Loading...
HomeMy WebLinkAboutORD-2018-010 Approval of 1.0 FTE Time-Limited Erosion Control Officer I Position and Budget Amendment #6-B ORD-2018-010 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 20, 2018 Action Agenda Item No. 8-d SUBJECT: Approval of 1.0 FTE Time-Limited Erosion Control Officer I Position and Budget Amendment #6-B DEPARTMENT: Planning and Inspections ATTACHMENT(S): 1. Erosion Control Officer I Job Description INFORMATION CONTACT: Craig Benedict, Planning & Inspections Inspections Director, 919-245-2592 Howard Fleming, Erosion Control/ Stormwater/Engineering Supervisor, 919-245-2586 Brenda Bartholomew, Human Resources Director, 919-245-2552 Paul Laughton, Deputy Finance Director, 919-245-2152 PURPOSE: To approve the creation of a 1.0 full-time equivalent (FTE) time-limited position to address the work load of a multi-year Erosion Control and Sedimentation Control project and approve Budget Amendment #6-B. BACKGROUND: Orange County has delegated authority to enforce the state sedimentation and erosion control ordinance. This authority creates county-wide jurisdiction through interlocal agreements with Hillsborough, Carrboro and Chapel Hill. Mebane also permits Orange County authority in the portion of its jurisdiction within Orange County. Development projects are assessed fees for permit review and inspections that cover the cost of personnel related to inspection activity. Since the recession, development activity and associated revenue has increased to support additional staff (Erosion Control Officer I) throughout the County. The Collins Ridge 103 acre high disturbance (greater than 50% of land area) multi-year project is projected to continue through 2022. The preconstruction meeting has been held and land grading preparation is underway. FINANCIAL IMPACT: An assessment of ongoing activity will also be conducted on an annual basis. Planning and inspections will revise revenue projections to include recent receipt of this multi-year project fee which will cover the cost of the new position. This request is consistent with the County Managers directive that new positions be revenue supported. Annual salary and benefits is estimated at $58,774. Approximately $2,800 is spent on operating annually and one time capital includes a computer and vehicle for $23,400, which will be paid from prior Hillsborough area NPDES (National Pollution Discharge Elimination System) funds. 1 A $125,000 land disturbance fee has been received for the support of this position for multiple years. Additional fee and associated duties received in this year’s budget from smaller projects will also be assigned to this position. This time-limited position is contingent on the receipt of sufficient annual erosion control funds to continue funding the total cost of the position through FY 2021-22. Since only a partial personnel expenditure for the remaining 2017/18 year is necessary, the majority of the revenue will be deferred to 2018/19 and subsequent years, as necessary. Revenues to date are in excess of annual budget projection. (i.e. $320,000 to date vs. $270,000 annual budget). SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: CREATING A SAFE COMMUNITY by supporting policies, procedures, regulations and programs that reduce harassment, exclusion, intimidation, and violence against Orange County residents. • GOAL: ESTABLISH SUSTAINABLE AND EQUITBALE LAND USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or polices. RECOMMENDATION(S): The Manager recommends that the Board approve the creation of a 1.0 full-time equivalent (FTE) time-limited position to address the work load of a multi-year Erosion Control and Sedimentation Control project and approve Budget Amendment #6-B. 2 Title: Erosion Control Officer I Number: 205 Department: Planning & Inspections/OPT Type: F/T w Benefits / Hourly Salary Range: Grade 17 Location: Orange County General Statement of Duties Performs entry-level plan review and site inspections to enforce erosion control and stormwater portions of the Unified Development Ordinance (UDO) and supports the Engineering group in performing various duties related to utility infrastructure in Orange County. Distinguishing Features of the Position An employee in this position enforces the erosion control and stormwater portions of the Unified Development Ordinance (UDO). Work is performed under regular supervision of the Engineering and Stormwater Division Supervisor, with technical direction and oversight provided by the Erosion Control Officer II position. Illustrative Examples of Work Part of the regulatory team that ensures land development in Orange County complies with the Unified Development Ordinance of Orange County. Evaluates and reviews applications for subdivision and other development proposals by engineers, developers and home owners for compliance. Facilitates the regulatory and approval processes by answering questions from and coordinating with stakeholders, including the applicant, the general public, construction personnel and other government entities. Performs surface water identifications (SWID’s). Ensures other contingent permits have been issued. Schedules and conducts pre-construction meetings to issue land disturbance permits and performs site inspections during construction to ensure compliance with the approved plans and specifications. Issues notices of violation (NOV’s) and stop work orders including revocation of land disturbance permits. Ensures data in land management central permitting system (LMCPS) and other departmental information systems are accurate and up-to-date. Adheres to the department’s safety rules and regulations. Performs other related duties as required. Attachment 1 3 Knowledge, Skills and Abilities Knowledge of modern office practices and procedures, including modern office technology. Knowledge of those portions of the County’s UDO and local municipalities’ ordinances regulating erosion control and stormwater management and be familiar with general land use regulations. Knowledge of the principles and practices of geology and hydrogeology. Knowledge of civil engineering principles and practices. Knowledge of surveying and drafting techniques and methods. Knowledge of relevant state laws and regulations. Skill in planning and prioritizing work. Skill in reading plans, drawings, and maps. Skill in the use of surveying and measurement tools and equipment. Skill in public and interpersonal relations. Skill in oral and written communication. Ability to walk over rough terrain and move around undeveloped property, as well as construction sites. Ability to drive a vehicle and find way to properties being considered for or under development. Ability to utilize the County’s geographic information system (GIS). Physical Requirements Must be able to physically perform the basic life operational support functions of standing, walking, stooping, typing, talking, sitting, bending, kneeling, grasping, hearing, handling, reaching and repetitive motions of the hands/wrists/feet. Must be able to perform light work exerting up to 20 pounds of force occasionally and/or up to 10 pounds of force frequently or constantly to lift, carry, push, pull, or otherwise move objects including the human body. Must possess the visual acuity to operate a passenger vehicle, prepare and analyze data and figures, perform accounting, work on a computer terminal, perform extensive reading, use measurement devices and observe construction activities, evaluate end product and the parameters associated with surface water identification. Worker is subject to inside and outside environmental conditions including extreme hot and cold temperatures. Worker may be subject to noise sufficient to require shouting in order to be heard. 4 Worker is subject to fieldwork hazards including moving construction equipment, encounters with electrified fences and road/traffic hazards, as well as water hazards, wildlife, insects and poisonous plants. Worker is subject to respiratory hazards including fumes, gases, chemicals, dust or dirt. Education and Experience Requires any combination of education and experience equivalent to a high school diploma and five years of related experience or college degree and one year of related experience. Possession of or ability to readily obtain an unrestricted, valid Type C driver’s license issued by the State of North Carolina. Functionally literate with Windows-based personal computers and MS Office software. Ability to type 25 words per minute. Licenses and/or Certifications Surface Water Identification (SWID) Training and Certification within one year of hire. Stormwater BMP Inspection & Maintenance Professional within one year of hire. Stormwater BMP Reviewer within two years of hire. 2/2016 5