Loading...
HomeMy WebLinkAboutAgenda - 11-20-2006-dORANGE COUNTY BOARD OF COMMISSIONERS ORANGE COUNTY PLANNING BOARD PUBLIC HEARING AGENDA ITEM ABSTRACT Meeting Date: November 20, 2006 Action Agenda .Item No. D.1-D. 4 SUBJECT• Non-Public Hearing Informational Items DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No ATTACHMENT(S): None Craig Benedict, Planning Dir, 245-2592 INFORMATION CONTACT: PURPOSE: To receive an update on various Planning Department tasks currently underway. BACKGROUND: Planning Department staff is involved in a number of on-going projects and tasks. Following is a brief. update on four items proposed for presentation at Quarterly Public Hearings during calendar year 2007: 1. Efland-Mebane Small Area Plan (EMSAP) Implementation Focus Group Update The EMSAP Implementation Focus Group has met three (3) times since its appointment by the BOCC in August. The Group .has identified implementation measures to be pursued for each of the recommendations contained in the EMSAP along with the entities and/or groups that should be involved with each measure. The Group has also prioritized-which implementation measures should be pursued first. It is possible that some implementing regulations related to zoning in the EDD could be heard at the February 2007 Quarterly Public Hearing. The Group is meeting on November 30 to review potential zoning text and/or. map changes. 2. Proposed Changes to the Soil Erosion and Sedimentation Control Ordinance The Department of the Environment and Natural Resources (DENR) Land Quality Section conducted a technical audit of the Orange County Sedimentation and Erosion (S&E) Control program in November 2005. The audit results were mailed in September of 2006. The State has requested various revisions to the County's ordinance to match requirements in their model ordinance. Historical Note: The State last requested/suggested changes to Orange County's S&E Ordinance in 1992. i:i:`.C"rnnpr<:ha:nsivr t'Irnmiu; Lic`,Citi(Vi''•?~)pG Pidaic Ide;irin~s~Nc,;~ .^..p QVi1':~rn-1''HH fntorft~at.ion~zl Item;Nnn-C'rSiticitrxrioiram~;A,~.t:K)C~ 2 3. Zoning Ordinance Text Amendments As reported in August 2005, Planning staff has been reviewing the need to modify existing landscaping and signage regulations to eliminate regulatory conflicts within each individual section and attempt to make the regulations more user friendly for County residents. The Churton Street Revitalization Plan (Town of Hillsborough and DCA two- year project) with which the County participated creates a timely basis to bring forth amendments to implement the enhanced signage and landscaping ideas of the plan. Staff is prepared to present amendments to both Article Nine (9) Signs and Article Twelve (12) Landscaping and -Buffer Requirements at the February 2007 Quarterly Public Hearing for review by the County Board of Commissioners and Planning Board. 4. Traffic Impact Requirements Questions have been raised regarding how and when the development review process prompts traffic improvements (i.e. right and left turn lanes, traffic signals, etc.) Current Orange County regulations, Article 13 of the Zoning Ordinance and Section IV-B-3-e of the Subdivision Regulations require a traffic impact study for any Special Use Permit or Site plan generating more than 800 daily trips (approximate number of trips generated by an 80-lot residential subdivision). The current standards for traffic improvements for new subdivisions deal with an analysis of existing traffic conditions and existing traffic capacities, and do not consider the cumulative impact to the transportation system that future development may have on the existing roadways. Proposed ordinance amendments will include standards that capture the cumulative effects of development so that public road improvement requirements for new developments can be employed in a consistent manner at every level of the development review process, and the "first" developments will riot be exempted from contributing to potential future needs. Development of the amended traffic impact threshold criteria will take into consideration the followin g factors: 1. Size, type and location of development 2. Functional classification of road; 3. Capacity of abutting roads to handle traffic; 4. The most recent traffic counts; 5. The volume-to-capacity (v/c) ratio; 6. Connectivity to other undeveloped properties; 7. Right-of-way requirements; 8. Impact Assessments; and 9. Mixed Use development. FINANCIAL IMPACT: No County financial impact at this time with human resources being used from existing departmental staff. RECOMMENDATION(S): Receive as information and provide direction as appropriate. (i;`C`~~mnrehenvi~~. F'lani+ing t?i:~ t',(.:Nl:i`.2+iUti i9ihlu: T(ea~in,~s'hii~•,• 2Q C?I'}1`Nnii-i'1t Tnfu~?~atiunal iw.enrt~tion-Pu!~lic'1'l'eariuE~,ltc:ms:li~~;.(>C~C