot ofstate maintained roads. The instrument used is an 81
encroachment agreement that spells who is responsible for what. This is to be expected with the extent of the work 82
they are doing. Prior to a final inspection, we will look at areas like this and if there is damage that warrants repair, 83
we shouldrequire them to do that. Back to Dairyland Road, it was included on our secondary road construction 84
program presented to the BOCC. This was a time we were moving secondary road construction funds from their 85
primary purpose of paving unpaved roads to going toward paved road improvements because we have effectively86
paved out the available unpaved county roads in the county. Our project was to widen the pavement on the road two 87
feet and resurface. The existing pavement is variable. This is a low tech project. It is not intended to be specifically 88
a bike ped type of project, just a safety improvement. Because of that variability and the way the pavement is89
marked, the widthdoes vary.We are looking at doing Lebanon Road in the Mebane area and a portion ofNew 90
Sharon Church Road. All remaining unpaved roads were reprioritized by a competing statewide basis for $12 million 91
dollars total. 92
93
Jeff Charles: In the past, we have talked about Old 86, the Calvander section,as part of a bigger improvement of 94
taking Old 86 all the way to Hillsborough. Is there a way to partition it?95
96
Chuck Edwards: For the past few years, I was relying on the secondary paved improvements to deal with some of 97
these routes. A road like Old 86 is typically not going to be paved ina single year anyway.98
99
Jeff Charles: Our hope was that if the Hogan Farmarea would donate the right-of-way, it would reduce the cost.100
101
Chuck Edwards: Yes.102
103
Jeff Charles: How do you do that?104
105
Chuck Edwards: There are ways to do that and there may already be dedicated right-of-way.106
107
Abigaile Pittman: We recently had an Orange County Expo and the planning departmenthad to man atable for four 108
hours. We had of our bike map and I only got one comment consistently. They picked up the bike map and said this 109
is a hot issue for me because when I try to drive through the county roads, the bikers don’t have anywhere to ride.110
4
D R A F T
111
Chuck Edwards: That reflects in the list.112
113
Abigaile Pittman: Thenext topic on the agenda isa discussion of the status of any state discussions/projects related 114
to the feasibility of using existing triangle region railway infrastructure for commuter rail purposes as part of a multi-115
modal transportation system.Ms. Pittman showed the Board a copy of the 2008 commuter rail capacity study done 116
by HNTB. 117
118
Chuck Edwards: I tried to get information about this topic before tonight’s meeting and failed.119
120
Paul Guthrie: I was on the task force that looked at the Hillsborough Rail Station. There was a lot of conceptual 121
planningabout the railroad right-of-way. Is anyone paying attentionto the fact that we have a 300-foot right-of-way 122
through the county that could be used for transportational purposes?123
124
Ed Lewis: I had an opportunity to attend the TSS (Traffic Separation Study) workshop.125
126
Paul Guthrie: At some level, this project is not going to move becauseyou ask but for a lot of other reasons. As this 127
position comes out, this could be a good time for an opportunitythat this couldbecome the key ingredient in 128
beginning anintegrated transportation system in this county.129
130
Alex Castro: The Research Triangle Foundation which is doing a revamping of the RTP, in their presentation, they 131
have two commuter rail stations, one which will provide shuttles to RDU airport. 132
133
Abigaile Pittman: The next topic of discussion is issues related to private street conversions for acceptance into the 134
state maintained system.Typical issues are people in subdivisions with private streets and the burden of maintaining 135
that over years, and then they decide they want the state to take over maintenance of the state.136
137
Chuck Edwards: The process starts when the developer has to make a decision as to whether he wants to pursue 138
state maintained or privately maintained roads. The bottom line is if they choose state maintained, it has to be 139
designed by our standards. DOT is involved in the beginning.Once we sign off, the developer will take it, develop it 140
and sellhomes. Once he meets a certain threshold of a certain house count per mile he can petition the road for 141
state maintenance. There are times when usually the homeowners want to pursue state maintenance for a private 142
road. The issues are the private roadshave a private right-of-way so it is not eligible for that alone. So there has to 143
be a conversion. The typical issue that we deal with is school stops. School buses won’t go down a private road. 144
There are moderate subdivisions that are built to the design and construction standards of a state maintained road, it 145
is a matter of replating the private to public but we have learnedthat can create issues with the county as to whether 146
that developer was trying to circumvent the subdivision regulations.147
148
Abigaile Pittman: There is problem ifthe road has been constructed to our Class B standards and they have to 149
overcome issues such as the placement of utilities, road widening, ditching, and encroachments. It is almost 150
impossible to overcome and sometimes the maintenance cost on those roads becomes a huge burdenon the 151
property owners. 152
153
Chuck Edwards: The Class B road, we sometimes refer to those as a glorified driveway and it isnot be feasible to 154
bring them upto our standards.155
156
Abigaile Pittman: Another topic for discussionis if there are available resourcesfor minor improvements at problem 157
sites/intersections within the county.I have been in discussion with Orange County School Districts regarding several 158
sites. There are issues with intersections to their driveways, wherethey need minor improvements to help the flow of 159
traffic. We have a list of improvements, what do I do with that list and arethere any available funds?160
161
Chuck Edwards: There is a group within our traffic engineering branch called Municipal School and Transit 162
Assistance (MSTA)and their purpose is to help school systems solve existing problems and avoid future ones. 163
Funding is fairly low at this point butthere are ways to get funding and you need to ask.164
165
5
D R A F T
Ted Triebel: One that comes immediately to mind is the Cameron ParkElementary and St. Mary’s Road;has that 166
been looked at?167
168
Chuck Edwards: It has been looked at. Recommendations have been made for internal improvements. We will be 169
glad to revisit that.170
171
Jeff Charles: The ChapelHill Bike Ped Board received a letter from a gentlemanthat lived of Whitfield and he walks 172
into Chapel Hill area and his concern was the new 86 and I40 Bridgefor pedestrians. We weren’t sure if it was in the 173
Town or County.174
175
Chuck Edwards: We received the same information. Our traffic folks are looking at that. An obvious thing was the 176
bridge was not designed for pedestrian walking. 177
178
Paul Guthrie:Are yougiving attention to the deteriorationof the old Kerr Scott Bridges? 179
180
Chuck Edwards: Absolutely. 181
182
Paul Guthrie: Some things tend to get overlooked. How are you approaching that issue?183
184
Chuck Edwards: One well-funded program we have is for the replacement of public bridges. 185
186
Paul Guthrie:I’ll give you one example, Old Greensboro Road and Phil’s Creek Bridge.There is more and more 187
heavy truck traffic using that road, 18 wheelers and every time they go down that hill they knock another hole in the 188
pavement. I assume you are doing regular inspection of these older bridges.189
190
Chuck Edwards: I wish I had brought my list, I will get back with Abigaile with more information.191
192
Jeff Charles: NCDOT worked on onebridge on Arthur Minnisnear Borland. There is another old bridge by that one 193
that was actually in worse shape. Do you know if that one is prioritized?194
195
Chuck Edwards: Yes. They are handled by a design contractor.196
197
Jeff Charles: That will hit the cyclingcommunity hard.198
199
Chuck Edwards: We do reach out to others on these projects to provide public information.200
201
Abigaile Pittman: In theBuckhorn Economic Development District, there is old bridge on the south perimeter. We 202
wouldn’t want it replaced as it is because the development in the areawill be industrial. When you look at these 203
issues with related land use changes involved,do you consider upgrading the bridge to accommodate industrial 204
traffic? 205
206
Chuck Edwards: Under this program, we are trying to get the best bang for the buck. At some point, if there is a 207
need to change that, that particular bridge may not fit this program but another program.208
209
Paul Guthrie: If there are no other topics, we can move on.210
211
Chuck Edwards: Abigaile is giving out information about resurfacing roads.212
213
Abigaile Pittman: Reviewed information.Elizabeth Gregory will tell us about some of the problems encountered with 214
emergency service vehicles on these 12-foot private road standards.215
216
Elizabeth Gregory: The main problem is the width because fire trucks are large and the ambulances also. People do 217
not realize the county has no hydrants so the fire truck cannot hook up to a hydrant. They have to shuttle water 218
which means trucks go to water sources and fill the truck that is on the scene of the fire. The main problem is the 219
trucks have to turn around, so if they can’t pass each other. Our standard when weget into a subdivision is 20 feet 220
6
D R A F T
but we try to work with DOTwith their standard of 18 feet. When you get down to 12 feetas in the Class B roadway,221
they will need to send a smaller fire truck which holds less water. It is an access problem. Fire trucks are very 222
expensive. If there are roads they cannot get down; they need to wait for another fire truck to get additional hose. 223
224
Jeff Charles: What is the limit of length because of the pressure issue?225
226
Elizabeth Gregory: You can go as far as you want. We have learned who helps us the most with this issue is the 227
insurance company. They tell them itis important to have a driveway large enough to get a fire truck down. Also, 228
there are problems with ambulancesas a safety for both the patient and the workers. The biggest complaint we hear 229
from fire departments is access.230
231
AbigailePittman: What are some typical widths of the fire trucks and ambulances?232
233
Elizabeth Gregory: The ambulances are 12 foot. Fire trucks are usually that size but a latter truck is wider. 234
235
Abigaile Pittman: What is the width of the ladder truck?236
237
Elizabeth Gregory: I am not sure.238
239
Abigaile Pittman: We have a related issue that you may be able to comment on. There are types of subdivisions that 240
are exempt from the county’s subdivision regulations. The staff would like you to discuss doing away with the Class 241
B roads and only allow Class A and to develop a requirement that newly created lots have access to a compiling 242
road.243
244
Jeff Charles: This is all new construction.245
246
Abigaile Pittman: To allow reasonable and affordable options for small subdivisions, staff suggests consideration of a 247
revision that may allow three lots to share a driveway as long as they are designed so the emergency service 248
vehicles can turn around and it is not longer than a certain determinednumber of feet. There would have to be 249
discussion as to what that numberis.250
251
Elizabeth Gregory: A lot of it has to do with if it is a 20-foot wide road,or if it has a hydrant and it should be 26 feet 252
wide.What we ask for is a 96-foot radius because a fire truck does not run like a car. The money for fire trucks and 253
ambulances comes from the tax payer.254
255
Jeff Charles: How do you approach the condition of the surface for turning around?256
257
Elizabeth Gregory: If you hit bumps in the road in an ambulanceand it costs $250,000. That makes a difference.258
259
Jeff Charles: Over the coming years, there will be more of the Tobacco Trail situations where you need emergency 260
services, not a fire truck. Maybe we should add a fourth item of concern to staff’s list about emergency access to trail 261
systems. I am recommending you think about that.262
263
Paul Guthrie: I was comparing the Fire Code in Appendix D with the local ordinance and why is there a disconnect 264
when the Fire Code requires a much greater capability than this.265
266
Abigaile Pittman: We connect with the NCDOT standards for the Class A roadways. 267
268
Paul Guthrie: As Ms. Gregory mentioned regarding turn around, there is no way a fire truck could make use of that 269
turn around.270
271
Abigaile Pittman: I think it would tough to change the Class A since NCDOT has this adopted 18-footstandard. 272
273
Ted Triebel: I think the action you are asking for tonight is for us to suggest to the Boardof County Commissioners 274
that it is time for review these standards. 275
7
D R A F T
276
Abigaile Pittman: We are not asking you to decide what those standards are but to tell the BOCC what you think the 277
issues are they need to have staff reviewthemand bring back more detail.278
279
