Loading...
HomeMy WebLinkAbout2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2'a 70 ( 9i -6-0 CHANGE ORDER CHANGE ORDER NO.: 2 DATE: Jan 24, 2018 Project: Historic Rogers Road Sewer Expansion Project Contractor: Moffat Pipe, Inc. Engineer /Architect: URS Corporation — North Carolina CONTRACTOR is directed to make the following changes in the Contract Documents Description: Revise the quantity of jack and bore pipe to be installed with corresponding change in unit price in accordance with the Standard General Conditions of the Construction Contract, Section 00 57 00. Install additional gate at the entry to the easement near the Orange County Animal Shelter. Remove additional trees from the Glenbrooke HOA parcel, as well as the large 60 -inch oak tree located on Mr. Dave Bellin's property near Outfall D. Provide additional sanitary sewer services to three additional parcels, and remove sanitary sewer services from ten parcels (net change of 7 sanitary sewer service removals). A more detailed breakdown of these changes can be found in Attachment A — Work Change Directive Log. The following line items shall be applied against the Section 00 41 44, Unit Price Contract Bid Form, with changes in the estimated quantities for Item Nos. 4C, 10, 11, 17, and 29; and additional Item Nos. 10A, 33, and 34. 4C 8 -inch Diameter Epoxy Linear Feet +130 $73.00 $9,490.00 18 Coated Ductile Iron Each -1 $5,000 - $5,000 29 Sanitary Sewer Pipe, 10- Each +1 $6,000.00 $6,000.00 33 12 ft. depth Lum Sum 1 $1,500.00 $1,500.00 10 16 -Inch Diameter Steel Linear Feet -220 $800.00 - $176,000.00 Casin& Jack and Bore 10a Revised 16 -inch Diameter Linear Feet 78 $937.56 $73,129.68 Steel Casing Jack and Bore 11 8 -Inch Diameter Epoxy Linear Feet -130 $50.00 - $6,500.00 - oate Ductile Iron Sanitary Sewer Carrier 17 1 Sanitary Sewer Service via Open Cut Each -7 $5,000 - $35,000 18 Sanitary Sewer Service via Dry Bore Each -1 $5,000 - $5,000 29 Gate Each +1 $6,000.00 $6,000.00 33 Glenbrooke Tree Removal Lum Sum 1 $1,500.00 $1,500.00 34 Large 60" Oak Tree Removal Lump Sum 1 $18,447.29 $18,447.29 Net Adjustment of this Change Order - $113,933 03 Attachments: Attachment A - Work Change Directive Log. Attachment B — Contractor's change order request. Attachment C — revised sheets CU -1018, CU -103R, CU -1088, CU -110R, CU -115R. CHANGE ORDER NO.: 2 Page 2 of 3 CHANGE IN CONTRACT SUM OR PRICE: CHANGE IN CONTRACT TIME OR TIMES: Original Contract Price Original Contract Times $4,782,436.00 Final Completion: July 15, 2018 Net change from previous Change Orders No. I to Net change from previous Change Orders No. l to No.2 : - $110,233.03 No. 2: 0 days Contract Sum or Price prior to this Change Order Contract Times prior to this Change Order $4,786,136.00 Final Completion: July 15, 2018 Net Increase of this Change Order Net Increase of this Change Order - $113,933.03 Zero days Contract Sum or Price with all approved Change Contract Times with all approved Change Orders Orders $4,672,202.97 Final Completion: July 15, 2018 RECOMMENDED: f s E By: t r4 i$ Engineer Krista Paredes- Toledo, PE Date: REVIEWED: By' Ora a County Craig Benedict, AICP Date: t 5 The adjustment in Contract Sum or Price and/or Contract Time or Times stated in this Change Order shall comprise the total price and/or time adjustment due or owed the CONTRACTOR for the work or changes defined in this Change Order. By executing the Change Order, the CONTRACTOR acknowledges and agrees that the stipulated price and/or time adjustments include the costs and delays for all work contained in the Change Order, including costs and delays associated with the interruption of schedules, extended overheads, delay, and cumulative impacts or ripple effect on all other non - affected work under this Contract. Signing of the Change Order constitutes full and mutual accord and satisfaction for the adjustment in Contract Sum or Price or Contract Time or Times as a result of increases or decreases in costs and time of performance caused directly and indirectly from the change, subject to the current scope of the entire work as set forth in the Contract Documents. Acceptance of the waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Contract, and that CONTRACTOR waives all rights to file a claim on this Change Order after it is properly executed. CHANGE ORDER NO.: 2 Page 3 of 3 IN WITNESS WHEREOF, the undersigned have caused the execution hereof: ATTEST: Secretary f [Corporate Seal] CONTRACTOR: OWNER: Orange Cou By: Name: Bonnie Hammersley Title: Orange County Manager Date: MOFFA PIPE, INC Name: Jes�'e DuClau Title: Cor(tractor Address: 4901 Unicon Drive Wa�t,NC 27587 Dater OWNER: Orange Cou By: Name: Bonnie Hammersley Title: Orange County Manager Date: