HomeMy WebLinkAboutBOA minutes 061013Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 1 of 92
MINUTES 1
BOARD OF ADJUSTMENT 2
JUNE 10, 2013 3
REGULAR MEETING 4
5
MEMBERS PRESENT: Larry Wright, Full Member (Chair) 6
David Blankfard, Full Member (Vice Chair) 7
Karen Barrows, Full Member 8
Samantha Cabe, Alternate Member 9
James Carter, Full Member 10
Mark Micol, Alternate Member 11
12
STAFF PRESENT: Michael Harvey, Current Planning Supervisor 13
Debra Graham, Board Secretary 14
James Bryan, Staff Attorney 15
16
17
AGENDA ITEM 1: CALL TO ORDER AND ROLL CALL 18
19
Larry Wright called the meeting to order at 7:28 p.m. 20
21
AGENDA ITEM 2: SWEARING IN OF NEW MEMBERS 22
23
Karen Barrows and Samantha Cabe were sworn in as new members by Debra Graham. 24
25
AGENDA ITEM 3: ELECTION OF OFFICERS 26
27
MOTION made by David Blankfard to elect Larry Wright as Chair. Seconded by James Carter. 28
VOTE: Unanimous 29
30
MOTION made by Mark Micol to elect David Blankfard as Vice-Chair. Seconded by James Carter. 31
VOTE: Unanimous 32
33
AGENDA ITEM 4: CONSIDERATION OF ADDITIONS TO AGENDA 34
35
Larry Wright: I would like to welcome the new members. Also, I would like to thank Dr. Carter for his 36
service on this board. I would also like to present a certificate to Dr. Carter for his valuable 37
contribution since 2007. 38
39
40
AGENDA ITEM 5: APPROVAL OF MINUTES 41
a. December 10, 2012 42
43
Larry Wright: Who would be eligible to vote, the new members? 44
45
James Bryan: It is this board’s minutes so whoever is currently on the board, except the alternates. 46
47
Michael Harvey: Mr. Micol will be voting since he was a voting member for this meeting. 48
49
MOTION made by David Blankfard to accept minutes as written. Seconded by Mark Micol. 50
51
VOTE: Unanimous 52
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 2 of 92
1
AGENDA ITEM 6: PUBLIC CHARGE 2
3
The Board of Adjustment pledges to the citizens of Orange County its respect. The 4
Board asks its citizens to conduct themselves in a respectful, courteous manner, both 5
with the Board and with fellow citizens. At any time should any member of the Board or 6
any citizen fail to observe this public charge, the Chair will ask the offending person to 7
leave the meeting until that individual regains personal control. Should decorum fail to 8
be restored, the Chair will recess the meeting until such time that a genuine commitment 9
to this public charge is observed. All electronic devices such as cell phones, pagers, 10
and computers should please be turned off or set to silent/vibrate. 11
12
The Board of Adjustment is a quasi-judicial administrative body established in 13
accordance with the provisions of local regulations and State law to perform specified 14
functions essential to the County’s planning program. Action(s) taken by the board are 15
based solely on competent, substantial, and material evidence presented during a 16
previously scheduled and advertised public hearing on a specific item. As detailed 17
within Section 2.12.2 of the UDO the Board chair reserves the right to exclude evidence 18
and testimony that is deemed: ‘incompetent, irrelevant, immaterial, or unduly repetitious’ 19
and therefore fails to reasonably address the issues before the Board of Adjustment. 20
While it should be noted there is no time limit on the presentation of evidence, the Chair 21
asks that the presentation of evidence be consistent with established policies, rules of 22
procedure, and acceptable levels of decorum to ensure a fair and equitable hearing for 23
all parties. 24
25
AGENDA ITEM 7: CASE A-1-13: Class B Special Use Permit Proposing Development of 26
Telecommunication Facilities at 7444 Bill Poole Road (PIN 0808-87-1763) 27
In accordance with Section(s) 2.7 Special Uses, 5.2.2 Table of Permitted Uses, 5.3.2 28
Application of Use Standards – Special Uses, and 5.10 Standards for Telecommunication 29
Facilities of the UDO American Tower and AT and T Mobility have submitted a Class B 30
Special Use Permit application seeking a permit to erect a 199 foot telecommunication tower 31
on a 56 acre parcel of property at 7444 Bill Poole Road further identified utilizing Orange 32
County Parcel Identification Number (PIN) 0808-87-1763. 33
As detailed within the application, the applicant wishes to erect a telecommunication tower 34
within a 100 foot by 100 foot leased area on the north-west portion of the aforementioned 35
parcel. There will be an equipment cabinet at the base of the tower to house equipment for 36
the various communication providers utilizing the tower within a 60 foot by 60 foot fenced 37
compound. 38
Access to the proposed facility is proposed to be through a proposed drive allowing access 39
from New Sharon Church Road. 40
41
The following persons were sworn in: 42
Desiree Goldman
David A. Smith
Jill House
Aaron Nelson
Karen Kemerait
Michael Harvey
Rusty Monroe
David Lacava
Stephen M. Howard
Jeremy T. Browner
Ann Lee-Blythe
43
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 3 of 92
1
Michael Harvey: I have been duly sworn in. On page 7, we have the abstract, on page 13 there is 2
the property map denoting the parcel (where the tower is proposed for development), on page 15-24, 3
we have staff comments, on pages 25-38 we have notification materials and certifications of mailing 4
as well as sign postings, and on pages 39-96 we have the findings of fact and recommendations by 5
staff. I would like to go over the basic points of the application, let the applicant make their case, and 6
review the findings of fact with you. Once the public hearing is closed the applicant, staff, or any 7
other interested party will not be able to answer any questions of the Board of Adjustment or speak to 8
the Board of the Adjustment. I would like to introduce into the record copies of the Orange County 9
Unified Development Ordinance as well as the Comprehensive Plan with respect to this case. I also 10
have an Exhibit submitted this afternoon by our telecommunications consultant, The Center for 11
Municipal Solutions, which I would like to hand out as Exhibit 1. This replaces The Center for 12
Municipal Solutions letter contained in your packet on pages 15-16. The recommendations for 13
approval have not changed but some of the issues have been modified. We believe the 14
recommended conditions still address these issues. American Tower and AT&T Mobility have 15
proposed the erection of a telecommunication tower on property owned by Michael Fagan whose 16
mailing address is 7505 New Sharon Church Road. The particular parcel of property, I will call your 17
attention to the vicinity map which is on page 13, this is the site of a former telecommunication tower 18
that was decommissioned several years ago. The applicant is seeking the authorization to erect a 19
new tower. On page 8 and 9 in the abstract, this application has been submitted in accordance with 20
the requirements of Sections 2.7, 5.2.2, 5.32, 5.10.8 of the Orange County Unified Development 21
Ordinance. The applicant will be leasing a 100x100 foot area on the northwest portion of this parcel 22
and there will be a 60x60 foot fenced in compound. This (information) is also detailed within their 23
narrative. It is contained in their document packet. We have provided you with our initial comments 24
beginning on page 9. The County has fairly rigorous standards detailed within 5.10.8 concerning 25
location of telecommunication facilities. We have a preference of location. I would stipulate at the 26
onset of this hearing is that there are no preselected sites, no County owned properties, County 27
leased sites or any other parcel property within the hierarchy with the criteria to locate a 28
telecommunication tower. We have deemed that this particular parcel of property is viable given the 29
lack of County owned or leased property in the area. We have provided you with comments from the 30
County staff with respect to this development project. You will note the County staff has indicated 31
their favorability to the application. That is Orange County Sheriff’s Department, Fire Marshall’s 32
office, Environmental Health, staff of DEAPR (Department of Agriculture, Environment, Parks and 33
Recreation). We also have correspondence from the Center for Municipal Solutions, our 34
telecommunications consultant. As you will remember from past special use permit hearings, staff 35
provides recommendations which we will go over later with respect to this application’s compliance 36
with submittal standards. We will not offer a recommendation on the applicant’s compliance with 37
general standards detailed within 5.3.2.a2 of the UDO specifically that the use will maintain or 38
promote public health, safety and general welfare if located where proposed and developed and 39
operated according to the plan as submitted. The use will maintain or enhance the value of 40
contiguous property and the location and character of the use according to the plan submitted will be 41
in harmony within the area which it is to be located. The use is in compliance with the plan for the 42
physical development of the County as embodied within the regulations of the Comprehensive Plan. 43
You are required to make your findings based on the material evidence entered into the record during 44
this hearing. On page 10, we identified various policies and goals with respect to the adopted 2030 45
Comprehensive Plan which has been entered into the record that we believe support the 46
development of a telecommunication facility not only in the County but on this property. I will state for 47
the record we have not received any public comments expressing support or concern relating to this 48
proposal, specifically the proposal at 7444 Bill Poole Road. This is a quasi-judicial hearing in that you 49
will be accepting sworn testimony and evidence into the record and that is what you are basing your 50
decisions on. Your decisions are subject to appeal as described in the Unified Development 51
Ordinance within 30 days that has been made part of the record. I would like to turn it over to the 52
applicant and allow them to present their application. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 4 of 92
1
Larry Wright: For the record, on page 9, item 1, could you define for the record, there are no pre-2
selected sites, how do you define that? 3
4
Michael Harvey: In accordance with the Unified Development Ordinance Section 5.10.8, we have a 5
hierarchy of sites that we have determined represent the optimal location sites for a 6
telecommunications facility. That particular section is located in Section 5.10.8, subsection (B) 4, 7
Standards of Evaluation, Subsection B, Location of Wireless Support Structures. Applicant for 8
facilities shall locate site and erect said facilities according to the following priorities, in this order, on 9
existing county owned facilities without increasing the height of the tower structure, on County owned 10
properties or facilities, on properties in areas zoned for commercial or industrial use, on properties in 11
areas zoned agricultural residential, on properties in areas zoned for residential use. We are 12
stipulating in our abstract that there are no existing County owned facilities in this area, there are no 13
existing telecommunications facilities in this area that can be co-located upon, there are no County 14
owned properties or facilities where a cell tower could be put in this general area of the County. 15
There are no properties in this general area of the County zoned for commercial industrial use and 16
this is no properties near areas zoned agricultural residential so we believe this is consistent with the 17
hierarchy. 18
19
Larry Wright: On page 10, you referred to items A through F, don’t they come in the 2030 20
Comprehensive Plan, and isn’t that drawn from Chapter 8? 21
22
Michael Harvey: One is drawn from Chapter 5 which is a Land Use Goal. Services and Facility 23
Community Goals are derived from Chapter 7. The rest are taken from Chapters 7 and 8. 24
25
Karen Kemerait: My name is Karen Kemerait and I am an attorney with the law firm of Styers, 26
Kemerait and Mitchell. I have been sworn. I am here on behalf of American Tower Corporation and 27
AT&T Mobility in regard to their co-applicant and special use permit application to construct a 199 foot 28
monopole. Before I begin providing information about how we have met all the specific and general 29
requirements, I would like to give some general background information to explain why we are here 30
today. I think everyone knows that in the past several years there have been dramatic changes in the 31
technology for wireless telecommunications and those changes have resulted in real impacts to 32
telecommunications carriers, to communities such as Orange County and to the customers of the 33
wireless communications companies. With wireless communications, the typical services which are 34
the telephone services and there are so many more benefits. For example, we now have the services 35
and benefits of convenience so that the public can make calls from just about anywhere. The public 36
can work remotely from their offices, coffee shops and their homes. There are also the benefits of 37
safety so motorists on roads can dial 911 from their phone during emergencies and also the 911 38
benefits during times of natural disaster such as a hurricane. The landline systems go down and 39
telecommunications towers remain standing and their 911 services remain available. Also, I think the 40
most dramatic technological change has been about the connectedness to the world that has come 41
about with the advent of smart phones. The smart phones have allowed for the digital devices 42
messaging through email, text, data phone and video. And with these changes, the public has come 43
to expect and sometimes demand access to these different services and benefits. I think it is 44
important for communities to be aware that the public is expecting this and it is also important from an 45
economic development perspective because with economic development that is becoming more and 46
more tied to having access to wireless telecommunication services. 47
48
Moving on to our application, this is an application that is very important, obviously to American Tower 49
and AT&T but I also think it is important for Orange County. There are many areas of Orange County 50
that have no coverage or insufficient coverage and there has not been a new tower constructed… I 51
should say was actually constructed and approved in the spring 2009. With the demand for more 52
services due to the new technology that the public is expecting, the infrastructure has not kept pace 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 5 of 92
for that demand and AT&T has been approached over the past few years by residents of Orange 1
County, customers and businesses and they have also been in contact with the Chamber of 2
Commerce and Orange County is looking for better service within the County so AT&T has come 3
forward with plans to increase their telecommunications coverage within Orange county and they are 4
planning to provide a real significant investment in Orange County so tonight there will be two 5
applications before the Board of Adjustment. The one we will speak about today and there is a 6
second one that would come after this application. AT&T and American Tower also filed a third 7
application at the same time and that application was for another monopole telecommunications 8
tower to be located in the Phelps Road area. After that tower application was submitted, I was 9
approached as the attorney for AT&T and American Tower by some members of the County to let me 10
know there had been new County property in the area and that was the new Solid W aste Facilities 11
Center located on Walnut Grove Church Road. Orange County, the planning department, asked that 12
we look at that facility rather than the lease that we entered into with a private property owner and so 13
we are in the process of entering into a lease with the County for that facility. The reason I bring that 14
up is that I think it is important to realize that AT&T and American Tower are making this investment 15
in Orange County but also trying very hard to work in a collaborative way with the County. We are 16
trying to reach a win-win situation to be able to provide telecommunications coverage in the best 17
possible way in the County. Currently we are only proceeding with two applications. I would like to 18
talk briefly about the need for this telecommunications tower. There is a significant gap in coverage in 19
the northeastern part of the county and when there is a gap in coverage, the first thing AT&T and 20
American Tower will do is prepare a search ring to determine where that gap in coverage is and to 21
locate places where the AT&T antennas could be located. The first place that AT&T and American 22
Tower would be considering would be existing structures. For example, a water tank or existing tower 23
or building that is of sufficient height that it could locate its antennas on. As Mr. Harvey said, there 24
are no such structures in this area of Orange County so therefore American Tower started looking for 25
property to lease and approached Mr. Fagan about leasing a 100x100 foot portion of his property. 26
This will resolve this gap in coverage and this gap in coverage is north of the Little River Regional 27
Park and it is to fill in coverage between Highway 57 and Highway 157. Under tab 20, we have a 28
propagation map. The first propagation map shows where the tower will be located. This is the area 29
where there is a gap and the whiter area means no coverage whatsoever. Pink means not reliable or 30
very spotty. Most of this area is white or pink. Blue means you would be able to have some 31
coverage as a pedestrian walking outside. The green means that you would have coverage in your 32
vehicle. Yellow means you would have coverage in residential buildings and red is the coverage you 33
would like to see the most of and that would be business in-building coverage. After this contrast, 34
this will show the coverage that will be available after the telecommunications tower. 35
36
Larry Wright: For the first Figure 3, could you show that to the audience. 37
38
Karen Kemerait: This is the second propagation map. This is the area where the tower will be 39
located (see white and pink). This is where coverage will be available. 40
41
Samantha Cabe: Can I ask a question as an alternate? 42
43
James Bryan: There is not a firm legal gray area. Some boards allow alternates to participate and 44
some don’t. 45
46
Michael Harvey: We allow alternates to participate. 47
48
Samantha Cabe: I need clarification. In your coverage maps… is there any signal whatsoever for 49
AT&T? 50
51
Karen Kemerait: That is AT&T coverage and one of the things we are talking specifically about AT&T 52
and AT&T will be the carrier that will be located on the tower and as our application shows, there is 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 6 of 92
room for AT&T’s antenna and for three additional carriers so when other carriers, (i.e. Verizon, Alltel), 1
if they want to come and provide coverage in this area, they can enter into a lease agreement with 2
American Tower and attach their antennas to the tower as well. 3
4
Samantha Cabe: Your map showing there is no coverage; there could be different carrier’s coverage 5
there, just not AT&T coverage? 6
7
Karen Kemerait: There could be but since there is not another tower located in the area, I think it is 8
unlikely there would be good coverage for any other carrier in the area, however, I have not studied 9
the other carrier’s coverage but I suspect the likelihood is that other carriers are going to come 10
approach American Tower to ask to locate their antennas on the tower as well. As we were talking 11
about, there had been an Alltel tower located in the location where American Tower’s tower will be 12
located. For a special use permit application we talked about the 100 foot by 100 foot parcel that will 13
be leased by American Tower and located on Mr. Fagan’s property which is an ideal location for the 14
tower. It is a very large parcel of land, 56 acres, undeveloped and heavily wooded. And one of the 15
reasons it is such a good location is the wooded area will make it so the tower will not be visible from 16
that location or barely visible or just the top of the tower visible from other locations. The property is 17
in agricultural residential and the tower will be located 900 feet from New Sharon Church Road and 18
219 feet from the closest property line which is Mr. Fagan’s property line and his residence is located 19
on that nearby property. I also mentioned there would be room for three additional carriers in addition 20
to AT&T and the antennas as required by the Orange County Ordinance are going to be flush 21
mounted to the tower and flush mounted means they will be up against the tower so they will be much 22
less visible than the antennas that protrude from the side of the tower. Under Attachment 7, we have 23
photographs of the balloon test that was conducted and that will show the areas where the towers will 24
not be visible whatsoever and in the few locations where the top of the tower will be visible. The top 25
of the tower will be visible from a few locations on Bill Poole Road and along New Sharon Church 26
Road but from all other locations it will not be visible. We have shown in our application that we have 27
met all the technical requirements and the specific requirements of the Ordinance for 28
Telecommunications Towers. In addition, the county’s consultant, CMS has provided its 29
recommendation report stating that CMS’ opinion is that we have in fact met all those technical 30
requirements. Moving on to the Special Use General Standards. We have provided quite a bit of 31
information or application materials showing that we have met all the general requirements as well. I 32
would like to put this into the evidence as well. The Findings of Fact from the planning staff has also 33
stated they have received sufficient evidence from the applicant meeting the general standards and 34
at this point they have received no evidence that would establish grounds for a negative finding of 35
fact. We have shown that the tower use will maintain or promote the public health, safety and 36
general welfare. We have provided information that the addition of the antennas will comply with all 37
federal laws and with the FCC rules and regulations. As I have mentioned previously, the 38
background information will promote the public health and safety by providing access to emergency 39
and 911 services. Also, I talked about economic development that too will promote the public health 40
and general welfare of the county. I also provided quite a bit of information on the application about 41
how the use will maintain or enhance the value of contiguous property. As I mentioned, the tower will 42
not be visible from most locations and only the top of the tower will be visible from a couple of 43
locations. The tower will not be a nuisance or an environmental hazard. This will be an unmanned 44
facility and will generate, once it is constructed; only two or four vehicle trips per month which means 45
there will be no increase in traffic in the area. The tower will not be lit, it will be only 199 feet and FAA 46
requirements state that towers above 200 feet will have to be lit so this tower will not be lit. The tower 47
will also not have any noise or glare so therefore there is no element of nuisance or environmental 48
hazard. We also provided a property impact analysis report prepared by David Smith. Mr. Smith is a 49
North Carolina certified real estate appraiser and he performed the research and analysis as 50
contained in the report and his conclusion is that the proposed tower will maintain or enhance the 51
value of contiguous property. Finally, we have information in the application materials that the tower 52
will be in harmony in the area in which it is located and will be in compliance with the ordinance and 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 7 of 92
Comprehensive Plan. As I mentioned we have met all the specific requirements of the ordinance and 1
that has been the opinion of the county’s consultant, CMS, as well. It is also clear that when a county 2
adopts an ordinance and allows a particular usage, such as a telecommunications tower, to be a 3
special use in a zoning district such as here, the AR zoning district, that creates a presumption or 4
case that the telecommunications use is in harmony with the area in which it will be located so we 5
have by virtue of it being a special use in the ordinance, the telecommunications tower is in harmony 6
with the area. We have provided information in addition to that to show the visibility of the towers will 7
be minimal and it will not be an environmental hazard or a nuisance. Therefore, we have met all 8
specific requirements of the ordinance and all the general requirements for special uses and David 9
Smith who is the appraiser is here to speak briefly. I don’t know if there is any concern or opposition 10
to this application and if not… 11
12
Karen Barrows: How far is this tower going to be from the Caldwell Fire Department? 13
14
Karen Kemerait: I don’t know where the Caldwell Fire Department tower is. 15
16
Karen Barrows: It is not very far. I looked at your legend distance. It is probably a mile and one half. 17
18
Michael Harvey: It is actually two miles. There is no tower on the property. If you will turn to tab 14 19
of the applicant’s packet, we have the telecommunication plan map sites. Orange County has 20
adopted a Master Telecommunication Plan for use as a marketing tool in terms of trying to solicit the 21
use and development in these particular locations. Caldwell Fire Department has indicated their 22
interest but there is no current tower on that site and this site or the proposed site, as we alluded to in 23
our abstract actually addresses a hole that Caldwell can’t. I know AT&T and American Tower looked 24
at the Caldwell site; there still would have been a hole in this particular area of the county. They 25
chose to try to fill that hole recognizing that there could be a tower one day on Caldwell through 26
participation of this administration plan. 27
28
Larry Wright: You talked in terms of co-location on the tower and you spoke in terms of Verizon or 29
some other carrier co-locating on that tower and then in the packet, there is wording to the point that 30
other county agencies, such as emergencies could locate on that tower. Given there is only x amount 31
of room for panels to be installed on that tower, is there any priority to who may be given space on 32
that tower over others? 33
34
Karen Kemerait: We have already committed to providing space on the tower for county purposes 35
and when an application would come from another carrier, it would be considered, to make sure that 36
there would be room for it and be considered in. Jill, is there anything you would like to add? 37
38
Jill House: I am Jill House, I am with American Tower. It is generally our policy to accept the 39
applications on a first come first serve basis. If the county expresses interest and that is a condition 40
of approval certainly space could be allotted to them. 41
42
David Blankfard: Is there any agreement right now for county services on the pole? 43
44
Jill House: Not a blanket agreement. 45
46
Michael Harvey: Let me answer a little bit. The county can’t negotiate or enter into any kind of 47
negotiation with a tower that doesn’t legally have a permit so we have not approached or been 48
approached. We cannot proceed because then obviously it can be argued that we are doing this 49
solely to get the site, which is not the case. There is a condition on page 96 indicating that co-50
location site shall be offered to the County for the placement of an antenna in support of local 51
emergency communication needs. If it is determined that it is not necessary or viable then they have 52
met their obligation under provisions of the special use permit. If it is approved, the county can reject 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 8 of 92
the site and say then don’t need it but they have indicated that a condition will reserve that site and 1
offer that site to the county. What we do with it is our prerogative at an appropriate time. 2
3
Larry Wright: Are volunteer emergency services technically part of the county or not? And how 4
would they interact with this tower? 5
6
Michael Harvey: I don’t know if I am qualified to answer that question. What I will say is there is 7
countywide information network, VIPER system that volunteer fire departments are tied into as 8
additional intended communication is provided then obviously the local departments, as my 9
understanding, have access to that same system. 10
11
Larry Wright: They run independent of this telecommunications tower? 12
13
Michael Harvey: We have an emergency communications system through the county, the VIPER 14
system. It may be determined that this system is not necessary and we do not need an antenna on 15
this tower. The local volunteer fire departments make use of the same VIPER county wide system. 16
17
Larry Wright: I am really confused because the Planning Board was talking about the need for 18
telecommunications towers because some emergency systems had to communicate through Mebane 19
to interface with 911 or there was a very awkward system of communication because we had so 20
many spots without coverage. 21
22
Michael Harvey: Mr. Chairman, I don’t feel comfortable responding because I don’t have any 23
knowledge to testify this. What I can testify to is that David Sykes of Orange County Emergency 24
Management indicates that he believes the tower is a good location and obviously one of the 25
conditions, I wish I could answer but I don’t feel I should mislead you, is that if they offer a site to the 26
county, the county can do with it what it wishes. 27
28
David Blankfard: On your structural qualifications, tab 28, it states the tower will be designed for 90 29
miles per hour wind speed however, once you get emergency services on there, your importance 30
factor will change to be slightly elevated. How are you going to deal with that once the tower has 31
been constructed? Will you have someone else come back and verify that? 32
33
Jill House: It will be designed for standard loading for the four carriers so you won’t need to 34
reevaluate it after the carriers are installed. If anyone additional goes on, it may accommodate even 35
more equipment. 36
37
David Blankfard: Okay. So it will be checked again? 38
39
Jill House: Yes. Actually CMS requires the structural analysis for each publication but they will need 40
to be structurally enhanced we don’t anticipate. 41
42
Michael Harvey: That is covered in Section 5.10.8 location is required to go through similar process 43
in terms of submitting the necessary documentation. 44
45
Karen Barrows: There is a letter from Michael F. Plahovinsak, P.E. who is a professional engineer 46
and he starts by saying I understand there may be some concern… 47
48
Michael Harvey: That is tab 28. 49
50
Karen Barrows: Is that what you are addressing? 51
52
Larry Wright: Did you get your questions answered? 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 9 of 92
1
Karen Barrows: I was wondering who the global Building Officials might be that have concerns? 2
3
Michael Harvey: No one from my office expressed concerns and the building inspection officials 4
didn’t express concern. Without putting words in Karen’s mouth, let me state that if this tower is 5
approved or if any tower is approved, it has to go through the building permit process. That building 6
permit process requires them to submit engineering and documentation proving the load ratio can be 7
handled. CMS, our communications consultant is required to review and certify that record and it is 8
also engineering required. 9
10
Jill House: We do have to go through the building permit process and by stating some concern; I 11
think what he is alluding to is providing information in response, not that there had been concern 12
expressed specifically. I would like to as Dave Smith who has prepared the Real Estate Impact 13
Report to provide some information about his name, address, background, credentials and then 14
describe this report. 15
16
Michael Harvey: This is tab 40. 17
18
David Smith: My name is David Smith and I have been sworn in. I lived in the western part of 19
Durham on Morristown Circle. I am a certified general real estate appraiser which means I am 20
qualified to appraise all kinds of property. I also have an MAI and SRA professional designations 21
which are like having a CPA, you can be an accountant and not be a CPA. You can be an appraiser 22
and not be MAI, just a different level of experience. 23
24
Michael Harvey: Sorry, tab 39. 25
26
David Smith: I have been appraising for 30 years, in Durham and Orange and surrounding counties. 27
I have prepared an impact analysis of this tower on the properties in the area. I went and looked at 28
the properties in the area and the tower sites, best I could determine where it was based on plans of 29
the proposed tower. 30
31
Larry Wright: You mean tower site as in where the tower will be located on the particular property? 32
33
David Smith: Based on a set of plans of the proposed tower, inspection of properties in the area of 34
the proposed tower, analysis of data gathered and facts and conclusions as contained in the report 35
you have as subject to the assumptions with the conditions as stated, it is my opinion that the 36
proposed tower will maintain or enhance the value of contiguous property and will be in harmony with 37
the area. I can go in more detail but it is in the report if you have any more questions. 38
39
Larry Wright: Have you ever in your experience… you have appraised properties where towers are 40
erected and then traced the value of properties and then traced the value of properties after they 41
were erected, is this true? A tower is erected in 2009 and you’ve traced the value of adjacent 42
properties, etc. and so you have done that? 43
44
David Smith: I have appraised properties with towers on them, is that what you mean? 45
46
Larry Wright: But then mapped the adverse effects on any on adjacent properies after they were 47
erected? 48
49
David Smith: I don’t know that I have done an impact analysis after a tower has been erected. 50
51
Larry Wright: This is what citizens are interested in, is the impact analysis of towers after they have 52
been built. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 10 of 92
1
David Smith: I have done impact analysis on properties where towers currently exist. 2
3
Larry Wright: The properties on which they exist? 4
5
David Smith: The ones around them. 6
7
Larry Wright: Have you found any adverse effects to that? 8
9
David Smith: No, I have not. 10
11
Larry Wright: In Orange County? 12
13
David Smith: No, I have not. 14
15
Larry Wright: In Durham? 16
17
David Smith: Yes. 18
19
Larry Wright: You have found adverse effects? 20
21
David Smith: No adverse effect in Durham or Orange County. 22
23
Larry Wright: Thank you. 24
25
Samantha Cabe: Have you ever found that a tower has adversely affected a property in any of your 26
analysis? 27
28
David Smith: No. 29
30
Jill House: That is all the evidence I have at this point. 31
32
Larry Wright: Are there any public witnesses that would like to speak? 33
34
Desiree Goldman: I have been sworn in. My name is Desiree Goldman, I have lived in Orange 35
County 17 years and I am here tonight representing the 500 members of the Greater Chapel Hill 36
Association of Realtors. We service all of Orange County. We are in support of the approval of both 37
cell tower installations that will be up for tonight. We find that connectivity is extremely important to 38
homebuyers. Many people choose to no longer have land lines. When looking at a house, this 39
happened to me today, showing houses in the northern Hillsborough areas, St. Mary’s, I had clients in 40
town from Chicago. They had drove around to the different houses yesterday, soon as we got to the 41
house, before we got to the house, they said we came by and there was no cell service yesterday and 42
that was immediately a problem for them that there was no cell service at a particular house they 43
were looking at. Many clients do not put in land lines anymore and many security systems are no 44
longer using land lines as a way of having the security systems in homes. They are using cell 45
phones. This is all very important to the quality of when people are making their decision and 46
purchasing their home and it is a detriment if there is not good connectivity. Orange County loves 47
people working from home so they are not in their car. We have very intellectual people and people 48
who work at their house and they need all the broadband they can get, all the connectivity they can 49
get. This makes a big effect on when people select their homes and we support any and all 50
telecommunication service and the connectivity for all Orange County. Thank you. 51
52
James Carter: You are a realtor? 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 11 of 92
1
Desiree Goldman: Yes. 2
3
James Carter: You strongly support this tower? 4
5
Desiree Goldman: Absolutely. It is not a good thing to not be able to have cell service at a house 6
and more and more people, our society is changing. Five years ago that would have never been a 7
question. Every time I go to a house people pull out their phone to see if they are getting service. 8
That is one of the first things they do when they consider looking at buying a house. 9
10
Larry Wright: Can you repeat your title and who you represent? 11
12
Desiree Goldman: My title is Legislative Affairs Liaison from the Greater Chapel Hill Association of 13
Realtors. 14
15
Michael Harvey: Next on the list is Aaron Nelson. 16
17
Aaron Nelson: My name is Aaron Nelson. I have been duly sworn. I am the President of the Chapel 18
Hill/Carrboro Chamber of Commerce. We represent 1,000 businesses in the Greater Orange County 19
area as well as 450 realtors. First I want to thank you for serving. This is an important issue and 20
many of us have left our family and home. My organization is a volunteer membership organization, 21
1,000 small businesses pay membership dues and so do 450 realtors. I am here to speak on their 22
behalf particularly we also have 100 sole proprietors in home based businesses among our members. 23
One of the things we have been hearing for a while is complaints about cell phone services in Orange 24
County. Some folks that move from other areas wonder how they could live in the mountains of North 25
Carolina with better coverage than in rural North Carolina than they can get in a county with the 26
highest per capita income in the state of North Carolina and they are disappointed with the services 27
so we have been petitioning and asking AT&T to improve their service as well as other providers. So I 28
want to say thank you to them for bringing forward a proposal to enhance the cell phone service and 29
answering the request of citizens of our community as well as businesses in our community to bring 30
this forward. Specifically, businesses need reliable cell phone services for both data and telephone 31
and text. Many businesses now communicate with their employees. There was a time when we 32
would touch to talk and we were using Nortel’s other systems but now we text in order to 33
communicate with employees. Businesses need that information to be able to take the order or find a 34
delivery location. I was talking to an auto mechanic. He has five locations and they had a brand new 35
Mercedes and they didn’t know how to reset the service light so his mechanic pulled out his phone, 36
Goggled it and watched a YouTube video on how to reset that high end Mercedes odometer so he 37
was using the data from the internet to conduct his business. I was talking with businesses in and 38
around Orange County and we just continue to hear that is what is important to them. For phone and 39
data, text to communicate with their clients and customers, to order, to find delivery in order to 40
communicate to the home office. We also hear from relocating and expanding businesses that this is 41
important. Desiree’s comments are ones we hear as well. Folks want to know before they locate 42
their business whether they have access to cell phone. They are choosing more and more not to use 43
land lines and are using wireless systems and for us we also carry the security. In the event that our 44
land line was cut at our office our security system has a cell phone mounted and that is the backup 45
system for loss of power. More and more business and homes do not need that so if we can improve 46
that cell phone coverage in the county we think that is really important. It is also important to us that 47
everyone has equitable access in the county. This should not be the case only if you live in certain 48
areas. We deserve equitable access and our rural areas have been left out too long and we are 49
grateful there is now a proposal and hope there are more coming in order to light up the entire county 50
so everyone has access to this important business resource, economic development tool and 51
communication too. 52
53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 12 of 92
Michael Harvey: There are two more people actually…. Karen Kemerait who has spoken and Rusty 1
Monroe. Mr. Monroe (our telecommunications consultant) can answer questions. Next on the list is 2
David Lacava. 3
4
David Lacava: I have no additional comments. 5
6
Michael Harvey: Steven M. Howard. 7
8
Steven M. Howard: No additional comments. 9
10
Michael Harvey: Jeremy Browner. 11
12
Jeremy Browner: I have been duly sworn. I rise in support of this application. I am a sole practice 13
attorney in Chapel Hill and also the Vice-Chair for the Economic Development and Public Policy 14
Committee for the Chapel Hill/Carrboro Chamber of Commerce. I first want to draw your attention to 15
a couple of public policy interest of the county that are at stake here. One is the versification of the 16
tax base. One of the most important things we need to do is develop business in our community. 17
One of the most important….one of the more important areas now, in modern business, is 18
telecommunication and access to that. You have a couple of alternatives; of course we have satellite, 19
we have cable and we have terrestrial antennas that we are talking about today. Cable won’t extend 20
to rural areas because they can’t recover their investment. Satellite is very slow. It is available in 21
rural areas but it is slow and not useful for business applications so the only real way to bring 22
broadband in an effective manner is the use of terrestrial antennas which require them to be erected 23
and data services be put on top of them. Another public policy area that we are trying to do is 24
bridging the digital divide. The digital divide is from the ones that have access to broadband and 25
ones that do not. This is a very important tool, the internet, in education now. Also, not just business 26
but educating our children, need to have access to the various topics that teachers want them to have 27
access then enhance their learning ability. The entertainment is switching a lot to entertainment 28
through the internet. A lot used to be getting signals from broadcast TV, it switched to cable and now 29
it will be switching to entertainment through the internet. They did not testify whether or not 3G or 4G 30
would be more accessible. I am assuming 4G would be more accessible on these antennas. 3G and 31
4G, for your information, 4G is a faster data capability that allows faster communication with the data 32
traffic. Now, obviously voice is important but mainly what we are considering is data. Other 33
applications that are considered are agricultural applications. Agricultural applications use cellular 34
broadband to report moisture, to report sun, to report all sorts of data points that are available to gain 35
higher yield on agricultural fields. I wanted to stress that although some towers may be unsightly this 36
particular application the applicant has stressed greatly about the lack of harm, cosmetic or actual 37
harm. They have had an expert testify about property and the impact of property prices. They have 38
had blue tests that talked about the visibility of the antenna after it is erected. All of which that these 39
have minimal on the surrounding community and we talked about the impact versus what we are 40
trying to achieve through a public policy, diversify our economic tax base, bridge the digital divide and 41
bring in more businesses to the county. These are the things you should think about when you vote 42
on this application. 43
44
Larry Wright: You are talking about the various types of communications and how you can bring 45
telecommunications; you talk about satellite or terrestrial antenna. I live in northern Orange County 46
and I live 200 feet from the tower but I have Century Link and they have high speed access and I 47
think that is one vehicle or way for people in rural Orange County. I used to rely on the antenna 48
about 200 feet from my house but Century Link is better for us and I get better speed. Of course it 49
has been a number of years but it is one more vehicle that people have. 50
51
Jeremy Browner: I believe that technology you are referring to is DSL. DSL speed decreases away 52
from the node station so as you go away, the speed decreases dramatically so with cell towers, that 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 13 of 92
doesn’t happen. Obviously you have to receive the signal but that means the telecommunications 1
company has to build more nodes so yes DSL is available in some locations but on a general basis. 2
You need terrestrial antennas to maintain that broadband. 3
4
Michael Harvey: The last person to speak is Ann Lee-Blythe. 5
6
Ann Lee Blythe: I am a resident on Bill Poole Road. I am here to testify not necessarily against 7
because it is clearly a needed telecommunications with the county to improve. I am more concerned 8
about the performance that will be on this tower versus what AT&T has been and also would it 9
interrupt other service that people have like Verizon. I have Verizon down the street and it works well. 10
I don’t have any other phone in my house. My fear is that I don’t want to have an interruption in my 11
service because of the erection of this tower because I am already committed and I am using it for 12
work from home and I also think the residents are due to understand whether this a 4G LTE whatever 13
kind of tower or performance and interference that it can have. 14
15
Jill House: I can give a general answer to that because different carriers have different frequencies 16
there will be no interference between AT&T and Verizon. As far as what will be available…. 17
18
David Lacava: I am the specialist for AT&T. 19
20
Ann Lee-Blythe: And what would be the time table of the LTE. As residents… those of us who have 21
services and are paying over two years, if there is any problem it causes us… 22
23
David Lacava: LTE would be launched on this tower with the initial construction of the tower. 24
25
Larry Wright: Any questions? 26
27
Michael Harvey: Beginning on page 39, we have the Findings of Fact that you need to go through 28
this evening. We have provided recommendations what we believe to be evidence submitted in the 29
record as justifying either an affirmative or a negative finding. I am going to go over these briefly. 30
Beginning on page 40, we are dealing with compliance with Sections 2.2 and 2.7.3 of the Unified 31
Development Ordinance dealing with the submittal of a Class B Special Use Permit application. You 32
will find that staff has made an affirmative finding of compliance with respect to Sections 2.2 and 33
2.7.3. We have provided the various documentation in the record that justifies an affirmative finding. 34
For example, Tab 2 of the application packet contains a complete application, Class B Special Permit 35
Application; there are copies of the checks demonstrating the applicant has paid the necessary fees. 36
As required by 2.7.3 (B)(1), there is a full and complete application project narrative. In Tab 3 37
outlining complies not only with the code but answering the basic questions in compliance with the 38
ordinance. We have found that Section 2.7.3 (B)(5) on page 41 is not applicable, that requires a 39
submittal of a preliminary subdivision plan. They are not proposing a subdivision so they are not 40
required to submit. They have provided the required elevations and a listing of all property owners in 41
1,000 feet as required by the code. Turning to pages 42 and 43, we have found that Section 2.7.3 42
(B)(8) of the code requiring an environmental assessment is not required given this property is 43
disturbing less than two acres per our Unified Development Ordinance. We have also provided 44
additional insight why the applicant is not required to adhere to this provision. The applicant has 45
answered the necessary questions with respect to the method and disposal of trees, limbs, stumps 46
and construction debris associated with the project as well as the anticipated schedule for buildout 47
which is in Tab 37 and we have found that 2.7.3 (B)(11) is not applicable as they are not requesting 48
vesting. Does anyone have any questions? 49
50
Larry Wright: There has been mention here of the Walnut Church Grove and the Phelps Road sites, 51
we are not addressing those…. 52
53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 14 of 92
Michael Harvey: No sir. This is solely on the New Sharon Church Road/Bill Poole Road application, 1
case A-1-13. Beginning on page 44, Section 2.7.5, compliance with submittal notification 2
requirements. There is a typo at the top so please correct CLASS A to CLASS B. This is a Class B 3
Special Use Permit. We have provided the necessary documentation detailed in compliance with the 4
notification requirements. Attachment 3 of your abstract package, you will recall some mail 5
certification signed by staff and included a copy of the certified letter sent to all property owners within 6
1,000 feet. The certified stubs/receipts signify letters were mailed within the appropriate time period. 7
We also did submit a legal ad to the newspaper that was advertised as required by the UDO. On 8
page 45, compliance with Section 5.10.8 Standards for Telecommunications Facilities. Again, we 9
have provided our recommendation with respect to the evidence in the records supporting an 10
affirmative finding. You will note that as required by Section 5.10.8 (A) (1) (b) of the applicant’s tab 3 11
contains a detailed narrative as well as tab 6, 7 15, 16, 17, 19, 20, 21 and 22 providing the necessary 12
documentation justifying the approval of the tower, elevation drawings and on page 46 all the 13
necessary information is contained in tab 3, 6 and 7. We do have a statement already discussed by 14
a professional engineer, licensed by the State of North Carolina, indicating the tower can support the 15
loads. On pages 48-49, we have found the additional compliance with respect to the application to 16
the necessary documents providing detail. I will ask you to note with respect to Section 5.10.8 (A) (1) 17
(g) on page 48, the applicant has provided the initial Geotech report and they are going to be required 18
to submit a final Geotech report that can’t be done until they actually start doing more testing and 19
they won’t do that until the permit is issued. So please keep in mind a final engineering report, 20
Geotech report, will be submitted as part of the building permit application standard but staff has 21
reviewed the Geotech report and found it is not proficient and it complies with the code. Compliance 22
with Subsection A continues all the way to page 52. The question has already been brought up today 23
about co-location. I will remind the Board there are co-location standards in this ordinance. They are 24
not required compliance with Section 5.8.10 (A) (2) because this is not a co-location application but 25
we do provide there will be co-locations. The ordinance has standards dealing with co-locations but 26
issues with co-locations will be addressed at such time they are proposed and the applicant is 27
required to demonstrate compliance with 5.8.10 (A) (2) at that time. Beginning on page 53, we have 28
compliance with Section 5.8.10 (B) General Submittal Requirements and I will attest that they have 29
complied. We have provided you the necessary detail. Page 54, we provide information on the 30
balloon test that is chiefly contained in tabs 7 but there is information in tabs 3, 7, 8, 9, 10, 11 and 12 31
addressing compliance with this section. On page 56 and 57, we talk about compliance with 32
Landscape standards; existing vegetation will be utilized to comply with existing landscape standards. 33
This is also, as we have noted, a heavily vegetated site. This goes on for several pages. Staff has 34
provided the necessary documentation that we believe exists in the record on the application itself 35
demonstrated compliance on 5.10.8 so if you would turn to page 89 where we get into compliance 36
with specific standards, 5.3.2 of the Unified Development Ordinance specifically the method and 37
adequacy provision for sewage disposal facilities, solid waste and water service. Attachment two of 38
our application package contains the necessary documentation from Orange County Solid Waste, 39
Orange County Environmental Health indicated the project will comply with the necessary standards 40
they are not proposing a septic system or well so Environmental Health has no issues with the 41
project. Solid Waste, Jeff Scouten has indicated his approval for the project. Page 90, method and 42
adequacy of police, fire and rescue squad protection. Attachment two provides the necessary detail; 43
David Sykes has indicated his approval. Orange County Sherriff’s office has also indicated to staff 44
their approval that the project can be served. Method and adequacy of vehicular access to the site 45
and traffic conditions have a site plan where the applicant is intending to show access in tab 6. A 46
recommended condition of approval is that we get a final driveway permit from DOT. DOT has seen 47
the site plan and expressed no concerns over access management. Mr. Fagan will have to address 48
continual access to the tower. On page 91, compliance with Section 5.3.2 (A) Special Uses – 49
General Standards and this is where we don’t provide a recommendation because it is based on the 50
testimony this evening. I will remind you with respect to compliance with Section 5.3.2 (A) (2) (a) the 51
use will maintain or promote the public health safety and general welfare if located where proposed 52
and developed and operated according to the plan submitted. You have in the packet, tab 3, the 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 15 of 92
project narrative, tab 39, Mr. Smith’s Impact Analysis, tab 6, the site plan indicating the project will 1
comply with the code and promote the public’s health safety and general welfare. You have tabs 14, 2
16 and now on page 92, 14, 16, 17, 18, 19, 20, 21, 22, and 30 are tabs having information 3
demonstrating the need for the tower and the development of the tower will be done with respect to 4
guarantee the public’s general health, safety and welfare. Page 93, complies with Section 5.3.2 (A) 5
(2) (b) which is the use will maintain or enhance the value of contiguous property. You have had 6
testimony this evening from Mr. Smith and the application packet specifically tabs 3, 39 and 6 provide 7
other documentation and information necessary to demonstrate compliance. On page 94, we have 8
requirements of Section 5.3.2 (A) (2) (c) which is the location and character of the use if developed in 9
accordance to the plan submitted will be in harmony with the area in which is it to be located. As staff 10
indicates in our abstract several provisions of the 2030 Comprehensive Plan supporting the submittal 11
of telecommunication applications and the approval of telecommunication applications. We also 12
stipulate that tabs 3, 39 and 6 provide information demonstrating compliance with this standard. We 13
have heard no comments prior to this hearing indicating the project should not be approved so on 14
page 95 and 96, if the board does see fit to issue the permit, we recommend the imposition of 19 15
conditions which are spelled out herein. I will add, and the applicant can confirm, that they have 16
reviewed these conditions and have no issues with them being attached. 17
18
Larry Wright: Are there any questions for Mr. Harvey? 19
20
Karen Barrows: On page 85, 5.10.8 (B), Bond Security, is that in addition to the liability? 21
22
Michael Harvey: Yes, and on page 86, liability insurance they have to cover as well. If there are no 23
more questions, that concludes staff’s presentation. 24
25
Karen Kemerait: I want to confirm that we had reviewed the conditions. 26
27
Larry Wright: Any statement from the applicant? 28
29
Karen Kemerait: Nothing in addition to what I have already stated. 30
31
Larry Wright: We have gathered the evidence and now it’s time to close the hearing. Are there any 32
general comments from the Board right now? 33
34
Samantha Cabe: This is my first time here and I am not voting as an alternate but does the attorney 35
reiterate the charge of what we must do if we find this? 36
37
Larry Wright: It depends on the case and usually what we have is our charge is what we have to go 38
through and then we go through the findings and right now most of this case is in the findings so we 39
will move right to the findings. We don’t have to make any formal recommendations… on this 40
application we can move right to the findings. Let’s go through on page 39. 41
42
Debra Graham: Larry, you didn’t make a motion to close the public hearing. 43
44
MOTION made by Karen Barrows to close this portion of the public hearing. James Carter seconded. 45
VOTE: Unanimous 46
47
The public hearing portion of the meeting was closed at approximately 8:49 pm. 48
49
James Bryan: Can I ask a question for clarification? Who are the five voting members and do you 50
allow alternates in the deliberations. I reiterated before that it is gray but for deliberations there is a 51
little more weight not to have alternates. 52
53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 16 of 92
Larry Wright: In the past, the alternates have commented in the deliberations and we have found that 1
to be of great value and I would like to continue that. I have worked with Samantha before and she is 2
very capable and I would like to have that expertise. 3
4
Debra Graham: She won’t be voting. 5
6
James Bryan: The remaining five will be voting. 7
8
Larry Wright: Let’s get started with the findings. 9
10
11
12
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 17 of 92
1
FINDINGS OF THE ORANGE COUNTY BOARD OF ADJUSTMENT 2
PERTAINING TO A REQUEST SUBMITTED BY 3
AT AND T / AMERICAN TOWER 4
REQUESTING A CLASS B SPECIAL USE PERMIT APPROVAL 5
FOR A TELECOMMUNICATION TOWER AT 6
7444 BILL POOLE ROAD/7505 NEW SHARON CHURCH ROAD – PIN 0808-87-1763 7
8
As required under Section 5.2 Table of Permitted Uses of the Orange County Unified 9
Development Ordinance (UDO), a Class B Special Use Permit is required for the erection of a 10
telecommunication tower, over 75 feet but under 200 feet in height, in accordance with the 11
provisions of Section 2.7 of the UDO. Such permits shall comply with general and specific 12
standards as set forth in Section(s) 5.3.2 and 5.10.8 of the UDO. 13
14
Section 5.3.2 (A) (2) of the UDO requires written findings certifying compliance with the 15
following: 16
17
(1) The use will maintain or promote the public health, safety and general welfare, if 18
located where proposed and developed and operated according to the plan as 19
submitted; 20
21
(2) The use will maintain or enhance the value of contiguous property (unless the use is a 22
public necessity, in which case the use need not maintain or enhance the value of 23
contiguous property); and 24
25
(3) The location and character of the use, if developed according to the plan submitted, 26
will be in harmony with the area in which it is to be located and the use is in 27
compliance with the plan for the physical development of the County as embodied in 28
these regulations or in the Comprehensive Plan, or portion thereof, adopted by the 29
Board of County Commissioners; 30
31
In addition, the Board shall make findings certifying that the application is complaint with the 32
following specific standards: 33
34
(1) Specific standards for the submission of Special Use Permit applications as outlined 35
within Section(s) 2.2 and 2.7 of the UDO, 36
(2) Specific regulations governing the development of telecommunication tower as set 37
forth in Section 5.10.8 (A) through (B) of the UDO, 38
(3) Section 5.3.2 (B) relating to the method and adequacy of the provision of: 39
a. Sewage disposal facilities, 40
b. The adequacy of police, fire, and rescue squad protection, and 41
c. The adequacy of vehicular access to the site and traffic conditions around the site 42
(4) The general findings outlined within Section 5.3.2 (A) (2). 43
44
Listed below are the findings of the Orange Planning staff regarding the application in question. The 45
findings have been presented by Article and requirement to assist the Board of Adjustment in its 46
deliberations. 47
48
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 18 of 92
1
2
SECTION 2.2 AND 2.7.3 CLASS B SPECIAL USE PERMIT APPLICATION COMPONENTS ("Yes" 3
indicates compliance; "No" indicates non-compliance) 4
5
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 2.2
The application for a
Class B Special Use
Permit shall be on forms
provided by the Planning
Department.
X_ Yes ____No Tab 2 of the application
booklet contains a
complete Orange County
Class B Special Use
Permit application for the
project.
_x_Yes ____No
2.2.4 (D)
Applications must be
accompanied by the fee
amount that has been
established by Board of
County Commissioners.
Application fees are
nonrefundable.
X_ Yes ____No Tab 1 of the application
booklet contains a copy
of the checks submitted
for the required fees.
Staff will stipulate the
applicant submitted the
required application fee
for the permit application.
_x_Yes ____No
2.7.3 (B) (1)
A full and accurate
description of the
proposed use, including
its location, appearance,
and operational
characteristics.
X_ Yes ____No Tab 3 of the application
booklet contains a
complete project
narrative describing the
proposed use and
operational
characteristics of the
proposed tower.
_x_Yes ____No
2.7.3 (B) (2)
The names and
addresses of the owners
of the property
X_ Yes ____No Tab(s) 3 and 4 of the
application booklet
contains information
concerning the names
and addresses of the
owner of the property
where the tower is to be
located.
_x_Yes ____No
6
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 19 of 92
SECTION 2.2 AND 2.7.3 CONTINUED ("Yes" indicates compliance; "No" indicates 1
non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
2.7.3 (B) (3)
Relevant information
needed to show
compliance with the
general and specific
standards governing the
Special Use
X_ Yes ____No The application booklet
contains various
documents, including a
site plan, containing the
necessary information
establishing compliance
with the provisions of the
Ordinance.
_x_Yes ____No
2.7.3 (B) (4)
Ten (10) copies of the site
plan prepared by a
registered N.C. land
surveyor, architect, or
engineer.
X_ Yes ____No Tab 6 of the application
booklet contains the
required site plan
completed by Tower
Engineering
Professionals of Raleigh,
NC.
_x_Yes ____No
2.7.3 (B) (5)
If the application involves
a Preliminary Subdivision
Plat, 26 copies of the Plat
prepared in accordance
with Section 7.14 shall be
provided.
_X_ Not
Applicable
The project does not
involve or propose a
subdivision. As a result
no preliminary plat is
required.
_x__ Not
Applicable
2.7.3 (B) (6)
A list of all parcels located
within 1000 (Staff Note –
telecommunication tower
applicants are required to
observe a 1000 foot area)
feet of the subject parcel
and the
name and address of
each property owner, as
currently listed in the
Orange County tax
records.
X_ Yes ____No Tab 12 of the application
booklet contains a
complete list of property
owners within 1000 feet
of the subject property
as maintained by Orange
County Land Records.
_x_Yes ____No
2.7.3 (B) (7)
Elevations of all structures
proposed to be used in
the development.
X_ Yes ____No Tab 6 of the application
booklet contains the
required elevations
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 20 of 92
SECTION 2.2 AND 2.7.3 CONTINUED ("Yes" indicates compliance; "No" indicates 1
non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
2.7.3 (B) (8)
Ten (10) copies of an
Environmental
Assessment or
Environmental Impact
Statement as required by
Section 6.16 of the UDO
_X__ Not
Applicable
Per Section 6.16.2
Exemptions of the UDO
projects involving less
than a total area of two
(2) acres or less are not
required to produce an
Environmental
Assessment.
The proposed project will
not impact more than 2
acres of land area (lease
area is only 100 ft. by
100 ft. in area).
Per Section 6.16.3
Environmental
Assessment of the UDO
the project will not
involve the grading of
more than 40,000 sq. ft.
of property (exclusive of
roads), involve more
than 10,000 gallons per
day of water usage.
_x__ Not
Applicable
2.7.3 (B) (9)
Method of disposal of
trees, limbs, stumps and
construction debris
associated with the
permitted activity, which
shall be by some method
other than open burning.
X_ Yes ____No Tab(s) 6 and 37 of the
application booklet
contains the site plan
which notes construction
or land clearing debris
generated on-site will be
disposed of in
accordance with the
County’s Solid Waste
Management Ordinance.
_x_Yes ____No
2.7.3 (B) (10)
Statement from the
applicant indicating the
anticipated development
schedule for the build-out
of the project.
X_ Yes ____No Tab 37 of the application
booklet contains the
required information,
specifically the tower
work shall commence by
September 2013 (if
project is approved and
there are no appeals)
and be completed within
approximately 6 weeks.
_x_Yes ____No
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 21 of 92
SECTION 2.2 AND 2.7.3 CONTINUED ("Yes" indicates compliance; "No" indicates 1
non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
2.7.3 (B) (11)
Statement from the
applicant in justification of
any request for vesting for
a period of more than two
years (five years
maximum)
X Not Applicable The applicant is not
requesting vesting of the
project.
_x_ Not Applicable
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 22 of 92
SECTION 2.7.5 CLASS B SPECIAL NOTIFICATION REQUIREMENTS ("Yes" indicates 1
compliance; "No" indicates non-compliance) 2
3
Ordinance Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 2.7.5 (a)
The Planning Director shall
give public notice of the
date, time and place of the
public hearing
_X Yes
____No
Attachment 3 of the
Abstract package
produced by staff
provides the necessary
detail outlining
compliance with this
requirement.
_x_Yes ____No
2.7.5 (b)
Such notice shall be
published in a newspaper
of general circulation in
Orange County once a
week for two successive
weeks, with the first notice
to be published not less
than ten days not more
than we days prior to the
date of the hearing.
_X Yes
____No
The legal ad for the June
10, 2013 BOA public
hearing was published in
the News of Orange and
the Herald consistent
with the requirements of
the UDO.
_x_Yes ____No
2.7.5 (c)
The Planning Director shall
post on the affected
property a notice of the
public hearing at lest ten
days prior to the date of
said hearing.
_X Yes
____No
Attachment 3 of the
Abstract package
produced by staff
provides the necessary
detail outlining
compliance with this
requirement.
_x_Yes ____No
2.7.5 (d)
Written notice shall be sent
by certified mail to all
adjacent property owners
not less than 15 days
before the hearing date.
Adjacent property owners
are those whose property
lies within five hundred feet
of the affected property
and whose manes and
addresses are currently
listed in the Orange
County tax records.
_X Yes
____No
Attachment 3 of the
Abstract package
produced by staff
provides the necessary
detail outlining
compliance with this
requirement.
_x_Yes ____No
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 23 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.10.8 W ireless
Telecommunications
Support Structures –
Submittal and Review
Requirements
5.10.8 (A) (1) (a)
A site plan and site plan
application package
prepared in accordance
with Section 2.5 shall be
presented for approval to
the Planning Division
including all requirements
for site development plan
approval as required.
X Yes ___No Tab(s) 6 of the
application booklet
contains the required
information, specifically
the required site plan.
_x_Yes ____No
5.10.8 (A) (1) (b)
A detailed description of
the proposed
telecommunication
support structure (i.e.
monopole, self-supporting
lattice, etc.) including a
detailed narrative
description and
explanation of the specific
objective(s) for the new
facility including a
description as to the
coverage and/or capacity,
technical requirements,
and the identified
boundaries of the specific
geographic area of
intended coverage for the
proposed
telecommunication
support structure
X Yes ___No Tab 3 of the application
booklet contains a
complete project
narrative describing the
proposed use as well as
an explanation of the
specific objective(s) for
the new facility.
Tab(s) 6, 7, 15, 16, 17,
19, 20, 21, 22 of the
application booklet
contains other supporting
documentation satisfying
this requirement.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 24 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (c)
Elevation drawings and
color renderings of the
proposed tower showing:
(i) The vertical rendition of
the telecommunication
support structure(s)
identifying all users and
attachments,
(ii) All related fixtures,
structures, appurtenances
and apparatus including
the height of said
structures above the
lowest adjacent pre-
existing grade,
(iii) The materials that will
be used on site for said
structures including their
color and any proposed
lighting and shielding
devices, and
(iv) If the facility is
intended to be a stealth,
as defined herein, the
colors and screening
devices for the Planning
Director to verify
consistency with
applicable definitions.
X Yes ___No Tab(s) 3, 6 and 7 of the
application booklet
contains the required
information.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 25 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (d)
A signed statement from
the applicant certifying
that the proposed
telecommunication
support structure:
(i) Shall be maintained in
a safe manner,
(ii) Is in compliance with
all conditions of all
applicable permits and
authorizations without
exception, and
(iii) Is in compliance with
all applicable and
permissible local, State,
and Federal rules and
regulations.
X Yes ___No Tab(s) 3 and 30 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (e)
A statement, prepared by
a professional engineer
licensed in the State of
North Carolina, which
through rational
engineering analysis,
certifies the tower's
compliance with
applicable standards as
set forth in the State of
North Carolina Building
Code, and any associated
regulations; and describes
the tower's capacity,
including an example of
the number and type of
antennas it can
accommodate.
X Yes ___No Tab(s) 3 and 28 of the
application booklet
contains the required
information.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 26 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (f)
A statement stating how
the proposed tower will
minimize visual
intrusiveness to
surrounding properties in
the area. Criteria that may
be used for such evidence
may be height and type of
existing trees surrounding
the proposed tower, and
local topography.
X Yes ___No Tab(s) 3 and 7 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (g)
A copy of the installed
foundation design
including a geotechnical
sub-surface soils
investigation, evaluation
report, and foundation
recommendation for the
proposed wireless support
structure.
X Yes ___No Tab(s) 3 and 41 of the
application booklet
contain required
information. A final
geotech report is
required prior to the
issuance of a building
permit.
Staff will recommend this
become a condition of
approval.
_x_Yes ____No
5.10.8 (A) (1) (h)
The existing cell sites
(latitude, longitude, power
levels) to which this
proposed site will be a
handoff candidate.
X Yes ___No Tab(s) 15 and 21 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (i)
Propagation studies of the
proposed site and
showing all adjoining
planned, proposed, in-
service or existing sites.
This will include all of the
modeling information used
to produce the study
including, but not limited
to, any assumptions made
about ambient tree height.
X Yes ___No Tab(s) 17 and 20 of the
application booklet
contains the required
information.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 27 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (j)
The search ring utilized in
finding the proposed site.
X Yes ___No Tab(s) 3 and 19 of the
application booklet
contains the required
information.
The County
telecommunication’s
consultant, CMS, has
reviewed the information
and concurs with the
applicant’s assertions.
Their comments are
detailed within
Attachment 2 of the
abstract.
_x_Yes ____No
5.10.8 (A) (1) (k)
The number, type, height,
and model of the
proposed antennas along
with a copy of the
applicable specification
sheet(s).
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (l)
The make, model and
manufacturer of the tower
and antenna(s), antenna
heights and power levels
of proposed site. This will
include documentation
establishing the azimuth,
size, and centerline height
location of all proposed
and existing antennas on
the structure.
X Yes ___No Tab(s) 3, 6 and 17 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (m)
The frequency,
modulation and class of
service of radio or other
transmitting equipment.
X Yes ___No Tab(s) 3, 13, 17, and 21
of the application booklet
contains the required
information.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 28 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (n)
The maximum
transmission power
capability of all radios, as
designed, if the applicant
is a cellular or functional
equivalent carrier, or the
maximum transmission
power capability, as
designed, of all
transmission facilities if
the applicant is not a
cellular or functional
equivalent carrier.
X Yes ___No Tab(s) 3, 17, and 21 of
the application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (o)
The actual intended
transmission and the
maximum effective
radiated power of the
antenna(s).
X Yes ___No Tab(s) 3, 17, and 21 of
the application booklet
contains the required
information.
.
_x_Yes ____No
5.10.8 (A) (1) (p)
The direction(s) of
maximum lobes and
associated radiation of the
antenna(s).
X Yes ___No Tab(s) 3, 17 and 21 of
the application booklet
contains the required
information.
.
_x_Yes ____No
5.10.8 (A) (1) (q)
Certification that the NIER
levels at the proposed site
are within the threshold
levels adopted by the
FCC.
X Yes ___No Tab(s) 3 and 21 of the
application booklet
contains the required
information.
_x_Yes ____No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 29 of 92
SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (A) (1) (r)
Certification that the
proposed antenna(s) will
not cause interference
with other
telecommunications
devices.
X Yes ___No Tab(s) 3 and 21 of the
application booklet
contains the required
information.
_x_Yes ____No
5.10.8 (A) (1) (s)
A written affidavit stating
why "the proposed site is
necessary for their
communications service"
(e.g., for coverage,
capacity, hole-filling, etc.)
and a statement that there
are no existing alternative
sites within the provided
search ring and there are
no alternative
technologies available
which could provide the
proposed
telecommunications
service need without the
tower.
X Yes ___No Tab(s) 3 and 22 of the
application booklet
contains the required
information.
The affidavit was
prepared by Jerry Jones
of AT and T
_x_Yes ____No
5.10.8 (A) (1) (t)
A copy of the FCC license
applicable for the intended
use of the facility as well
as a copy of the 5 and 10
year building out plan
required by the FCC.
X Yes ___No Tab(s) 3 and 13 of the
application booklet
contains the required
information.
_x_Yes ____No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 30 of 92
SECTION 5.8.10 (A) (2) ADDITIONAL SUBMITTAL REQUIREMENTS – CO LOCATION OF 1
ANTENNAS ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (A) (2)
In addition to the
requirements denoted
herein, applications for the
co-location of antennas on
existing structures shall
be required to submit the
following:
X Not Applicable The applicant is not
proposing the co-location
of antenna with this
application.
The proposal is for a new
tower, not for the co-
location of equipment.
As a result the
requirements of Section
5.8.10 (A) (2) are not
applicable to this
application request.
This section will be
applicable in the future
where co-locations are
proposed for the tower if
approved.
_x_ Not Applicable
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 31 of 92
SECTION 5.8.10 (B) GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS 1
("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (1) (a) and (b)
Overall Policy and Desired
Goals
The overall policy and
desired goals for Special Use
Permits for wireless
telecommunications support
structures shall be promoting
and encouraging, wherever
possible, the following:
(a) Alternatives to
constructing new wireless
support structures, including
but not limited to the co-
location of wireless
telecommunications
equipment and mitigating the
visual effect of a wireless
telecommunication support
structure to an extent not
commercially impracticable;
and
(b) The placement, height
and quantity of wireless
telecommunications towers
and equipment in such a
manner, including but not
limited to the use of stealth
technology or camouflage
techniques, to minimize
adverse aesthetic and visual
impacts on the land,
property, buildings, and other
facilities adjacent to,
surrounding, and in generally
the same area as the
requested location of such
wireless telecommunications
support structure, which shall
mean using the least visually
and physically intrusive
facility that is not
technologically or
commercially impracticable
under the facts and
circumstances.
X Yes ___No Tab(s) 3, 14, 16, 17, 19,
and 20 of the application
booklet contains the
required information
addressing this
requirement.
There are no existing
towers in the area to
address service needs,
so co-location
opportunities were not
available.
There are no County pre-
designated sites in this
area affording a pre-
screened/sanctioned
location for a
telecommunication
facility.
The existing OWASA
site (refer to Map in Tab
14) would not serve this
area.
Tab(s) 3 and 6 provides
sufficient information
denoting compliance with
subsection (b).
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 32 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (2) Balloon
Test
(a) The applicant shall, at
least six weeks prior to a
Class B Special Use
Permit public hearing and
at least 11 weeks prior to
a Class A Special Use
Permit public hearing,
conduct a balloon test
whereby the applicant
shall arrange to fly, or
raise upon a temporary
mast, a minimum of 10’3”
in length, brightly colored
red or orange balloon at
the maximum height of
the proposed new
wireless support structure.
(b) The balloon test shall
be flown for at least four
consecutive daylight
hours starting sometime
between 10:00 A.M. and
2:00 P.M. on the dates
chosen.
(c) A notice of the dates
(including a second date
in case of poor visibility,
weather or atmospheric
conditions on the initial
date), times, and location
of the balloon test shall be
mailed, by certified mail,
return receipt requested,
by the applicant, to all
persons owning property
within 1,000 feet of the
subject parcel no less
X Yes ___No Tab(s) 3, 7, 8, 9, 10, 11,
and 12 of the application
booklet contains the
required information.
The balloon test was
completed on April 13,
2013 – 8 weeks prior to
the June 10, 2013 BOA
public hearing. This date
did not fall on a holiday
and is consistent with the
requirement of Section
5.8.10 (B) (2) (d) of the
UDO as detailed herein.
Tab 7 contains pictures
of the balloon test, which
was held from 10:00 a.m.
until 2:00 p.m. on April
13, 2013.
Notices of the balloon
test were sent to
property owners within
1000 feet, of the subject
property, via certified
mail on March 25, 2013,
20 days prior to the
scheduled balloon test.
The list of property
owners within 1000 feet
utilized by the applicant
was generated utilizing
data maintained by
Orange County Land
Records as required by
the UDO.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 33 of 92
1
than 14 days in advance
of the first test date. The
data contained within the
office of Orange County
Land Records shall be
used as the primary
source for determining
which residents are to
receive notice of the
balloon tests.
(d) The primary date shall
be on a weekend
(excluding legal holidays),
but to prevent delays in
the processing of the
application, and in case of
poor weather or
atmospheric conditions on
the initial date, the
secondary date may be a
weekday.
(e) The applicant shall
inform the County
Planning Staff, in writing,
of the dates and times of
the test at least 14 days in
advance.
(f) The applicant shall also
post a sign on the subject
property, and directional
signs posted at locations
to be determined by
Planning Staff. The signs
shall measure no more
than nine square feet in
area and no less than four
square feet in area, giving
the contact information of
the County Planning
Department, the proposed
dates, times, and location
of the balloon test. The
signs shall be posted to
meet the same time limits
as provided for in the
balloon test notification as
stated above.
Signs were posted on
the property, as well as
off-site directional signs,
on March 22, 2013.
Planning staff was
informed of the test as
required by Section
5.8.10 (B) (2) (e) as
detailed herein.
2
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 34 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) Submittal
Requirements
5.8.10 (B) (3) (a)
(a) A site plan showing
the following:
(i) The entire site
(including property
boundary lines) and size
of all existing structures
within 500 feet of the site,
(ii) Existing and proposed
structures on site,
(iii) The fall zone of the
tower,
(iv) Existing and proposed
topography at a contour
interval of five feet and
(v) Any officially
designated floodways and
floodplains, or the
presence of alluvial soils.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-1 of the site
plan contained in Tab 6
provides the size of all
structures within 500 feet
of the site as well as
denoting the fall zone of
the proposed tower and
the existing/proposed
topography lines.
There is a statement on
sheet C-1 indicating
there are no
floodways/floodplains on
the property. Staff
concurs with this finding.
The project will involve a
stream crossing (i.e.
driveway) consistent with
the provisions of Section
6.13 of the UDO.
_x_Yes ___No
5.8.10 (B) (3) (b)
Plans, and elevations for
all proposed structures
and descriptions of the
color and nature of all
exterior material, along
with the make, model, and
manufacturer of the
proposed structure,
maximum antenna
heights, and power levels.
X Yes ___No Tab(s) 3, 6 and 17 of the
application booklet
contains the required
information.
Sheet C-3 of the site
plan contained in Tab 6
provides information
about the tower and
antennas.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 35 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (c)
A Landscape and Tree
Preservation Plan drawn
at the same scale as the
site plan, showing the
existing and proposed
trees, shrubs, ground
cover and other
landscape materials. This
plan shall minimize
adverse visual effects of
wireless
telecommunications
support structures and
antennas through careful
design, siting, landscape
screening and innovative
camouflaging techniques.
X Yes ___No Tab(s) 3 and 6of the
application booklet
contains the required
information.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 36 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (d)
Evidence that the
applicant has investigated
the possibilities of placing
the proposed equipment
on an existing wireless
support structure. Such
evidence shall consist of:
i. A listing of all wireless
telecommunications
support structures within a
two mile radius of the
proposed wireless support
structure site and a listing
of all wireless support
structure, utility poles and
other structures in the
vicinity of the proposed
facility that are technically
feasible for utilization by
the applicant to fill all or a
substantial portion of the
telecommunications
service need identified by
the Applicant pursuant to
section 5.10.8(A)(1)(s).
Documents shall be
submitted at the time of
application filing that
indicates the applicant’s
ability or inability to co-
locate on the identified
tower(s) and reasons why.
X Yes ___No Tab(s) 3, 15, 16, and 22,
of the application booklet
contains the required
information.
Tab 22 contains an
affidavit indicating there
are no existing towers,
buildings, or other
useable structures within
a 2 mile radius in which
antennas could be
attached.
Tab 16 contains a
memorandum from
BlueWave Development
reviewing search criteria
for a property to support
the proposed 199 foot
tall tower.
Tab 15 contains a
search ring map.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 37 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (d)
(continued)
ii. Delineation of the
boundaries of the
maximum search ring
within which the
telecommunication
equipment can function as
intended. The following
information shall be
provided for all existing
wireless support
structures within the
search ring:
a. Wireless
telecommunication
support structure height;
b. Existing and planned
wireless support structure
users;
c. Whether the existing
wireless
telecommunication
support structure could
accommodate the
telecommunication
equipment to be attached
to the proposed wireless
support structure without
causing structural
instability or radio
frequency interference;
and
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 38 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (d)
(continued)
d. If the proposed
telecommunication
equipment cannot be
accommodated on the
existing wireless
telecommunication
support structure, assess
whether the existing
wireless support structure
could be structurally
strengthened or whether
the antennas transmitters
and related equipment
could be protected from
electromagnetic
interference, and
generally describe the
means and projected cost
of shared use of the
existing wireless support
structure; and
e. Any restrictions or
limitations of the FCC or
FAA that would preclude
the shared use of the
wireless support structure;
f. Propagation studies of
all adjoining planned,
proposed, in-service, or
existing sites, and;
g. Any additional
information requested by
the County.
iii. A summary
explanation of why
proposed
telecommunication
equipment cannot be
located on any of the
existing wireless support
structures in the search
ring.
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 39 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (e)
Documentation from
applicable state or federal
agencies indicating
requirements, which affect
the appearance of the
proposed wireless support
structure, such as lighting
and coloring.
X Yes ___No Tab(s) 3 and 33 of the
application booklet
contains the required
information.
There is no lighting
required for the
proposed tower.
_x_Yes ___No
5.8.10 (B) (3) (f)
Draft bond which will
guarantee the removal of
the wireless support
structure in the event that
it is abandoned or unused
for a period of 12 months.
X Yes ___No Tab(s) 3 and 32 of the
application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (g)
A listing of, and current
tax map identifying, all
property owners within
1,000 feet of the parcel
and addressed, first class
stamped envelopes to the
property owners for
notifications of the public
hearing in accordance
with Sections 2.7.5 and
2.7.6 of this Ordinance.
X Yes ___No Tab(s) 3 and 12 of the
application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (h)
A report containing any
comments received by the
applicant in response to
the balloon test along with
color photographs from
various locations around
the balloon.
X Yes ___No Tab(s) 3 and 7 of the
application booklet
contains the required
information.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 40 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (i)
Evidence that the balloon
test requirement has been
met, including a notarized
statement and listing of
the property owners
notified of the test, a copy
of a current Orange
County Tax Map showing
the subject property and
all properties within the
notification ring, and
copies of the certified mail
returned receipts from the
mail-out.
X Yes ___No Tab(s) 3, 8, 9, 10, 11 of
the application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (j)
A notarized statement that
the sign posting
requirement has been
met.
X Yes ___No Tab(s) 3 and 10 of the
application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (k)
Photographs of a clearly
visible balloon floated at the
proposed tower location to
the maximum height of the
tower, as well as
photographs with the
proposed tower and
associated antennas
superimposed upon them
showing what the proposed
tower will look like.
Photographs shall be taken
from locations such as:
property lines, and/or nearby
residential areas, historic
sites, roadways, including
scenic roads and major view
corridors, and other locations
as deemed necessary by the
Planning Staff to assess the
visual impact of the proposed
tower.
X Yes ___No Tab(s) 3 and 7 of the
application booklet
contains the required
information.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 41 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (l)
The Special Use Permit
application shall include a
statement that the facility
and its equipment will
comply with all federal,
state and local emission
requirements.
X Yes ___No Tab(s) 3 and 21 of the
application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (m)
An Applicant may be
required to submit an
Environmental
Assessment Analysis and
a Visual addendum.
Based on the results of
the Analysis, including the
Visual addendum, the
County may require
submission of a more
detailed visual analysis.
The scope of the required
Environmental and Visual
Assessment will be
reviewed at the pre-
application meeting.
_X_ Not applicable The applicant was not
required by staff to
complete the additional
information
_x_ Not
applicable
5.8.10 (B) (3) (n)
If required, a Visual
Impact Assessment,
which shall include:
_X_ Not applicable The applicant was not
required by staff to
complete the additional
information. As a result
the provisions of this
section do not apply.
_x_Not applicable
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 42 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.8.10 (B) (3) (o)
All applications shall
contain a demonstration
that the wireless support
structure is sited so as to
have the least visually
intrusive effect reasonably
possible and thereby have
the least adverse visual
effect on the environment
and its character, on
existing vegetation, and
on the residences in the
area of the
telecommunications
tower.
X Yes ___No Tab(s) 3 and 7 of the
application booklet
contains the required
information.
_x_Yes ___No
5.8.10 (B) (3) (p)
A statement, prepared by
a professional engineer
licensed in the State of
North Carolina, which
through rational
engineering analysis,
certifies the tower's
compliance with
applicable standards as
set forth in the State of
North Carolina Building
Code, and any associated
regulations; and describes
the tower's capacity,
including an example of
the number and type of
antennas it can
accommodate.
X Yes ___No Tab(s) 3 and 30 of the
application booklet
contains the required
information.
Tab 30 contains a
statement authored by
Margaret Robinson of
American Tower
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 43 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.10.8 (B) (4)
Standards of Evaluation
5.10.8 (B) (4) (a)
(a) The telecommunications
equipment planned for the
proposed wireless support
structures cannot be
accommodated on an
existing wireless support
structures due to one or
more of the following
reasons:
(i) The planned equipment
would exceed the structural
capacity of existing and
approved wireless support
structures, considering
existing and planned use of
those wireless support
structures and the wireless
support structures cannot be
reinforced to accommodate
planned or equivalent
equipment at a reasonable
cost.
(ii) The planned equipment
would cause radio frequency
interference with other
existing or planned
equipment for these wireless
support structures, and the
interference cannot be
prevented at a reasonable
cost.
(iii) Existing or approved
wireless support structures
do not have space on which
the equipment can be placed
so it can function effectively
and reasonably in parity with
similar existing or approved
equipment.
(iv) No tower or other
suitable facility exists in an
area where the equipment to
be placed on the tower will
function in its intended
manner.
X Yes ___No Tab(s) 3 and 14 of the
application booklet
contains the required
information.
There are no existing
towers in the area to
address service provision
needs. As a result the
antenna proposed for the
site cannot be located
elsewhere.
The application in its
entirety provides the
necessary
documentation outlining
why the tower has to go
on this property.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 44 of 92
1
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 2
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 3
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (b)
Location of Wireless
Support Structures:
(i) Applicants for facilities
shall locate, site and erect
said facilities according to
the following priorities, in
the following order:
a. On existing County-
owned facilities without
increasing the height of
the tower or structure.
b. On existing Facilities
without increasing the
height of the tower or
structure.
c. On County-owned
properties or facilities.
d. On properties in areas
zoned for commercial or
industrial use.
e. On properties in areas
zoned Agricultural
Residential (AR).
f. On properties in areas
zoned for residential use.
X Yes ___No Tab(s) 3 and 14 of the
application booklet
contains the required
information.
There are no ‘County’
owned facilities in the
area allowing for antenna
to be located.
There are no existing
towers in the area to
address service provision
needs.
There are no ‘County’
owned properties where
a tower could be located.
There are no
commercially and/or
industrially zoned
properties in the area
where a tower could be
located.
There subject property is
zoned AR.
This property is zoned
for residential use.
_x_Yes ___No
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 45 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (b)
Continued
(ii) If an Applicant
proposes to place
telecommunications
equipment at a location
that is not a preferred
priority 1 site, then the
Applicant must provide a
detailed explanation as to
why a higher priority site
is not proposed. The
explanation shall be in the
form of a written report
demonstrating the
Applicant’s review of the
above locations in order of
priority and the reason(s)
for the site selection. The
explanation shall, at a
minimum, include the
information required by
section 5.10.8(B)(3)(e).
(iii) The application shall
not be approved unless it
demonstrates that the
telecommunications
equipment may not be
sited at a higher priority
site because of
commercial
impracticability or
because no higher priority
site is available that would
serve to provide the
telecommunications
service need identified by
the Applicant as provided
for in section
5.10.8(A)(1)(s).
X Yes ___No This property represents
the lowest priority site
per Section 5.10.8 (B) (4)
(b) (i) (f) as detailed
above.
The proposed tower is
located: ‘On properties in
areas zoned for
residential use’
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 46 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (b)
Continued
(iv) An Applicant may not
by-pass sites of higher
priority merely because
the site proposed is the
only site leased or
selected. Agreements
between providers limiting
or prohibiting co-location
shall not be a valid basis
for any claim of
commercial
impracticability.
(v) Notwithstanding that a
potential site may be
situated in an area of
highest priority or highest
available priority, an
application shall not be
approved if it conflicts with
the provisions and
requirements of this
Ordinance.
The applicant is not by-
passing a ‘higher priority’
site with the proposal to
erect a tower on this
property. There are no
higher priority sites in the
area where a tower can
be located.
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 47 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (b)
Continued
(vi) Wireless support
structures shall not be
located within one-half (½)
mile of any existing
monopole, lattice or guyed
wireless telecommunications
support structure.
a. An exception may be
allowed when the applicant
can sufficiently demonstrate
that:
i. Appropriate space on the
existing telecommunication
wireless support structure is
not available; or
ii. The applicant has made
good faith effort to negotiate
an agreement with the owner
of the existing wireless
telecommunication support
structure and has been
unsuccessful, which must be
documented in writing; or
iii. The telecommunication
equipment on the existing
wireless telecommunication
support structure is not
compatible with the proposed
telecommunication
equipment of the applicant;
or
iv. Adequate coverage by the
applicant cannot be met at
the location of the existing
wireless telecommunication
support structure; or
v. The existing wireless
telecommunication support
structure cannot be
reasonably modified to
accommodate additional co-
location by the applicant.
There are no wireless
support structures within
½ mile of this property.
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 48 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (b)
Continued
b. Exceptions shall only
be allowed after a
thorough analysis of the
search area, provided by
the applicant is performed
by the County’s consultant
or Staff, indicating that
coverage is not possible
on an existing wireless
support structure at the
four-carrier capacity or
other user capacity that
can be achieved. There
must be an 80% approval
vote of the deciding board
for this specific finding to
pass the exception
criteria.
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 49 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (c)
Setbacks
(i) Within or adjacent to
residential zoning districts,
minimum setbacks from
the base of the wireless
support structure to the
property boundary shall
be equal to 110% of the
wireless support structure
height.
(ii) If the wireless support
structure is proposed as
an accessory use to a
residential use, the
setback shall be 110% of
the wireless support
structure height from any
residence or dwelling unit
on the subject property.
(iii) Adjacent to non-
residential uses or non-
residential zoning districts,
minimum setbacks from
the base of the wireless
support structure to the
property boundary shall
be the greater of 20% of
the tower height, or the
minimum required
setback.
(iv) All buildings and other
structures to be located
on the same zoning lot as
a telecommunication
tower wireless support
structure shall conform
with the setbacks
established for the zoning
district or as established
through the subdivision
process, whichever is
greater.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-1 of the site
plan contained in Tab 6
indicates the base of the
tower will be 218 feet
from the nearest
property line.
The application package
indicates there are no
residential ‘houses’ on
the site.
There are also no
adjacent non-residential
land uses or zoning
districts per subsection
(iii) as detailed herein.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 50 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (d) Access
(i) At a wireless
telecommunications
support structure site, an
access road, turn around
space and parking shall
be provided to assure
adequate emergency and
service access.
(ii) Maximum use of
existing roads, whether
public or private, shall be
made to the extent
practicable.
(iii) Road construction
shall, at all times,
minimize ground
disturbance and the
cutting of vegetation.
(iv) Road grades shall
closely follow natural
contours to assure
minimal visual disturbance
and reduce soil erosion.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-1 and C-2 of the
site plan contained in
Tab 6 contains sufficient
detail denoting
compliance.
Existing roads will be
utilized to the maximum
extent possible. Road
construction shall follow,
to the greatest extent
possible, the existing
contour of the land and
minimize the removal of
vegetation.
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 51 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (e)
Landscape and Buffers
(i) A Type C Landscape
Buffer shall be provided
between the wireless
support structures and its
accessory structures and
adjoining
property/properties.
(ii) Existing vegetation
may be removed only to
the extent necessary to
accommodate the
wireless support
structures, equipment
buildings, and support
structures such as guy
wires.
(iii) Plantings around the
compound perimeter,
outside of any fence or
wall, shall be composed
entirely of fast growing
evergreen vegetation.
(iv) New plantings and
existing vegetation used
for screening shall be at
least six feet in height or
greater at planting.
(v) Proposed plantings
(name, type, height) shall
be shown on the
Landscape Plan for the
facility.
(vi) Landscaping shall
provide a screen on a
year-round basis.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
The proposed tower is
located in a heavily
wooded area of the
property. Existing
vegetation satisfies the
landscape buffer
requirement.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 52 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (f)
The visibility of the balloon
to adjacent properties and
the surrounding area shall
not constitute sole
justification of denial of a
permit application but is
an indication of what
location on the site may
be less visually intrusive.
X Yes ___No The applicant
acknowledges the
condition. Balloon Test
information, including
visibility
pictures/renderings are
contained within Tab 7 of
the application package
_x_Yes ___No
5.10.8 (B) (4) (g)
The applicant shall
demonstrate and provide
a description in writing
and by drawing how it
shall effectively screen
from view the base and all
related equipment and
structures of the proposed
facility.
X Yes ___No Tab(s) 3, 6, and 7 of the
application booklet
contains the required
information.
Sheet C-1 of the site
plan in Tab 6 provides
information on the
landscaping. Tab 7
provides information
related to the balloon
visibility.
_x_Yes ___No
5.10.8 (B) (4) (h)
The site plan shall
indicate a location for at
least two equipment
buildings in addition to
that proposed for use by
the applicant.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-2 of the site
plan in Tab 6 provides
the required information.
_x_Yes ___No
5.10.8 (B) (4) (i)
All utilities at a facility site
shall be installed
underground and in
compliance with all Laws,
ordinances, rules and
regulations of the County,
including specifically, but
not limited to, the National
Electrical Safety Code
and the National Electrical
Code where appropriate.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 53 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (j)
All wireless support
structures shall satisfy all
applicable public safety,
land use, or zoning issues
required in this Ordinance,
including aesthetics,
landscaping, land-use
based location priorities,
structural design,
setbacks, and fall zones.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
_x_Yes ___No
5.10.8 (B) (4) (k)
Fences and Walls
(i) An eight foot fence or
wall shall be required
around the base of any
wireless support
structures. This fence or
wall shall encompass all
accessory equipment
within the compound.
(ii) Fences shall be
required around guy wire
tie downs
(iii) A fence or wall may be
placed around the
perimeter of the facility to
include guy wire tie downs
and associated equipment
should the
applicant/owner wish to
do so.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-10 of the site
plan contained in Tab 6
contains the required
information on proposed
fences and walls.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 54 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (l)
The communications
tower is structurally
designed to support
additional users as
provided for in Section
5.10.8(A)(3)(d), and the
Special Use Permit
includes a statement that
the owner of the wireless
support structure is willing
to permit other user(s) to
attach communication
equipment which do not
interfere with the primary
purpose of the wireless
support structure,
provided that such other
users agree to negotiate a
reasonable compensation
to the owner from such
liability as may result from
such attachment.
X Yes ___No Tab(s) 3 and 31 of the
application booklet
contains the required
information.
Tab 31 contains the
required co-location
certification document.
_x_Yes ___No
5.10.8 (B) (4) (m)
To minimize the number
of antenna arrays and
thus the visual impact, the
County may require the
use of dual mode
antennas to be used,
including by two different
carriers, unless it can be
proven that such will not
work technologically and
that such would have the
effect of prohibiting the
provision of service in the
County.
X Yes ___No The applicant
acknowledges the
condition.
Staff is recommending
this as a specific
condition of approval.
Language within the
application allows for this
if required by the County.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 55 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (n)
Structures shall be
galvanized and/or painted
with a rust-preventive
paint of an appropriate
color to harmonize with
the surroundings.
X Yes ___No The applicant
acknowledges the
condition.
Language within the
application indicates the
proposed monopole will
be constructed of
galvanized steel, grey in
color, and will ‘harmonize
and blend with and into
the environment and
natural color of the
background’
_x_Yes ___No
5.10.8 (B) (4) (o)
Both the wireless
telecommunications
support structure and any
and all accessory or
associated
telecommunication
equipment and related
facilities shall maximize
the use of building
materials, colors and
textures designed to blend
with the structure to which
it may be affixed and/or to
harmonize with the natural
surroundings, this shall
include the utilization of
stealth technology as may
be required by the
County.
X Yes ___No Tab(s) 3 of the
application booklet
contains the required
information.
Language within the
application indicates the
proposed monopole will
be constructed of
galvanized steel, grey in
color, and will ‘harmonize
and blend with and into
the environment and
natural color of the
background’
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 56 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (p)
Antennas
(i) All new or replacement
antennas, except omni-
directional whip antennas,
shall be flush-mounted or
as close to flush-mounted
as is technologically
possible on any facility, so
long as such does not
have the effect of
prohibiting the provision of
service to the intended
service area, alone or in
combination with another
site(s), unless the
applicant can prove that it
is technologically
impracticable.
(ii) If attached to a
building, all antennas shall
be mounted on the facie
of the building and
camouflaged so as to
match the color and, if
possible, texture of the
building or in a manner so
as to make the antennas
as visually innocuous and
undetectable as is
possible given the facts
and circumstances
involved.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-3 of the site
plan contained within
Tab 6 indicated the
antennas will be located
on the proposed
monopole tower will be
flush mounted.
Language within the
application indicates this
condition will be adhered
to.
Subsection (ii) is not
applicable to this
application.
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 57 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (q)
Lighting
__X__ Not
Applicable
As detailed within the
application the tower is
not required, or is it
going to be, illuminated.
_x_ Not Applicable
5.10.8 (B) (4) (r)
The tower and antenna
will not result in a
significant adverse impact
on the view of or from any
historic site, scenic road,
or major view corridor.
X Yes ___No Adjacent roadways are
not designated as scenic
roads or major view
corridors.
According to a
memorandum from
Orange County DEAPR
staff, contained within
Attachment 2 of the
staff abstract, there are
no issues with respect to
detraction from historic
sites.
_x_Yes ___No
5.10.8 (B) (4) (s)
Facilities, including
antennas, towers and
other supporting
structures, such as guy
anchor points and wires,
shall be made
inaccessible to individuals
and constructed or
shielded in such a manner
that they cannot be
climbed or collided with;
and transmitters and
telecommunications
control points shall be
installed in such a manner
that they are readily
accessible only to persons
authorized to operate or
service them.
X Yes ___No The applicant
acknowledges the
condition.
Language within the
application indicates this
condition will be adhered
to.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 58 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (t)
All abandoned
communication wireless
support structures shall be
removed within 12 months
of the cessation of use. A
bond or other security
guaranteeing the removal
of the tower in the event
that it is abandoned or
unused for a period of 12
months shall be posted. A
cost estimate shall be
provided by a qualified
General Contractor
licensed in the State of
North Carolina. The
amount of the security
shall be 110% of the
estimate.
X Yes ___No The applicant
acknowledges the
condition.
Language within the
application indicates this
condition will be adhered
to.
This will be addressed
prior to the issuance of a
Certificate of Occupancy
of the structure and shall
become a condition of
approval.
_x_Yes ___No
5.10.8 (B) (4) (u)
A determination shall be
made that the facility and
its equipment will comply
with all federal, state and
local emission
requirements, and the
Special Use Permit shall
include a statement that
the facility and its
equipment will comply
with all federal, state and
local emission
requirements.
X Yes ___No The applicant
acknowledges the
condition.
Language within the
application indicates this
condition will be adhered
to.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 59 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (v)
Electro-magnetic radiation
levels.
(i) The Special Use Permit
shall include a condition
that the electro-
magnetic radiation levels
maintain compliance with
requirements of the FCC,
regarding emission of
electromagnetic radiation.
(ii) Within 30 days of
installation of equipment
on the tower, and within
30 days of the installation
of any additional
equipment in the future,
the tower owner shall
provide documentation of
emission levels in relation
to FCC standards.
(iii) In addition, the tower
owner must provide
documentation of
emission levels within five
working days if so
requested by Orange
County.
(iv) Orange County may
make such requests at
any time, not to exceed
two times per year.
X Yes ___No The applicant
acknowledges the
condition.
Language within the
application indicates this
condition will be adhered
to.
This will become a
condition of approval for
the project.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 60 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (w)
“High Voltage”, "No
Trespassing" and Other
Signs
(i) If high voltage is
necessary for the
operation of the
telecommunications tower
or any accessory
structures, "HIGH
VOLTAGE - DANGER"
warning signs shall be
permanently attached to
the fence or wall and shall
be spaced no more than
40 feet apart.
(ii) "NO TRESPASSING"
warning signs shall be
permanently attached to
the fence or wall and shall
be spaced no more than
40 feet apart.
(iii) The letters for the
"HIGH VOLTAGE -
DANGER" and "NO
TRESPASSING" warning
signs shall be at least six
inches in height. The two
warning signs may be
combined into one sign.
The warning signs shall
be installed at least five
feet above the finished
grade of the fence.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-11 of the site
plan contained within
Tab 6 provides the
signage details for the
project, demonstrating
compliance with this
provision.
_x_Yes ___No
3 4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 61 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (w)
Continued
(iv) The warning signs
may be attached to
freestanding poles if the
content of the signs
would, or could, be
obstructed by
landscaping. Signs noting
federal registration (if
required) shall be
attached to the tower
structure in compliance
with federal regulation.
(v) Facilities shall contain
a sign no larger than four
square feet to provide
adequate notification to
persons in the immediate
area of the presence of
RF radiation or to control
exposure to RF radiation
within a given area.
(vi) A sign no larger than
four square feet
containing the name(s) of
the owner(s) and
operator(s) of the
antenna(s) as well as
emergency phone
number(s) shall be
installed. The sign shall
be on the equipment
shelter or cabinet of the
applicant and be visible
from the access point of
the site and must identify
the equipment owner of
the shelter or cabinet.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-11 of the site
plan contained within
Tab 6 provides the
signage details for the
project, demonstrating
compliance with this
provision.
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 62 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (4) (w)
Continued
(vii) On tower sites, an
FCC registration sign, as
applicable, is also to be
present. The signs shall
not be lighted, unless
applicable law, rule or
regulation requires
lighting.
(viii) The use of any
portion of a tower for
signs or advertising
purposes including
company name, banners,
streamers, etc. shall be
strictly prohibited.
(ix) Mobile or immobile
equipment not used in
direct support of a tower
facility shall not be stored
or parked on the site of
the telecommunication
tower, unless repairs to
the tower are being made.
X Yes ___No Tab(s) 3 and 6 of the
application booklet
contains the required
information.
Sheet C-11 of the site
plan contained within
Tab 6 provides the
signage details for the
project, demonstrating
compliance with this
provision.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 63 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (5)
Bond Security
(a) The applicant and the
owner of record of any
proposed facility property
site shall, at its cost and
expense, be jointly
required to execute and
file with the County a
bond, or other form of
security acceptable to the
County as to type of
security and the form and
manner of execution, in
an amount of at least
$75,000.00 for a tower
and with such sureties as
are deemed sufficient by
the County to assure the
faithful performance of the
terms and conditions of
this Section and
conditions of any Special
Use Permit issued
pursuant to this Section.
(b) The full amount of the
bond or security shall
remain in full force and
effect throughout the term
of the Special Use Permit
and/or until any necessary
site restoration is
completed to restore the
site to a condition
comparable to that, which
existed prior to the
issuance of the original
Special Use Permit Tower
Inspection
X Yes ___No Tab(s) 3 of the
application booklet
acknowledges the
condition and indicates it
shall be adhered to.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 64 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (6)
Liability Insurance
(a) A holder of a Special Use
Permit for a wireless support
structure shall secure and at
all times maintain public
liability insurance for
personal injuries, death and
property damage, and
umbrella insurance
coverage, for the duration of
the Special Use Permit in the
following amounts:
(i) Commercial General
Liability covering personal
injuries, death and property
damage: $1,000,000 per
occurrence/$2,000,000
aggregate; and
(ii) Automobile Coverage:
$1,000,000.00 per
occurrence/ $2,000,000
aggregate; and
(iii) A $3,000,000 Umbrella
coverage; and
(iv) Workers Compensation
and Disability: Statutory
amounts.
(b) For a wireless support
structure on County property,
the Commercial General
Liability insurance policy shall
specifically name the County
as an additional insured. The
insurance policies shall be
issued by an agent or
representative of an
insurance company licensed
to do business in the State
and with a Best’s rating of at
least A.
X Yes ___No Tab(s) 3 of the
application booklet
acknowledges the
condition and indicates it
shall be adhered to.
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 65 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (6)
Liability Insurance
Continued
(c) The insurance policies
shall contain an
endorsement obligating
the insurance company to
furnish the County with at
least 30 days prior written
notice in advance of the
cancellation of the
insurance.
(d) Renewal or
replacement policies or
certificates shall be
delivered to the County at
least 15 days before the
expiration of the insurance
that such policies are to
renew or replace.
(e) Before construction of
a permitted facility is
initiated, but in no case
later than 15 days prior to
the grant of the building
permit, the holder of the
Special Use Permit shall
deliver to the County a
copy of each of the
policies or certificates
representing the
insurance in the required
amounts. A Certificate of
Insurance that states that
it is for informational
purposes only and does
not confer rights upon the
County shall not be
deemed to comply with
this Section.
X Yes ___No Tab(s) 3 of the
application booklet
acknowledges the
condition and indicates it
shall be adhered to.
This shall become a
condition of approval for
the project.
_x_Yes ___No
3
4
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 66 of 92
SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1
CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
5.10.8 (B) (6)
Liability Insurance
Continued
(c) The insurance policies
shall contain an
endorsement obligating
the insurance company to
furnish the County with at
least 30 days prior written
notice in advance of the
cancellation of the
insurance.
(d) Renewal or
replacement policies or
certificates shall be
delivered to the County at
least 15 days before the
expiration of the insurance
that such policies are to
renew or replace.
(e) Before construction of
a permitted facility is
initiated, but in no case
later than 15 days prior to
the grant of the building
permit, the holder of the
Special Use Permit shall
deliver to the County a
copy of each of the
policies or certificates
representing the
insurance in the required
amounts. A Certificate of
Insurance that states that
it is for informational
purposes only and does
not confer rights upon the
County shall not be
deemed to comply with
this Section.
X Yes ___No Tab(s) 3 of the
application booklet
acknowledges the
condition and indicates it
shall be adhered to.
This shall become a
condition of approval for
the project.
_x_Yes ___No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 67 of 92
SECTION 5.3.2 (B) – SPECIFIC STANDARDS – SPECIAL USE PERMITS ("Yes" indicates 1
compliance; "No" indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.3.2 (B) (1)
Method and adequacy of
provision for sewage
disposal facilities, solid
waste and water service.
X_ Yes ____No Attachment 2 of the
staff prepared abstract
contains
memorandum/emails
from Orange County
Environmental Health
indicating there are no
septic systems required
for the support of the
proposed
telecommunication
tower.
There is also an e-mail
from Jeff Scouten,
Orange County Solid
Waste, indicating his
approval of the project.
_x_Yes ____No
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 68 of 92
SECTION 5.3.2 (B) CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 1
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.3.2 (B) (2)
Method and adequacy of
police, fire and rescue
squad protection.
X_ Yes ____No Fire protection will be
provided by the White
Cross Volunteer Fire
Department, rescue
service by the Orange
County Emergency
Management, and police
protection by the Orange
County Sheriff’s
Department.
Attachment 2 of the
staff prepared abstract
contains an e-mail from
Mr. David Sykes of
Orange County
Emergency Management
concerning approval of
the project.
Orange County Sheriff’s
office has also indicated
they can support the
project.
_x_Yes ____No
Section 5.3.2 (B) (3)
Method and adequacy of
vehicle access to the site
and traffic conditions
around the site.
_X Yes ___No The submitted site plan
shows the required
access points.
A recommended
condition of approval is
the applicant secure a
NC DOT drive permit
allowing for the project to
be accessed via New
Sharon Church Road
_x_Yes ____No
2
MOTION made by David Blankfard to agree with staff’s findings on pages 40 through 90. 3
4
Larry Wright: I was going to take it by sections. 5
6
David Blankfard: Do we not have a second? 7
8
MOTION made by David Blankfard to agree with staff’s findings on pages 40 through 90. Mark Micol 9
seconded. 10
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 69 of 92
1
Samantha Cabe: My only comment as the alternate is to reiterate that we have to base our decision 2
on the evidence and the only evidence before us supports all those findings. 3
4
Larry Wright: That is why I would like to break it down by sections. 5
6
MOTION made by David Blankfard to agree with staff’s findings on pages 40 through 90. Mark Micol 7
seconded. 8
VOTE: 4 in favor, 1 opposed (Larry Wright) 9
10
Larry Wright: Mr. Bryan, don’t we have to document why we are doing this or voting for staff findings 11
and we have to justify this? 12
13
James Bryan: The justifications are in the next three. 14
15
Debra Graham: We have done this in the past. 16
17
18
19
20
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 70 of 92
SECTION 5.3.2 (A) Special Uses – General Standards ("Yes" indicates compliance; "No" 1
indicates non-compliance) 2
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
In accordance with
Section 5.3.2 (A) (2), the
Board of Adjustment shall
also consider the following
general conditions before
the application for a
Special Use can be
approved:
NOTE: Planning
Staff does not
provide a
recommendation
on these items as
the Board is
expected to act
based on the
sworn testimony
provided at the
hearing.
Section 5.3.2 (A) (2) (a)
The use will maintain or
promote the public health,
safety and general
welfare, if located where
proposed and developed
and operated according to
the plan as submitted.
_ Will _Will
Not
Staff will remind the
Board there is the
following information
available, as submitted
by the applicant, related
to addressing this
requirement:
• The application
package and project
narrative contained
within Tab 3 of the
application booklet.
• Tab 39 of the
application booklet
contains an impact
analysis, completed
by David Smith,
indicating the project
will not impact the
value of adjacent
property.
• Tab 6 of the
application booklet
contains a site plan
denoting the projects
compliance with the
UDO.
x
Will
_Will
Not
3
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 71 of 92
1
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.3.2 (A) (2) (a)
Continued
• Tab(s) 14, 16, 17, 18,
19, 20, 21, 22, 28,
and 30 of the
application booklet
contain evidence
demonstrating the
need for the tower,
provisions for
guaranteeing the
public’s safety and
general welfare.
2
Larry Wright: Let’s move on to page 91. This is General Standards and we have the requirements in 3
5.3.2 (A) (2) (a) and on page 92 this is continued and the findings continue onto tables 14, 16, 17, 18, 4
19, 20, 21, 22, 28, and 30. Do I have a motion for this? 5
6
MOTION made by Mark Micol to find in favor of the finding that the use will maintain and promote the 7
public health, safety and general welfare if located where proposed based on the testimony of 8
Desiree Goldman representing the Greater Chapel Hill Association of Realtors and Aaron Nelson, 9
President of the Chapel Hill Carrboro Chamber of Commerce that the additional tower will encourage 10
the expansion of affordable high speed internet access in the County and provide equitable access to 11
rural underserved areas. David Blankfard seconded. 12
VOTE: Unanimous 13
14
15
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 72 of 92
SECTION 5.3.2 (A) Special Uses – General Standards ("Yes" indicates compliance; "No" 1
indicates non-compliance) 2
3
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.3.2 (A) (2) (b)
The use will maintain or
enhance the value of
contiguous property
(unless the use is a public
necessity, in which case
the use need not maintain
or enhance the value of
contiguous property).
Will _Will
Not
Staff will remind the
Board there is the
following information
available, as submitted
by the applicant, related
to addressing this
requirement:
• The application
package and project
narrative contained
within Tab 3 of the
application booklet.
• Tab 39 of the
application booklet
contains an impact
analysis, completed
by David Smith,
indicating the project
will not impact the
value of adjacent
property.
• Tab 6 of the
application booklet
contains a site plan
denoting the projects
compliance with the
UDO.
x
Will
_Will
Not
4
Larry Wright: On page 93, Section 5.3.2 (A) (2) (b) and we have on page 94, Section 5.3.2 (A) (2) 5
(c). What is the board’s pleasure? 6
7
Debra Graham: You need to do page 93 and 94 separately. 8
9
MOTION made by David Blankfard to find in favor that the use will maintain or enhance the value of 10
the contiguous properties based on the finding of the Impact Analysis prepared by David A. Smith, 11
MAI, SRA. Mark Micol seconded. 12
VOTE: Unanimous 13
14
15
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 73 of 92
1
Ordinance
Requirements
PLANNING
STAFF
RECOMMENDED
FINDINGS
EVIDENCE SUBMITTED
TO SUPPORT
FINDINGS
BOA
FINDINGS
Section 5.3.2 (A) (2) (c)
The location and
character of the use, if
developed according to
the plan submitted, will be
in harmony with the area
in which it is to be located
and the use is in
compliance with the plan
for the physical
development of the
County as embodied in
these regulations or in the
Comprehensive Plan, or
portion thereof, adopted
by the Board of County
Commissioners.
Is __ Is
Not
Staff will remind the
Board there is the
following information
available, as submitted
by the applicant, related
to addressing this
requirement:
• The application
package and project
narrative contained
within Tab 3 of the
application booklet.
• Tab 39 of the
application booklet
contains an impact
analysis, completed
by David Smith,
indicating the project
will not impact the
value of adjacent
property.
• Tab 6 of the
application booklet
contains a site plan
denoting the projects
compliance with the
UDO.
x Is __ Is
Not
2
Larry Wright: On page 94, Section 5.3.2 (A) (2) (c). 3
4
MOTION made by David Blankfard to find in favor that the location and character of use if developed 5
according to the plan submitted will be in harmony with the area which is to be located and the use is 6
in compliance with the plan for the physical development of the county as embodied in these 7
regulations or in the Comprehensive Plan or a portion thereof adopted by the Board of County 8
Commissioners based on the fact that it will not be an environmental impact or additional traffic, no 9
lights on the structure, no noise and limited visibility. Mark Micol seconded. 10
VOTE: Unanimous 11
12
13
14
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 74 of 92
1
1. The height of the tower shall not exceed a height of 199 feet above pre-construction grade as 2
detailed within the approved application package as reviewed and acted upon by the Board of 3
Adjustment at their June 10, 2013 meeting. 4
2. Existing vegetation, as detailed on the approved site plan reviewed and acted upon by the 5
Board of Adjustment at their June 10, 2013 meeting, shall be maintained as indicated. 6
3. The facility and its equipment shall comply with all federal, state and local emission 7
requirements. 8
4. The electro-magnetic radiation levels shall be maintained compliance with all federal, state 9
and local requirements, including the requirements of the Federal Communications 10
Commission regarding emission of electromagnetic radiation. Within 30 days of installation of 11
equipment on the tower, and within 30 days of the installation of any additional equipment in 12
the future, the tower owner shall provide documentation of emission levels in relation to FCC 13
standards to the County for review. In addition, the tower owner must provide documentation 14
of emission levels within five working days if so requested by Orange County. Orange County 15
may make such requests at any time, not to exceed 2 times per year. 16
5. Two ten pound 2-A:20-B:C dry chemical portable fire extinguishers shall be installed at the site 17
at a conspicuous location for use during an emergency event. 18
6. As required within Section 5.10.8 (A) (1) (g) of the UDO, the applicant shall be required to 19
provide a final copy of the installed foundation design including a geotechnical sub-surface 20
soils investigation, evaluation report, and foundation recommendation for the proposed 21
wireless support structure prior to the commencement of land disturbing activities associated 22
with the construction of the telecommunication facilities. 23
7. The applicant shall obtain a driveway permit from the NC Department of Transportation 24
approving the driveway access for the project off of New Sharon Church Road. 25
8. Final assignment of a street address shall be completed by Orange County Land Records 26
prior to the issuance of any permit authorizing land disturbing activity on the property. 27
9. The applicant shall obtain all necessary development permits from the County prior to the 28
initiation of and land disturbing activity associated with the construction of the 29
telecommunication facilities including, but not limited to: Building Permit, Erosion 30
Control/Stormwater Management Permit, Zoning Compliance Permit. 31
RECOMMENDATION
:
Staff has not received any information that would establish grounds for making a negative finding on the
general standards as detailed above. These standards include maintaining or promoting the public health,
safety, and general welfare, maintaining or enhancing the value of contiguous property, the use being in
harmony with the area in which it is to be located, and the use being in compliance with the general plan for
the physical development of the County.
Staff has reviewed the application, the site plan, and all supporting documentation and has found that the
applicant complies with the specific standards and required regulations as outlined within the UDO
Provided the Board of Adjustment finds in the affirmative on the specific and general standards, the Board
could make a positive finding on this application. In the event that the Board makes a recommendation to
issue the permit, staff recommends the attachment of the following conditions:
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 75 of 92
10. Any proposed co-location of antenna on this tower shall be reviewed, acted upon, and 1
installed in accordance with the provisions of the UDO. 2
11. A co-location site shall be offered to the County for the placement of antenna in support of 3
local emergency communication needs. 4
12. The applicant shall submit all necessary bonding/financial security documents to the County 5
Attorney’s office for review and approval guaranteeing the removal of the tower in the event it 6
is abandoned or unused for a period of 12 months. A cost estimate shall be provided by a 7
qualified contractor. The amount of the security shall be 110 percent of the estimate. This 8
must be completed before building permits are issued. 9
13. Telecommunication tower owners shall submit a report to the County Inspections Division 10
certifying structural and electrical integrity upon completion of the initial construction and at 11
intervals as specified within the UDO. 12
14. Inspection records shall be kept by the tower owner and made available upon request to the 13
County Inspections Division during regular business hours. Inspections shall be performed as 14
specified within the UDO. 15
15. In those cases where an inspection is required, which is not performed by Orange County 16
Inspections, the applicant is required to notify the Planning Department and any applicable 17
County telecommunication consultant of the inspection and its results. 18
16. Nothing associated with the approval, development or use of the property in support of the 19
proposed telecommunication facilities shall be construed as impacting the use of the property 20
for bona-fide farm purposes. Expansion of farming activities shall not constitute a modification 21
of the special use permit as detailed within the UDO requiring a re-review of the project by the 22
Board of Adjustment. 23
17. The County’s telecommunications consultant shall issue a final Certificate of Completion upon 24
the completion of a final inspection of the constructed telecommunication facilities. 25
Commercial service cannot be provided/initiated until this final Certificate is completed and 26
issued. 27
18. The Special Use Permit will automatically expire within 12 months from the date of approval if 28
the use has not commenced or construction has not commenced or proceeded unless a 29
timely application for extension of this time limit is approved by the Board of Adjustment. 30
19. If any condition of this Special Use Permit shall be held invalid or void, then this Special Use 31
Permit shall be void in its entirety and of no effect. 32
33
MOTION made by Karen Barrows to approve the request with the additional 19 recommendations. 34
David Blankfard seconded. 35
VOTE: Unanimous 36
37
MOTION made by Karen Barrows to accept this special use permit for a communications tower off 38
New Sharon Church Road with the 19 conditions from staff. David Blankfard seconded. 39
VOTE: Unanimous 40
41
MOTION made by David Blankfard that there were no oppositions to the findings of fact. James Carter 42
seconded. 43
VOTE: Unanimous 44
45
46
47
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 76 of 92
1
AGENDA ITEM 8: CASE A-2-13: Class B Special Use Permit Proposing Development of 2
Telecommunication Facilities at 1426 Old Greensboro Road (PIN 9768-22-3
3878) 4
In accordance with Section(s) 2.7 Special Uses, 5.2.2 Table of Permitted Uses, 5.3.2 5
Application of Use Standards – Special Uses, and 5.10 Standards for 6
Telecommunication Facilities of the UDO American Tower and AT and T Mobility have 7
submitted a Class B Special Use Permit application seeking a permit to erect a 199 8
foot telecommunication tower on a 28 acre parcel of property at 1426 Old Greensboro 9
Road further identified utilizing Orange County Parcel Identification Number (PIN) 10
9768-22-3878. 11
As detailed within the application, the applicant wishes to erect a telecommunication 12
tower within a 100 foot by 100 foot leased area on the south-west portion of the 13
aforementioned parcel. There will be an equipment cabinet at the base of the tower to 14
house equipment for the various communication providers utilizing the tower within a 15
60 foot by 60 foot fenced compound. 16
Access to the proposed facility is proposed to be through a proposed drive off of 17
Sesame Road. 18
19
The following persons were sworn in: 20
21
Rusty Monroe
Jeremy Browner
David A. Smith
Karen Kemerait
Dakota Johnson
Jill House
Michael Harvey
Kristen C. Smith
Desiree Goldman
Aaron Nelson
David Lacava
Stephen M. Howard
Gary Dixon
22
Larry Wright. I would like to state that this is a separate case from the one before even though the 23
attorney and the applicant will have the same case of characters. This will be on 1426 Old 24
Greensboro Road property. Does anyone have any comments? 25
26
James Bryan: This board did hear partial testimony about this in the previous case. That expatriate 27
communication just for information in case anyone came in late. 28
29
Michael Harvey: On page 97, we have another Special Use Permit by American Tower and AT&T 30
Mobility proposing to erect a telecommunication facility on a parcel of property located on 1426 Old 31
Greensboro Road, PIN 9768-22-3878. There is a property map in Attachment 1 providing an aerial 32
photo of the property. Attachment 2 is staff comments relating to this application. We would also like 33
to point out that I have a revised, what I am calling Applicant Exhibit 1, a revised letter for the Center 34
of Municipal Solutions approving the project or recommending approval of the project. Attachment 3 35
is a Notification of Materials for certification for the mailing and the sign posting and the special use 36
permit Findings of Fact. We are looking at another 199 foot telecommunication tower and a 100 by 37
100 foot leased area of the subject parcel. There will be a 60 by 60 foot fenced compound supporting 38
the telecommunication tower. As we stipulated during the last application on page 99, there are no 39
preselected sites or County owned/leased sites or commercial property in this general area where a 40
telecommunication tower should be located and as such, this is the last tier out of the residential 41
zoned property where telecommunications tower could be located and it required by 5.10.8 of the 42
UDO. As I have indicated, Attachment 2 contains various comments from county departments on this 43
project. We will stipulate that the applicant met their burden with respect to submission of this 44
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 77 of 92
application as required by the UDO. As you know, we are not making any recommendations on the 1
general findings of fact on page 100. The use will maintain or promote the public health, safety and 2
general welfare; the use will maintain or enhance the value of contiguous property; the location and 3
character of the use, if developed according to the plan submitted, is in harmony with the area in 4
which it is to be located and consistent with the Comprehensive Plan. We don’t make 5
recommendations on those. On page 100, we have identified several key components of the 6
Comprehensive Plan leaving credence to the notion of allowing telecommunications facilities on this 7
property and the rural areas of the county. Unlike the last application, we have received numerous 8
phone calls from adjoining property owners related to this proposal expressing concern over the 9
development of a tower. There have been complaints over the lack of notice that in notifying 10
individuals of this hearing, there have been complaints that the local residents have not had sufficient 11
time to secure the services of necessary experts to refute the application, and there have been 12
accusations that the project will have a negative impact on the value of adjacent property. There 13
have been complaints that local residents will be able to see the tower. This is a quasi-judicial 14
hearing where you are accepting evidence as sworn testimony and you have to base the decision to 15
approve or deny the application on that sworn testimony, competent material, substantial evidence 16
introduced into the record. I would like to enter into the record an approved copy of the Orange 17
County Unified Development Ordinance and the 2030 Comprehensive Plan, as well as our abstract. 18
19
Larry Wright: Is this a tree farm? 20
21
Michael Harvey: No sir. 22
23
Larry Wright: If the property is maintained as it states then, if in the findings this property does have 24
to be maintained as presented in the application therefore, they cannot log it. 25
26
Michael Harvey: The current property owners, the Yows, cannot do anything that would have a 27
negative impact on the approval of this tower. For example, if there are areas (of the property) that 28
are designated as being preserved, vegetation being preserved, to meet a land use buffer 29
requirement, that area has to be maintained but obviously their continued use of the property as a 30
farm is guaranteed by state law and there is a condition that states that the approval of the cell tower 31
will in no way, shape or form limit their ability to continue to use the property as a farm use. 32
33
Larry Wright: Board members have any other questions, Mr. Harvey, the applicant’s attorney? 34
35
Karen Kemerait: I am an attorney with the law firm of Styers, Kemerait and Mitchell. I apologize in 36
advance for repeating some of the same information but the board knows this is a separate 37
application so I will have to be somewhat redundant. I will go briefly to the background materials. 38
There have been numerous changes in technology for the wireless industry that effected carriers and 39
wireless communications devices are much more than telephone systems in today’s modern world. 40
There are more benefits and services that are available such as convenience so that calls can be 41
made from any location and people can work remotely from homes and offices. One of the benefits 42
and services would be a safety benefit so that telecommunications customers could use their 43
telecommunications devices to access 911 or emergency services at times when they might have car 44
trouble or during disasters such as hurricanes when the land line systems may be down. Also, the 45
most recent is connectedness to the world that has been available through the advent of smart 46
phones. With the availability of messaging, internet, text, emails, data, phones, video, etc. the 47
technology changes have been happening very rapidly. The public has been both expecting and 48
demanding that these services become available to them. I think it is very important to communities 49
from an economic development perspective that such wireless telecommunication services are made 50
available. As I previously mentioned Orange County has not had a new telecommunications tower 51
approved since 2009 therefore, the telecommunications infrastructure has not kept pace with the 52
rapid improvement in technology that is required when additional infrastructure is necessary. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 78 of 92
1
I want to move on to one comment that I have heard from Mr. Harvey about concerns about not 2
having enough notice from some of the neighbors. I wanted to point out that there has been a 3
significant amount of notice that has been provided. There has been more than two months in which 4
we have been providing notice about the proposed tower and that has been ample time for the 5
neighbors to learn about what we have proposed and be prepared for the hearing. The first notice 6
was over two months ago. We are required by the ordinance to perform a balloon test and a balloon 7
test was conducted for a four hour period on April 20 and part of the balloon test is there is notice 8
posted on the property about the proposed telecommunications tower and prior to the balloon test, on 9
April 3, we sent certified letters to all property owners within 1,000 feet of the tower site. In the letter, 10
we provided information that we were filing a special use permit application and we also provided the 11
site plans for the special use permit application and also general information that answered questions 12
that residents might have about telecommunications towers. Also in the letter I provided information 13
about if there were questions or concerns, I provided my telephone number and email address and 14
stated I could be contacted. I did receive one telephone call from a woman and I spoke to her 15
generally about our application but that is the only contact I have had by email or telephone about our 16
proposed applications. Also, a notice was published in two different newspapers, the News of 17
Orange County, notice of the special use permit application was provided on April 3, 10 and 17 and in 18
the Herald Sun, notice was provided on April 5, 12 and 19 and more recently the county’s ordinance 19
does not require that a community meeting be held but I heard from Mr. Harvey that there had been 20
some concern so I wanted to have a neighborhood meeting so I could try to listen to what the 21
concerns are and hopefully address them and provide answers so I voluntarily had a community 22
meeting and I sent the letters on April 28 to all the property owners within 1,000 feet of the site and 23
the community meeting was held on June 4. 24
25
Larry Wright: How many people attended? 26
27
Karen Kemerait: About 12. The reason I provide all that history is because I wanted you to know 28
there has been two and one half months which notice had been provided to the neighbors. I want to 29
talk specifically about the application. This is a very important application for AT&T and American 30
Tower and also for Orange County as well. There are many areas in Orange County where there is 31
no coverage or insufficient coverage especially in the rural areas outside Chapel Hill, Carrboro and 32
Hillsborough and this is another area in the rural area of Orange County. While the demand for the 33
wireless service continues to increase, the construction for the infrastructure has not kept pace and 34
been stagnant since 2009. AT&T specifically with this location has been approached by people who 35
live in the area, traveling from the Greensboro area east toward Carrboro in their cars and businesses 36
in the area and also had conversations with business owners generally in Orange County and the 37
Chamber of Commerce about how better telecommunication coverage is necessary and this is a very 38
critical area where coverage is needed. AT&T and American Tower is coming forward with a plan 39
and they are coming forward with a significant investment to improve coverage for the Orange County 40
residents. The reason for this particular tower is there is a large gap in coverage and when there is a 41
large gap in coverage detected a team of construction analysts and engineers look for ways to fill that 42
gap in coverage and they first look at existing structures (i.e., telecommunication towers, water tanks, 43
etc.) and in this area, there were no telecommunications, water tanks or large buildings that AT&T 44
could put its antennas on and that would be AT&Ts first preference to find an existing structure to 45
locate its antennas on. When there were no existing structures, AT&T and American Tower have 46
been working hard to find a good location for a new telecommunications tower and we have found, 47
what I believe is an ideal location for this telecommunications tower and I don’t think it would be 48
possible to find a better location than this in this area where the coverage is needed. This is a large 49
tract of land, 28 acres, and part of it is used for farm land and there are also woods directly 50
surrounding the tower and the purpose of this tower is to solve that gap in coverage. The gap is west 51
of the town of Carrboro and it also will resolve the gap in coverage along Old Greensboro and Jones 52
Ferry Road. Under tab 20 and this is the propagation map and this is where the tower location would 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 79 of 92
be and as you can see, the area surrounding this tower is pink and white and blue and a little green 1
and the coverage you are looking for is red and yellow if possible and you want as little pink and white 2
and blue if possible and as I mentioned before white is no coverage, pink is not reliable coverage, 3
blue is coverage as a pedestrian when you are walking, green is in vehicle coverage, yellow means 4
you would have coverage in a residential building and red means you would have coverage in a 5
business building. After the site is constructed… this is the propagation map that shows the 6
telecommunication coverage that will be available with this site. 7
8
Samantha Cabe: Can you indicate on those maps where Jones Ferry and Greensboro Highway are? 9
10
Karen Kemerait: This is Old Greensboro Road and Jones Ferry Road comes down this way. This is 11
Highway 54, this is West Main Street, this is Highway 86 and this is 15-501. 12
13
Larry Wright: Can we see the before picture alongside that? 14
15
Samantha Cabe: Is the Chatham County line marked on there? 16
17
Karen Kemerait: Once this site is on air, that will provide the corridor east from Greensboro to the 18
west going into Carrboro and also add this contiguous coverage and these sites will hand off to each 19
other so there will be contiguous coverage in this area. 20
21
Larry Wright: You were pointing to where it is white. 22
23
Karen Kemerait: There is no coverage here. 24
25
Larry Wright: Could you repeat the statement where you were going down toward the white into the 26
Greensboro coverage. 27
28
Karen Kemerait: This would be along Old Greensboro Road west towards Greensboro… 29
30
Stephen Howard: I have been sworn. This is Old Greensboro Road. 31
32
Larry Wright: Where it goes blue to pink to white. Where are we relative to Orange County there? 33
What township? Is it still Carrboro? 34
35
Stephen Howard: It’s west of Carrboro. You go out Jones Ferry and over University Lake. 36
37
Larry Wright: I guess I’m asking the devil’s advocate question, what are we gaining by this tower 38
when I look at those two? 39
40
Stephen Howard: I assume you have maps. 368048 which is the closest one, that is an existing 41
tower we co-located on in 2000 on 625 Old Fayetteville Road and 368210, which is the one to the 42
northwest, that is at 5607 Highway 54, an SBA tower that was built that we co-located on in 2000. 43
44
Larry Wright: Can we see the two together again? 45
46
Stephen Howard: There is some signal out there but it is a very weak signal. You are not going to 47
get good coverage inside the homes and it will not be adequate and reliable for all the vehicles 48
traveling there. 49
50
Larry Wright: This is a tower how many feet high? 51
52
Stephen Howard: Proposed 199. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 80 of 92
1
Larry Wright: Can you build a higher tower? 2
3
Stephen Howard: Not according to the ordinance. 4
5
Karen Kemerait: We could build a higher tower but if it was above 199 feet it would have to be lit 6
according to FAA requirements and I think American Tower and the belief is that it would be 7
preferable not to have a tower that would be lit. Even if you had a taller tower, it wouldn’t provide a 8
larger expanse of coverage. The ordinance is written in a way to encourage towers less than 200 9
feet because once they are 200 feet so they won’t be lit, then they come before the Board of 10
Adjustment quasi-judicial proceeding. 11
12
Michael Harvey: You have to remember that we have multiple classifications of tower processes in 13
our code. A 200 foot tall and higher tower has to use the Class A Special Use Permit process, 14
meaning it goes before the BOCC and Planning Board during one of four scheduled quarterly public 15
hearings in February, May, August, typically, sometimes in September and November with the 16
Planning Board making a recommendation. There is also a requirement if a tower goes over 200 feet 17
that it has to be illuminated and I would make a statement that just because you have a taller tower 18
does not guarantee signal strength so going over 200 feet does not guarantee anything. The 19
applicant proposed a tower consistent with the Class B Special Use Permit process. They are correct 20
in that we have a preference for non-illuminated towers because of the issues they present to local 21
property owners and residents. They have chosen to go through this process consistent with the 22
code. 23
24
Larry Wright: What concerns me is all this other white. 25
26
Stephen Howard: What is not shown on here because it has not been proposed yet is there is a co-27
location proposed further down Jones Ferry Road southwest of this location. It is an existing tower 28
located at 3995 Jones Ferry Road. As you can see from the maps, as you go west along Old 29
Greensboro Road, there is virtually no coverage and the signal strength drops off quite a bit and there 30
is not much out there so you can see where the sites are located. This is the next step down Jones 31
Ferry Road, there is another co-location that will be proposed. 32
33
Larry Wright: Okay. 34
35
Stephen Howard: Eventually as the design plans mature and evolve, we will be proposing sites along 36
Old Greensboro Road. Don’t know the exact time frame. 37
38
Larry Wright: I know it is really problematic out there. 39
40
Karen Kemerait: This is a step in the process where AT&T is working to provide that coverage in the 41
County because we recognize there is insufficient coverage especially in the rural areas of the 42
county. This is an important step in providing that coverage. 43
44
Samantha Cabe: You are also close to the Chatham line and there may be towers built in Chatham 45
that help. 46
47
Stephen Howard: It is safe to say we are working in Chatham County to find co-locations and areas 48
that may be acceptable. 49
50
Larry Wright: For the record, reflect the maps that are displayed here. 51
52
Karen Kemerait: Those propagation maps are located under tab 20 of the application. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 81 of 92
1
Karen Kemerait: As Mr. Harvey said, we are filing an application for a Class B Special Use Permit 2
application. The tower will not be lit. It will be less than 200 feet so it will not have to be lit. It will be 3
a 199 foot monopole and it will be located on a 100 by 100 foot leased area on Mr. and Mrs. Yow’s 4
property. As I previously mentioned, the property is a large tract of land, 28 acres, and it is used for 5
farmland. The property is zoned rural buffer and the tower will be located 375 feet from Sesame 6
Road and 219 feet from the property line. Under tab 6, we have site plans; this is an enlarged page 7
from the site plan. It shows the 100 foot by 100 foot leased area with the 60 foot by 60 foot fenced 8
enclosure. The antennas, as required by the ordinance, will be flush mounted to the tower which 9
means they will be pressed up against the tower so they will not be visible. The intent is that you 10
typically see the protrude away from the tower. We have shown that we are meeting all the FCC 11
requirements regarding emissions and we have shown that there will be an access road which will be 12
a 12 foot access road that will come from Sesame Road. I would like to touch a little on the access 13
road. The access road, as I mentioned, will be a gravel road and it will come from Old Greensboro 14
Road, has access to Sesame Road and the gravel access road will come off Sesame Road. Sesame 15
Road is a secondary road. DOT has provided this information. The secondary roads are appropriate 16
for residential uses, farming uses and industrial uses. The tower use will generate almost no traffic 17
whatsoever. The tower will be an unmanned facility and it will generate two to four vehicles per 18
month for maintenance purposes only. The construction of the tower will occur and take about four 19
weeks and it could be a shorter period of time. The reason I bring up the Sesame Road and the 20
access road is when I attended the community meeting, there was some concern about the traffic 21
that could be generated along Sesame Road and as I mentioned it will be an unmanned facility and 22
there will only be, at most, two to four vehicle trips per month so virtually no traffic will be generated 23
from this tower along Sesame Road and according to DOT standards, secondary roads are 24
appropriate for residential farming, business and industrial uses. I believe that most residential, 25
business and industrial uses will generate significantly more traffic than two to four vehicle trips that 26
this tower use will generate. Also, there was some concern that a school bus drop off and pick up 27
occurred along Sesame Road. As I mentioned this is a 60 foot right of way so there will be ample 28
access for a school bus and maintenance trucks. During the four week construction period, I have 29
spoken with American Tower and we are willing to show good faith and even though there will be no 30
hazard whatsoever, we will determine when the school bus drop off and pick up occurs and ensure 31
that none of the construction trucks are traveling along Sesame Road during school bus drop off and 32
pick up time periods. 33
34
Karen Barrows: There is a letter in here from David Sykes, who is the Assistant Fire Marshall, and he 35
said the tower owner will need a plan that allows access to the facility at any time. Have you spoken 36
to that yet? 37
38
Karen Kemerait: Yes. We are providing a plan about access that can be provided according to what 39
Mr. Sykes has stated. That will be addressed. 40
41
Michael Harvey: That will also be a condition of approval for the building permit that the fire marshal 42
has to sign off on the building permit application before a certificate of occupancy is issued and that 43
assumes this permit is issued, the fire marshal will have to sign off on it. 44
45
Karen Kemerait: Under tab 7 of the application materials, we have provided information about the 46
balloon test. As I mentioned the balloon test was conducted on April 20. The balloon test will show 47
that this is a very good location for the tower. The visibility of the tower is going to be extremely 48
limited. It will not be visible from most locations. The top of the tower will be visible from a few 49
locations. It will be visible when you are driving east along Old Greensboro Road towards Carrboro 50
and it will also be visible from a few of the houses located along Pineview Road but for the locations 51
where the tower will be visible, the base of the tower will not be visible at all and only the top of the 52
tower will be visible. We have shown that we have met all the technical requirements of the 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 82 of 92
ordinance and CMS, who is the county’s consultant, has provided his recommendation report and 1
stated that we have met all technical and specific requirements of the ordinance. 2
3
Larry Wright: I have a question on the visibility. I look at these locations and it seems like this is 4
being erected in a small wooded are and what is the size of that area? How many acres? Location 4 5
I am looking at and then I am looking for location 3, this is tab 7 so it seems like there is a canopy of 6
trees that from some of these locations masks the tower, am I right? 7
8
Karen Kemerait: That is correct. 9
10
Larry Wright: Then I look at, for instance location 6, under tab 7, and there is a larger panel that is a 11
picture and then the top panel shows the location of a tower in a wooded area on the upper right hand 12
side. How large is that wooded area surrounding the tower? The proposed tower. 13
14
Karen Kemerait: The property owners are here and they may be able to speak. I will try to get that 15
information to you, how large that area is. 16
17
Larry Wright: I would like to state that when a tower was located in back of my house I wanted to 18
make sure they put the balloon test up and they have all these nice pictures where it masked it but 19
what happens is they can log it in three days after we make our decision and so in part of the 20
recommendation, I ask the Board if there could be some sort of agreement that they would maintain 21
that and not log it in the way they presented it to the Board with a balloon test and the property owner 22
agreed to do that with the attorney. 23
24
Karen Kemerait: That has not been discussed yet however, I can talk to the property owner and see 25
if that is something that could be agreed to or not. Moving on to the general standards, I think it is 26
important to point out that the visibility of the tower is not granted. Having the top of the tower is not 27
grounds for denying a special use permit. 28
29
Larry Wright: No, but it could be grounds for… it is just like this board has asked a landowner or 30
asked the applicant if they would put up buffers as a noise barrier against a kennel and they agree to 31
do that. What I am saying is that this could be a condition. I can’t do it on my own and you can’t do it 32
on your own but this could be a condition that this buffer would be maintained as presented to the 33
Board. 34
35
Karen Kemerait: I don’t have the authority to agree to it as I am speaking to you and the property 36
owners are here and that is why we ask them to come so if issues did arise that I could speak to them 37
and see what their response would be. What I would suggest is that after I finish my presentation I 38
could speak to the property owners and provide a response. For the general standards, we have also 39
shown in the application materials that we have met all the general standards for special uses. We 40
have shown the evidence is presented for all three of the general standards. First, we have shown 41
that the telecommunications tower use will maintain or promote the public health, safety and general 42
welfare. We have shown that the RF emissions will comply with all federal standards and laws. We 43
have shown that the telecommunications tower will provide access to 911 services in times of 44
emergencies. We have also, in my earlier presentation, talked about how the telecommunications 45
tower will provide convenience to Orange County and the residents who live and travel in this area 46
and to the public in general by having access to the wireless services and I have also talked about 47
how this is very important for economic development purposes for the area surrounding the tower and 48
Orange County as a whole. The application materials also provide information about how the use will 49
maintain or enhance the value of contiguous property. There will be no environmental hazard from 50
this tower and there will be no nuisance. The tower will generate little traffic. It is an unmanned 51
facility and generate only two to four vehicle trips per month. There will be no odor, noise or glare 52
and it will be an unlit tower. We also have the property impact analysis that has been provided by 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 83 of 92
David Smith, who is a North Carolina certified real estate appraiser and he has completed and 1
provided his expert opinion that the telecommunications tower will maintain or enhance the value of 2
contiguous property. I have also shown in the application materials that we have met the third 3
general standard that the telecommunications tower will be in harmony in the area which it is located 4
and it will be in compliance with the ordinance and with the Comprehensive Plan. As the Board 5
knows, the inclusion of a use such as a telecommunication tower use as a special use for a particular 6
zoning district, in this case, the rural buffer zoning classification, that the use is in harmony with the 7
area in which it is to be located. We have also provided evidence in addition to that to show for the 8
previous standard, that the tower will not be an environmental hazard and it will not create a nuisance 9
and it will be in harmony with the rural area in which it will be located so therefore, I have shown that 10
we have met all specific and technical requirements of the ordinance and all the general requirements 11
of the ordinance. David Smith, the appraiser, is here to speak about his property impact analysis but 12
if the Board would like I could speak to the property owners about your question and have some 13
information about that first. 14
15
Larry Wright: Can Mr. Smith give his presentation while you do yours? 16
17
David Smith: I have been sworn. I live at 3 Morristown Circle in Durham, North Carolina. I am a 18
state certified general appraiser, I also have an MAI and SRI designations of the appraisal institute. 19
20
Karen Kemerait: Have you had an opportunity to prepare a property impact analysis? 21
22
David Smith: Yes, I have. 23
24
Karen Kemerait: Who asked you to prepare that property impact analysis? 25
26
David Smith: You did. 27
28
Karen Kemerait: Can you describe the research and analysis you did for that property impact report? 29
30
David Smith: This information is in the report you have. To estimate the effect of a cell tower on 31
nearby properties, I located residential lot sales in two subdivisions in Durham. One where there 32
were two cell towers clearly visible and one that was not. These subdivisions were in the same area 33
near Eno River in Durham and I analyzed the sales of these lots. One of these was the River’s Edge 34
Subdivision. It is the one with the two towers adjacent to it. One of these towers was 470 feet lighted 35
lattice so you could see it very easily. The other was a 192 foot unlit similar to the one that is 36
proposed here. The subdivision has about 50 residential lots and the tax values of the houses that 37
were built range from $255,000 to $639,000 with an average of $456,000. Forty two of the lots sold 38
between August 2003 and March 2009. Eno Forrest is the other subdivision and it is located in the 39
same general area with no towers visible. This subdivision has 25 lots with tax values that range from 40
$366,000 to $566,000 with an average of about $460,000 so the averages are pretty close. Twenty 41
two lots sold in this subdivision between November 2004 and June 2007. They are similar in most 42
respects, they are both in Northern Durham and near Eno River and would appeal to the same type 43
of buyer. I analyzed the sales of the lots in the two subdivisions and I made adjustments for things 44
like primarily difference in time because of the way property values go up and down depending on 45
time. I have charts of these sales in this report and they are on pages 12 and 13 behind tab 39. 46
While the lots vary in sales price, the average is both before and after adjusting for market conditions, 47
that is time, give very close indications. Based on this, the two telecommunication towers have not 48
had significant effect on property values and their construction will maintain or enhance the value of 49
contiguous property in my opinion. Also, cellular towers have become a necessary and desired item 50
in today’s world. In order to meet this need, telecommunication towers have become a common part 51
of the landscape, much the same as power lines, telephone lines and other utilities have. Like these 52
utilities, telecommunication towers are needed in locations throughout the country. As such, they are 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 84 of 92
in harmony with the area in the same way that other utilities are. In conclusion, based on the set of 1
plans in the proposed tower and inspection of the properties in the area of the proposed tower site, 2
an analysis of data gathered and facts of inclusion contained in this report and subject to the 3
assumptions and limited conditions stated, it is my opinion that the proposed tower will maintain or 4
enhance the value of the contiguous properties and will be in harmony with the area. 5
6
Samantha Cabe: In the example you gave in the two subdivisions in Durham, did you compare the 7
sales of the lots prior to the erection of the tower with sales of the lots after the erection of the tower 8
or did you compare sales in general without regard to timing? 9
10
David Smith: One of them, the towers were already in place before the subdivision sold any lots. 11
The other one, there were no towers at all. 12
13
Samantha Cabe: How many of these types of evaluations have you done? 14
15
David Smith: About 9. 16
17
Samantha Cabe: Have you ever found that a cell tower had a negative impact on property value? 18
19
David Smith: No, I never have. 20
21
Larry Wright: Any other questions? 22
23
Karen Kemerait: We have spoken with the property owners and Mr. and Mrs. Yow have stated they 24
are willing to provide an easement so that the existing trees that are shown on the schematics will be 25
preserved. 26
27
Mark Micol: Why was that area chosen? Was it due to topography or to keep it out of the farmland? 28
Is there a particular reason you didn’t move it over 100 feet? 29
30
Karen Kemerait: There had been an earlier location and there is a stream buffer and then the actual 31
tower location had to be moved outside the stream buffer. We had tried to put the tower as deep into 32
the woods as possible so that it would have as less visibility as possible. When we met with Mr. 33
Harvey, he informed us that it was located in the stream buffer and we were disappointed because 34
we did have to move the tower outside that area so we have worked really hard to find a very good 35
site. We found this 28 acre piece of property and put the tower located within the wooded area and 36
we actually have it located deeper in the woods than it currently is. 37
38
Larry Wright: Anyone else want to speak for the applicant? Mr. Harvey do you want to speak? 39
40
Michael Harvey: I think it would be best to hear from people on the list. The first person signed up 41
was Mr. Monroe, who is the County’s telecommunication consultant; he is here to answer any specific 42
questions the Board may have to address any concerns or comments. The next individual signed up 43
is Jeremy Browner. 44
45
Jeremy Browner: I have been duly sworn. I rise in support. I am a solo practice attorney in Chapel 46
Hill; I live in Carrboro. I am also the Vice-Chair for the Economic Development and Public Policy 47
Committee. I want to reiterate what I said in the earlier application which is this tower is a very 48
important public policy for the county which we want to diversify our tax base because we are having 49
issues funding services we have now and continuously require tax increases. One of the ways we 50
can fight this is having more businesses formed and increasing the value of the property and one of 51
the ways to do that is allowing businesses to be formed outside the normal town limits we have now 52
and one of the only ways of doing that is having access to data which is very important. Of course, 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 85 of 92
we also have the other important policies. We have the access to data for internet purposes. We 1
have access to internet for agricultural purposes. We need access for security. A lot of security 2
systems need access to that. We need to access to data for offices on the go. As a solo practice 3
attorney I constantly, when I am out of the office and going to court and seeing clients, I am 4
constantly referring to my smart phone device to check in with the office to see what clients need and 5
then respond to clients. That is an important aspect to any modern business. Clients expect it and 6
customers expect it when you are in the business. This also has a public policy interest in bridging 7
the digital divide. The rural communities, especially Orange County, have limited to no access to 8
broadband internet. There are alternatives but the alternatives are not as useful as terrestrial 9
antennas. It is important that the Board review this. If there is any opposition, review it with the light 10
of the understanding that the policy interest should outweigh any opposition to the antenna that is 11
being applied for today. 12
13
Michael Harvey: The next two individuals listed are David Smith and Kim Kemeriat. After that is 14
Dakota Johnson. 15
16
Dakota Johnson: I have been duly sworn. I am not here to question anyone’s education in the real 17
estate business. There was one that told me that there would be a deduction in the property value 18
being that close to the house. It will be 300 feet from my front yard. Secondly, the map she was 19
showing about the coverage, AT&T, I have had AT&T before; bad choice. AT&T cannot pick up at a 20
lot of places I have lived and Verizon picks up perfectly where we live now. Third, the road is 60 feet, 21
you would think that the road is a little longer than 60 feet but it is about as wide as from here to you 22
and there is not really any room. Trash trucks can’t come down there, recycling trucks can’t come 23
down there because they can’t turn around. Imagine the big trucks bringing the tower down there 24
and checking on the maintenance on the ones that would be built. 25
26
Michael Harvey: Jill House is the next on the list. 27
28
Jill House: I have nothing further. 29
30
Michael Harvey: Then I have Kristen Smith. 31
32
Kristen Smith: I have been duly sworn. I am an Orange County native and I currently work in Chapel 33
Hill. I also live off Old Greensboro Highway. Just today I was able to be a part of the leadership 34
development program and this is where I heard the County Planning Director talk about the 35
importance of infrastructure. The Superintendent of Schools talk ed about the role of technology and 36
education and I used the smartphone the entire time to talk and text staff members, speakers, bus 37
drivers and recording the experience on social media. Additionally I used the smartphone while I was 38
in Chapel Hill and Carrboro all over to answer work emails and make a couple of phone calls. As a 39
staff member of the Chamber of Commerce not only do I know firsthand the importance in value of 40
wireless infrastructure but how important it is to advocate for this infrastructure so that our area can 41
continue to attract new businesses and relocators. On a more personal note, I live a mile from the 42
proposed site. I don’t think the proposed cell tower will have any adverse effect on our family’s 43
health. On the contrary, in caring for an aging parent, this increased telecommunications 44
infrastructure will only help our family’s health in ensuring reliable communications and emergency 45
management and reliable mobile communication, who is a physician, and also helps care for both of 46
our parents. As an Orange County native that cares about the future of our community, I hope you 47
will support increased telecommunication infrastructure by approving this proposed tower site. Thank 48
you. 49
50
Michael Harvey: Desiree Goldman. 51
52
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 86 of 92
Desiree Goldman: I have been duly sworn. I have lived in Orange County for 17 years. I am here 1
representing the Greater Chapel Hill Association of Realtors and their 500 members. We are in 2
support of the two cell phone towers and this one is even more important than the last one given the 3
density of the traffic that comes into this area. We have people that commute from Burlington that 4
come along Old 54 and Old Greensboro. Northern Chatham is growing. Jones Ferry is going to be 5
used more. I have hit a deer out there. You do not want to be out there hitting a deer in a car and 6
not be able to make a phone call. That is very dangerous and there are not lights on the streets. We 7
have to be able to communicate. The National Association of Realtors not only supports broadband 8
infrastructure but has commissioned its own studies showing that communities that have access to a 9
broadband have a six percent higher property value. I also have clients check to see whether or not 10
they can get cell connection. That is something that is now a part of what people look for when they 11
move to the area. Security systems are using cell phones instead of land lines. Most people I sell 12
homes to do not put land lines in anymore. This is really important and so many people work from 13
home and they like to move to the Chapel Hill, Durham, Carrboro, all of this is because of the 14
heightened technology and the ability to commute. This keeps people off the roads. We say we want 15
to improve our carbon footprint so having people be able to work from homes using broadband is a 16
way to do that. The other thing I think is important is safety. In real estate, one of the things we don’t 17
think about is it is dangerous. I go out and show properties to people I don’t know too well. If I am 18
out in an area that doesn’t have cell phone coverage, that is a problem. We have a code at our 19
office. I am out with somebody, I call and say please look for the red file. They know I am in trouble. 20
If I can’t reach them, that is a problem. There are times I have actually had to have someone drive 21
with me when I go out into an area that I can’t get good coverage to make sure I am safe. Bad things 22
do happen to realtors. So I really think that this is incredibly important so given how much we want to 23
have our small businesses grow into this area, I really support you in approving those towers and all 24
those white areas in the future. We need it all covered. 25
26
Michael Harvey: Aaron Nelson. 27
28
Aaron Nelson: I rise before you in approving this and to say a personal thank to Jeremy Browner for 29
coming out on his birthday. I say this in jest, our kids have all gone to bed without a kiss by their 30
parents here and so we are all here because this is really important to us so we appreciate you taking 31
the time to be here and listen to this. I represent the Chapel Hill Chamber of Commerce and been 32
their CEO for thirteen years and for thirteen years counseled businesses and home based 33
businesses about how to grow and thrive in the greater Chapel Hill Carrboro community. We have 34
1,000 small to mid-size businesses as well as 500 realtors that are members of our chamber so 35
collectively they put about 80,000 people and over the last thirteen years had lots of conversations 36
with lots of people about how to grow and have their business thrive. More and more of those 37
conversations are happening to business persons on their cell phone. They are calling me from their 38
phone in the car hands free; we hope they are in the passenger seat doing email, communicating, 39
pulling down data. At home, kids are on the smart phone or tablet connecting to the school system. 40
More and more, this is becoming a critical infrastructure just like when we widen roads that neighbors 41
are unhappy about widening or when we string cable along underground and disturb the right of way 42
and do the digging or put telephone wires out to places. At first, our communities’ reaction to those 43
have been negative, but over time, these cell towers are just a critical part of the infrastructure we are 44
going to have throughout our community and it is our organizations’ priority that we extend more and 45
more so I want to say a thank you and for the record to AT&T for responding. They don’t put up 46
towers if no one wants them. That is a waste of their time and money. They are going to pay a lot of 47
money to make this happen over lots of years and they are doing so at the request of Orange County 48
citizens and Orange County businesses and we appreciate their responsiveness and we ask the 49
same of you that you respond to that request and begin to extend this infrastructure. Business need 50
access to this broadband and internet so they can do text, talk on the phone, use data and use the 51
internet at home as well as on the go. They communicate with their clients and customers and take 52
orders. I have had conversations with the businesses so we called our members along this corridor, 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 87 of 92
a wood working business a little further down, a gentleman owns a towing company. You know if you 1
had your car towed and want to make a telephone call to whoever just took it, you sure hope it rings 2
and you hope they answer so George’s Towing does a whole lot of business by cell phone. In fact, 3
ensues the Town of Chapel Hill for the ability to use his cell phone in doing that business and that is 4
really important. Also spoke with CEOs of local companies who live in the area and talked about 5
communicating back to their business is really important so from my professional opinion and work 6
with thousands of businesses over a decade, this is an infrastructure that is critical. Our Chamber of 7
Commerce has never spoken to the Board of Adjustment before, not at the county, not at the city, not 8
at the town so why rise tonight and that is because the issue is so important and so we hope that you 9
will hear that as well. As I have commented earlier, our interest is also in equitable access. It 10
shouldn’t just be the case of people who live in dense areas or who live along a transit corridor or who 11
live on 54 or Highway 40 nor do we want it to be the case that people should have to leave their 12
house to walk to the corner to get cell phone coverage or they should leave their business to drive 13
towards the highway to pick up a telephone call. W e want equitable access throughout the county 14
and the public policy objectives are really important and we hope the standard is not whether you see 15
it or not, that is a standard that won’t survive as we need to go across the county. The testimony 16
earlier which we hear from realtors as well, is that you can see it doesn’t have a negative impact on 17
your property value which is a standard you have before you and we hope you will support approving 18
this tower; it’s important to our local business community and to the folks who work there. Thank you. 19
20
Michael Harvey: The next two individuals are with the applicant, David Lacava and Stephen Howard. 21
Then we have Mr. Gary Dixon. 22
23
Gary Dixon: This being the first time this is on this hearing, I had asked for a 30-day adjournment to 24
procreate for this. We were notified of the public hearing two weeks ago even though we knew about 25
the cell tower, we did not know about the public hearing. We thought we would have more time than 26
two weeks. I had handed out a letter signed by our petitioners, the adjoining property owners but I 27
never got an opportunity to ask for a delay or adjournment. I am not sure what happened in the 28
procedure. Mr. Harvey said this is the first time on and it is possible and it is a very good chance to 29
get 30 days to simply prepare for this. 30
31
Larry Wright: Are you asking for one now? 32
33
Gary Dixon: Yes; a thirty day adjournment to better prepare for this. We were notified of the public 34
hearing two weeks ago. 35
36
Larry Wright: Let me consult our attorney. 37
38
James Bryan: I believe it would be in… They don’t have to but they could to allow for more fact 39
finding. 40
41
Larry Wright: You feel that within 30 days, if we continue this and adjourn for 30 days, not adjourn 42
but have a continuance for 30 days, have a recess for 30 days that you could come back and be 43
prepared. 44
45
Greg Dixon: Yes sir. 46
47
Larry Wright: What we would do is this would be sort of a recess? 48
49
James Bryan: You could recess that would be fine. 50
51
Larry Wright: For 30 days and we do not have to repeat the testimony but we cannot discuss this, 52
right? 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 88 of 92
1
James Bryan: Definitely true. 2
3
Larry Wright: We don’t have to repeat all the testimony from the applicant’s attorney; we could start 4
with the gentleman right here, right? 5
6
James Bryan: Yes. There are two things, one, as you know, I am not familiar with the Board’s 7
procedure so you may want to ask staff. I am not sure but if you have members that are not going to 8
be here, you might have voting problems. 9
10
Larry Wright: We will have one member that has not heard the case but we will still have a quorum. 11
W e would have an alternate that could take the place. 12
13
Michael Harvey: You have six people here sitting. Obviously you have, with Mr. Carter’s absence 14
since his term is up, you have five people sitting on this Board, who have the right to vote and have 15
heard the testimony and heard the case. Those are the five people that would be deciding the case 16
because they would hear the other testimony. All five have to be here for that to occur. Mr. Schmidt, 17
who is taking Mr. Carter’s position that, is part of the answer. The other part of the answer is that if 18
you choose to do this after hearing from all other parties, you would adjourn to a date and time 19
certain, July meeting, and you would close the public hearing and motion to adjourn to the date and 20
time certain to reconvene. 21
22
Samantha Cabe: Was the notice provided, property notice in accordance with the ordinance and/or 23
the statues required for the public notice of such type of decision? 24
25
James Bryan: I haven’t reviewed it; I would have to refer to staff. 26
27
Samantha Cabe: Was the notice provided proper under the ordinance and/or the statute that 28
provides the notice? 29
30
Michael Harvey: Yes. 31
32
Samantha Cabe: So it was properly noticed. The amount of notice required by law was actually 33
given? 34
35
Michael Harvey: Correct. 36
37
Samantha Cabe: If we were to adjourn, would a separate notice requirement be imposed? 38
39
Michael Harvey: No, and the reason being that you are adjourning to a date and time certain and we 40
don’t have to re-advertise the hearing or resend certified letters; we might have to post a state public 41
hearing notice in the newspaper but that…... That is if you feel it necessary to adjourn. 42
43
Mark Micol: How many petitioners do we have? 44
45
Greg Dixon: This is representative of each family so there are multiple members in each family; this 46
is just a representative of each family. There are a dozen families that live in visibility of the tower. 47
48
Samantha Cabe: How many are on the petition? 49
50
Greg Dixon: Seven. 51
52
Larry Wright: How many were at the community forum of those numbers? 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 89 of 92
1
Greg Dixon: Most of these. Six if not all these were at the information meeting, I think. But that was 2
basically showing us those maps, we have not had enough time, we had two weeks. You can look at 3
the certified mail that came of the hearing. 4
5
Larry Wright: What I want to ask you is, what you would be bringing in one month from now that you 6
cannot state here? 7
8
Greg Dixon: Proper representation, proper documentation, a consultation and we need to retain legal 9
counsel. I have been in touch with an attorney who is out of state and he has not had enough time. 10
11
Larry Wright: We have to look at evidence; this is how we base this. We look at material evidence 12
and we look at expert evidence and if you want counsel, then I can understand. 13
14
Karen Kemerait: I would object to the case being deferred. We have been discussing the case for 15
approximately two hours and as I have mentioned there has been more than two months’ worth of 16
notice and then the community meeting was done in addition to the ordinance requirements plus if the 17
case is deferred for a month and the public hearing about what has been provided thus far is closed I 18
think we would need to have an opportunity to listen to the witnesses and testimony that comes back 19
at the next hearing and reopen the public hearing and give my witnesses an opportunity to respond. 20
We have a room full of people who have come as well who are fully prepared to testify and we also 21
have public witnesses who cared enough to come to the meeting so I think from a legal standpoint, 22
closing the public hearing and just allowing additional witnesses to come from the opponents would 23
not be legally sufficient and we would have to have an opportunity to respond and all our witnesses 24
would have to come back again in another month as well. As I mentioned notice has been provided 25
over two and half months. 26
27
Larry Wright: He says he wants to get counsel. 28
29
Karen Kemerait: I believe that over two months in which notice has been provided has been given 30
ample opportunity to be prepared for the hearing. 31
32
Samantha Cabe: I have a question for each of you. At the public hearing, did you explain to the 33
individual present that what you were applying to do and there was an application process and there 34
would eventually be a decision made by the County? 35
36
Karen Kemerait: In the letters about the balloon test, I indicated that we had filed a Class B Permit 37
application and provided the site plans, provided information about cell towers and said please call 38
me or email me. I provided my direct telephone number at work and my email address and received 39
the one telephone call I mentioned. During the community meeting, I talked about the hearing, it 40
would be occurring tonight. I tried to provide much of the information that I provided tonight about the 41
specifics, I brought the maps, the site plans and I answered the questions so it was an opportunity to 42
provide as much information about our application as I could and also to respond and answer 43
questions. 44
45
Samantha Cabe: Mr. Dixon, when did you contact the attorney out of state? 46
47
Greg Dixon: As soon as I got the letter about the hearing. 48
49
Samantha Cabe: So you did not contact an attorney when you found out they were going to be 50
making application and asking the county? 51
52
Greg Dixon: Yes, I did contact attorneys and realtors but I could not decide…. 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 90 of 92
1
Samantha Cabe: Did you do it then, after the public hearing or did you do it at the community 2
meeting? 3
4
Greg Dixon: The community meeting was just Tuesday, less than a week ago but upon getting this 5
information, we have a small sign on side of the road that you can barely read with a trash bag over it. 6
That is the meeting advertising requirement but you literally have to stop on an 18 foot wide road to 7
try to read this and that is the only notice. Granted we had a little balloon flying but do a lot of people 8
understand what that means, I don’t think so. 9
10
Samantha Cabe: When did you do the community meeting? 11
12
Karen Kemerait: Tuesday night. In addition, we sent certified letters as required by the ordinance. 13
We provided certified letters on April 3 to all property owners within 1,000 feet of the tower site as 14
required by the ordinance and that was to advise of the balloon test that was in support of the 15
application and we published notices in the two newspapers and then in addition, I provided my own 16
letter about the meeting asking those 1,000 feet of the tower site and invited them to come to the 17
community meeting. 18
19
Samantha Cabe: What were the dates? 20
21
Karen Kemerait: I sent the letter out of May 28 and the community meeting was held on June 4 and 22
that is what my office did and in addition to that I know there were requirements that the planning 23
staff is required to do as far as providing the notice. I can only speak to what my office did and those 24
were the notices in the two different newspapers, the certified letters and the community meeting and 25
the letters regarding the community meeting in addition to the site that had been posted. 26
27
Samantha Cabe: I thought I heard you say you did that in April. 28
29
James Carter: Mr. Dixon, in your petition, how many of those people are here tonight? 30
31
Greg Dixon: We signed it here so they are all here. 32
33
Mark Micol: You just decided tonight to ask for the 30 day extension? 34
35
Greg Dixon: I have been speaking with Mr. Harvey as soon as I found out about the public hearing; I 36
literally took a week off work to work on the letter. 37
38
Mark Micol: Have you been in contact with the attorney or has this attorney tried to contact the 39
county? 40
41
Michael Harvey: I have not been in contact with any other counsel in this case except Ms. Kemerait. 42
I have spoken to Mr. Dixon at length on several occasions since notice of the hearing was sent out. 43
44
Greg Dixon: There aren’t any local attorneys I could find with the experience with cell towers so I had 45
to look elsewhere so it just took time. I’m a poor person, he is talking about $400,000 houses, and 46
we live in trailers over there. It is hard for a person on a fixed income, not everybody lives in trailers, 47
there are some homes there but I personally live in a trailer, my income is limited, it is hard to hire an 48
attorney. 49
50
Larry Wright: It is time for the Board to have a discussion on this. I would like to open this up. 51
Samantha? 52
53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 91 of 92
Samantha Cabe: I can’t vote on the continuance but I would say that if the notice has been given in 1
accordance with the law and we have gone this far in the hearing, I would vote against the 2
continuance because the planning staff and the applicant have done everything they are required to 3
do in order to set this hearing for a date in addition to numerous hours of planning and all our time 4
here tonight and all the witnesses time on both sides of the issue. 5
6
Mark Micol: If we had a letter from his attorney requesting a continuance before tonight, I would be 7
more acceptable to a continuance but just to come in tonight after we have heard the testimony and 8
ask for a continuance, it’s not a good reason. 9
10
James Carter: I agree with my colleague. If we would have heard more, I am all supportative of Mr. 11
Dixon’s comments but if we had additional time earlier, I would support giving Mr. Dixon more time. 12
13
David Blankfard: What is Mr. Dixon’s recourse, can his lawyer appeal? 14
15
Michael Harvey: Every decision of the Board of Adjustment is subject to appeal to the Orange 16
County Superior Court. 17
18
David Blankfard: So he does have some recourse. 19
20
Karen Barrows: I am torn but I wanted to ask a procedural question, if we were to grant a 21
continuance for the neighborhood folks to come in with their lawyer to address Karen’s concern how 22
would she or her colleagues get to respond to what is said? 23
24
Michael Harvey: In my mind, the public hearing is adjourned to the date and time certain, Ms. 25
Kemerait and her experts will be coming back and as additional information is presented into the 26
record by Mr. Dixon’s attorney, they will obviously refute it at that point and time and offer additional 27
testimony at the time refuting or outlining why the information is incorrect. 28
29
Mark Micol: What is precedence for doing the continuation? Since I have been on the board, we 30
haven’t done that so is that maybe setting a precedence? 31
32
Michael Harvey: Each case it unique. In my tenure with Orange County, there have been two cases 33
that have been continued either due to latenesee of the hour, the need for additional information or 34
testimony; it is the Board’s prerogative. With all due respect to the both parties that have spoken, the 35
fact that we have gone an hour and half into testimony, in my opinion is irrelevant and that is my 36
opinion. You have a local property owner that has submitted a request, whether you believe the 37
request if valid or not, is your call, that is why you are discussing it. I believe there are practical 38
issues with getting all her experts and the cost that would incur to come back but Mr. Dixon has 39
presented you with a petition. You need to determine the viability and validity of the petition and you 40
need to determine if, based on the concerns that Mr. Dixon has, or anyone else, if continuance would 41
allow there to be entered into the record challenging either documentation. If you determine that you 42
don’t think it is going to happen, that has to weigh on your decision to vote yes or no. 43
44
Samantha Cabe: As a practicing attorney, Mr. Browner may be able to give additional testimony to 45
this. There is a current movement afoot in our legislature to put further restrictions on what decisions 46
can or cannot be made and I do have some concern that postponing this may allow time for 47
legislation that could go through that lessen our control over what is in our decision making power 48
and that may or not come to fruition but it is actually a concern that is out there in the legal 49
community. 50
51
James Carter: Are we looking at this regarding Mr. Dixon’s comments? You would look at the legality 52
aspects; we are going to disregard what she has to say about the petition? 53
Approved 7/8/2013
OC Board of Adjustment – 6/10/2013 Page 92 of 92
1
Samantha Cabe: My comment is directed at the fact that, I don’t know if it would actually affect what 2
is in this special use permit and the applicant would choose to change things that it might be possible 3
to change but it could actually result in the possibility that would be more negative to the surrounding 4
being possible. Don’t know if it would come to fruition or not. There are things happening that would 5
further limit the control of the counties and specifically this board of adjustment. 6
7
Larry Wright: I would like to take a vote. How many board members are in favor of Mr. Dixon’s 8
petition? Raise your hands please. Karen, Larry and James are in favor of the continuance. Mark 9
and David are against the continuance. We declare a continuance of this session and it will continue 10
in the next 30 days. Is it the next 30 days we are scheduled to meet? It would be July 10th? 11
12
Michael Harvey: If you choose to do this it would be at your next regular meeting which would be July 13
8th. Obviously your attorney will speak to you in a minute. 14
15
James Bryan: There was a question about whether a majority of four could vote or a simple majority. 16
A brief review did make it clear that it is a routine matter that would require a simple majority. 17
18
Larry Wright: The continuance carried. 19
20
James Bryan: That would be my advice. 21
22
Larry Wright: I declare this meeting adjourned and be reconvened on Monday, July 8, 2013. Board 23
members are not to discuss this and we will pick up where we left off. 24
25
Samantha Cabe: Time certain is 7:30? 26
27
Larry Wright: Yes. We will bring our documents as we have them and leave the notebooks from the 28
first case. 29
30
31
AGENDA ITEM 9: ADJOURNMENT 32
MOTION made by David Blankfard to adjourn. Seconded by James Carter. 33
VOTE: Unanimous 34
35
The meeting was adjourned at approximately 10:35 p.m. 36
37
38
39
Tina Owen, Minutes Preparer 40
41