Loading...
HomeMy WebLinkAboutAgenda - 03-20-2018 8-c - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2018 Annual Technical Advisory Committee ReportORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 20, 2018 Action Agenda Item No. 8-c SUBJECT: Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2018 Annual Technical Advisory Committee Report DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: 1. SAPFO Partners Transmittal Letter 2. Draft 2018 SAPFOTAC Annual Report and Larger Scale Projection Worksheets Ashley Moncado, Planner II, 919-245-2589 Craig Benedict, Director, 919-245-2575 PURPOSE: To receive the 2018 Annual Report of the SAPFO Technical Advisory Committee (SAPFOTAC) and transmit it to the SAPFO partners for comments before certification in May. NOTE: The School Capacity Capital Investment Plan (CIP) Needs Analysis projects no new school capacity needs in the next 10 years for elementary, middle and high school levels for both Orange County Schools (OCS) and Chapel Hill-Carrboro City Schools (CHCCS). ADDITIONAL NOTE: The State of North Carolina passed legislation in 2017 resulting in a decrease in class size averages from 1:21 to 1:20 for kindergarten to third grade for the 2017- 2018 school year. As a result, both school districts experienced a decrease in capacity at the elementary school level this school year. This legislation also proposed an additional decrease in class size averages from 1:20 to 1:17 for kindergarten to third grade for the 2018-19 school year. Due to significant statewide ramifications as a result of the reduced class size averages, the North Carolina General Assembly unveiled House Bill 90 which allows for a phasing-in process to address the decrease in class size averages over the next four years. Based on House Bill 90, average class sizes for kindergarten to third grade will be phased-in as provided below: 2019 – 2020 1:19 2020 – 2021 1:18 2021 – 2022 1:17 Over time the phasing-in of the 1:17 class size averages will result in a decrease in capacity of approximately 660 students for CHCCS. Due to a waiver from the state, CHCCS will have an additional year to plan for impacts resulting from changes in class size. OCS has begun the process of adjusting average class sizes this school year in order to prepare for future reductions. The SAPFO Technical Advisory Committee will continue to monitor this issue and determine the need for the reconvening of the Schools Joint Action Committee (SJAC), which is comprised of elected officials, in the future. The SJAC is rarely used, but can suggest how to implement legislation as it relates to SAPFO. The Board of Commissioners should at some point consider whether or not to move forward on this implementation, and this issue is proposed as a topic for an upcoming County/Schools Collaboration Meeting. 1 ADDITIONAL NOTE: Charter and private schools are not included as part of the SAPFO Annual Report and, as a result, their membership and capacity numbers are not monitored or included in future projections. SAPFO projections are used for projecting only public school capacity needs. However, the SAPFO Technical Advisory Committee does monitor charter and private schools and their effect on student enrollment in both school districts. Charter and private schools numbers are not collected for SAPFO purposes; however, impacts due to enrollment at these schools are accounted for in SAPFO process with the annual reporting of student membership and growth rates contained in the 10-year student projections. BACKGROUND: 1. Annual Report Each year, since 2004, the SAPFOTAC Report is updated to reflect actual changing conditions of student membership and school capacity. This information is analyzed and used to project future school construction needs based on adopted level of service standards. There are two steps to the full report. The first part (Student Membership and Capacity) is certified in the fall and then this full report, in the following spring, is to keep the SAPFO system calibrated. At the December 12, 2017 Board of County Commissioners meeting, the Board approved the November 15, 2017 actual membership and capacity numbers (i.e. first part) for both Orange County Schools (OCS) and Chapel Hill-Carrboro City Schools (CHCCS). A draft of the full annual SAPFOTAC Report is complete and has been reviewed by the SAPFOTAC members. 2. SAPFOTAC The SAPFOTAC, comprised of representatives of both school systems, the Planning Directors of the County and Towns, and County Finance staff, is tasked to produce an annual report for the governing boards of each SAPFO partner outlining changes in actual membership, capacity, student projections, and their collective impacts on the Capital Investment Plan (CIP) and the future issuance of Certificates of Adequate Public Schools (CAPS). Orange County’s Planning Staff compiles the report, holds a meeting discussing the various aspects, and then prepares a draft report, which is reviewed by the SAPFO Technical Advisory Committee. 3. Membership Data CHCCS total increased from the previous year: 124 students (45) Elementary School 4 Middle School 165 High School OCS total decreased from the previous year: 105 students (110) Elementary School 6 Middle School (1) High School ( ) denotes decrease 4. Capacity Data The State of North Carolina passed legislation in 2017 resulting in a decrease in class size averages from 1:21 to 1:20 for kindergarten to third grade for the 2017-2018 school year. As a result, both school districts experienced a decrease in capacity at the elementary school level this school year. Changes in class size averages resulted in a loss of 165 seats for CHCCS and 333 seats for OCS. OCS experienced a greater loss in capacity due to the adjusting of average class sizes this school year in order to prepare 2 for future reductions. The 10-year projection worksheets illustrate capacity changes at the elementary school level. 5. Capacity Information SAPFO vs. DPI The SAPFO is a local ordinance, independent of State Department of Public Instruction (DPI) projections and rules regarding class size. The SAPFO, for instance, does not count temporary modular classrooms as fulfilling the capacity level of service outlined in the SAPFO interlocal Memorandum of Understanding (MOU). The MOU requires ‘bricks and mortar’ instead of temporary facilities and also requires its own set of future student projections to identify long-term capital school construction needs. However, the County did phase in the smaller class size mandates in previous years that decreased capacity. Decisions will have to be made if new discussions at the state level create any class size changes that should or should not be reflected in the County’s SAPFO. Future decisions would reflect the timing and impact of new state legislation. This year, CHCCS and OCS did not exceed the adopted level of service standards established in the SAPFO, nor do projections show a potential need for additional capacity at the elementary, middle, and high school levels within the 10-year planning period. 6. Student Projection Analysis CHCCS Student membership projections show a mix of increases and decreases at all levels within the 10-year planning period. Projections are shown on page 37 of the report. OCS Student membership projections show a mix of increases and decreases at all levels within the 10-year planning period. Projections are shown on page 36 of the report. The City of Mebane lies partially within Orange County and students within the Orange County portion of Mebane attend Orange County schools. However, Mebane does is not party to the SAPFO agreement and does not require that CAPS be issued prior to development approvals. Although the SAPFO system is not formally regulated in Mebane, students residing within the Orange County portion of Mebane are accounted for in the SAPFO process with the annual reporting of student membership and growth rates contained in the 10-year student projections. 7. School Capacity CIP Needs Analysis CHCCS Projected needs: Elementary School Projections show no needs in the next 10 years Middle School Projections show no needs in the next 10 years High School Projections show no needs in the next 10 years OCS Projected needs: Elementary School Projections show no needs in the next 10 years Middle School Projections show no needs in the next 10 years High School Projections show no needs in the next 10 years NOTE: School capacity changes as part of a school renovation/upgrade project will be reviewed as necessary by the BOCC and school districts. 3 8. Student Generation Rates The updated student generation rates were approved on May 19, 2015 and are shown in Attachment II.E.1 on page 43 of the report. Updated rates began to be used for CAPS issuances in the fall of 2015 and are based on an inventory of recently built units from January 1, 2004 to December 31, 2013. 9. Access to Full Report The draft SAPFOTAC report will be posted on the Orange County Planning Department’s web site. A letter and the Executive Summary of the report will be sent to all SAPFO partners after this BOCC meeting advising them of the availability of the draft report and inviting comment. It is anticipated the draft 2018 SAPFOTAC report will be brought back to the BOCC for certification at the May 15, 2018 regular meeting. 10. Additional Information There are two primary parts to the SAPFO system. The first part, Certificate of Adequate Public Schools (CAPS), is the testing and gaging of the student generation rate (SGR) from development projects against available capacity within the schools. The second part, student projections and capacity needs assessment, is the tracking of historical enrollment and the projection of future student enrollment against existing capacity at a certain school level. This part is not directly related to a development project, but a current year outcome of how many children actually ‘show up’ in a school year. This includes new students that also come from existing housing stock. The purpose of explaining these two parts of the SAPFO system is to illustrate how projects can be approved as part of the CAPS system when capacity is available yet aberration in actual enrollment can cause future year projections to accelerate capital needs dramatically. The 10-year student projections developed for the SAPFO Annual Report forecast future school needs based on current student membership numbers and historic growth rates derived by the five projection models. The process accounting for students once they are actually enrolled in the school system emphasizes a delay that exists from the time a residential development is approved and developed to when students begin to enter the system. For example, the proposed residential growth that has occurred in the recent past within Mebane’s jurisdiction has yet to be seen with OCS student membership numbers and fully entered into the historically based projection methods. Orange County staff will continue to work with the SAPFO Technical Advisory Committee and our planning partners to monitor future residential development throughout Orange County. In summary, although the SAPFO Technical Advisory Committee report does not show immediate capital needs, the development approvals in both school districts will, after a normal lag, accelerate capital school needs and renovations based on localized student increases at specific schools. These local impacts will have to be analyzed by the school district to determine the best method to resolve new demands (i.e. redistricting, renovation, new school construction, etc.). FINANCIAL IMPACT: Current student growth projections do not show capacity needs for additional schools in either the CHCCS District or OCS District during the 10-year projection period. 4 SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to this agenda item: • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. RECOMMENDATION(S): The Manager recommends the Board: 1. Receive the 2018 SAPFOTAC Annual Report; and 2. Authorize the Chair to sign the transmittal letter to SAPFO partners contained in Attachment 1. 5 March 21, 2018 Pam Hemminger, Mayor Dr. Stephen H. Halkiotis, Chair Town of Chapel Hill Orange County Board of Education 405 Martin Luther King Jr. Blvd. 200 E. King Street Chapel Hill, NC 27514 Hillsborough, NC 27278 Lydia Lavelle, Mayor Rani Dasi, Chair Town of Carrboro Chapel Hill-Carrboro Board of Education 301 W. Main Street 750 Merritt Mill Road Carrboro, NC 27510 Chapel Hill, NC 27516 Tom Stevens, Mayor Town of Hillsborough P.O. Box 429 Hillsborough, NC 27278 Subject: Schools Adequate Public Facilities Ordinance Technical Advisory Committee (SAPFOTAC) Annual Report Dear Sir or Madam: This letter is to update you on the status of the 2018 Annual SAPFOTAC Report. In accordance with the SAPFO Memoranda of Understanding (MOU), the Board of County Commissioners (BOCC) approved the November 15, 2017 actual membership and capacity numbers for Orange County Schools and Chapel Hill – Carrboro City Schools at its meeting on December 12, 2017. The SAPFOTAC, comprised of representatives of both school systems and the Planning Directors of the County and Towns has produced the 2018 Annual Report. As per the SAPFO MOU, the annual technical report contains information on Level of Service, Building Capacity, Membership Date, Capital Investment Plan, Student Membership Projection Methodology, Student Membership Projections, Student Membership Growth Rate, Student/Housing Generation Rate, and the SAPFO Process. Enclosed for your use are copies of the 2018 Executive Summary and the March 20, 2018 BOCC meeting agenda item abstract when the BOCC received the draft report. The full draft SAPFOTAC report is available on the Orange County Planning Department website in the Current Interest Projects section at the following link: http://www.co.orange.nc.us/planning/SpecialProjects.asp The 2018 Annual SAPFOTAC Report is scheduled to be certified by the BOCC at a regular meeting in May 2018. Therefore, if you have any comments pertaining to the report, please forward them to Craig N. Benedict, Planning Director, no later than 5:00 p.m. on April 23, 2018. Mr. Benedict can be reached by phone at (919) 245-2592 or by e-mail at cbenedict@orangecountync.gov. Any comments received will be part of our agenda package in May. BOCC Letterhead Attachment 1 6 Please share this information and the 2018 SAPFOTAC report with your respective boards. Sincerely, Mark Dorosin Chair Enclosures cc: Board of County Commissioners Bonnie Hammersley, Orange County Manager Travis Myren, Deputy Orange County Manager Roger L. Stancil, Manager, Town of Chapel Hill David Andrews, Manager, Town of Carrboro Eric Peterson, Manager, Town of Hillsborough Pamela Baldwin, Superintendent, Chapel Hill-Carrboro City Schools Todd Wirt, Superintendent, Orange County Schools Todd LoFrese, Assistant Superintendent for Support Services, Chapel Hill–Carrboro City Schools Catherine Mau, Coordinator for Student Enrollment, Chapel Hill-Carrboro City Schools Patrick Abele, Chief Operations Officer, Orange County Schools Craig Benedict, Planning Director, Orange County Ben Hitchings, Planning and Development Services Director, Town of Chapel Hill Margaret Hauth, Planning Director, Town of Hillsborough Trish McGuire, Planning Director, Town of Carrboro 7 ORANGE COUNTY, NC SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PREPARED BY A STAFF COMMITTEE: PLANNING DIRECTORS, SCHOOL REPRESENTATIVES, TECHNICAL ADVISORY COMMITTEE (SAPFOTAC) (PURSUANT TO PROVISIONS OF A MEMORANDUM OF UNDERSTANDING ADOPTED IN 2002 & 2003) (ORDINANCES ADOPTED IN JULY 2003) Annual Report 2018 (BASED ON NOVEMBER 2017 DATA) CERTIFIED BY THE BOCC ON MAY X, 2018 Attachment 2 8 Table of Contents 2018 SAPFOTAC Executive Summary ............................................................................................................................ i Introduction........................................................................................................................................................................ v Schools Adequate Public Facilities Ordinance Partners ............................................................................................... vi Planning Directors/School Representatives Technical Advisory Committee ............................................................. vii I. Base Memorandum of Understanding ......................................................................................................................... 1 A. Level of Service ..................................................................................................................................................... 1 B. Building Capacity and Membership ................................................................................................................... 2 Attachment I.B.1 Orange County School Capacity (Elementary, Middle, & High) (2016-17) .............................................. 5 Attachment I.B.2 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2016-17)........................................... 8 Attachment I.B.3 Orange County School Capacity (Elementary, Middle, & High) (2017-18) .................................................. 11 Attachment I.B.4 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2017-18)......................................... 14 C. Membership Date................................................................................................................................................ 17 II.Annual Update to Schools Adequate Public Facilities Ordinance System ............................................................ 18 A. Capital Investment Plan (CIP) .......................................................................................................................... 18 B. Student Membership Projection Methodology ................................................................................................ 19 Attachment II.B.I – Student Membership Projection Descriptions............................................................................................. 20 Attachment II.B.2 – Student Membership Projection Models Performance Analysis (2016-17) ............................................... 21 Attachment II.B.3 – Student Membership Projection Models Performance Analysis (2017-18) ............................................... 25 C. Student Membership Projections ...................................................................................................................... 29 Attachment II.C.1 – Orange County Student Projections (Elementary, Middle, & High) (2016-17) ......................................... 34 Attachment II.C.2 – Chapel Hill/Carrboro Student Projections (Elementary, Middle, & High) (2016-17) ............................... 35 Attachment II.C.3 – Orange County Student Projections (Elementary, Middle, & High) (2017-18) ......................................... 36 Attachment II.C.4 – Chapel Hill/Carrboro Student Projections (Elementary, Middle, & High) (2017-18) ............................... 37 D. Student Membership Growth Rate ................................................................................................................... 38 Attachment II.D.1 – Orange County and Chapel Hill/Carrboro Student Growth Rates (Chart dates from 2017-2027 based on 11/14/16 membership numbers) (2016-17) .................................................................. 39 Attachment II.D.2 – Orange County and Chapel Hill/Carrboro Student Growth Rates (Chart dates from 2018-2028 based on 11/15/17 membership numbers) (2017-18) .................................................................. 40 E. Student / Housing Generation Rate .................................................................................................................. 41 Attachment II.E.1 – Current Student Generation Rates (2015) .................................................................................................. 43 III.Flowchart of Schools Adequate Public Facilities Ordinance Process .......................................................... 44 A. Capital Investment Plan (CIP) (Process 1) ....................................................................................................... 44 Attachment III.A.1 – Process 1 Capital Improvement Plan ........................................................................................................ 45 B. Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) Update (Process 2) .............................................................................................................................................. 46 Attachment III.B.1 – Process 2 Certificate of Adequate Public Schools (CAPS) Allocation ..................................................... 47 9 i 2018 SAPFOTAC Executive Summary I. Base Memorandum of Understanding A. Level of Service ....................................................................(No Change) ........Pg. 1 Chapel Hill/Carrboro School District Orange County School District Elementary 105% 105% Middle 107% 107% High 110% 110% B. Building Capacity and Membership ..................................(Change) ..............Pg. 2 Chapel Hill/Carrboro School District Orange County School District Capacity Membership Increase from Prior Year Capacity Membership Increase from Prior Year Elementary 5664 5522 (45) 3361 3183 (110) Middle 2944 2833 4 2166 1730 6 High 3875 3927 165 2439 2445 (1) C. Membership Date – November 15 .......................................(No Change) ........Pg.17 II. Annual Update to SAPFO System A. Capital Investment Plan (CIP) ...........................................(No Change) ........Pg. 18 B. Student Membership Projection Methodology .................(No Change) ........Pg. 19 The average of 3, 5, and 10 year history/cohort survival, linear and arithmetic projection models. C. Student Membership Projections .......................................(Change) ..............Pg. 29 Analysis of 5 Years of Projections for 2017-18 School Year – Chapel Hill/Carrboro City Schools (The first column for each year includes the student membership projection made for 2017-18 in that given year. The second column for each year includes the number of students the projection was off compared to actual membership. An “L” indicates the proje ction was low compared to the actual, whereas an “H” indicates the projection was high compared to the actual.) Year Projection Made for 2017-18 Membership Actual 2017 Membership 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Elementary 5522 5875 H353 5927 H405 5730 H208 5584 H62 5605 H83 Middle 2833 3072 H239 2999 H166 2966 H133 2854 H21 2847 H14 High 3927 4108 H181 3982 H55 3858 L69 3820 L107 3832 L95 10 ii Analysis of 5 Years of Projections for 2017-18 School Year – Orange County Schools (The first column for each year includes the student membership projection made for 2017-2018 in that given year. The second column for each year includes the number of students the projection was off compared to actual membership. An “L” indicates the projection was low compared to the actual, whereas an “H” indicates the projection was high compared to the actual.) Year Projection Made for 2017-18Membership Actual 2017 Membership 2012-13 2013-14 2014-15 2015-16 2016-17 Elementary 3183 3654 H471 3627 H444 3234 H51 3308 H125 3253 H70 Middle 1730 1824 H94 1862 H132 1782 H52 1776 H46 1751 H21 High 2445 2472 H27 2533 H88 2581 H136 2539 H94 2480 H35 D. Student Membership Growth Rate ....................................(Change) ..............Pg. 39 Projected Average Annual Growth Rate over Next 10 Years Chapel Hill/Carrboro School District Orange County School District Year Projection Made: 2013-14 2014-15 2015-16 2016-17 2017-18 2013-14 2014-15 2015-16 2016-17 2016-17 Elementary 1.44% 1.11% 0.92% 0.91% 0.36% 1.30% 0.55% 0.80% 0.51% 0.58% Middle 1.58% 1.15% 0.82% 0.95% 0.21% 1.42% 0.09% 0.67% 0.36% 0.13% High 1.27% 1.22% 0.93% 0.72% 0% 1.35% 0.39% 0.56% 0.22% -0.10% E. Student / Housing Generation Rate ..................................(No Change) ........Pg. 42 SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS (based on future year Student Membership Projections) CHAPEL HILL/CARRBORO SCHOOL DISTRICT Elementary School Level A. Does not currently exceed 105% LOS standard (current LOS is 97.5%). B. The projected growth rate at this level is expected to decrease over the next 10 years, but remain positive (average ~0.36% per year compared to 1.15% over the past 10 years). C. Similar to last year, projections are not showing a need for an additional Elementary School in the 10-year projection period. Middle School Level A. Does not currently exceed 107% LOS standard (current LOS is 96.2%). B. The projected growth rate at this level is expected to decrease over the next 10 years, but remain positive (average ~0.21% compared to an average of 1.15% over the past 10 years). C. Similar to last year, projections are not showing a need for an additional Middle School in the 10-year projection period. High School Level A. Does not currently exceed the 110% LOS standard (current LOS is 101.3%). B. The projected growth rate at this level is expected to decrease over the next 10 years (average ~0.0% compared to 0.59% over the past 10 years). 11 iii C. Similar to last year, projections are not showing a need to expand Carrboro High School from the initial capacity of 800 students to the ultimate capacity of 1,200 students in the 10-year projection period. ORANGE COUNTY SCHOOL DISTRICT Elementary School Level A. Does not currently exceed 105% LOS standard (current LOS is 94.7%). B. The projected growth rate at this level is expected to decrease, but remain positive over the next 10 years (average ~0.58% compared to 0.72% over the past 10 years). C. Similar to last year, projections are not showing a need for an additional Elementary School in the 10-year projection period. Middle School Level A. Does not currently exceed 107% LOS standard (current LOS is 79.9%). B. The projected growth rate at this level is expected to decrease, but remain positive over the next 10 years (average ~0.13% compared to 0.90% over the past 10 years). C. Similar to last year, projections are not showing a need for an additional Middle School in the 10-year projection period. High School Level A. Does not currently exceed 110% LOS standard (current LOS is 100.2%). B. The projected growth rate at this level is expected to decrease the next 10 years (average ~ -0.10% compared to 1.16% over the past 10 years). C. Similar to last year, projections are not showing a need to expand Cedar Ridge High School from the initial capacity of 1,000 students to 1,500 students in the 10-year projection period. ADDITIONAL INFORMATION The Schools Adequate Public Facilities Ordinance (SAPFO) student projections illustrate when the adopted level of service capacities are forecasted to be met and/or exceeded in anticipation of CIP planning and the construction of a new school. Both school districts continue planning efforts to renovate and expand existing facilities to address school capacity needs in a more feasible way. Additional capacity resulting from school renovations and expansions will be added to the projection models in stages, once funding is approved, versus the addition of greater capacity when a new school is constructed and completed. The renovation and expansion to existing facilities may delay construction of new schools further into the future. This process will pose some challenges to SAPFO compared to the existing process which indicates in advance when a completely new school is needed. Decisions on the timing of reconstruction (i.e. capacity additions) funding would be directly linked to the SAPFO model at the appropriate time. SAPFO student projections for this year are not showing a need for new school construction or expansion in the 10-year projection period for both school districts due to slowing student growth rates. However, planned residential development in the near future may increase student membership and accelerate school construction and expansion needs into the 10-year projection period. Although capacity and construction needs are not identified this year, both school districts face a large backlog of school capital maintenance and renovation projects that need to 12 iv be addressed. Given that student projections are not showing an immediate need for school construction in the 10-year period, this may provide the time for both school districts to commence and/or complete these projects in order to address ongoing needs. Changes in Average Class Size The State of North Carolina passed legislation in 2017 resulting in a decrease in class size averages from 1:21 to 1:20 for kindergarten to third grade for the 2017-2018 school year. As a result, both school districts experienced a decrease in capacity at the elementary school level this school year. This legislation also proposed an additional decrease in class size averages from 1:20 to 1:17 for kindergarten to third grade for the 2018-19 school year. Due to significant statewide ramifications as a result of the reduced class size averages, the North Carolina General Assembly unveiled House Bill 90 which allows for a phasing-in process to address the decrease in class size averages over the next four years. Based on House Bill 90, average class sizes for kindergarten to third grade will face a decrease from 1:20 to 1:19 for the 2019-2020 school year, 1:19 to 1:18 for the 2020-21 school year, and 1:18 to 1:17 for the 2021-2022 school year. Overtime the phasing-in of the 1:17 class size averages will result in a decrease in capacity of approximately 660 students for CHCCS. Due to a waiver from the state, CHCCS will have an additional year to plan for impacts resulting from changes in class size. OCS has begun the process of adjusting average class sizes this school year in order to prepare for future reductions. The SAPFO Technical Advisory Committee will continue to monitor this issue and determine the need for the reconvening of the Joint Action Committee in the future. Charter Schools Currently, there are two Charter Schools located in the Town of Hillsborough. Eno River Academy (K-12) serves 326 students and The Expedition School (K-8) serves 542 students. Charter and private schools are not included as part of the SAPFO Annual Report and, as a result, their membership and capacity numbers are not monitored or included in future projections. SAPFO projections are used for projecting only public school construction needs. However, the SAPFO Technical Advisory Committee does monitor charter and private schools and their effect on student enrollment in both school districts. If a charter or private school were to close and a spike were to be realized in school enrollment, the student projections would likely accelerate the need for additional capacity in future years, but likely still within an appropriate time for CIP planning. Charter Schools are also monitored by the Department of Public Institution (DPI) which provides pupil information, based on data received from Charter Schools located in Orange County, to the County for funding purposes. Although charter and private schools numbers are not collected for SAPFO purposes, impacts due to enrollment at these schools are accounted for in SAPFO process with the annual reporting of student membership and growth rates contained in the 10-year student projections. 13 v Orange County, NC School Adequate Public Facilities Ordinance Introduction The Schools Adequate Public Facilities Ordinance (SAPFO) and its Memorandum of Understanding are ordinances and agreements, respectively. Supporting documents are anticipated to be dynamic to incorporate the annual changing conditions of membership, capacity and student projections that may affect School Capital Investment Plan (CIP) timing. This formal annual report will be forthcoming to all of the Schools Adequate Public Facilities Ordinance partners each year as new information is available. This updated information is used in the schools capital needs process of the Capital Investment Plan (Process 1) and within elements of the Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) spreadsheet system (Process 2). This report and any comments from the Schools Adequate Public Facilities Ordinance partners will be considered in the first half of each year by the Board of County Commissioners at a regular or special meeting. The various elements of the report are then “certified” and formally considered in the process of the upcoming Capital Investment Plan. The Certificate of Adequate Public Schools system is updated after November 15 when data is received from the school districts with actual membership and pre-certified capacity (i.e. CIP capacity or prior “joint action” capacity changes). The Schools Adequate Public Facilities Ordinance and Memorandum of Understanding have dynamic aspects. The derivation of the baseline and update to the variables will continue in the future as a variety of school related issues are fine-tuned by technical and policy groups. The primary facet of this report includes the creation of mathematical projections for student memberships by school levels (Elementary, Middle and High) and by School Districts (Chapel Hill/Carrboro and Orange County). This information is found in Section II, Subsections B, C, D, and E. In summary, this report serves as an update to the dynamic conditions of student membership and school capacity which affect future projected needs considered in Capital Investment Planning. 14 vi Interested parties may make their comments known to the Board of County Commissioners prior to their review of the report and school CIP completion or ask questions of the SAPFOTAC members. Schools Adequate Public Facilities Ordinance Partners ANNUAL REPORT AS OUTLINED IN Schools Adequate Public Facilities Ordinance Memorandum of Understanding (SAPFO MOU) SECTION 1d RESPECTFULLY SUBMITTED TO SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PARTNERS Chapel Hill/Carrboro School District SAPFO Orange County School District SAPFO Board of County Commissioners Board of County Commissioners Carrboro Board of Aldermen Hillsborough Town Council Chapel Hill Town Council Chapel Hill/Carrboro School Board Orange County School Board 15 vii Planning Directors/School Representatives Technical Advisory Committee (aka SAPFOTAC) Town of Carrboro Trish McGuire, Planning Director 301 West Main Street Carrboro, NC 27510 Town of Chapel Hill Ben Hitchings, Planning and Development Services Director 405 Martin Luther King, Jr. Blvd. Chapel Hill, North Carolina 27514 Town of Hillsborough Margaret Hauth, Planning Director P.O. Box 429 Hillsborough, NC 27278 Orange County Planning Department Craig Benedict, Planning Director Ashley Moncado, Special Projects Planner Gary Donaldson, Director of Finance and Administrative Services 131 W. Margaret Lane P.O. Box 8181 Hillsborough, NC 27278 Orange County School District Todd Wirt, Superintendent Patrick Abele, Chief Operations Officer 200 E. King Street Hillsborough, NC 27278 Chapel Hill-Carrboro School District Todd LoFrese, Assistant Superintendent for Support Services Catherine Mau, Coordinator of Student Enrollment 750 Merritt Mill Road Chapel Hill, NC 2751 16 1 I. Base Memorandum of Understanding A. Level of Service 1. Responsible Entity for Suggesting Change – Change can only be effectuated by amendment to Memorandum of Understanding (MOU) by all SAPFO partners. 2. Definition – Level of Service (LOS) means the amount (level) of students that can be accommodated (serviced) at a certain school system grade group [i.e., Elementary level (K-5), Middle Level (6-8), High School Level (9-12)]. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District Elementary Middle High School Elementary Middle High School 105% 107% 110% 105% 107% 110% 4. Analysis of Existing Conditions: Analysis of Existing Conditions: Chapel Hill/Carrboro School District Orange County School District These standards are acceptable at this time. These standards are acceptable at this time. 5. Recommendation: Recommendation: Chapel Hill/Carrboro School District Orange County School District No change from above standard. No change from above standard. 17 Section I 2 B. Building Capacity and Membership 1. Responsible Entity for Suggesting Change – The Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) will receive requested changes that are CIP related and adopted in the prior year. CIP capacity changes will be updated along with actual membership received in November of each year. Other changes will be sent to a ‘Joint Action Committee’ of the BOCC and Board of Education, as noted in the MOU, who will make recommendations and forward changes (on the specific forms with justification) to the full Board of County Commissioners for review and action. These non- CIP changes would be updated in the upcoming November CAPS system recalibration and included in the SAPFOTAC report. 2. Definition – “For purposes of this Memorandum, "building capacity" will be determined by reference to State guidelines and the School District guidelines (consistent with CIP School Construction Guidelines/policies developed by the School District and the Board of County Commissioners) and will be determined by a joint action of the School Board and the Orange County Board of Commissioners. As used herein the term "building capacity" refers to permanent buildings. Mobile classrooms and other temporary student accommodating classroom spaces are not permanent buildings and may not be counted in determining the school districts building capacity.” 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District The original certified capacity for each of the schools was certified by the respective superintendent and incorporated in the initialization of the CAPS system (Chapel Hill Carrboro School District April 29, 2002 - Base) The original certified capacity for each of the schools was certified by the respective superintendent and incorporated in the initialization of the CAPS system (Orange County School District April 30, 2002 - Base) Capacity changes were made each year as follows: Capacity changes were made each year as follows: 2003: Increase of 619 at Rashkis Elementary. 2004: No changes at Elementary, Middle, or High School levels. 2005: No changes at Elementary, Middle, or High 2003: No net increase in capacity at Elementary level. No changes at Middle School level. Increase of 1,000 at Cedar Ridge High School. 2004: No net increase in capacity at Elementary 18 Section I 3 School levels. 2006: No changes at Elementary, Middle, or High School levels. 2007: An increase of 800 at the High School level with the opening of Carrboro High School. 2008: An increase of 323 at the Elementary School level due to the opening of Morris Grove Elementary School and the implementation of the 1:21 class size ratio in grades K-3 2009: No changes at Elementary, Middle, or High School levels. 2010: An increase in capacity of 40 students at the High School level with Phoenix Academy High School becoming official high school within the district 2011: No changes at Elementary, Middle, or High School levels. 2012: No changes at Elementary, Middle, or High School levels. 2013: An increase in capacity of 585 students due to the opening of Northside Elementary School. 2014: An increase in capacity of 104 students due to the opening of the Culbreth Middle School addition. 2015: No changes at Elementary, Middle, or High School levels. 2016: No changes at Elementary, Middle, or High School levels. 2017: A decrease in capacity of 165 students due to the implementation of the 1:20 class size ratio in grades K-3. level. No changes at Middle or High School levels. 2005: An increase in capacity of 100 at Hillsborough Elementary with the completion of renovations. 2006: An increase in capacity of 700 at the Middle School level with the completion of Gravelly Hill Middle School and an increase of 15 at the High School level with the temporary location of Partnership Academy Alternative School. An increase of 2 at the Elementary level due to a change in the capacity calculation for each grade at each school. 2007: No changes at Elementary, Middle, or High School levels. 2008: A decrease of 228 at the Elementary School level due to the implementation of the 1:21 class size ratio in grades K-3 and an increase of 25 at the High School level with the completion of the new Partnership Academy Alternative School. 2009: No changes at Elementary, Middle, or High School levels. 2010: No changes at Elementary, Middle, or High School levels. 2011: No changes at Elementary, Middle, or High School levels. 2012: No changes at Elementary or Middle School levels. A decrease of 119 at High School level as a result of a N.C. Department of Public Instruction (DPI) study. 2013: No changes at Elementary, Middle, or High 19 Section I 4 School levels. 2014: No changes at Elementary, Middle, or High School levels. 2015: No changes at Elementary, Middle, or High School levels. 2016: No changes at Elementary, Middle, or High School levels. 2017: A decrease in capacity of 333 students due to the implementation of the 1:20 class size ratio in grades K-3. 4. Analysis of Existing Conditions: Analysis of Existing Conditions: Chapel Hill/Carrboro School District Orange County School District The Schools Facilities Task Force developed a system to calculate capacity. Any changes year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The Schools Facilities Task Force developed a system to calculate capacity. Any changes year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The requested 2017-18 capacity is noted on Attachment I.B.4 The requested 2017-18 capacity is noted on Attachment I.B.3 5. Recommendation: Recommendation: Chapel Hill/Carrboro School District Orange County School District Accept school capacities at all levels, as reported by CHCCS and shown in Attachment I.B.4. Accept school capacities at all levels, as reported by OCS and shown in Attachment I.B.3. 20 Section I 5 Attachment I.B.1 Orange County School Capacity (Elementary, Middle, & High) (2016-17) (Page 1 of 3) 21 Section I 6 Attachment I.B.1 Orange County School Capacity (Elementary, Middle, & High) (2016-17) (Page 2 of 3) 22 Section I 7 Attachment I.B.1 Orange County School Capacity (Elementary, Middle, & High) (2016-17) (Page 3 of 3) 23 Section I 8 Attachment I.B.2 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2016-17) (Page 1 of 3) 24 Section I 9 Attachment I.B.2 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2016-17) (Page 2 of 3) 25 Section I 10 Attachment I.B.2 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2016-17) (Page 3 of 3) 26 Section I 11 Attachment I.B.3 Orange County School Capacity (Elementary, Middle, & High) (2017-18) (Page 1 of 3) 27 Section I 12 Attachment I.B.3 Orange County School Capacity (Elementary, Middle, & High) (2017-18) (Page 2 of 3) 28 Section I 13 Attachment I.B.3 Orange County School Capacity (Elementary, Middle, & High) (2017-18) (Page 3 of 3) 29 Section I 14 Attachment I.B.4 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2017-18) (Page 1 of 3) 30 Section I 15 Attachment I.B.4 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2017-18) (Page 2 of 3) 31 Section I 16 Attachment I.B.4 Chapel Hill/Carrboro School Capacity (Elementary, Middle, & High) (2017-18) (Page 3 of 3) 32 Section II 17 C. Membership Date 1. Responsible Entity for Suggesting Change – Change can be effectuated only by amendment to Memorandum of Understanding (MOU) by all SAPFO partners. The Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) may advise if a change in date would improve the reporting or timeliness of the report. 2. Definition – The date at which student membership is calculated. This date is updated each year and also serves as the basis for projections along with the history from previous years. “For purposes of this Memorandum, the term "school membership" means the actual number of students attending school as of November 15 of each year. The figure is determined by considering the number of students enrolled (i.e. registered, regardless of whether a student is no longer attending school) and making adjustments for withdrawals, dropouts, deaths, retentions and promotions. Students who are merely absent from class on the date membership is determined as a result of sickness or some other temporary reason are included in school membership figures. Each year the School District shall transmit its school membership to the parties to this agreement no later than five (5) school days after November 15. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District November 15 of each year November 15 of each year 4. Analysis of Existing Conditions: This will be analyzed in the future years to determine if it is an exemplary date. 5. Recommendation: Recommendation: Chapel Hill/Carrboro School District Orange County School District No change at this time. No change at this time. 33 Section II 18 II. Annual Update to Schools Adequate Public Facilities Ordinance System A. Capital Investment Plan (CIP) 1. Responsible Entity for Suggesting Change – The updating of this section will be conducted by the Board of County Commissioners (BOCC) after review of the CIP requests from the School Districts. Action regarding CIP programs usually occurs during the BOCC budget Public Hearing process in the winter and spring of each year. The development of the CIP considers the conditions noted in the SAPFOTAC report released in the same CIP development year including LOS (level of service), capacity, and membership projections. 2. Definition – The process and resultant program to determine school needs and provide funding for new school facilities through a variety of funding mechanisms. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District Not Applicable Not Applicable 4. Analysis of Existing Conditions: The MOU outlines a system of implementing the SAPFO, including issuing Certificates of Adequate Public Schools (CAPS) to new development if capacity is available. The Requests for CAPS will be evaluated using the most recently adopted Capital Investment Plan. A new Capital Investment Plan is currently under development for approval prior to June 30, 2018. 5. Recommendation: Not subject to staff review 34 Section II 19 B. Student Membership Projection Methodology 1. Responsible Entity for Suggesting Change – This section is reviewed and recommended by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) to the BOCC for change, if necessary. 2. Definition – The method(s) by which student memberships are calculated for future years to determine total membership at each combined school level (Elementary, Middle, and High School) which take into consideration historical membership totals at a specific time (November 15) in the school year. These methods are also known as ‘models’. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District Presently, the average of five models is being used: namely 3, 5, and 10 year history/cohort survival methods, Orange County Planning Department Linear Wave, and Tischler Linear methods. Attachment II.B.1 includes a description of each model. 4. Analysis of Existing Conditions: Performance of the models is monitored each year. The value of a projection model is in its prediction of school level capacities at least three years in advance of capacity shortfalls so the annual Capital Investment Plan (CIP) updates can respond proactively with siting, design, and construction. Attachment II.B.1 includes a description of each model. Attachment II.B.3 shows the performance of the models for the 2015-16 school year from the prior year projection. 5. Recommendation: More than fifteen years of projection results are now available. Analysis on the accuracy of the results is showing that some models have better results in one district while others have better results in the other district. The historic growth rate is recorded by the models, but projected future growth is more difficult to accurately quantify. In all areas of the county, proposed growth is not included in the SAPFO projection system until actual students begin enrollment. The system is updated in November of each year, becoming part of the historical projection base. 35 Section II 20 Attachment II.B.I – Student Membership Projection Descriptions 36 Section II 21 Orange County School District School Membership 2016-2017 School Year (November 15, 2016) 11/13/15 Actual 2015-16 2016 Report Projection for 2016-17 11/15/16 Actual 2016-17 Change between actual Nov 2015 - Nov 2016 Elementary 3318 3293 -25 Model Projection is T 3366 H73 OCP 3376 H83 10C 3306 H13 5C 3289 L4 3C 3288 L5 AVG 3325 H32 11/13/15 11/15/16 Middle 1739 1724 -15 Model Projection is T 1764 H40 OCP 1769 H45 10C 1733 H9 5C 1726 H2 3C 1724 Equal AVG 1743 H19 11/13/15 11/15/16 High 2469 2446 -23 Model Projection is T 2504 H58 OCP 2511 H65 10C 2478 H32 5C 2506 H60 3C 2519 H73 AVG 2504 H58 Totals 11/13/15 11/15/16 Elementary 3318 3293 Middle 1739 1724 High 2469 2446 7526 7463 -63 Model Projection is T 7634 H171 OCP 7656 H193 10C 7517 H54 5C 7521 H58 3C 7531 H68 AVG 7572 H109 H means High L means Low Attachment II.B.2 – Student Membership Projection Models Performance Analysis (2016-17) (Page 1 of 4) 37 Section II 22 Orange County School District School Membership 2016-2017 School Year (November 15, 2016) Statistical Findings PROJECTION TYPE ABBREVIATIONS ‘TISCHLER’ LINEAR (T) ORANGE COUNTY PLANNING (OCP) 10-YEAR COHORT (10C) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level  The projections were mixed low to high, ranging from 5 students below to 83 students above actual membership. On average, the projections were 32 students higher than the actual membership.  The membership actually decreased by 25 students between November 13, 2015 and November 15, 2016. Middle School Level  The majority of projections were all high, ranging from 2 students to 45 students above actual membership. One projection equaled actual membership. On average, the projections were 19 students higher than the actual membership.  The membership actually decreased by 15 students between November 13, 2015 and November 15, 2016. High School Level  Projections were all high, ranging from 32 to 73 students above actual membership. On average, the projections were 58 students higher than the actual membership.  The membership actually decreased by 23 students between November 13, 2015 and November 15, 2016. TOTAL  The totals of all school level projections were all high, ranging from 54 to 193 students above actual membership. On average, the projections were 109 students higher than the actual membership.  The membership decreased in total by 63 students, which is the sum of -25 at Elementary, -15 at Middle, and -23 at High. Attachment II.B.2 – Student Membership Projection Models Performance Analysis (2016-17) (Page 2 of 4) 38 Section II 23 Chapel Hill/Carrboro School District School Membership 2016-2017 School Year (November 15, 2016 11/13/15 Actual 2015-16 2016 Report Projection for 2016-17 11/15/16 Actual 2016-17 Change between actual Nov 2015 - Nov 2016 Elementary 5501 5567 +66 Model Projection is T 5576 H9 OCP 5602 H35 10C 5547 L20 5C 5534 L33 3C 5502 L65 AVG 5552 L15 11/13/15 11/15/16 Middle 2844 2829 -15 Model Projection is T 2883 H54 OCP 2878 H49 10C 2815 L14 5C 2798 L31 3C 2775 L54 AVG 2830 H1 11/13/15 11/15/16 High 3701 3762 +61 Model Projection is T 3752 L10 OCP 3792 H30 10C 3753 L9 5C 3757 L5 3C 3732 L30 AVG 3757 L5 Totals 11/13/15 11/15/16 Elementary 5501 5567 Middle 2844 2829 High 3701 3762 12,046 12,158 +112 Model Projection is T 12,211 H53 OCP 12,272 H114 10C 12,115 L43 5C 12,089 L69 3C 12,009 L149 AVG 12,139 L19 H means High L means Low Attachment II.B.2 – Student Membership Projection Models Performance Analysis (2016-17) (Page 3 of 4) 39 Section II 24 Chapel Hill/Carrboro School District School Membership 2016-2017 School Year (November 15, 2016) Statistical Findings PROJECTION TYPE ABBREVIATIONS ‘TISCHLER’ LINEAR (T) ORANGE COUNTY PLANNING (OCP) 10-YEAR COHORT (10C) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level  Projections were mixed, ranging from 65 students below to 35 students above actual membership. On average, the projections were 15 students lower than the actual membership.  The actual membership increased by 66 students between November 13, 2015 and November 15, 2016. Middle School Level  Projections were mixed, ranging from 54 students below to 54 students above actual membership. On average, the projections were 1 student higher than the actual membership.  The actual membership decreased by 15 students between November 13, 2015 and November 15, 2016. High School Level  The majority of projections were low, ranging from 30 to 5 students below actual membership. One projection was 30 students above actual membership. On average, the projections were 5 students lower than the actual membership.  The actual membership increased by 61 students between November 13, 2015 and November 15, 2016. TOTAL  The total of all school level projections were mixed, ranging from 149 students below to 114 students above actual membership. On average, the projections were 19 students lower than the actual membership.  The membership increased in total by 112 students, which is the sum of +66 at Elementary, -15 at Middle, and +61 at High. Attachment II.B.2 – Student Membership Projection Models Performance Analysis (2016-17) (Page 4 of 4) 40 Section II 25 Orange County School District School Membership 2017-18 School Year (November 15, 2017) 11/14/16 Actual 2016-17 2017 Report Projection for 2017-18 11/15/17 Actual 2017-18 Change between actual Nov 2016 - Nov 2017 Elementary 3293 3183 -110 Model Projection is T 3335 H152 OCP 3329 H146 10C 3213 H30 5C 3203 H20 3C 3188 H5 AVG 3253 H70 11/14/16 11/15/17 Middle 1724 1730 +6 Model Projection is T 1746 H16 OCP 1744 H14 10C 1763 H33 5C 1753 H23 3C 1750 H20 AVG 1751 H21 11/14/16 11/15/17 High 2446 2445 -1 Model Projection is T 2477 H32 OCP 2476 H31 10C 2472 H27 5C 2493 H48 3C 2482 H37 AVG 2480 H35 Totals 11/14/16 11/15/17 Elementary 3293 3183 Middle 1724 1730 High 2446 2445 7463 7358 -105 Model Projection is T 7558 H200 OCP 7549 H191 10C 7448 H90 5C 7449 H91 3C 7420 H62 AVG 7484 H126 H means High L means Low Attachment II.B.3 – Student Membership Projection Models Performance Analysis (2017-18) (Page 1 of 4) 41 Section II 26 Orange County School District School Membership 2017-2018 School Year (November 15, 2017) Statistical Findings PROJECTION TYPE ABBREVIATIONS ‘TISCHLER’ LINEAR (T) ORANGE COUNTY PLANNING (OCP) 10-YEAR COHORT (10C) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level  The projections were all high, ranging from 5 students to 152 students above actual membership. On average, the projections were 70 students higher than the actual membership.  The membership actually decreased by 110 students between November 14, 2016 and November 15, 2017. Middle School Level  The majority of projections were all high, ranging from 14 students to 33 students above actual membership. On average, the projections were 21 students higher than the actual membership.  The membership actually increased by 6 students between November 14, 2016 and November 15, 2017. High School Level  Projections were all high, ranging from 27 to 48 students above actual membership. On average, the projections were 35 students higher than the actual membership.  The membership actually decreased by 1 student between November 14, 2016 and November 15, 2017. TOTAL  The totals of all school level projections were all high, ranging from 62 to 200 students above actual membership. On average, the projections were 126 students higher than the actual membership.  The membership decreased in total by 105 students, which is the sum of -110 at Elementary, +6 at Middle, and -1 at High. Attachment II.B.3 – Student Membership Projection Models Performance Analysis (2017-18) (Page 2 of 4) 42 Section II 27 Chapel Hill/Carrboro School District School Membership 2017-18 School Year (November 15, 2017) 11/14/16 Actual 2016-17 2017 Report Projection for 2017-18 11/15/17 Actual 2017-18 Change between actual Nov 2016 - Nov 2017 Elementary 5567 5522 -45 Model Projection is T 5641 H119 OCP 5632 H110 10C 5599 H77 5C 5580 H58 3C 5575 H53 AVG 5605 H83 11/14/16 11/15/17 Middle 2829 2833 +4 Model Projection is T 2867 H34 OCP 2893 H60 10C 2844 H11 5C 2822 L11 3C 2807 L26 AVG 2847 H14 11/14/16 11/15/17 High 3762 3927 +165 Model Projection is T 3812 L115 OCP 3812 L115 10C 3850 L77 5C 3848 L79 3C 3839 L88 AVG 3832 L95 Totals 11/14/16 11/15/17 Elementary 5567 5522 Middle 2829 2833 High 3762 3927 12,158 12,282 +124 Model Projection is T 12,320 H38 OCP 12,337 H55 10C 12,293 H11 5C 12,250 L32 3C 12,221 L61 AVG 12,284 H2 H means High L means Low Attachment II.B.3 – Student Membership Projection Models Performance Analysis (2017-18) (Page 3 of 4) 43 Section II 28 Chapel Hill/Carrboro School District School Membership 2017-2018 School Year (November 15, 2017) Statistical Findings PROJECTION TYPE ABBREVIATIONS ‘TISCHLER’ LINEAR (T) ORANGE COUNTY PLANNING (OCP) 10-YEAR COHORT (10C) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level  Projections were all high ranging from 53 students to 119 students above actual membership. On average, the projections were 83 students higher than the actual membership.  The actual membership decreased by 45 students between November 14, 2016 and November 15, 2017. Middle School Level  Projections were mixed, ranging from 26 students below to 60 students above actual membership. On average, the projections were 14 students higher than the actual membership.  The actual membership increased by 4 students between November 14, 2016 and November 15, 2017. High School Level  Projections were all low, ranging from 77 to 115 students below actual membership. On average, the projections were 95 students lower than the actual membership.  The actual membership increased by 165 students between November 14, 2016 and November 15, 2017. TOTAL  The total of all school level projections were mixed, ranging from 61 students below to 55 students above actual membership. On average, the projections were 2 students higher than the actual membership.  The membership increased in total by 124 students, which is the sum of -45 at Elementary, +4 at Middle, and +165 at High. Attachment II.B.3 – Student Membership Projection Models Performance Analysis (2017-18) (Page 4 of 4) 44 Section II 29 C. Student Membership Projections 1. Responsible Entity for Suggesting Change – The updating of this section will be conducted by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) and referred to the BOCC for annual report certifications. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2. Definition – The result of the average of the five student projection models represented by 10 year numerical membership projections by school level (Elementary, Middle, and High) for each school district (Chapel Hill/Carrboro City School District and Orange County School District). 3. Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District The 5 model average discussed in Section II.B (Student Projection Methodology) See Attachment II.C.4 The 5 model average discussed in Section II.B (Student Projection Methodology) See Attachment II.C.3 4. Analysis of Existing Conditions The membership figures and percentage growth on the attachments show a decrease at the Chapel Hill/Carrboro City Schools’ elementary school level and at the Orange County Schools’ elementary and high school levels. The attachments show an increase at the Chapel Hill/Carrboro City Schools’ middle and high school levels and Orange County Schools’ middle school level. Chapel Hill/Carrboro Schools and Orange County Schools projected average annual growth rates have all decreased since the previous year. The projected annual growth rates show positive and negative growth for all three levels in the 10-year projection period. Attachment II.C.3 and Attachment II.C.4 show year by year percent growth and projected level of service (LOS). The projection models were updated using current (November 15, 2017) memberships. Ten years of student membership were projected thereafter. 45 Section II 30 Chapel Hill/Carrboro School District Elementary The previous year (2016-17) projections for November 2017 at this level were overestimated by 83 students. The actual membership decreased by 45 students. Over the previous ten years, this level has shown varying increases in growth rates including a decrease in actual membership in 2009-10 which was most likely due to the shorter enrollment period caused by the institution of the new date requiring kindergarteners to be five years old. Following that dip, membership numbers experienced an increase each year with a significant jump (168 students) in 2011-12 before experiencing a decrease in 2014-15, 2015-16, and this school year. Growth rates during the past ten years have ranged from -1.57% to +3.88%. The district’s eleventh elementary school, Northside Elementary School, opened in 2013. The need for an additional elementary school is not anticipated in the 10-year projection period. This is similar to last year’s projections. Although not included in SAPFO school capacity or membership numbers, Pre-K programs continue to impact operations at District elementary schools where Pre-K programs exist. Specific impacts of Pre-K programs at the elementary school level will continue to be reviewed and discussed in the coming year. Middle The previous year (2016-17) projections for November 2017 for this level were overestimated by 14 students. The actual membership increased by 4 students. Over the previous ten years, this level has shown varying increases before experiencing a decrease in 2015-16 and 2016-17. Growth rates during this time period have ranged from -0.59% to +2.86%. Capacity was increased in 2014 with the opening of the Culbreth Middle School science wing. The need for an additional middle school is not anticipated in the 10-year projection period. This is similar to last year’s projections. High School The previous year (2016-17) projections for November 20176 for this level were underestimated by 95 students. The actual membership increased by 165 students. Over the previous ten years, change has been variable with decreases in membership in five of the ten years. Growth rates during this time period have ranged from -1.74 to +3.27%. The need for additional high school 46 Section II 31 capacity at Carrboro High School is not anticipated in the 10-year projection period. This is similar to last year’s projections. Due to renovations to Chapel Hill High School, this level will experience an increase in capacity of 105 seats for the 2020-21 school year. Additional Information for Chapel Hill/Carrboro School District Following the economic downturn, there has been an increase in residential projects, specifically multifamily development, in the Town of Chapel Hill. Currently, there are over four thousand proposed single family and multifamily housing units approved, but undeveloped in the CHCCS district. As previously stated, proposed growth is not included in the SAPFO projection system until actual students begin enrollment. The CAPS test is conducted during the approval process at a certain stage. Once students are enrolled in a school year, through annual reporting of student membership numbers, 10-year student projections can be updated to display future capacity needs in time to efficiently plan for future school construction requests. Staff and the SAPFO Technical Advisory Committee will continue to monitor and evaluate the demand and growth of residential development in Chapel Hill and Carrboro as well as its effect on student membership rates. Due to the closing of Kestrel Heights Charter in Durham County in 2017, CHCCS reported an increase in membership at the high school level. Charter schools are not included as part of the SAPFO Annual Report and, as a result, their membership and capacity numbers are not monitored or included in future projections. However, the SAPFO Technical Advisory Committee does monitor charter schools and their effect on student enrollment at both school districts. If a charter school does close and a spike is realized in school enrollment, the student projections will likely accelerate the need in future years, still within an appropriate time for CIP planning. Charter Schools are additionally monitored by the Department of Public Institution (DPI) which provides pupil information, based on data received from Charter Schools located in Orange County, to the County for funding purposes. Orange County School District Elementary The previous year (2016-17) projections for November 2017 at this level were overestimated by 70 students. Actual membership decreased by 110 students. Over the previous ten years, this level experienced positive growth before experiencing a decrease in 2014-15, 2016-17, and this 47 Section II 32 school year. Growth rates during this period have ranged from -5.07% to +2.80%. In the Orange County school system, historic growth is more closely related to new residential development than in the Chapel Hill/Carrboro School District, which has a sizeable number of new families in older, existing housing stock. The need for an additional Elementary School is not anticipated in the 10 year projection period. This is similar to last year’s projections. Although not included in SAPFO school capacity or membership numbers, Pre-K programs continue to impact operations at District elementary schools where Pre-K programs exist. Specific impacts of Pre-K programs at the elementary school level will continue to be reviewed and discussed in the coming year. Middle The previous year (2016-17) projections for November 2017 for this level were overestimated by 21 students. The actual membership increased by 6 students. Over the previous ten years, growth has varied widely and includes decreases in student membership in four of the ten years. Growth rates during this period have ranged from -2.20% to +4.00%. The district’s third Middle School, Gravelly Hill Middle School, opened in October 2006. The need for an additional Middle School is not anticipated in the 10 year projection period. This is similar to last year’s projections. High School The previous year (2016-2017) projections for November 2017 for this level were overestimated by 35 students. The actual membership decreased by 1 student. Over the previous ten years, growth was positive before experiencing a decrease in membership in 2009-10. Following this decrease, membership and growth rates increased every school year before experiencing additional decreases in 2015-16, 2016-17, and this school year. Growth rates during this period ranged from -1.32% to 4.58%. In 2011-12 student membership increased by 32 while capacity decreased by 199 at Orange County High School as a result of a N.C. Department of Public Instruction (DPI) study. Similar to last year’s projections, the need for additional capacity at Cedar Ridge High School is not anticipated in the 10 year projection period. However, to address public safety concerns with the current high school capacity exceeding the 100% threshold, Orange County Schools is in preliminary planning stages to expand Cedar Ridge High School from initial capacity of 1,000 students to1,500 students for the 2020-21 school year. 48 Section II 33 Additional Information for Orange County School District The City of Mebane lies partially within Orange County and students within the Orange County portion of Mebane attend Orange County schools. However, the City of Mebane is not a party to the SAPFO agreement and therefore does not require that CAPS (Certificate of Adequate Public Schools) be issued prior to development approvals. Following the economic downtown, there has been a slight increase in approved and undeveloped residential development in the City of Mebane and the Town of Hillsborough. Currently, there are over two thousand proposed single family and multifamily housing units approved, but undeveloped in the City of Mebane and the Town of Hillsborough. The residential growth that has occurred in the recent past within Mebane’s and Hillsborough’s jurisdiction has yet to be seen with OCS student membership numbers and fully realized into the historically based projection methods due to the recession, charter schools, and possibly new family dynamics effecting family size. Staff and the SAPFO Technical Advisory Committee will need to continue monitoring and evaluating the demand and growth of residential development in Mebane and Hillsborough as well as its effect on student membership rates. Currently, there are two Charter Schools located in the Town of Hillsborough. Eno River Academy (K-12) serves 326 students and The Expedition School (K-8) serves 542 students. Both of these charter schools continue to have an effect on OCS membership numbers. Charter schools are not included as part of the SAPFO Annual Report and, as a result, their membership and capacity are not monitored or included in future projections. However, the SAPFO Technical Advisory Committee does monitor charter schools and their effect on student enrollment at both school districts. If a charter school were to close and a spike were to be realized in school enrollment, the student projections will likely accelerate the need for additional capacity in future years, still within an appropriate time for CIP planning. Charter Schools are also monitored by the Department of Public Institution (DPI) which provides pupil information, based on data received from Charter Schools located in Orange County, to the County for funding purposes. 5. Recommendation: Use statistics as noted in 3 above 49 Section II 34 Attachment II.C.1 – Orange County Student Projections (Elementary, Middle, & High) (2016-17) 50 Section II 35 Attachment II.C.2 – Chapel Hill/Carrboro Student Projections (Elementary, Middle, & High) (2016-17) 51 Section II 36 Attachment II.C.3 – Orange County Student Projections (Elementary, Middle, & High) (2017-18) 52 Section II 37 Attachment II.C.4 – Chapel Hill/Carrboro Student Projections (Elementary, Middle, & High) (2017-18) 53 Section II 38 D. Student Membership Growth Rate 1. Responsible Entity for Suggesting Change – The updating of this section will be conducted by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) each year and referred to the BOCC for annual report certification. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2. Definition – The annual percentage growth rate calculated from the projections resulting from the average of the five models represented by 10 year numerical membership projections by school level for each school district. This does not represent the year-by- year growth rate that may be positive or negative, but rather the average of the annual anticipated growth rates over the next 10 years. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District See Attachment II.D.2 See Attachment II.D.2 4. Analysis of Existing Conditions: Analysis of Existing Conditions: Chapel Hill/Carrboro School District Orange County School District The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Projected Average Annual Growth Rate over next ten years: The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Projected Average Annual Growth Rate over next ten years: 5. Recommendation: Recommendation: Chapel Hill/Carrboro School District Orange County School District Use statistics as noted. Use statistics as noted. Year Projection Made: 2013- 2014 2014- 2015 2015- 2016 2016- 2017 2017- 2018 Elementary 1.44% 1.11% 0.92% 0.91% 0.36% Middle 1.58% 1.15% 0.82% 0.95% 0.21% High 1.27% 1.22% 0.93% 0.72% 0% Year Projection Made: 2013- 2014 2014- 2015 2015- 2016 2016- 2017 2017- 2018 Elementary 1.30% 0.55% 0.80% 0.51% 0.58% Middle 1.42% 0.09% 0.67% 0.36% 0.13% High 1.35% 0.39% 0.56% 0.22% -0.1% 54 Section II 39 Attachment II.D.1 – Orange County and Chapel Hill/Carrboro Student Growth Rates (Chart dates from 2017-2027 based on 11/14/16 membership numbers) (2016-17) 55 Section II 40 Attachment II.D.2 – Orange County and Chapel Hill/Carrboro Student Growth Rates (Chart dates from 2018-2028 based on 11/15/17 membership numbers) (2017-18) 56 Section II 41 E. Student / Housing Generation Rate 1. Responsible Entity for Suggesting Change – The updating of this section will be conducted by Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) and referred to the BOCC for certification. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2. Definition – Student generation rate refers to the number of public school students per housing unit constructed in each school district, as defined in the Student Generation Rate Study completed by TisherBise on October 28, 2014. Housing units include single family detached, single family attached/duplex, multifamily, and manufactured homes. 3. Standard for: Standard for: Chapel Hill/Carrboro School District Orange County School District See Attachment II.E.1 See Attachment II.E.1 4. Analysis of Existing Conditions: At the January 2014 SAPFOTAC meeting, members discussed the increased number of students generated in both school districts from new development, particularly multifamily housing. The SAPFOTAC recommended further evaluation of the adopted Student Generation Rates and the impacts the number of bedrooms a particular housing type may have on student generation rates. As a result, Orange County entered into a contract with TischlerBise to update the student generation rate analysis. The new student generation rates were approved on May 19, 2015 and are shown in Attachment II.E.1. New rates from the 2014 Student Generation Rates for Orange County Schools and Chapel Hill-Carrboro School District Report are based on an inventory of recently built units from January 1, 2004 to December 31, 2013. It should be noted that students are generated from new housing as well as from existing housing where new families have moved in. The CAPS system estimates new development impacts and associated student generation, but it is important to understand that student increases are a composite of both of these factors. This effect can be dramatic and can vary greatly between areas and districts where either new 57 Section II 42 housing is dominant or new families move into a large inventory of existing housing stock. 5. Recommendation: No change at this time. 58 Section II 43 Attachment II.E.1 – Current Student Generation Rates (2015) 59 Section III 44 III. Flowchart of Schools Adequate Public Facilities Ordinance Process Abstract: The Schools Adequate Public Facilities Ordinance process has two distinct components: A. Capital Investment Plan (CIP) (Process 1) Timeframe: In November of each year, Student Membership and Building Capacity is transmitted from the school districts to the Orange County Board of Commissioners for consideration and approval and used in the following years CIP (e.g. November 15, 2017 membership numbers used to develop a CIP to be considered for adoption in June 2018). Process Framework 1. SAPFOTAC projects future student membership from historical data, current membership and hypothetical growth rates from established methodologies. 2. School Districts and BOCC compare projections to existing capacity and proposed Capital Investment Plan. 3. SAPFOTAC forwards data and projections to all SAPFO partners. 4. School Districts develop Capital Investment Plan Needs Assessment during this process 5. The Capital Investment Plan work sessions and Public Hearings are conducted by the BOCC in the spring of each year. 6. The adoption of CIP that sets forth monies and timeframe for school construction (future capacity) by BOCC. 60 Section III 45 School Adequate Public Facilities Ordinance Process 1 - Capital Investment Planning (CIP) Projection Method (Historical Membership1 plus Hypothetical Growth Rate  CIP Approval (Proposed New Construction i.e. School Capacity Added by number seats & year)  CAPS System2 (Certificate of Adequate Public Schools)   Actual Adjustments (Current Year Actual Replaces Past Year Membership Projection)     1Historical Membership is a product of students generated from: (1) pre-existing/approved undeveloped lots where new housing is built, (2) existing housing stock with new families/children, and (3) newly approved housing development (in the future this component will be known as CAPS approved development) 2The only part of the CAPS System (i.e., computer spreadsheet subdivision tracking) that receives data from the Process 1 CIP includes the actual membership (November 15 of preceding CIP year) and new school capacity amount (seats) in a specific year pursuant to the CIP. At t a c h m e n t I I I . A . 1 – Pr o c e s s 1 C a p i t a l I m p r o v e m e n t Pl a n 61 Section III 46 B. Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) Update (Process 2) Timeframe: The CAPS system is updated approximately November 15 of each year when the school districts report actual membership and ‘pre-certified’ capacity, whether it is CIP associated or prior ‘joint action’ agreement. ‘Joint action’ determinations of changes in capacity due to State rules or other non-construction related items are anticipated to be done prior to the November 15 capacity and membership reporting date. This update may reflect the Board of County Commissioners action on the earlier year Capital Investment Plan (CIP) as it affects capacity and addition of new actual fall membership. The Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) stays in effect until the following year – (e.g.: November 15, 2005 to November 14, 2006). New development is originally logged for a certain year. As the CAPS system is updated, each CAPS projection year is ‘absorbed’ by the actual estimate of a given year. Later year CAPS projections of the same development remain in the future year CAPS system accordingly. For example, if a 50-lot subdivision is issued a CAPS, 15 lots may be assigned to “Year 1,” 10 lots to “Year 2,” 10 lots to “Year 3,” 10 lots to “Year 4,” and 5 lots to “Year 5.” When “Year 1” is updated, the students generated from the 15 lots are absorbed by the actual estimate. The students generated in “Years 2, 3, 4, and 5” are held in the CAPS system and added to the appropriate year when the CAPS system is updated. As previously noted in Section II.C, The City of Mebane is not a party to the SAPFO and does not require that CAPS be issued prior to approving development activities. Increasing development within this area of the county has the potential to encumber a significant portion of the available capacity within the Orange County School District. Although the SAPFO system is not formally regulated in Mebane, staff monitors development activity and when students enter the school system their enrollment is calculated and used in future school projection needs. Please note that the two processes (CIP and CAPS) are on separate, but parallel tracks. However, the CIP does create a crossover of capacity information between the two processes. 62 Section III 47 For example, the SAPFO system for both school districts that will be established / initiated / certified each year in November and is based on prior year created and/or planned CIP capacity and current school year membership. The SAPFOTAC report including new current year membership and projections are to be used for upcoming CIP development as noted in Process 1. CIP Process 1 (for CIP 2018 - 2028) November 2017 – June 2018 (using 2018 SAPFOTAC Report) SAPFO CAPS Process 2 (for SAPFO System 2018 – 2019) November 2017 - November 2018 63 49 School Adequate Public Facilities Ordinance Process 2 - Certificate of Adequate Public Schools (CAPS) Allocation 2018 CAPS system is effective November 15, 2017 through November 14, 2018. The system is updated with new membership, CIP capacity changes, and any other BOCC/School District joint action approved capacity prior to November 15, 2017. This information is received within 5 days of November 15 and posted within the next 15 days. This CAPS system recalibration is retroactive to November 15, 2017. CAPS Allocation System 1. Certified Capacity 2 LOS Capacity 3. Actual Membership 4. Year Start Available Capacity 5. Ongoing Current Available Capacity (includes available capacity decreases from approved CAPS development by year) 6. CAPS approved development a. Total units b. Single Family1 c. Other Housing1 CAPS System AC2=SC2 - (ADM2+ND12+ND22+…) AC0 - Issue CAPS AC0 - Defer CAPS to later date 1Student Generation Rates from CAPS housing type create future membership estimate. Please note that this CAPS membership future estimate is different than the projection based on historical data and projection models used in the CIP process 1. This estimate only captures new development impact, which is the component that the SAPFO can regulate. 2AC - Available Capacity - Starts at Annual Update Capacity and reduces as CAPS approved development is entered into the system. SC - Certified School Level Capacity ADM - Average Daily Membership ND - New Development; ND1 means first approved CAPS approved development At t a c h m e n t I I I . B . 1 – Pr o c e s s 2 C e r t i f i c a t e o f A d e q u a t e P u b l i c S c h o o l s ( C A P S ) Al l o c a t i o n 64 REVISED 2/1/2018 CH C C S S t u d e n t P r o j e c t i o n s ( 1 ) ( 4 ) El e m e n t a r y Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 2 0 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 4, 4 7 4 4 , 5 5 1 4 , 6 9 2 4 , 6 9 5 4 , 8 7 9 4 , 9 8 0 5 , 1 7 3 5 , 3 0 2 5 , 2 1 9 5 , 2 9 6 5 , 4 6 4 5 , 5 4 3 5 , 5 5 4 5 , 5 4 1 5 , 5 0 1 5 , 5 6 7 5 , 5 2 2 Ti s c h l e r ( 2 ) 5,5565,5905,6245,6585,6925,7255,7595,7935,8275,861 OC P l a n n i n g 5,5415,5865,6295,6725,7135,7545,7805,8075,8185,817 10 Y e a r G r o w t h 5,4965,4035,3925,4015,4085,4625,5175,5725,6285,684 5 Y e a r G r o w t h 5,4755,3665,3395,3335,3355,3895,4425,4975,5525,607 3 Y e a r G r o w t h 5,4795,3915,3805,3755,3735,4275,4815,5365,5915,647 Av e r a g e 5,5095,4675,4735,4885,5045,5515,5965,6415,6835,723 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 7 7 1 4 1 3 1 8 4 1 0 1 1 9 3 1 2 9 (8 3 ) 77 1 6 8 7 9 1 1 (1 3 ) ( 4 0 ) 66(45)(13)(42)615164744454240 Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e ( L O S ) 4 , 3 0 2 4 , 3 0 2 4 , 9 2 1 4 , 9 2 1 4 , 9 2 1 4 , 9 2 1 4 , 9 2 1 5 , 2 4 4 5 , 2 4 4 5 , 2 4 4 5 , 2 4 4 5 , 2 4 4 5 , 8 2 9 5 , 8 2 9 5 , 8 2 9 5 , 8 2 9 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 5 , 6 6 4 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S 1 7 2 2 4 9 (2 2 9 ) ( 2 2 6 ) ( 4 2 ) 59 2 5 2 5 8 (2 5 ) 52 2 2 0 2 9 9 (2 7 5 ) ( 2 8 8 ) ( 3 2 8 ) ( 2 6 2 ) ( 1 4 2 ) ( 1 5 5 ) ( 1 9 7 ) ( 1 9 1 ) ( 1 7 6 ) ( 1 6 0 ) ( 1 1 3 ) ( 6 8 ) ( 2 3 ) 1959 Ca p a c i t y - 1 0 5 % L e v e l o f S e r v i c e ( L O S ) 4, 5 1 7 4 , 5 1 7 5 , 1 6 7 5 , 1 6 7 5 , 1 6 7 5 , 1 6 7 5 , 1 6 7 5 , 5 0 6 5 , 5 0 6 5 , 5 0 6 5 , 5 0 6 5 , 5 0 6 6 , 1 2 0 6 , 1 2 0 6 , 1 2 0 6 , 1 2 0 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 5 , 9 4 7 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 5 % L O S (4 3 ) 34 (4 7 5 ) ( 4 7 2 ) ( 2 8 8 ) ( 1 8 7 ) 6 (2 0 4 ) ( 2 8 7 ) ( 2 1 0 ) (4 2 ) 37 (5 6 6 ) ( 5 7 9 ) ( 6 1 9 ) ( 5 5 3 ) ( 4 2 5 ) ( 4 3 8 ) ( 4 8 0 ) ( 4 7 4 ) ( 4 5 9 ) ( 4 4 3 ) ( 3 9 6 ) ( 3 5 1 ) ( 3 0 6 ) ( 2 6 4 ) ( 2 2 4 ) Ac t u a l - % L e v e l o f S e r v i c e 10 4 . 0 % 1 0 5 . 8 % 9 5 . 3 % 9 5 . 4 % 9 9 . 1 % 1 0 1 . 2 % 1 0 5 . 1 % 1 0 1 . 1 % 9 9 . 5 % 1 0 1 . 0 % 1 0 4 . 2 % 1 0 5 . 7 % 9 5 . 3 % 9 5 . 1 % 9 4 . 4 % 9 5 . 5 % 9 7 . 5 % Av e r a g e - % L e v e l o f S e r v i c e 97.3%96.5%96.6%96.9%97.2%98.0%98.8%99.6%100.3%101.0% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 1. 7 2 % 3 . 1 0 % 0 . 0 6 % 3 . 9 2 % 2 . 0 7 % 3 . 8 8 % 2 . 4 9 % - 1 . 5 7 % 1 . 4 8 % 3 . 1 7 % 1 . 4 5 % 0 . 2 0 % - 0 . 0 4 % - 0 . 7 2 % 1 . 2 0 % - 0 . 8 1 % - 0 . 2 3 % - 0 . 7 7 % 0 . 1 0 % 0 . 2 7 % 0 . 3 0 % 0 . 8 6 % 0 . 8 0 % 0 . 8 1 % 0 . 7 5 % 0 . 7 0 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e CH C C S S t u d e n t P r o j e c t i o n s ( 1 ) Mi d d l e Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 2 0 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 2, 5 4 0 2 , 6 0 8 2 , 6 1 2 2 , 5 6 0 2 , 5 7 2 2 , 5 9 2 2 , 6 2 2 2 , 6 9 7 2 , 7 0 8 2 , 7 2 2 2 , 7 5 3 2 , 7 8 5 2 , 8 5 8 2 , 8 6 1 2 , 8 4 4 2 , 8 2 9 2 , 8 3 3 Ti s c h l e r ( 2 ) 2,8502,8682,8852,9032,9202,9372,9552,9722,9903,007 OC P l a n n i n g 2,8482,8462,8422,8392,8352,8552,8742,8942,9002,918 10 Y e a r G r o w t h 2,9263,0133,0113,0022,9252,8862,8682,8482,8772,906 5 Y e a r G r o w t h 2,9072,9762,9592,9422,8562,8022,7692,7452,7722,800 3 Y e a r G r o w t h 2,9152,9752,9462,9322,8712,8332,8032,7732,8012,829 Av e r a g e 2,8892,9362,9292,9242,8812,8632,8542,8462,8682,892 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 6 8 4 (5 2 ) 12 2 0 3 0 7 5 1 1 1 4 3 1 3 2 7 3 7 6 (1 7 ) ( 1 5 ) 45646(7)(5)(42)(19)(9)(7)2224 Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e 2, 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 8 4 0 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 2 , 9 4 4 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S (3 0 0 ) ( 2 3 2 ) ( 2 2 8 ) ( 2 8 0 ) ( 2 6 8 ) ( 2 4 8 ) ( 2 1 8 ) ( 1 4 3 ) ( 1 3 2 ) ( 1 1 8 ) ( 8 7 ) ( 5 5 ) 18 (8 3 ) ( 1 0 0 ) ( 1 1 5 ) ( 1 1 1 ) ( 5 5 ) ( 8 ) ( 1 5 ) ( 2 0 ) ( 6 3 ) ( 8 1 ) ( 9 0 ) ( 9 8 ) ( 7 6 ) ( 5 2 ) 10 7 % L e v e l o f S e r v i c e 3, 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 0 3 9 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 3 , 1 5 0 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 7 % L O S (4 9 9 ) ( 4 3 1 ) ( 4 2 7 ) ( 4 7 9 ) ( 4 6 7 ) ( 4 4 7 ) ( 4 1 7 ) ( 3 4 2 ) ( 3 3 1 ) ( 3 1 7 ) ( 2 8 6 ) ( 2 5 4 ) ( 1 8 1 ) ( 2 8 9 ) ( 3 0 6 ) ( 3 2 1 ) ( 3 1 7 ) ( 2 6 1 ) ( 2 1 4 ) ( 2 2 1 ) ( 2 2 6 ) ( 2 6 9 ) ( 2 8 7 ) ( 2 9 6 ) ( 3 0 4 ) ( 2 8 2 ) ( 2 5 8 ) Ac t u a l - % L e v e l o f S e r v i c e 89 . 4 % 9 1 . 8 % 9 2 . 0 % 9 0 . 1 % 9 0 . 6 % 9 1 . 3 % 9 2 . 3 % 9 5 . 0 % 9 5 . 4 % 9 5 . 8 % 9 6 . 9 % 9 8 . 1 % 1 0 0 . 6 % 9 7 . 2 % 9 6 . 6 % 9 6 . 1 % 9 6 . 2 % Av e r a g e - % L e v e l o f S e r v i c e 98.1%99.7%99.5%99.3%97.9%97.2%96.9%96.7%97.4%98.2% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 2. 6 8 % 0 . 1 5 % - 1 . 9 9 % 0 . 4 7 % 0 . 7 8 % 1 . 1 6 % 2 . 8 6 % 0 . 4 1 % 0 . 5 2 % 1 . 1 4 % 1 . 1 6 % 2 . 6 2 % 2 . 7 3 % - 0 . 5 9 % - 0 . 5 3 % 0 . 1 4 % 1 . 9 8 % 1 . 6 1 % - 0 . 2 4 % - 0 . 1 7 % - 1 . 4 4 % - 0 . 6 5 % - 0 . 3 1 % - 0 . 2 6 % 0 . 7 6 % 0 . 8 4 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e CH C C S S t u d e n t P r o j e c t i o n s ( 1 ) Hi g h Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 2 0 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 2, 9 6 3 3 , 1 6 2 3 , 3 3 0 3 , 4 2 2 3 , 5 1 4 3 , 5 2 0 3 , 6 3 5 3 , 6 3 0 3 , 6 0 6 3 , 6 4 0 3 , 7 1 4 3 , 7 9 6 3 , 7 6 4 3 , 7 3 0 3 , 7 0 1 3 , 7 6 2 3 , 9 2 7 Ti s c h l e r ( 2 ) 3,9513,9753,9994,0234,0484,0724,0964,1204,1444,168 OC P l a n n i n g 3,9383,9403,9413,9413,9403,9133,8973,8823,8893,897 10 Y e a r G r o w t h 3,8843,9013,9003,9144,0844,0914,0714,0683,9553,925 5 Y e a r G r o w t h 3,8893,8943,8783,8533,9963,9873,9523,9313,8053,759 3 Y e a r G r o w t h 3,9123,9393,9453,9374,0744,0594,0284,0203,9103,879 Av e r a g e 3,9153,9303,9333,9344,0284,0244,0094,0043,9413,926 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 1 9 9 1 6 8 9 2 9 2 6 1 1 5 (5 ) ( 2 4 ) 34 7 4 8 2 (3 2 ) ( 6 6 ) ( 2 9 ) 61165(12)153195(4)(16)(5)(64)(15) Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e 3, 0 3 5 3 , 0 3 5 3 , 0 3 5 3 , 0 3 5 3 , 0 3 5 3 , 0 3 5 3 , 8 3 5 3 , 8 3 5 3 , 8 3 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 8 7 5 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 3 , 9 8 0 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S (7 2 ) 12 7 2 9 5 3 8 7 4 7 9 4 8 5 (2 0 0 ) ( 2 0 5 ) ( 2 2 9 ) ( 2 3 5 ) ( 1 6 1 ) ( 7 9 ) ( 1 1 1 ) ( 1 4 5 ) ( 1 7 4 ) ( 1 1 3 ) 524055(47)(46)48442924(39)(54) 11 0 % L e v e l o f S e r v i c e 3, 3 3 9 3 , 3 3 9 3 , 3 3 9 3 , 3 3 9 3 , 3 3 9 3 , 3 3 9 4 , 2 1 9 4 , 2 1 9 4 , 2 1 9 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 2 6 3 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 4 , 3 7 8 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 1 0 % L O S (3 7 6 ) ( 1 7 7 ) ( 9 ) 83 1 7 6 1 8 2 (5 8 4 ) ( 5 8 9 ) ( 6 1 3 ) ( 6 2 3 ) ( 5 4 9 ) ( 4 6 7 ) ( 4 9 9 ) ( 5 3 3 ) ( 5 6 2 ) ( 5 0 1 ) ( 3 3 6 ) ( 3 4 8 ) ( 3 3 3 ) ( 4 4 5 ) ( 4 4 4 ) ( 3 5 0 ) ( 3 5 4 ) ( 3 6 9 ) ( 3 7 4 ) ( 4 3 7 ) ( 4 5 2 ) Ac t u a l - % L e v e l o f S e r v i c e 97 . 6 % 1 0 4 . 2 % 1 0 9 . 7 % 1 1 2 . 8 % 1 1 5 . 8 % 1 1 6 . 0 % 9 4 . 8 % 9 4 . 7 % 9 4 . 0 % 9 3 . 9 % 9 5 . 8 % 9 8 . 0 % 9 7 . 1 % 9 6 . 3 % 9 5 . 5 % 9 7 . 1 % 1 0 1 . 3 % Av e r a g e - % L e v e l o f S e r v i c e 101.0%101.4%98.8%98.8%101.2%101.1%100.7%100.6%99.0%98.6% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 6. 7 2 % 5 . 3 1 % 2 . 7 6 % 2 . 6 9 % 0 . 1 7 % 3 . 2 7 % - 0 . 1 4 % - 0 . 6 6 % 0 . 9 4 % 2 . 0 3 % 2 . 2 1 % - 0 . 8 4 % - 1 . 7 4 % - 0 . 7 8 % 1 . 6 5 % 4 . 3 9 % - 0 . 3 1 % 0 . 3 8 % 0 . 0 7 % 0 . 0 3 % 2 . 4 1 % - 0 . 1 0 % - 0 . 3 9 % - 0 . 1 1 % - 1 . 5 9 % - 0 . 3 8 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e (1 ) I t i s i m p o r t a n t t o n o t e t h a t t h i s r e f l e c t s t h e N o v e m b e r 1 5 , 2 0 1 7 d a t e o f m e m b e r s h i p a s o u t l i n e d i n b y t h e S c h o o l s A d e q u a t e P u b l i c F a c i l i t i e s O r d i n a n c e . I t d o e s n o t i n c l u d e C H C C S s t u d e n t s a t t e n d i n g t h e H o s p i t a l S c h o o l . (2 ) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o j e c t i o n s f o r b o t h C H C C S a n d O C S . O r i g i n a l p r o j e c t i o n s u s e d i n p r i o r y e a r s p r o j e c t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C (3 ) A n n u a l g r o w t h r a t e c a l c u l a t e d u s i n g a c t u a l m e m b e r s h i p f o r y e a r s 2 0 0 8 - 0 9 t h r o u g h 2 0 1 7 - 1 8 a n d a v e r a g e m e m b e r s h i p f o r y e a r s 2 0 1 8 - 1 9 t h r o u g h 2 0 2 7 - 2 8 (4 ) C l a s s s i z e s f o r g r a d e s K - 3 = 1 : 2 3 f o r s c h o o l y e a r s 2 0 0 0 t h r o u g h 2 0 0 7 - 0 8 . I n a c c o r d a n c e w i t h 2 0 0 5 S c h o o l C o l l a b o r a t i o n W o r k G r o u p d i r e c t i o n , e f f e c t i v e t h e 2 0 0 8 - 2 0 0 9 s c h o o l y e a r w i t h t h e o p e n i n g o f C H C C S E l e m e n t a r y # 1 0 , K - 3 c l a s s s i z e s a r e 1 : 2 1 a s d i r e c t e d b y p a s t S t a t e l e g i s l a t i v e a c t (1 ) It is imp o r tan t to n o te th at th i s r e fl ec ts th e Nov e m ber 15 , 20 1 7 date o f m e m ber s hi p a s o u tl i ne d in by th e Schoo ls Ad eq u a te Publ i c Fac il i t i es Ordi na n c e . It doe s n o t inc lude CH C C S s tuden ts a tt en di ng th e Hos p it al Scho (2 ) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o j e c t i o n s f o r b o t h C H C C S a n d O C S . O r i g i n a l p r o j e c t i o n s u s e d i n p r i o r y e a r s p r o j e c t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C (3 ) Ann u a l g r o w th r a te c a lcu lated u s ing a c tua l m e m ber s hi p for y e a r s 20 0 8 -09 th ro u g h 20 1 7 -18 a n d a v e r a g e m e m ber s hi p for y e a r s 20 1 8 -19 th ro u g h 20 2 7 -2 (1 ) It is imp o r tan t to n o te th at th i s r e fl ec ts th e Nov e m ber 15 , 20 1 7 date o f m e m ber s hi p a s o u tl i ne d in by th e Schoo ls Ad eq u a te Publ i c Fac il i t i es Ordi na n c e . It doe s n o t inc lude CH C C S s tuden ts a tt en di ng th e Hos p it al Scho (2 ) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o j e c t i o n s f o r b o t h C H C C S a n d O C S . O r i g i n a l p r o j e c t i o n s u s e d i n p r i o r y e a r s p r o j e c t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C (3 ) A n n u a l g r o w t h r a t e c a l c u l a t e d u s i n g a c t u a l m e m b e r s h i p f o r y e a r s 2 0 0 8 - 0 9 t h r o u g h 2 0 1 7 - 1 8 a n d a v e r a g e m e m b e r s h i p f o r y e a r s 2 0 1 8 - 1 9 t h r o u g h 2 0 2 7 - 2 El e m e n t a r y S c h o o l # 1 1 o p e n s w i t h 5 8 5 s e a t s Pe r N o v e m b e r 1 5 , 2 0 0 5 C e r t i f i e d C a p a c i t y C a l c u l a t i o n s , C H C C S p r o j e c t s E l e m e n t a r y # 1 0 o p e n i n g f o r s c h o o l y e a r 20 0 8 - 0 9 . I n a c c o r d a n c e w i t h B O C C a d o p t e d S c h o o l C o n s t r u c t i o n S t a n d a r d s , e l e m e n t a r y s c h o o l c a p a c i t y t o t a l s 60 0 s t u d e n t s . Im p o r t a n t N o t e : P e r 2 0 0 5 a g r e e m e n t o f S c h o o l C o l l a b o r a t i o n W o r k G r o u p , G r a d e s K - 3 c l a s s s i z e re d u c e d f r o m 1 : 2 3 t o 1 : 2 1 t h e y e a r E l e m e n t a r y # 1 0 o p e n s ( t o a l l o w f o r p r i o r L e g i s l a t i v e A c t i o n r e : re d u c e d c l a s s s i z e ) El e m e n t a r y S c h o o l # 9 o p e n s i n f a l l 2 0 0 3 w i t h a d d i t i o n a l 6 1 9 s e a t s Ad d i t i o n a l 1 0 4 n e w s e a t s a t C u l b r e t h M i d d l e S c h o o l Ph o e n i x A c a d e m y H i g h S c h o o l b e c o m e s of f i c i a l h i g h s c h o o l s t a r t i n g 2 0 1 0 - 1 1 s c h o o l ye a r w i t h 4 0 s t u d e n t c a p a c i t y Hi g h S c h o o l # 3 o p e n s i n f a l l 2 0 0 7 w i t h 8 0 0 a d d i t i o n a l s e a t s Capacity decrease due to change in class size ratios per House Bill 13 (K-3 average class size ratios are 1:20 as directed by State legislative action)Chapel Hill High School adding 105 seats.65 REVISED 2/1/2018 OC S S t u d e n t P r o j e c t i o n s ( 1 ) ( 4 ) El e m e n t a r y Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 20 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 2, 8 9 3 2, 9 0 1 2, 9 4 5 3 , 0 1 6 3 , 0 0 6 3 , 0 7 2 3 , 1 5 8 3 , 1 6 5 3 , 2 1 1 3 , 2 8 5 3 , 3 4 8 3 , 4 0 3 3 , 4 3 3 3 , 2 5 9 3 , 3 1 8 3 , 2 9 3 3 , 1 8 3 Ti s c h l e r ( 2 ) 3,2013,2183,2363,2533,2713,2883,3063,3243,3413,359 OC P l a n n i n g 3,2003,2213,2443,2673,2933,3183,3443,3693,3913,409 10 Y e a r G r o w t h 3,1403,1173,1623,1703,2083,2403,2723,3053,3383,372 5 Y e a r G r o w t h 3,1283,0973,1343,1343,1683,2003,2323,2643,2973,330 3 Y e a r G r o w t h 3,1393,1153,1573,1653,2023,2343,2663,2993,3323,365 Av e r a g e 3,1613,1543,1863,1983,2283,2563,2843,3123,3403,367 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 8 44 7 1 (1 0 ) 66 8 6 7 4 6 7 4 6 3 5 5 3 0 (1 7 4 ) 59 (25)(110)(22)(8)3311312828282827 Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e 3, 8 2 0 3, 8 2 0 3, 8 2 0 3 , 8 2 0 3 , 9 2 0 3 , 9 2 0 3 , 9 2 0 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 6 9 4 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 3 , 3 6 1 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S (9 2 7 ) (9 1 9 ) (8 7 5 ) ( 8 0 4 ) ( 9 1 4 ) ( 8 4 8 ) ( 7 6 2 ) ( 5 2 9 ) ( 4 8 3 ) ( 4 0 9 ) ( 3 4 6 ) ( 2 9 1 ) ( 2 6 1 ) ( 4 3 5 ) ( 3 7 6 ) ( 4 0 1 ) ( 1 7 8 ) ( 2 0 0 ) ( 2 0 7 ) ( 1 7 5 ) ( 1 6 3 ) ( 1 3 3 ) ( 1 0 5 ) ( 7 7 ) ( 4 9 ) ( 2 1 ) 6 10 5 % L e v e l o f S e r v i c e 4, 0 1 1 4, 0 1 1 4, 0 1 1 4 , 0 1 1 4 , 1 1 6 4 , 1 1 6 4 , 1 1 6 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 8 7 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 3 , 5 2 9 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 5 % L O S (1 , 1 1 8 ) (1 , 1 1 0 ) (1 , 0 6 6 ) ( 9 9 5 ) ( 1 , 1 1 0 ) ( 1 , 0 4 4 ) ( 9 5 8 ) ( 7 1 4 ) ( 6 6 8 ) ( 5 9 4 ) ( 5 3 1 ) ( 4 7 6 ) ( 4 4 6 ) ( 6 2 0 ) ( 5 6 1 ) ( 5 8 6 ) ( 3 4 6 ) ( 3 6 8 ) ( 3 7 5 ) ( 3 4 3 ) ( 3 3 1 ) ( 3 0 1 ) ( 2 7 3 ) ( 2 4 5 ) ( 2 1 7 ) ( 1 8 9 ) ( 1 6 2 ) Ac t u a l - % L e v e l o f S e r v i c e 75 . 7 % 75 . 9 % 77 . 1 % 7 9 . 0 % 7 6 . 7 % 7 8 . 4 % 8 0 . 6 % 8 5 . 7 % 8 6 . 9 % 8 8 . 9 % 9 0 . 6 % 9 2 . 1 % 9 2 . 9 % 8 8 . 2 % 8 9 . 8 % 8 9 . 1 % 9 4 . 7 % Av e r a g e - % L e v e l o f S e r v i c e 94.2%93.8%94.8%95.1%96.1%96.9%97.7%98.5%99.4%100.2% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 0. 2 8 % 1. 5 2 % 2 . 4 1 % - 0 . 3 3 % 2 . 2 0 % 2 . 8 0 % 0 . 2 2 % 1 . 4 5 % 2 . 3 0 % 1 . 9 2 % 1 . 6 4 % 0 . 8 8 % - 5 . 0 7 % 1 . 8 1 % - 0 . 7 5 % - 3 . 3 4 % - 0 . 5 6 % - 0 . 2 5 % 1 . 0 4 % 0 . 3 5 % 0 . 9 6 % 0 . 8 6 % 0 . 8 6 % 0 . 8 6 % 0 . 8 3 % 0 . 8 1 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e OC S S t u d e n t P r o j e c t i o n s ( 1 ) Mi d d l e Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 2 0 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 1, 5 2 7 1 , 6 3 1 1 , 6 7 1 1 , 5 9 3 1 , 5 9 0 1 , 5 8 0 1 , 6 3 7 1 , 6 0 1 1 , 6 6 5 1 , 6 9 8 1 , 7 0 4 1 , 6 8 4 1 , 7 4 7 1 , 7 6 2 1 , 7 3 9 1 , 7 2 4 1 , 7 3 0 Ti s c h l e r ( 2 ) 1,7401,7491,7591,7681,7781,7871,7971,8061,8161,825 OC P l a n n i n g 1,7391,7401,7441,7461,7511,7541,7581,7851,8041,824 10 Y e a r G r o w t h 1,8221,8381,7281,6901,6431,6751,6661,6891,7061,723 5 Y e a r G r o w t h 1,8121,8171,6991,6581,6061,6281,6121,6311,6481,664 3 Y e a r G r o w t h 1,8141,8271,7181,6801,6331,6611,6521,6751,6921,709 Av e r a g e 1,7851,7941,7301,7091,6821,7011,6971,7171,7331,749 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 1 0 4 4 0 (7 8 ) ( 3 ) ( 1 0 ) 57 (3 6 ) 64 3 3 6 (2 0 ) 63 1 5 (2 3 ) ( 1 5 ) 6559(65)(21)(27)19(4)201616 Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e 1, 4 6 6 1 , 4 6 6 1 , 4 6 6 1 , 4 6 6 1 , 4 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 2 , 1 6 6 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S 61 16 5 20 5 1 2 7 1 2 4 (5 8 6 ) ( 5 2 9 ) ( 5 6 5 ) ( 5 0 1 ) ( 4 6 8 ) ( 4 6 2 ) ( 4 8 2 ) ( 4 1 9 ) ( 4 0 4 ) ( 4 2 7 ) ( 4 4 2 ) ( 4 3 6 ) ( 3 8 1 ) ( 3 7 2 ) ( 4 3 6 ) ( 4 5 7 ) ( 4 8 4 ) ( 4 6 5 ) ( 4 6 9 ) ( 4 4 9 ) ( 4 3 3 ) ( 4 1 7 ) 10 7 % L e v e l o f S e r v i c e 1, 5 6 9 1, 5 6 9 1, 5 6 9 1 , 5 6 9 1 , 5 6 9 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 2 , 3 1 8 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 7 % L O S (4 2 ) 62 1 0 2 2 4 2 1 (7 3 8 ) ( 6 8 1 ) ( 7 1 7 ) ( 6 5 3 ) ( 6 2 0 ) ( 6 1 4 ) ( 6 3 4 ) ( 5 7 1 ) ( 5 5 6 ) ( 5 7 9 ) ( 5 9 4 ) ( 5 8 8 ) ( 5 3 2 ) ( 5 2 3 ) ( 5 8 8 ) ( 6 0 9 ) ( 6 3 6 ) ( 6 1 6 ) ( 6 2 1 ) ( 6 0 0 ) ( 5 8 4 ) ( 5 6 9 ) Ac t u a l - % L e v e l o f S e r v i c e 10 4 . 2 % 1 1 1 . 3 % 1 1 4 . 0 % 1 0 8 . 7 % 1 0 8 . 5 % 7 2 . 9 % 7 5 . 6 % 7 3 . 9 % 7 6 . 9 % 7 8 . 4 % 7 8 . 7 % 7 7 . 7 % 8 0 . 7 % 8 1 . 3 % 8 0 . 3 % 7 9 . 6 % 7 9 . 9 % Av e r a g e - % L e v e l o f S e r v i c e 82.4%82.8%79.8%78.9%77.7%78.5%78.4%79.3%80.0%80.8% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 6. 8 1 % 2 . 4 5 % - 4 . 6 7 % - 0 . 1 9 % - 0 . 6 3 % 3 . 6 1 % - 2 . 2 0 % 4 . 0 0 % 1 . 9 8 % 0 . 3 5 % - 1 . 1 7 % 3 . 7 4 % 0 . 8 6 % - 1 . 3 1 % - 0 . 8 6 % 0 . 3 5 % 3 . 1 9 % 0 . 5 0 % - 3 . 6 0 % - 1 . 2 1 % - 1 . 5 6 % 1 . 1 4 % - 0 . 2 5 % 1 . 2 0 % 0 . 9 2 % 0 . 9 2 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e OC S S t u d e n t P r o j e c t i o n s ( 1 ) Hi g h Sc h o o l Y e a r 20 0 1 - 0 2 2 0 0 2 - 0 3 2 0 0 3 - 0 4 2 0 0 4 - 0 5 2 0 0 5 - 0 6 2 0 0 6 - 0 7 2 0 0 7 - 0 8 2 0 0 8 - 0 9 2 0 0 9 - 1 0 2 0 1 0 - 1 1 2 0 1 1 - 1 2 2 0 1 2 - 1 3 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9 2 0 1 9 - 2 0 2 0 2 0 - 2 1 2 0 2 1 - 2 2 2 0 2 2 - 2 3 2 0 2 3 - 2 4 2 0 2 4 - 2 5 2 0 2 5 - 2 6 2 0 2 6 - 2 7 2 0 2 7 - 2 8 Ac t u a l 1, 7 5 3 1 , 8 2 8 1 , 8 8 7 2 , 0 5 7 2 , 1 2 4 2 , 1 8 4 2 , 2 0 1 2 , 2 4 2 2 , 2 1 7 2 , 2 2 2 2 , 2 8 3 2 , 3 1 5 2 , 4 2 1 2 , 5 0 2 2 , 4 6 9 2 , 4 4 6 2 , 4 4 5 Ti s c h l e r ( 2 ) 2,4582,4722,4852,4992,5122,5262,5392,5532,5662,580 OC P l a n n i n g 2,4602,4772,4962,5142,5352,5552,5762,5732,5822,595 10 Y e a r G r o w t h 2,3542,3762,4392,4722,5372,4672,4072,3422,3162,349 5 Y e a r G r o w t h 2,3682,4042,4712,4902,5452,4642,3922,3182,2822,305 3 Y e a r G r o w t h 2,3402,3512,3902,3972,4552,3872,3262,2622,2362,265 Av e r a g e 2,3962,4162,4562,4742,5172,4802,4482,4102,3962,419 An n u a l C h a n g e - I n c r e a s e ( D e c r e a s e ) i n A c t u a l & P r o j e c t e d M e m b e r s h i p ) 7 5 5 9 1 7 0 6 7 6 0 1 7 4 1 (2 5 ) 5 6 1 3 2 1 0 6 8 1 (3 3 ) ( 2 3 ) ( 1 ) ( 4 9 ) 20401843(37)(32)(39)(13)22 Ca p a c i t y - 1 0 0 % L e v e l o f S e r v i c e 1, 5 1 8 2 , 5 1 8 2 , 5 1 8 2 , 5 1 8 2 , 5 1 8 2 , 5 3 3 2 , 5 3 3 2 , 5 5 8 2 , 5 5 8 2 , 5 5 8 2 , 5 5 8 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 4 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 2 , 9 3 9 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 0 0 % L O S 23 5 (6 9 0 ) ( 6 3 1 ) ( 4 6 1 ) ( 3 9 4 ) ( 3 4 9 ) ( 3 3 2 ) ( 3 1 6 ) ( 3 4 1 ) ( 3 3 6 ) ( 2 7 5 ) ( 1 2 4 ) ( 1 8 ) 63 3 0 7 6 (43)(23)(483)(465)(422)(459)(491)(529)(543)(520) 11 0 % L e v e l o f S e r v i c e 1, 6 7 0 2 , 7 7 0 2 , 7 7 0 2 , 7 7 0 2 , 7 7 0 2 , 7 8 6 2 , 7 8 6 2 , 8 1 4 2 , 8 1 4 2 , 8 1 4 2 , 8 1 4 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 2 , 6 8 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 3 , 2 3 3 Nu m b e r o f S t u d e n t s , A c t u a l a n d P r o j e c t e d , O v e r ( U n d e r ) 1 1 0 % L O S 83 (9 4 2 ) ( 8 8 3 ) ( 7 1 3 ) ( 6 4 6 ) ( 6 0 2 ) ( 5 8 5 ) ( 5 7 2 ) ( 5 9 7 ) ( 5 9 2 ) ( 5 3 1 ) ( 3 6 8 ) ( 2 6 2 ) ( 1 8 1 ) ( 2 1 4 ) ( 2 3 7 ) ( 2 3 8 ) ( 2 8 7 ) ( 2 6 7 ) ( 7 7 7 ) ( 7 5 8 ) ( 7 1 6 ) ( 7 5 3 ) ( 7 8 5 ) ( 8 2 3 ) ( 8 3 6 ) ( 8 1 4 ) Ac t u a l - % L e v e l o f S e r v i c e 11 5 . 5 % 7 2 . 6 % 7 4 . 9 % 8 1 . 7 % 8 4 . 4 % 8 6 . 2 % 8 6 . 9 % 8 7 . 6 % 8 6 . 7 % 8 6 . 9 % 8 9 . 2 % 9 4 . 9 % 9 9 . 3 % 1 0 2 . 6 % 1 0 1 . 2 % 1 0 0 . 3 % 1 0 0 . 2 % Av e r a g e - % L e v e l o f S e r v i c e 98.2%99.1%83.6%84.2%85.6%84.4%83.3%82.0%81.5%82.3% An n u a l S t u d e n t G r o w t h R a t e ( 3 ) 4. 2 8 % 3 . 2 3 % 9 . 0 1 % 3 . 2 6 % 2 . 8 2 % 0 . 7 8 % 1 . 8 6 % - 1 . 1 2 % 0 . 2 3 % 2 . 7 5 % 1 . 4 0 % 4 . 5 8 % 3 . 3 5 % - 1 . 3 2 % - 0 . 9 3 % - 0 . 0 4 % - 2 . 0 1 % 0 . 8 4 % 1 . 6 6 % 0 . 7 4 % 1 . 7 2 % - 1 . 4 8 % - 1 . 2 7 % - 1 . 5 8 % - 0 . 5 4 % 0 . 9 3 % In d i c a t e s w h e n d i s t r i c t s u r p a s s e s S A P F O r e c o m m e n d e d L e v e l o f S e r v i c e (1 ) It is imp o r tan t to n o te th at th i s r e fl ec ts th e Nov e m ber 15 , 20 1 7 date o f m e m ber s hi p a s o u tl i ne d in by th e Schoo ls Ad eq u a te Publ i c Fac il i t i es Ordi na n c e . (2) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o jec t i o n s f o r b o t h C H C C S a n d O C S . O r i gin a l p r o jec t i o n s u s e d i n p r i o r yea r s p r o jec t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C S . (3) A n n u a l gro w t h r a t e c a l c u l a t e d u s i n g a c t u a l m e m b e r s h i p f o r yea r s 2 0 0 8 - 0 9 t h r o u gh 2 0 1 7 - 1 8 a n d a v e r a ge m e m b e r s h i p f o r yea r s 2 0 1 8 - 1 9 t h r o u gh 2 0 2 7 - 2 8 (4) C l a s s s i z e s f o r gra d e s K - 3 = 1 : 2 3 f o r s c h o o l yea r s 2 0 0 0 t h r o u gh 2 0 0 7 - 0 8 . I n a c c o r d a n c e w i t h 2 0 0 5 S c h o o l C o l l a b o r a t i o n W o r k G r o u p d i r e c t i o n , e f f e c t i v e t h e 2 0 0 8 - 2 0 0 9 s c h o o l yea r w i t h t h e o p e n i n g o f C H C C S E l e m e n t a r y # 1 0 , K - 3 c l a s s s i z e s a r e 1 : 2 1 a s d i r e c t e d b y p a s t S t a t e l e gis l a t i v e a c t i o n . (1 ) It is imp o r tan t to n o te th at th i s r e fl ec ts th e Nov e m ber 15 , 20 1 7 date o f m e m ber s hi p a s o u tl i ne d in by th e Schoo ls Ad eq u a te Publ i c Fac il i t i es Ordi na n c e . (2) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o jec t i o n s f o r b o t h C H C C S a n d O C S . O r i gin a l p r o jec t i o n s u s e d i n p r i o r yea r s p r o jec t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C S . (3 ) Ann u a l gro w th r a te c a lcu lated u s ing a c tua l m e m ber s hi p for yea r s 20 0 8 -09 th ro u gh 20 1 7 -18 a n d a v e r a ge m e m ber s hi p for yea r s 20 1 8 -19 th ro u gh 20 2 7 -28 (3 ) A n n u a l g r o w t h r a t e c a l c u l a t e d u s i n g a c t u a l m e m b e r s h i p f o r y e a r s 2 0 0 8 - 0 9 t h r o u g h 2 0 1 7 - 1 8 a n d a v e r a g e m e m b e r s h i p f o r y e a r s 2 0 1 8 - 1 9 t h r o u g h 2 0 2 7 - 2 8 (1 ) It is imp o r tan t to n o te th at th i s r e fl ec ts th e Nov e m ber 15 , 20 1 7 date o f m e m ber s hi p a s o u tl i ne d in by th e Schoo ls Ad eq u a te Publ i c Fac il i t i es Ordi na n c e . (2) T h e T i s c h l e r M o d e l p r o v i d e s f o r t h e " L i n e a r M e t h o d " o f p r o jec t i o n s f o r b o t h C H C C S a n d O C S . O r i gin a l p r o jec t i o n s u s e d i n p r i o r yea r s p r o jec t i o n m o d e l s i n c l u d e d t h e " L i n e a r E x t r a p o l a t i o n M e t h o d " f o r C H C C S . Im p o r t a n t N o t e : P e r 2 0 0 5 r e c o m m e n d a t i o n o f S c h o o l C o l l a b o r a t i o n W o r k G r o u p a n d a p p r o v e d b y BO C C w i t h a p p r o v a l o f 2 0 0 8 - 0 9 M e m b e r s h i p & C a p a c i t y n u m b e r s a n d c e r t i f i c a t i o n o f 2 0 0 9 S A P F O T A C re p o r t o f M a y 5 , 2 0 0 9 , G r a d e s K - 3 c l a s s s i z e r e d u c e d f r o m 1 : 2 3 t o 1 : 2 1 w i t h o p e n i n g o f C H C C S El e m e n t a r y # 1 0 - M o r r i s G r o v e ( t o a l l o w f o r p r i o r l e g i s l a t i v e a c t i o n r e : r e d u c e d c l a s s s i z e ) Ad d i t i o n a l 1 0 0 n e w s e a t s a t H i l l s b o r o u g h E l e m e n t a r y S c h o o l Mi d d l e S c h o o l # 3 o p e n s i n f a l l 2 0 0 6 w i t h 7 0 0 a d d i t i o n a l s e a t s Orange High capacity decreased, per DPI study Pa r t n e r s h i p A c a d e m y A l t e r n a t i v e S c h o o l r e l o c a t e d - c a p a c i t y a d d e d Pa r t n e r s h i p A c a d e m y A l t e r n a t i v e S c h o o l c a p a c i t y a d d e d Capacity decrease due to change in class size ratios per House Bill 13 (K-3 average class size ratios are 1:20 as directed by State legislative action)Cedar Ridge High School adding 500 seats.66