HomeMy WebLinkAbout2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2'a 70 ( 9i -6-0
CHANGE ORDER
CHANGE ORDER NO.: 2 DATE: Jan 24, 2018
Project: Historic Rogers Road Sewer Expansion Project
Contractor: Moffat Pipe, Inc.
Engineer /Architect: URS Corporation — North Carolina
CONTRACTOR is directed to make the following changes in the Contract Documents
Description: Revise the quantity of jack and bore pipe to be installed with corresponding change in unit
price in accordance with the Standard General Conditions of the Construction Contract, Section 00 57 00.
Install additional gate at the entry to the easement near the Orange County Animal Shelter. Remove
additional trees from the Glenbrooke HOA parcel, as well as the large 60 -inch oak tree located on Mr.
Dave Bellin's property near Outfall D. Provide additional sanitary sewer services to three additional
parcels, and remove sanitary sewer services from ten parcels (net change of 7 sanitary sewer service
removals). A more detailed breakdown of these changes can be found in Attachment A — Work Change
Directive Log.
The following line items shall be applied against the Section 00 41 44, Unit Price Contract Bid Form,
with changes in the estimated quantities for Item Nos. 4C, 10, 11, 17, and 29; and additional Item Nos.
10A, 33, and 34.
4C
8 -inch Diameter Epoxy
Linear Feet
+130
$73.00
$9,490.00
18
Coated Ductile Iron
Each
-1
$5,000
- $5,000
29
Sanitary Sewer Pipe, 10-
Each
+1
$6,000.00
$6,000.00
33
12 ft. depth
Lum Sum
1
$1,500.00
$1,500.00
10
16 -Inch Diameter Steel
Linear Feet
-220
$800.00
- $176,000.00
Casin& Jack and Bore
10a
Revised 16 -inch Diameter
Linear Feet
78
$937.56
$73,129.68
Steel Casing Jack and
Bore
11
8 -Inch Diameter Epoxy
Linear Feet
-130
$50.00
- $6,500.00
-
oate Ductile Iron
Sanitary Sewer Carrier
17 1
Sanitary Sewer Service
via Open Cut
Each
-7
$5,000
- $35,000
18
Sanitary Sewer Service
via Dry Bore
Each
-1
$5,000
- $5,000
29
Gate
Each
+1
$6,000.00
$6,000.00
33
Glenbrooke Tree Removal
Lum Sum
1
$1,500.00
$1,500.00
34
Large 60" Oak Tree
Removal
Lump Sum
1
$18,447.29
$18,447.29
Net Adjustment of this Change Order - $113,933 03
Attachments: Attachment A - Work Change Directive Log. Attachment B — Contractor's change order
request. Attachment C — revised sheets CU -1018, CU -103R, CU -1088, CU -110R, CU -115R.
CHANGE ORDER NO.: 2
Page 2 of 3
CHANGE IN CONTRACT SUM OR PRICE:
CHANGE IN CONTRACT TIME OR TIMES:
Original Contract Price
Original Contract Times
$4,782,436.00
Final Completion: July 15, 2018
Net change from previous Change Orders No. I to
Net change from previous Change Orders No. l to
No.2 : - $110,233.03
No. 2: 0 days
Contract Sum or Price prior to this Change Order
Contract Times prior to this Change Order
$4,786,136.00
Final Completion: July 15, 2018
Net Increase of this Change Order
Net Increase of this Change Order
- $113,933.03
Zero days
Contract Sum or Price with all approved Change
Contract Times with all approved Change Orders
Orders
$4,672,202.97
Final Completion: July 15, 2018
RECOMMENDED:
f
s
E
By: t r4 i$
Engineer
Krista Paredes- Toledo, PE
Date:
REVIEWED:
By'
Ora a County
Craig Benedict, AICP
Date: t 5
The adjustment in Contract Sum or Price and/or Contract Time or Times stated in this Change Order shall
comprise the total price and/or time adjustment due or owed the CONTRACTOR for the work or changes
defined in this Change Order. By executing the Change Order, the CONTRACTOR acknowledges and
agrees that the stipulated price and/or time adjustments include the costs and delays for all work
contained in the Change Order, including costs and delays associated with the interruption of schedules,
extended overheads, delay, and cumulative impacts or ripple effect on all other non - affected work under
this Contract. Signing of the Change Order constitutes full and mutual accord and satisfaction for the
adjustment in Contract Sum or Price or Contract Time or Times as a result of increases or decreases in
costs and time of performance caused directly and indirectly from the change, subject to the current scope
of the entire work as set forth in the Contract Documents. Acceptance of the waiver constitutes an
agreement between OWNER and CONTRACTOR that the Change Order represents an equitable
adjustment to the Contract, and that CONTRACTOR waives all rights to file a claim on this Change
Order after it is properly executed.
CHANGE ORDER NO.: 2
Page 3 of 3
IN WITNESS WHEREOF, the undersigned have caused the execution hereof:
ATTEST:
Secretary f
[Corporate Seal]
CONTRACTOR:
OWNER:
Orange Cou
By:
Name: Bonnie Hammersley
Title: Orange County Manager
Date:
MOFFA PIPE, INC
Name: Jes�'e DuClau
Title: Cor(tractor
Address: 4901 Unicon Drive
Wa�t,NC 27587
Dater
OWNER:
Orange Cou
By:
Name: Bonnie Hammersley
Title: Orange County Manager
Date: