Loading...
HomeMy WebLinkAboutOCPB agenda 0604141 ORANGE COUNTY PLANNING DEPARTMENT 131 W. MARGARET LANE, SUITE 201 HILLSBOROUGH, NORTH CAROLINA 27278 AGENDA ORANGE COUNTY PLANNING BOARD ORANGE COUNTY WEST CAMPUS OFFICE BUILDING 131 WEST MARGARET LANE – LOWER LEVEL CONFERENCE ROOM (ROOM #004) HILLSBOROUGH, NORTH CAROLINA 27278 Wednesday, June 4, 2014 Regular Meeting – 7:00 pm No. Page(s) Agenda Item 1. CALL TO ORDER 2. 3-4 INFORMATIONAL ITEMS a. Planning Calendar for June and July 3. 5-8 APPROVAL OF MINUTES May 7, 2014 Regular Meeting 4. CONSIDERATION OF ADDITIONS TO AGENDA 5. PUBLIC CHARGE Introduction to the Public Charge The Board of County Commissioners, under the authority of North Carolina General Statute, appoints the Orange County Planning Board (OCPB) to uphold the written land development laws of the County. The general purpose of OCPB is to guide and accomplish coordinated and harmonious development. OCPB shall do so in a manner which considers the present and future needs of its residents and businesses through efficient and responsive process that contributes to and promotes the health, safety, and welfare of the overall County. The OCPB will make every effort to uphold a vision of responsive governance and quality public services during our deliberations, decisions, and recommendations. Public Charge The Planning Board pledges to the residents of Orange County its respect. The Board asks its residents to conduct themselves in a respectful, courteous manner, both with the Board and with fellow residents. At any time, should any member of the Board or any resident fail to observe this public charge, the Chair will ask the offending member to leave the meeting until that individual regains personal control. Should decorum fail to be restored, the Chair will recess the meeting until such time that a genuine commitment to this public charge is observed. 6. CHAIR COMMENTS 1 2 No. Page(s) Agenda Item 7. 9-59 MAJOR SUBDIVISION CONCEPT PLAN: To review and make a decision on a major subdivision concept plan application seeking to sub-divide a 25.33 acre parcel of property into 14 single-family residential lots with 16.29 acres of common open space near the intersection of Stroud’s Creek Road and NC Highway 57 in Hillsborough Township. Presenter: Patrick Mallett, Planner II 8. COMMITTEE/ADVISORY BOARD REPORTS a. Board of Adjustment 9. ADJOURNMENT IF AN EMERGENCY OCCURS, OR IF YOU ARE RUNNING LATE FOR THE MEETING, PLEASE LEAVE A VOICE MAIL FOR MICHAEL HARVEY (919-245-2597). 2 *Planning Board Member Attendance Required SuMoTuWeThFrSa 123456789101112131415161718192021222324252627282930 June 2014 SuMoTuWeThFrSa 12345678910111213141516171819202122232425262728293031 July 2014June 2014 Ju n 1 - 7 Jun 1 2 3 4 5 6 7 7:00pm BOCC Reg Meeting (Department of Social Services) 7:30pm Town of Carrboro Alderman Meeting for JPA (Town Hall) 7:00pm *PLANNING BOARD MEETING (West Campus Office Bldg ) 7:00pm BOCC Budget Work Session (Southern Human Services) Ju n 8 - 1 4 8 9 1011 12 13 14 7:30pm 7:00pm BOCC Budget Work Session (Link Gov't Services) 7:00pm BOCC Budget Work Session (Southern Human Services) Ju n 1 5 - 2 1 15 16 17 18 19 20 21 7:00pm BOCC Reg Meeting (Southern Human Services) 7:00pm OUTBoard Meeting (West Campus Office Bldg) Ju n 2 2 - 2 8 22 23 24 25 26 27 28 Ju n 2 9 - J u l 5 29 30 Jul 1 2 3 4 5 Sun Mon Tue Wed Thu Fri Sat 3 *Planning Board Member Attendance Required SuMoTuWeThFrSa 12345678910111213141516171819202122232425262728293031 July 2014 SuMoTuWeThFrSa 12345678910111213141516171819202122232425262728293031 August 2014July 2014 Ju n 2 9 - J u l 5 Jun 29 30 Jul 1 2 3 4 5 7:00pm *PLANNING BOARD MEETING (West Campus Office Bldg ) HOLIDAY Ju l 6 - 1 2 6 7 8 9 10 11 12 Ju l 1 3 - 1 9 13 14 15 16 17 18 19 7:30pm Board of Adjustment (West Campus Office Bldg) Ju l 2 0 - 2 6 20 21 22 23 24 25 26 Ju l 2 7 - A u g 2 27 28 29 30 31 Aug 1 2 Sun Mon Tue Wed Thu Fri Sat 4 D R A F T 1 MINUTES 1 ORANGE COUNTY PLANNING BOARD 2 MAY 7, 2014 3 REGULAR MEETING 4 5 6 MEMBERS PRESENT: Peter Hallenbeck (Chair), Cheeks Township Representative; Lisa Stuckey, Chapel Hill 7 Township Representative; Buddy Hartley, Little River Township Representative; Maxecine Mitchell, At-Large 8 Bingham Township; Herman Staats, At-Large, Cedar Grove Township; Tony Blake, Bingham Township 9 Representative; James Lea, Cedar Grove Township Representative 10 11 12 MEMBERS ABSENT: Andrea Rohrbacher, At-Large Chapel Hill Township; Paul Guthrie, At-Large Chapel Hill 13 Township; Vacant- Eno Township Representative; Vacant- Hillsborough Township Representative; Vacant- At-Large; 14 15 16 STAFF PRESENT: Craig Benedict, Planning Director; Michael Harvey, Current Planning Supervisor; Perdita Holtz, 17 Special Projects Coordinator; Patrick Mallett, Planner II; Tina Love, Administrative Assistant II 18 19 20 OTHERS PRESENT: Michael Neal, Hartison Jones, Danny Jones, Pam Jones, Laney Jones 21 22 23 AGENDA ITEM 1: CALL TO ORDER AND ROLL CALL 24 25 26 AGENDA ITEM 2: INFORMATIONAL ITEMS 27 a) Planning Calendar for May and June 28 b) May 27, 2014 Quarterly Public Hearing – 7 p.m. @ Dept. of Social Services – Draft Legal 29 Ad Attached for Information 30 31 32 AGENDA ITEM 3: APPROVAL OF MINUTES 33 APRIL 2, 2014 REGULAR MEETING 34 35 MOTION by Tony Blake to approve the April 2, 2014 Planning Board minutes. Seconded by Lisa Stuckey. 36 VOTE: UNANIMOUS 37 38 39 AGENDA ITEM 4: CONSIDERATION OF ADDITIONS TO AGENDA 40 41 42 AGENDA ITEM 5: PUBLIC CHARGE 43 44 Introduction to the Public Charge 45 The Board of County Commissioners, under the authority of North Carolina General Statute, 46 appoints the Orange County Planning Board (OCPB) to uphold the written land development 47 laws of the County. The general purpose of OCPB is to guide and accomplish coordinated and 48 harmonious development. OCPB shall do so in a manner which considers the present and 49 future needs of its citizens and businesses through efficient and responsive process that 50 contributes to and promotes the health, safety, and welfare of the overall County. The OCPB 51 will make every effort to uphold a vision of responsive governance and quality public services 52 during our deliberations, decisions, and recommendations. 53 54 5 D R A F T 2 AGENDA ITEM 6: CHAIR COMMENTS 55 56 57 AGENDA ITEM 7: MAJOR SUBDIVISION PRELIMINARY PLAT APPLICATION: To review and make a recommendation 58 to the BOCC on a major subdivision preliminary plat application (Triple Crown Farms), located 59 off of Dairyland Road. 60 Presenter: Michael Harvey, Current Planning Supervisor 61 62 Michael Harvey: Reviewed abstract. 63 64 Michael Neal: Presented a PowerPoint presentation. 65 66 Tony Blake: I have two questions, one is, is there a fire pond or some sort of water access? The second is, I’ve 67 been reading the NC Legislature’s agenda and they have a proposal to push road maintenance and roads from DOT 68 to the counties. I don’t know if it will pass or not but has DOT proposed a turn lane or anything like that on Dairyland. 69 70 Michael Neal: No, and NCDOT has reviewed the plans. Going to the first question, the fire marshal’s comment is 71 that currently there is a fire pond right here (pointed out on map) and there’s also Buck Fork Creek and the fire 72 marshal in his letter suggested Buck Fork may provide the flow that he is requesting. That is something that we will 73 have to do, either identify this pond or somehow amend Buck Fork Creek and allow a fire point there. 74 75 Tony Blake: Ok, that’s all I had. 76 77 Buddy Hartley: Lots three, four and five, is it possible to have an option for them to go to either school district? 78 79 Michael Harvey: The developer can petition, but it has never been my experience that it has been approved (by 80 Chapel Hill/Carrboro). It is our opinion that those lots will be going to Orange County Schools. 81 82 Lisa Stuckey: When I was on the Chapel Hill Board, we never approved accepting additional. It’s so overcrowded 83 they are not expanding the boundary. 84 85 MOTION by Lisa Stuckey to recommend approval of the Triple Crown Subdivision preliminary plat application to the 86 BOCC. Seconded by Tony Blake. 87 VOTE: UNANIMOUS 88 89 90 AGENDA ITEM 8: JOINT PLANNING LAND USE AND AGREEMENT AMENDMENT: To make a recommendation to the 91 BOCC on County-initiated amendments to the text of the Joint Planning Land Use Plan and 92 Agreement in regards to the density in the Rural Buffer land use classification and 93 clarifications on other topics. This item was heard at the March 27, 2014 Joint Planning Public 94 Hearing and was previewed at the April 2, 2014 Planning Board meeting. 95 Presenter: Michael Harvey, Current Planning Supervisor 96 97 Michael Harvey: Reviewed abstract. 98 99 Pete Hallenbeck: Does anyone have any questions? 100 101 MOTION by Tony Blake to recommend approval to the BOCC. Seconded by Buddy Hartley. 102 VOTE: UNANIMOUS 103 104 105 AGENDA ITEM 9: JOINT PLANNING LAND USE AND AGREEMENT AMENDMENT: To make a recommendation to the 106 BOCC on County-initiated amendments to the text of the Joint Planning Land Use Plan and 107 Agreement in regards to allowing appropriate agricultural support enterprises in the Rural 108 6 D R A F T 3 Buffer land use classification. This item was heard at the March 27, 2014 Joint Planning 109 Public Hearing and was previewed at the April 2, 2014 Planning Board meeting. 110 Presenter: Perdita Holtz, Special Projects Coordinator 111 112 Perdita Holtz: Reviewed Abstract 113 114 Pete Hallenbeck: Does anyone have any questions? 115 116 MOTION by Herman Staats to recommend approval to the BOCC. Seconded by Tony Blake. 117 VOTE: UNANIMOUS 118 119 120 AGENDA ITEM 10: 2030 COMPREHENSIVE PLAN AND UNIFIED DEVELOPMENT ORDINANCE (UDO) TEXT 121 AMENDMENTS: To make a recommendation to the BOCC on government-initiated 122 amendments to the text of the UDO to establish a zoning program commonly referred to 123 Agricultural Support Enterprises (ASE) within the Rural Buffer land use classification. This 124 item was heard at the February 24, 2014 quarterly public hearing and was previewed at the 125 April 2, 2014 Planning Board meeting. The text amendments can be adopted by the BOCC 126 only if the Joint Planning Land Use Plan and Agreement (item #9 above) is adopted by all 127 three local governments (Orange County, Chapel Hill, and Carrboro). 128 Presenter: Perdita Holtz, Special Projects Coordinator 129 130 Perdita Holtz: Reviewed Abstract 131 132 Tony Blake: I have one question, under exclusions, these apply to the rural area and the Rural Buffer or just to the 133 Rural Buffer? 134 135 Perdita Holtz: All of these apply to the outside of the Rural Buffer but it will also apply within the Rural Buffer if this 136 amendment is adopted. No changes were necessary to that red text in order to make it apply to the Rural Buffer. 137 138 Lisa Stuckey: There was a lot here about water usage which seemed very forward thinking to me but on page 222, 139 the ‘greenhouse with on premise sales’, there was nothing in that section having to do with water. 140 141 Perdita Holtz: The reason it is not in there is that is an existing use that is allowed everywhere and it doesn’t 142 currently have that ground water use standard. We are looking at it as ‘do we want to make is more restrictive than it 143 is already’ for a use that is already covered in the UDO. 144 145 Herman Staats: Didn’t you also say that bona fide farming operations is not regulated by this. 146 147 Perdita Holtz: Correct, and any water usage done by the bona fide farm is not regulated. It is just the additional 148 water that would be necessary to run the regulated use. 149 150 Pete Hallenbeck: I think, also last month we commented, you have to be pretty crazy to start up some sort of 151 business for ag use and depend solely on well water. 152 153 Pete Hallenbeck: Does anyone have any questions? 154 155 MOTION by Lisa Stuckey to recommend approval to the BOCC. Seconded by Tony Blake. 156 VOTE: UNANIMOUS 157 158 159 AGENDA ITEM 11: COMMITTEE/ADVISORY BOARD REPORTS: 160 a. Board of Adjustment 161 7 D R A F T 4 b. Efland-Mebane Small Area Plan Implementation Focus Group (community meeting on 162 April 7, 2014 regarding proposed Efland zoning overlay districts) 163 164 Pete Hallenbeck: Updated the Board on public information meeting held in Efland regarding the proposed overlay 165 districts. 166 167 168 AGENDA ITEM 12: ADJOURNMENT: 169 170 171 8 ORANGE COUNTY PLANNING BOARD ACTION AGENDA ITEM ABSTRACT Meeting Date: June 4, 2014 Action Agenda Item No. SUBJECT: Major Subdivision Concept Plan Application – Stroud’s Creek DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENTS: INFORMATION CONTACT: 1. Application Package 2. Project Vicinity Map/Future Land Use Map Patrick Mallett, Planner II (919) 245-2577 Michael D. Harvey, Planner III (919) 245-2597 3. Staff Generated Correspondence 4. Notes from Neighborhood Information Meeting 5. Color Rendering of Concept Plan Under Separate Cover 6. Concept Plan Craig Benedict, Director (919) 245-2575 PURPOSE: To review and take action on a Major Subdivision Concept Plan application proposing a 14 lot single-family residential subdivision in accordance with the provisions of Section 2.15 and Article 7 Subdivisions of the Unified Development Ordinance (UDO). BACKGROUND: The basic facts concerning the current application are as follows: Applicant(s): Stephens Road Partners Attention Glenn Futrell 1050 Towerview Court Cary NC, 27513 Owner: Waterford Sterling LLC 214 South Kings Street Leesburg VA, 20175 Agent(s): Summit Engineers Terry Boylan and Chad Abbott 504 Meadowland Drive Hillsborough, NC 27278 Location: Stroud’s Creek Road - Please refer to Attachment 2 for a vicinity map of the parcel. Parcel Information: a. PIN: 9875-08-0900. b. Size of Parcel: 25.3 acres in area. 9 c. Zoning of Parcel: Agricultural Residential (AR) and Special Flood Hazard Area Overlay District (SFHA). The property is not located within a Watershed Protection Overlay District. d. Township: Hillsborough. e. School District: Orange County. f. Future Land Use Map Designation: Agricultural Residential and Rural Industrial Activity Node. Please refer to Attachment 2 for additional detail. g. Growth Management System Designation: Rural. h. Existing Conditions/Physical Features: Varying topography with heavy vegetation, primarily mixed hardwoods, throughout. There are streams running through the property with varying slopes. Portions of the property are also encumbered by floodplain and wetlands. i. Roads: Vehicular access to the subdivision is proposed via Stroud’s Creek Road, a NCDOT publicly maintained roadway. The subdivision proposes to build a public road (27’ wide pavement within a 40’ public right-of-way) that terminates in a cul-de-sac. The site is bordered by streams, floodplain and the Pathways Elementary School. Therefore, no additional public or private vehicular access to adjacent properties is proposed or required. The public road is designed to meet or exceed NCDOT and/or Town of Hillsborough residential street design standards. The cul-de-sac portion of the road is also designed to meet Orange County Fire and Emergency Services design preferences. j. Water and Sewer Service: The property is located within a primary public utility service area according to the Water and Sewer Management Planning Boundary Agreement (WASMPBA). The proposed residential lots will be served with public water (via a 4” domestic and 8-12” fire lines), and public sewer (via an 8” sanitary sewer line) by the Town of Hillsborough. Surrounding Land Uses: a. NORTH: Stroud’s Creek Road; an undeveloped single-family residential subdivision comprised of 40 lots all ten acres or more in size. b. SOUTH: Property within the corporate limits of the Town of Hillsborough. The property is slated for development as an office/industrial park. There is also an undeveloped 78 acre parcel within the County’s planning jurisdiction zoned AR. c. EAST : Church on property zoned AR; NC Highway 57. d. WEST: Pathways Elementary School zoned AR. 10 Development Process, Schedule, and Action: The typical cadence for the review of a major subdivision is as follows: • First Action – Planning staff schedules a Neighborhood Information Meeting (NIM). Staff Comment – DONE. This meeting was held on May 14, 2014. Please refer to Attachment 4 for a synopsis of meeting comments. • Second Action – The Planning Board reviews and takes action on the Concept Plan application approving either the ‘conventional’ or ‘flexible development’ layout. The Planning Board review begins on June 4, 2014. As a reminder the Concept Plan review is intended to allow Board members and the applicant to discuss the nature of the project and identify possible solutions to concerns identified by staff or surrounding property owners. If approved the Concept Plan serves as a ‘roadmap’ for the developer with respect to the acceptable lot and road layout as well as location of proposed/required open space and recreation areas. • Third Action – Once a concept plan is approved, the Planning Board reviews and makes a recommendation on the approval of the Preliminary Plat for the project. • Fourth Action – The BOCC reviews and take action on the Preliminary Plat application. • Fifth Action – Once all construction activities have been completed, or appropriate bonds have been approved, staff will sign off and allow the recordation of a Final Plat allowing for the individual lots to be created. PROPOSAL – SUBDIVISION TYPES: The petitioner has submitted a Major Subdivision Concept Plan application proposing to develop a maximum of 14 single-family residential lots with an overall proposed density for the project of 1 dwelling unit per every 1.68 acres of land area with approximately 17.29 acres of dedicated open space. Ultimately the applicant will be preserved approximately 68.32% of the site as dedicated open space. Proposed lots will be range in area from 14,217 (smallest) to 39,794 (largest) square feet in area. In accordance with Section 2.15.2 (C) (3) of the UDO, the applicant has elected to file a Conservation Cluster Flexible Development option for this project. Required minimum lots sizes have been reduced in accordance with the provisions of Section 7.13.4 (B) (6) of the UDO. A summary of the proposal is as follows: Subdivision Type Number of Lots Average Lot Size Area in Open Space Open Space Percentage Conservation Cluster Flexible Development Plan 14 Range from 14,217 to 39,794 sq. ft. in area 17.29 acres 68.25% common open space (33% typically required by the UDO) 11 STAFF COMMENT – SUBDIVISION TYPES: The proposal is in accordance with the anticipated densities for properties located within the Agricultural Residential land use category as defined within the adopted Comprehensive Plan as well as the Rural Designated areas as denoted on the Growth Management Systems Map. The size of the parcels is consistent for projects served by public water and sewer. It should be noted that in absence of such services, reduction of minimum lot sizes below one acre would be prohibited. The applicant has indicated he wishes to pursue the flexible development option for this project and has not submitted a conventional option, which has the support of staff. ROADS: The proposal involves the creation of a single public road to service the project, constructed to applicable NC Department of Transportation (DOT) and Town of Hillsborough roadway standards. The applicant intends to turn this road over for maintenance to the appropriate entity once development is completed. Specifically, the plan calls for: • A roadway, approximately 612 linear feet in length, terminating in a cul-de-sac. • The construction of the proposed roadway will not involve stream crossing. STAFF COMMENT - ROADS: Staff has determined that the proposed roadway construction and layout is consistent with the requirements of the UDO. It also avoids impacting environmentally sensitive areas (e.g. wetlands and streams). In reviewing the matter with Mr. D’Angelo Jones of NC DOT and Ms. Margaret Hauth of the Town of Hillsborough, staff has been informed that they have no concerns over the proposed roadway development, or its proposed public street access to Stroud’s Creek Road. If desired by the Orange County School System and NCDOT, the developer has proposed the construction of a 5’ wide sidewalk along the right-of-way of Stroud’s Creek Road. The sidewalk would be located within or alongside the right-of-way of the new residential street connection to the second access drive for Pathways Elementary School. UTILITIES: The applicant is proposing to serve the project with public water and sewer provided by the Town of Hillsborough. The applicant has indicated that where allowed and feasible electrical utility services for the residential homes will be located below ground. STAFF COMMENT - UTILITIES: The Town of Hillsborough has already approved (and provided a utility agreement) to serve the property with public water (4” domestic line and 8-12” fire line) and a 8” sanitary sewer line. Please refer to an e-mail from Mr. Kenny Keel, Town of Hillsborough, contained within Attachment 3 for additional information. STORMWATER DRAINAGE: Drainage will be engineered according to Best Management Practices (BMP) at the time of permit application for construction. The property is subject to recently adopted stormwater management guidelines limiting total nitrogen runoff of 2.2 pounds per acre annually and 0.33 pounds per acres annually for total phosphorus. 12 STAFF COMMENT – STORMWATER DRAINAGE: Orange County Erosion Control has not submitted comments at this time as there is no formal stormwater management plan required as part of the concept plan submittal. The applicant will be required to submit additional detail, with respect to the anticipated stormwater management plan, as part of the Preliminary Plat application package for review and comment. OPEN SPACE: The flexible development plan denotes the maintenance of a 30’ wide natural buffer along Stroud’s Creek Road and a 100-foot building setback along the perimeter of the project. Open space is identified in and around the existing streams and off of the denoted floodplain areas. The total area preserved as primary and secondary open space is approximately 753, 072 square feet (17.29 acres). The proposed open space is composed of existing, mature, vegetation and trees with an approximate height of between 30 to 50 feet. The area is also heavily encumbered with identified floodplains and delineated wetlands. STAFF COMMENT – OPEN SPACE: Staff has determined the proposed open space and land use buffers meet the requirements of the UDO. The developer has also proposed a 50’ wide Pedestrian Open Space Area (POSA) connection at the residential street (between lots 13 and 14) that would continue along the rear of lots 9-13 to connect to the sanitary sewer easement along the southern portion of the property. If desired by the Town of Hillsborough, the developer has also offered to provide a pedestrian access easement in conjunction with the sanitary sewer easement along the southern portion of the property. These provisions would provide the opportunity to have publically accessible open space on all sides of the development. LAND USE BUFFER: The site plan indicates there will be a 30-foot buffer along Stroud’s Creek Road comprised of existing, dense, vegetation composed of existing, mature, shrubs and trees with an approximate height of between 50 to 70 feet. STAFF COMMENT – LAND USE BUFFER: Section 6.8.6 (D) of the UDO requires that this project maintain a thirty (30) foot land use buffer separating the project from adjacent roadways. Staff has determined the proposed open space and land use buffers meet the requirements of the UDO. STAFF GENERATED CORRESPONDENCE: Attachment 3 contains the various comments for this project as of the date of abstract preparation. PUBLIC NOTIFICATION: Section 2.15.2 (D) of the UDO requires that each property owner within 500 feet be notified by regular mail of the Neighborhood Information Meeting (NIM). Staff mailed out letters to the property owner’s within 500 feet of the property concerning the May 14, 2014 NIM meeting on April 28, 2014. ANALYSIS: As required under Section 2.15.2 (E) of the UDO, the Planning Director is required to: ‘prepare and submit a recommendation’ on the concept plan to the Planning Board for consideration. In analyzing this request, the Planning Director offers the following: 1. The application has been deemed complete in accordance with the requirements of Section 2.2 and 2.15.2 of the UDO. 2. Staff has determined that the property is of sufficient size to support the proposed subdivision. 13 3. The proposal appears consistent with the various goals outlined within the Comprehensive Plan concerning development, including: a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County’s population and economy consistent with other Comprehensive Plan element goals and objectives. b. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features and that protect natural resources, cultural resources, and community character. c. Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural character, minimizes land use conflicts, supported by an efficient and balanced transportation system. 4. Staff supports the approval of the conservation cluster flexible development option as proposed by the applicant. FINANCIAL IMPACT: Staff has determined the project would not require augmentation of County budgetary outlays to support services and that anticipated revenues from property taxes should supplement increases in cost. RECOMMENDATION: The Planning Director recommends the Board: 1. Receive the Concept Plan application for the Stroud’s Creek Subdivision, and 2. Approve the Conservation Cluster Flexible Development option and allow the applicant to proceed with the development of a preliminary plat utilizing this layout. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ORANGE COUNTY BUILDING PERMIT ORANGE COUNTY BUILDING INSPECTIONS DIVISION (919) 245-2600 (919) 644-3347 FAX WWW.CO.ORANGE.NC.US/PLANNING/INDEX.HTM RECEIPT RECEIPT NUMBER:R14-001474 Applicant:STEPHENS ROAD PARTNERS LLC APD #:MI14-00028TYPE: Miscellaneous Items SITE ADDRESS: PARCEL: __________________________________________ _______________________________________ TRANSACTION DATE:05/12/2014TOTAL PAYMENT:350.00 TOTAL PAID FROM CURRENCY:350.00 TRANSACTION LIST: Type Method Description Amount ---------- -------- ------------- -------------- ------------ Payment Check 1161 350.00 TOTAL:350.00 ACCOUNT ITEM LIST: Description Account Code Current Pmts ------------------------------ -- -------------- ------------ ZONING PERMIT 10620003-430401 350.00 TOTAL:350.00 RECEIPT ISSUED BY:MHARVEY INITIALS: MDH ENTERED DATE:05/12/2014 TIME: 11:24 AM ___________________________________ ___________________________________ __ 34 HI AR STROUDS CREEK RD NC 5 7 TUMBLIN G BROOK L N 604 584 578 581 579 586 582 5 8 9 59 5 602 5 9 7 59 6 5 8 8 593 591 600 597 598 Lower EnoUnprotectedWatershed Falls LakeNitrogen - 2.2 lbs/ac/yrPhosphorous - 0.33 lbs/ac/yr USGS Water Feature Soils Survey Water Feature OC Updated Water Feature Water Body River Basins Watershed Parcels Township School System Boundary Contours County Boundary Soils Zoning City Limits ETJ Conservation EasementsHeld by Others Orange CountyConservation Easements 100 YR Floodplain (Effective 02/02/07) Floodway (Effective 02/02/07) 500 YR Floodplain (Effective 02/02/07) Buildings Water and Sewer Boundary · 0 230 460115Feet 1 inch = 300 feet Data shown on this map is obtained from Orange CountyGIS and is for reference only.Exact locations and boundaries should be verified.Map prepared by Orange County Planning & Inspections. PIN#: 9875080900LLC WATERFORD STERLING 214 S KING STLEESBURG, VA 20175 Pathways Elementary School Subject Parcel Variable width stream buffer Variable width stream buffer Town of Hillsborough Attachment 2 - Vicinity Map 35 PIN: 9875080900 N C 8 6 N NC 5 7 Future Land Use Map Subject Parcel Streams Parcels Water Supply Watersheds Resource Protection Areas 10 Year Transition Agricultural Residential City Limits Rural Industrial ·Orange County Planning and InspectionsBrian Carson (5/29/2014) 0 100 200Feet 1 in = 400 feet 36 Date: April 25, 2014 To: Michael Kelly Orange County Planning & Inspections Department Current Planning Division From: Alan Clapp Orange County Health Department Environmental Health Director RE: Stroud’s Creek Road Subdivision PIN: 9875080900 Michael, Environmental Health will not have any involvement in this subdivision if served by water and sewer. After reviewing the Site Plans C-1 and C-2, it appears well and septic systems will not be used. Let me know if you require anything further. Alan 37 1 Michael Kelly From:Kenny Keel <Kenny.Keel@hillsboroughnc.org> Sent:Friday, April 25, 2014 10:23 AM To:Michael Kelly; Tom King Subject:RE: Strouds Creek Major Subdivision Attachments:SterlingEstatesWSExtContract2013-executed.pdf Follow Up Flag:Follow up Flag Status:Flagged Michael, The approved and fully executed Water Sewer Extension Contract is attached, which documents Hillsborough’s intention to serve Sterling Estates. I have not received detailed utilities plans for the project yet, so I can’t say for sure about hydrant location. However, one of the plans you provided shows a fire hydrant at the cul-de-sac. I will likely also require one near the subdivision entrance as well. Kenny Keel, PE <>< Town Engineer/Utilities Director Town of Hillsborough 919-732-1270 ext 75 Fax 919-644-2390 kenny.keel@hillsboroughnc.org www.ci.hillsborough.nc.us Pursuant to NCGS Chapter 132, Public Records, this electronic mail message and any attachments hereto, as well as any electronic mail message(s) that may be sent in response to it ‘may’ be considered public record and as such are subject to request and review by anyone at anytime From: Michael Kelly [mailto:mkelly@orangecountync.gov] Sent: Thursday, April 24, 2014 5:08 PM To: Tom King; Kenny Keel Subject: Strouds Creek Major Subdivision Importance: High Dear Tom & Kenny: Orange County Current Planning is in the process of reviewing a proposed 14 lot major subdivision located along Strouds Creek Rd. and NC Hwy. 57. It is expected that all 14 lots will be serviced by water and sewer from the Town of Hillsborough. Could you please provide Orange County Planning with documentation attesting to such as well as the location(s) of fire hydrants throughout the parcel to provide water and fire protection? Thank you, D. Michael Kelly, Planning Technician Orange County Planning & Inspections Department Current Planning Division 131 W. Margaret Ln., Ste. 201 (Physical Location) P.O. Box 8181 (Mail) Hillsborough, NC 27278 (919) 245-2598 - phone (919) 644-3002 – fax 38 MEMORANDUM TO: Michael Kelly, Orange County Current Planning FROM: Jeff Scouten, Orange County Solid Waste Management SUBJECT: Stroud’s Creek Road Conceptual Subdivision Plan Review Comments DATE: May 1, 2014 I have completed my review of the subject plan and I offer the following comments that must be addressed before I can make a recommendation for approval:  Solid Waste Management Plan – Please have the applicant complete the attached Solid Waste Management Plan document and return to me for review and approval.  Standard Plan Notes – Please add the following standard notes in a prominent location on the plan: Construction Waste: 1. By Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, all present in construction waste, must be recycled. 2. By Orange County Ordinance, all haulers of construction waste must be properly licensed. 3. Prior to any demolition or construction activity on the site the applicant will hold a pre- demolition/pre-construction conference with the County’s Solid Waste staff. This may be the same meeting held with other development officials. 4. The presence of any asbestos containing material (‘ACM’) or other hazardous materials in construction and demolition waste shall be handled in accordance with any and all local, state, and federal regulations and guidelines.  Solid Waste Collection – The collection of solid waste will be either by private collector/hauler or the residents may elect to take their solid waste to one of the 5 solid waste convenience centers. The closest one to the project site is the Walnut Grove Church Road SWCC located at the intersection of HWY 86 and Walnut Grove Church Road north of Hillsborough. If the Town ultimately annexes this project, the Town’s Public Works Department would provide garbage pickup.  Recycling Collection – This project may qualify for rural curbside recycling collection. The applicant must contact the Orange County Recycling Programs Supervisor at 919-968-2788 x224 to request service. If it doesn’t qualify for service by the County residents may still take their recyclables to one of the 5 solid waste convenience centers. The closest one to the project site is the Walnut Grove Church Road SWCC located at the intersection of HWY 86 and Walnut Grove Church Road north of Hillsborough. Thank you for the opportunity to review this application and please do not hesitate to contact me should you have any questions or wish to discuss this matter further. 39 Orange County Solid Waste Management Plan All development applications must provide a detailed solid waste management plan, including a recycling plan and a plan for management of construction debris. The following form must be completed to fulfill this requirement. This form must be completed and approved to satisfy the requirement of a plan for management of construction debris. Please complete all information in its entirety. Assistance in completing this form is available from the Orange County Solid Waste Staff at (919) 968-2788 x107 or x109. COMPLETE ALL INFORMATION BELOW (Incomplete contact information will delay plan review and approval.) Project Name __________________________________________________ Property ID #: ________________________ Permit: ______________ Project Location __________________________________________________ __________________________________________________ Project Owner __________________________________________________ Contact Person __________________________________________________ Address __________________________________________________ __________________________________________________ Telephone (_____) _____-_______________ Fax/Mobile (_____) _____-_______________ / (_____) _____-_______________ Design Firm __________________________________________________ Contact Person __________________________________________________ Address __________________________________________________ __________________________________________________ Telephone (_____) _____-_______________ Fax/Mobile (_____) _____-_______________ / (_____) _____-_______________ Date ____________________________ Provide a brief description of the work to be performed under this application: (For example: construct a new commercial building [include use/sq. ft.], apartment complex [# units], place of worship, horizontal improvements for subdivision, etc.) 40 Page 2 of 7 1. Site Preparation Wastes (landclearing, demolition, deconstruction) During site preparation for a project the amount of waste destined for a construction waste landfill or an inert debris landfill should be minimized or diverted for reuse or recycling. Many materials can be reused, recycled, or salvaged, provided that materials are kept separate. This approach may also reduce overall project waste disposal costs. Regulated Recyclable Materials (clean wood waste, scrap metal and corrugated cardboard) generated in Orange County must be recycled. During demolition activities, metal and wood are often not “reasonably possible to separate” or doing so may present health and safety concerns (asbestos, lead paint, etc.). In these cases only, are regulated materials not required to be separated for recycling. Consider whether the following materials will be generated on this project, in any quantity, and indicate the management method(s).  1. Trees and Plant Materials: No tree/plant wastes will be produced (proceed to # 2) Tree waste will be salvaged as timber, mulch, or boiler fuel Valuable plants will be removed for replanting Landclearing and inert debris landfill (LCID) Construction and demolition debris landfill (C&D) Other (specify):  2. Dirt, Rock, Clean Fill, Inert materials to be removed from site: No inert materials will be removed from the site (proceed to # 3) Site Needs Fill Will be hauled to site needing fill. Construction and demolition debris landfill (C&D) Landclearing and inert debris landfill (LCID) Other (specify):  3. Asphalt Paving: No asphalt wastes will be produced (proceed to # 4) Recycled at asphalt-paving producer Used on or off site. Describe use: Disposed in an approved landfill (Orange County Landfill charges no tipfee if clean) Other (specify):  4. Concrete, Brick, Block, other Aggregate materials: No aggregate materials will be removed from the site (proceed to # 5) Recycled as scrap at an aggregate producer Used on or off site: Describe use: Construction and demolition debris landfill (C&D) Landclearing and inert debris landfill (LCID) 41 Page 3 of 7 Other (specify):  5. Metal Scrap (metal wastes are required by ordinance to be recycled) No metal waste will be produced (proceed to # 6) Segregated for on-site recycling collection Recycle at Orange County Landfill (no tip fee charged) Segregated for hauling to scrap dealer by general contractor Segregated for hauling to scrap dealer by sub-contractor Certified Commingled Recycling Facility Other (specify):  6. Clean Wood Wastes (clean wood wastes are required to be recycled) No clean wood wastes will be produced (proceed to # 7) Segregated for on-site recycling collection Recycle at Orange County Landfill (reduced tip fee charged) Saved and used on future jobs Separated for private salvage or charity Certified Commingled Recycling Facility Other (specify):  7. Demolition/Salvage of Buildings or Structures on the Site: No structure(s) will be removed (proceed to Construction Waste sect ion) Structure(s) must be removed. Please describe (include square footage for each structure): If any structure described above is greater than 500 ft2, it must be assessed for deconstruction possibilities. Please call Solid Waste Staff at (919) 968-2788 x107 or x109 to arrange an assessment. Could the structure(s) be moved from the site? YES NO Don’t Know Has the sale or donation of the structures been considered? Please explain: YES NO How will the structure be removed otherwise? What is the timetable on removal of the structure(s)? Are there salvageable materials (hardwood floors, fixtures, molding, that can be removed for reuse prior to demolition? If Yes, Please list (use a separate sheet if necessary): YES NO Don’t Know 42 Page 4 of 7 Have, or will, these materials been offered for sale or donation? YES NO 2. Construction Wastes During the construction phase there are multiple options for recycling building materials. Regulated Recyclable Materials (clean wood waste, scrap metal and corrugated cardboard) generated in Orange County must be recycled. Although other materials are not required to be recycled, you are highly encouraged to do so. One of the best methods of recycling is to separate the materials on the jobsite. You may also combine materials for delivery to a certified recycling facility. Specifying waste reduction/recycling practices on a project will assure better performance.  1. Clean Wood Wastes (clean wood wastes are required by ordinance to be recycled) No clean wood wastes will be produced (proceed to # 2) Segregated for on-site recycling collection Recycle at Orange County Landfill (reduced tip fee charged) Saved and used on future jobs Separated for private salvage or charity Certified Commingled Recycling Facility Other (specify):  2. Metal Scrap (metal wastes are required by ordinance to be recycled) No metal waste will be produced (proceed to # 3) Segregated for on-site recycling collection Recycle at Orange County Landfill (no tip fee charged) Segregated for hauling to scrap dealer by general contractor Segregated for hauling to scrap dealer by sub-contractor Certified Commingled Recycling Facility Other (specify):  3. Concrete, Brick, Block, other Aggregate materials: No aggregate materials will be removed from the site (proceed to # 4) Recycled as scrap at an aggregate producer Used on or off site: Describe use: Construction and demolition debris landfill (C&D) Landclearing and inert debris landfill (LCID) Other (specify):  4. Corrugated Cardboard (cardboard wastes are required to be recycled) No cardboard waste will be produced (proceed to # 5) Segregated for on-site recycling collection Recycle at Orange County Landfill (no tip fee charged) Segregated for hauling to paper dealer by general contractor Segregated for hauling to paper dealer by sub-contractor Certified Commingled Recycling Facility 43 Page 5 of 7 Other (specify):  5. Drywall No drywall waste will be produced (proceed to # 6) Segregated for on-site recycling collection Used on site as agricultural supplement Disposed in an approved landfill Certified Commingled Recycling Facility Other (specify):  6. Other Materials No other wastes will be produced (proceed to # 7) Please specify other wastes that will be produced and how they will be managed: Plastics (including vinyl and shrink-wrap): Carpet and padding: Shingles: Fixtures (sinks, tubs, lighting, etc): Other (specify): Other (specify): Other (specify): 7. Bulk Containers (Dumpsters) County ordinance requires that any bulk waste container be labeled to define what materials are intended or prohibited from being deposited in them and be serially numbered. Hauling Licenses are required for vehicles greater than 9000 GVW in Orange County. Ensure that your waste haulers is licensed. You may contact Orange County Solid Waste for a list of licensees at (919) 968-2788 x107 or x109. There will be one or more bulk containers at the site for construction wastes. Contractors will be required to remove own wastes without the use of bulk containers. Corral or similar system will be used. 44 Page 6 of 7 3. Recycling After Occupancy Depending on the eventual use of the structure, different waste materials will be produced and available for recycling. Recyclable materials must be separated into categories based on collection methods. PLANNING REQUIREMENTS:  Indicate location of all bulk waste containers for refuse and recycling. Plan must show location of all containers, even if using existing refuse/recycling enclosures. Standard details/notes for any of the following are available from Orange County Solid Waste Management (919-968-2788 x107 or x109).  All refuse/recycling containers are required to be on concrete pads.  Provide a detailed and scaled plan of all bulk waste containers areas that show: each container labeled, required screening, lighting, overhead clearances, bollards, and concrete pad.  Indicate whether refuse/recycling area will be gated. Any doors/gates will need retainers to be latched open for refuse/recycling collection.  Ensure adequate collection vehicle access to all containers for deposit and collection. Access templates are available from Orange County Solid Waste Management.  Sharing of exterior recycling locations is acceptable if a joint access/shared-use agreement is filed and the deeds of all properties amended.  Check materials that will be generated once the structure is ready for occupancy: Standard: glass bottles, metal cans, newspaper, glossy magazines, #1 plastics, #2 plastics Corrugated Cardboard (not including waxed or single layer cardboard) Mixed Paper: junk mail, cereal boxes Office Paper: white or colored copy paper, confidential papers Restaurant: food wastes, cooking oil, disposable dining ware Other Plastics: #5, #7 Business specific wastes (please describe): Cardboard Recycling Requirement Orange County Ordinance requires recyclable corrugated cardboard to be kept separate from all other refuse. All developments must provide for cardboard recycling. If the facility’s garbage will be collected from a bulk container (dumpster), a second waste container is likely to be required for cardboard. Public recycling drop -off sites can accommodate a very limited amount of commercial use (no > 50 boxes per week). Site Plan includes space for cardboard recycling container on Sheet # _____________________ Corrugated Cardboard will be handled in an alternate manner. Description Required: Collection Type: This project will be served by the following collection methods. Check all that apply. Exterior individual or cooperative-use bulk waste container site. May be suitable for apartment complexes, restaurants, places of worship, educational facility, office building, retail/office/restaurant combinations Garbage dumpster Garbage compactor Cardboard dumpster Cardboard compactor Recycling carts for glass, cans, plastic bottles, newspaper, magazines, office paper (co-mingled) Cooking grease rendering container (required for any commercial kitchen facility) 45 Page 7 of 7 Food waste collection container (If qualify based on volume; contact OCSW staff for details of program) Standard “curbside” recycling collection. May be suitable for single-family developments and subdivisions, including some duplex, triples, and townhome developments. 46 47 S:\\ErosionControlDivision\2014\Neuse\052214.PIN9875080900.WaterfordSterlingLLC ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 245-2575 Erosion Control Division 131 W. Margaret Lane (919) 245-2586 Suite 200 (919) 644-3002 (FAX) www.co.orange.nc.us P.O. Box 8181 Hillsborough, NC 27278 May 22, 2014 Branston, LLC Attn: Glenn Futrell 150 Towerview Ct. Cary, NC 27513 Re: Orange County Unified Development Ordinance Surface Water Identification Lower Eno Unprotected Watershed PIN: 9875080900 Dear Mr. Futrell: This letter serves as confirmation of an on-site surface water identification made by Orange County Erosion Control Division staff for the referenced parcel. Orange County enforces a stream buffer along streams and water features in the County per the Orange County Unified Development Ordinance (see Section 6.13 Stream Buffers). According to current Orange County GIS imagery of the parcel, there are (4) previously mapped water features, however, topography maps showed possible other water features that could be present and needed evaluation. Each of the water features are noted on the attached aerial photo and those that were found subject to buffer regulations will require an undisturbed buffer along both sides, as calculated per the referenced Ordinance regulations. These undisturbed buffer areas shall be measured from the top of the stream bank, outer edge of wet, marshy areas, or outer edge of the floodplain where applicable. In the instance where a water feature has braided stream segments with channels running parallel to one another, the