Ted Triebel: This problem has existed for decades in this county. My question is whether there would beany 280
documentation as to havethis proven to be a problem in 5 out of 100, etc. Is this a problem or not?281
282
Elizabeth Gregory: As far as documentation, I believe the fire departments, when they do their incident reports to 283
the state or fire marshal they documentif they had an access issue. We have not pulled the actual statistics. If we 284
can’t access one person, one house,itis a huge issue.We can research thatinformation. 285
286
Ted Triebel: Anytime we make a big change, thereneeds to be a data to back it up. 287
288
Paul Guthrie: As I understand the recommendation, you are asking this Boardto tell the BOCC to have staff to take 289
a look at this issue.290
291
Abigaile Pittman: We are saying if you agreewith staff’s recommendations,then recommend to the BOCC that they 292
have the staffcontinue to research it. 293
294
MOTION made by Jeff Charles to accept recommendations for the staff with the addition of the emergency access 295
for trailsystems. Seconded by Alex Castro.296
VOTE:Unanimous297
298
Ted Triebel: I live right by Little River Park which is a joint Durham/Orange County Park. We can look at those type 299
parks to say, this is what we accept as risks and this is what we think we shouldn’t accept.300
301
302
AGENDA ITEM V: STAFF UPDATES303
a.Safe Routes to School (SRTS) Action Plan304
OUTBoard Action: Receive updates305
306
Abigaile Pittman: Last night, the BOCC adopted the Safe Routes to School Action Plan. The next step is we will be 307
establishing a committee for implementation activities and they will be planning staff from Orange County, from the 308
Town of Hillsborough, someone from the School Board, the original steering committee and one or twomembers309
from the OUTBoard. 310
311
312
AGENDA ITEM VI: BOARD COMMENTS313
OUTBoard Action:Receive commentsand participate in discussion.314
a.Chair initiated a comment session regarding Board members’ thoughts on the 315
following potential topics:316
i.Critical transportation issues for Orange County, now and into the future.317
ii.The role of the OUTBoard in the examining of the difficulties in transportation 318
planning brought about by the programmatic fragmentation of current 319
transportation planning and funding.320
iii.Improved OUTBoard engagement of Orange County residents’ transportation 321
concerns.322
iv.Improving OUTBoard advisory service to the Board of County Commissioners.323
v.Agenda development.324
vi.The role of each member of the Board.325
vii.Meeting format, including presentations and member participation.326
327
OUTBoard Action: Receive comments and participate in discussion.328
329
8
D R A F T
Paul Guthrie: I would like to pose several questions for the Boardto considerover the next several meetings:income 330
and housing locations, work locations, school locations, affordable housing, income diversity, a discombobulating of331
transportation planning and providers, public and private, a lack of resources in revenue and authority statutory for 332
the city and county, the state governments role and responsibility and the costs and uncertainty of the future. The 333
role of the OUTBoard in examining the difficulties in transportation planning brought about by the programmatic 334
fragmentation of our current transportation planning of funding in private and public. Also, improved OUTBoard 335
engagement of Orangecounty residentsand transportation concerns; how we can improve our advisory service to 336
the BOCC; how we want to be involved in agenda development;what we see asthe optimum role for each member 337
of this Board;and we should look at meeting format including presentation and perception.I want to ask a question 338
and I hope every member of this Board knows the answer to this. What is the largest single transportation 339
organization inthis county;public or private? 340
341
Gary Saunders: Chapel Hill Transit.342
343
Paul Guthrie: Actually it’s the Orange County Schoolsand Chapel Hill Schools.The Orange County schools have 72 344
bus routes, 70 buses plus activity buses operating. Chapel Hill schools have 50 buses, 16 mini-buses, and 19 activity345
buses operating; so we have 120, 16 mini-buses, and probably another 30 activity buses all operating under two 346
different but similar systems. Chapel Hill Transit is the largest public transit organizationbut it doesn’t approach those 347
numbers of vehicles.My whole point is that while we probably spend less time on this issue, I wanted to point out that 348
thereis a number of things on transportation that go beyond what we now think of as transportation systems and at 349
some point I will argue that we ought to at least make a passing comment on is there a way to better coordinate 350
school transportation and public transportation in terms of route structure and things like that as we grow?That’s the 351
key word as we grow. We become less and less rural and more and more urban. Do we need to look at those 352
interfaces?There are a lot of statutory problems of the school bus issue, and the financing issue but that is the kind 353
of issue I would hope at some point in time we pay attention to. Where are we going in five years or ten years? A 354
perfect example to me is the way in which we approach the Triangle Transit government’s transportation systems 355
that they are trying to put in place now. It’s a little piecehere, a little piece there, and division is really about two 356
things. Building a coordinated bus system and building a limited rail system. I would hope thatover the next few 357
months and probably even years, we could tackle some of those things. I will be glad to send everyone what I just 358
said, that’s where I’m coming from so that we can really give good solid long term advice and not just be reactive to 359
the current issue if we just reacted to the current issue we will never build a vision for the future and this County will 360
need it. I have been doing something lately that scares the dickens out of people, take Google Earth,now for those 361
of you who have Google Earth;it will show you the 1993 flyovers and 2014 flyovers in sequence. Take parts of the 362
county and just click up the number of 10 to 14 different views that you can get for those years. See what has 363
happened in 20 years and then think what is goingto happen in the next 20 years. So that my little sermon for the 364
day. 365
366
Alex Castro: The service provided by OPT (they call it Old People Transportation)and Chapel Hill’s Easy Rider the 367
criteria, the determination of who gets the service is different. Individuals that are customers get confused. That 368
should be seamless and it should be one for everyone.369
370
371
AGENDA ITEM VII: UPCOMING AGENDA ITEMS OF INTEREST ON OTHER REGIONAL TRANSPORTATION RELATED 372
BOARD AGENDAS 373
OUTBoard Action:Receive information374
375
Abigaile Pittman: On May 8, the BOCC will review recommended bus expansion services program. In late May and 376
early Junewe have scheduled meetings for public outreach for the recommended bus expansion route, asking for 377
input on recommended specific routes.On June 12, from 8:00 AM to 4:00 PM, there will be a Map 21 Funding 378
Program given by the Town of Carrboro and Carrboro Bicycle Coalition. The next OUTBoard meeting is May 21.379
380
Jeff Charles: I would be interested in meeting with the Orange County Sherriff’s Department to talk about a project I 381
am working on with respect to the bicycle safety rules and the non-cyclist perception of cyclists. 382
383
9
D R A F T
Matt Day: The main information from TARPOis the project scoring for Strategic Transportation investments. We will 384
have a public hearing in early June to present draft scoring results.385
386
387
AGENDA ITEM VIII: ADJOURNMENT388
389
The meeting was adjourned by consensus.390
10
8/11/2014
1
Parks and Recreation
Master Plan 2030
Orange Unified Transportation Board
August 20, 2014
A Brief History
Recreation programs
since 1960s
1990s reports
1997 & 2001 Bonds
1988 Master Plan -
Opened 1st park 1998
$WWDFKPHQW11
8/11/2014
2
Overview of System -2014
9 Facilities and Locations
5 Parks
One Soccer Center
2 Recreation/
Community Centers
One Greenway
Planned Future Facilities
4 Future Parks
(land-banked sites)
2 Nature Preserves
with trails and access
areas
1 New Community
Center
12
8/11/2014
3
Recreation Programs/Services
Programs offered for youth and adults
Total program enrollment up 41% since 2009
Wide range of programs –sports, arts, life skills
Special Events (Egg Hunt, Fishing Rodeo, etc.)
All senior programs through Department on Aging
Population –Current Snapshot
Location2012 Pop.
Carrboro20,433
Chapel Hill (OC)55,474
Hillsborough6,271
Mebane (OC)2,000
Durham (OC)32
UnincorpOC53,731
Total137,941
County population =
138,000 (2012)
Around 60,000 in
traditional “service area”
20% of County under 18
13
8/11/2014
4
Population –Future Trends?
Top 10 nationally in education level
Above-average median income masks 17% below
poverty
By 2030, County could have 173,000 residents
Expect 70-80,000 people in service area?
Community Needs Assessments
Perhaps most important component of master plan
How does public view current facilities/programs
and future needs?
Several components (youth, statistical random-
sample, online, targeted groups)
Statistical survey administered by UNC-G profs
Total of 835 surveys received
14
8/11/2014
5
Summary of Survey Results
Facility Usage and Experience
Most used facilities:
SportsPlex
Central Rec Center
Little River Park
EurosportSoccer Center
Safety, maintenance and
operations of parks get high
marks (89-96% approval)
93% agreed parks and
programs enhance
economic health.
96% agreed parks and
programs enhance physical
and mental well-being
Summary of Survey Results
Most Popular Programs/Events
PROGRAMS
Youth Soccer
Youth Basketball
Open Gymnasium
Volleyball
EVENTS
Little River Trail Run
Annual Egg Hunt
Halloween Event
Fishing Rodeo
Earth Day Fair
15
8/11/2014
6
Summary of Survey Results
Most Desired New Programs/Facilities
PROGRAMS
Hiking
Swimming
Walking
Yoga, Biking, Camps
FACILITIES
Walking/hiking Trails
Nature Trails
Swimming Pool
Greenways
Sprayground, amphitheater
Other Responses
Expand outdoor recreation (82% agree)
Expand low-impact recreation (79%)
Trail system linking various areas of county (89%)
Indoor athletic complex? (64%)
Parks help reduce crime? (81%)
16
8/11/2014
7
Funding Strategy Responses
Donations and Grants (95/94% agree)
Use Existing Local Taxes (73% agree)
Voter-approved Bonds (70% agree)
Existing Property Taxes (70% agree)
User Fees (68% agree)
Increase New Local Taxes (34% agree)
Focus Groups and Open Houses
7 Focus Groups Held:
Soccer Facilities
Trails and Connectivity
Public Health and Parks
Park Facility Needs
Recreation Programs
Nature/Env. Programs
County/Town Coordination
6 Open Houses, etc.
Main Themes Heard:
More biking and hiking trails
Artificial Turf fields
When will new parks open?
(Blackwood Farm)
More soccer fields/centers
17
8/11/2014
8
Important Themes and Topics
Linking to the Goals/Objectives in Comp Plan
Synchronizing and coordinating with Town plans
State parks, OWASA, Schools, Others
Economic benefits of parks, rec and open space
Important linkages to public health, opportunities
Parks and conserving our natural resources
Standards and Findings
A number of changed conditions since 1988
Park Classifications:
School Park
Community Park (usually 40-75 acres)
District Park (usually 75-125 acres)
Regional Park (usually 150 acres +)
Nature Preserve Access Areas
Standards: Best Approach -use community needs
18
8/11/2014
9
Standards and Findings
Proposed Guiding Principles for Park Standards
Continue to Use Population-Based as Benchmark
Service Areas Defined Existing plans and policies
4 Districts
Overall –Set of 20 Findings Identified (pg. 9-13)
Goals and Objectives
Previously-created in
Comprehensive Plan
5 Goals with objectives
for each
Plan strategies attempt
to address these
19
8/11/2014
10
Recommendations
Weighing all the data
and findings
Basis of Park Planning
in place (districts, 1988
plan, CIP)
Proactive acquiring of
park sites = few “new”
parks are needed
Recommendations
1.Protect Investment in Parks and Open Space
a.Multi-Million $ Investment
b.Facility Renovation and Repairs
c.Operating and Maintenance
2.Build Planned Future Parks (pp. 10-12)
a.CIP and Lands Legacy Have “Set the Table”
b.4 New Parks
c.5 Future Phases at Existing Parks
d.2 (3) Nature Preserves with Publicly-Accessible Areas
20
8/11/2014
11
Recommendations
3.Complete Nature Preserves, Provide Access
4.Structure for Multi-Partner Capital Facilities
5.Master Plan for Orange County MST Segment
6.Build More Trails, Connections
Recommendations
7.Improve Access, Promote Healthy Lifestyles
8.Recreation Program Needs, Partnerships
9.Examine Role of Community Centers
a.Types of programs, offerings
b.Hours and usage expectations
c.Facilities and amenities
21
8/11/2014
12
Issues for Further Study
System Level of
Service
Review Land
Dedication, P-i-L
Coordination of
County, SportsPlex
Programs
Need for Public Pool?
Plan Updates (5/10 yrs.)
Artificial Turf Playing
Fields?
22
8/11/2014
13
For More Information
On the Web: http://orangecountync.gov/deapr/
Look under “Breaking News”
Email:deapr@orangecountync.gov
Call: 919-245-2510
23
Draft#2–7/24/14Attachment 1
EmergencyAccesstoTrailSystemsatOrangeCountyParks
DraftGoalsandObjectives
Thefollowingaredraftgoalsandobjectivesforaccommodatingemergencyservicepersonnelneeding
toaccesspeopleusingtrailsatOrangeCountyparksandnaturepreservesadministeredbytheOrange
CountyDepartmentofEnvironment,Agriculture,ParksandRecreation(DEAPR).
OrangeCountyparksthatcurrentlyhavetrailsareEflandͲCheeksPark,CedarGrovePark,FairviewPark,
RiverPark,andLittleRiverRegionalParkandNaturalArea.TheJonesCreekGreenwayconnectsLake
HoganFarmswithMorrisGroveElementarySchool.Futuretrailsarebeingdesignedforconstructionat
thefutureBlackwoodFarmPark,HollowRockAccessArea,andattheSevenMileCreekPreserve.
ThesedraftstandardsareintendedforreviewandcommentbytheParksandRecreationCouncil,the
EmergencyServicesDepartment,andtheOrangeUnifiedTransportationBoard.
OverarchingGoal:Trailsystemswillbedesignedandconstructedtoaccommodatethemaximum
enjoymentoftrailusers,however,indoingso,therewillbeconsiderationsfortopography,
sedimentationanderosioncontrol,theavoidanceofsensitivenaturalandculturalresources,public
safety,andtheprovisionofstagingareasforvehiclestoaccesstrailusersintimesofemergency.
Objective#1–Trailswillbeconstructedandmaintainedwithaminimumclearancewidthofsix
feet(evenifwidthofthetrailtreadisnarrower)andaminimumclearanceheightofeightfeet.
[SingleͲtrackbiketrailsatLittleRiverParkmayhavesectionslessthansixfeetofclearance.]
Objective#2–Trailnetworksgreaterthanonemileintotallengthwillbemarkedwithperiodic
signsthatspecifydistancesfromtrailheadsandwithGPSreferencepointsforuserstoidentify
theirlocationalongthetrail.
Objective#3–Trailswillbeshownonmapsdisplayedonkioskslocatedattrailheads,andmaps
willbeavailablefromtheparkoffice(forparksthathaveanoffice)andfromtheDEAPRCentral
RecreationCenterinHillsborough.
Objective#4–EmergencyServicevehicleswillhaveaccesstotrailsinsuchawaythatlarger
vehiclescanreachstagingareasidentifiedwithinthepark(andonmaps)andsmallerallͲterrain
vehicles(e.g.,Gator)canaccessmostsectionsofthetrail.Stagingareaswillbelocatedwhere
feasiblewithincloseproximity(approximately¼mile)toanypointalongthetrails.Keystoany
gates/bollardswillbeprovidedtotheappropriateEmergencyServicesprovider(s)andwillbe
availablefromtheparkoffice(forparksthathaveanoffice).
Objective#5–EachparkcontainingatrailnetworkwilldevelopanEmergencyActionPlan,
includingprotocolandproceduresfortrailͲrelatedemergencies.
24
$WWDFKPHQW25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50