buffer shall be measured from the outermost bank on either side. See below for examples of how the buffer is to be measured in varying situations: 48 S:\\ErosionControlDivision\2014\Neuse\052214.PIN9875080900.WaterfordSterlingLLC 2 OR OR 49 S:\\ErosionControlDivision\2014\Neuse\052214.PIN9875080900.WaterfordSterlingLLC 3 The following is a description of how the buffers affect the property: 1. Feature A, a previously mapped water feature, is present in the field and therefore subject to buffer regulations. The actual field location of the feature has been corrected on the Orange County GIS system and the beginning point has been flagged in the field for reference. The required stream buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 2. Feature A-1, a previously unmapped water feature, is present in the field and therefore subject to buffer regulations. The field location of the feature has been added to the Orange County GIS system and the beginning point has been flagged in the field for reference. The required buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 3. Feature B, a previously mapped water feature, is present in the field and therefore subject to buffer regulations. The actual field location of the feature has been corrected on the Orange County GIS system and the beginning point has been flagged in the field for reference. The required stream buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 4. Feature C, a previously unmapped wet, marshy area, is present in the field and therefore subject to buffer regulations. The field location of this area has been flagged in the field for reference. The required buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 5. Feature D, a previously mapped braided water feature with associated floodway and floodplain, is present in the field and therefore subject to buffer regulations. The actual field location of the feature has been corrected on the Orange County GIS system. The required stream buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 6. Feature E, a previously mapped water feature, is present in the field and therefore subject to buffer regulations. The actual field location of the feature has been corrected on the Orange County GIS system. The required stream buffer will either be a 65’ or 80’ undisturbed buffer along both sides depending on the slope value, as calculated per the referenced Ordinance regulations. 50 S:\\ErosionControlDivision\2014\Neuse\052214.PIN9875080900.WaterfordSterlingLLC 4 If you have questions about this determination, please contact me at (919) 245-2587. However, if you have further questions about the application of the Unified Development Ordinance to this parcel, how to calculate the buffer lengths, or possible restoration requirements, please contact Michael Harvey, Current Planning Supervisor at 919-245- 2597. Sincerely, Wesley Poole Erosion Control Officer Attachments: Aerial Photograph / Map cc: File 51 HI AR STROUDS CR EEK RD TUMBLING BROOKLN NC 5 7 Lower EnoUnprotectedWatershed 6 3 0 63 0 61 0 630 610 61 0 590 610 590 USGS Water Feature Soils Survey Water Feature OC Updated Water Feature Water Bodies River Basins Watershed Parcels Township School System Boundary Contours County Soils Zoning City Limits ETJ Conservation Easements Held by Others Orange County Conservation Easements 100 YR Floodplain (Effective 02/02/07) Floodway (Effective 02/02/07) 500 Year Floodplains (Effectve 02/02/07) Buildings Streams (Deleted) Water and Sewer Boundary Data shown on this map is obtained from Orange County GIS and is for reference only. Exact locations and boundaries should be field verified.Map prepared by Orange County Planning & Inspections. Orange CountySurface Water Identification · 0140280Feet PIN#: 9875080900 LLC WATERFORD STERLING 214 S KING ST LEESBURG, VA 20175 5/22/2014 Feature C Feature D Feature A Feature A-1 Feature B Feature E 52 53 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning (919) 245-2575 131 W. Margaret Lane Suite 201 (919) 644-3002 (FAX) P. O. Box 8181 www.orangecountync.gov Hillsborough, NC 27278 STROUD’S CREEK NEIGHBORHOOD INFORMATION MEETING NOTES WEDNESDAY, MAY 14, 2014 LOCATION: ORANGE COUNTY PLANNING DEPT. SECOND FLOOR CONFERENCE RM. TIME: 12:00-1:00 PM MEETING ORGANIZER: TERRY BOYLAN Stephen’s Road Partners is seeking Concept Plan approval from Orange County Planning staff regarding a proposed 15 lot major subdivision. Per Section 2.15 of the Orange County Unified Development Ordinance (UDO), entitled Major Subdivisions, a neighborhood information meeting was held by the developer. Three adjacent property owners were in attendance, the developer, two staff from Summit Design and Engineering, and three staff from Orange County Planning. Stroud’s Creek Major Subdivision Background: Applicant: Glenn Futrell, Stephens Road partners, LLC, Cary NC PIN: 9875-08-0900 Agricultural Residential (AR)/ Lower Eno Unprotected W/S Total Acreage: 25.33 acres Legal Description: PB 3617/ PG 198 Proposal: Applicant is proposing a 15 lot major subdivision (Stroud’s Creek) in Orange County with 16.29 acres devoted towards Primary and Secondary Open Space. Applicant submitted Major Subdivision Concept Plan to Current Planning staff for review on April 23, 2014. Adjacent property owners were presented with a concept plan of the proposed development at the meeting and questions pertaining to the development and County subdivision process were answered by staff. Namely, property owners asked the following concerns: I. New road construction and maintenance; - COMMENT: The roads would be built to NC DOT public road standards and maintained by either NC DOT or the Town of Hillsborough. II. Public utilities (water and sewer for project); - COMMENT: The Town would be providing public water/sewer. The question was asked if the service could be expanded beyond this project to serve other adjacent property. Planning staff indicated there would be no such opportunity as the Town of Hillsborough has already indicated they are not going to allow for the extension of services beyond this parcel. 54 III. Details regarding Open Space, stream buffers, floodplain and potential pedestrian access; COMMENT: The applicant indicated they would like to obtain final approvals by the end of the year if at all possible and begin construction in the spring of 2015. IV. Development timeframe. The meeting was meant to serve as an informational session and provide adjacent property owners with an overview of the major subdivision process in Orange County. The next public meeting will be held on June 4, 2014 at 7:00 pm where the Orange County Planning Board will discuss Stroud’s Creek. The meeting was adjourned at 12:30 p.m. 55 56 57 58 59