Meeting Date: November 20, 2006
Action Agenda
Item No. C.3
SUBJECT: Upper Eno Critical Area Zoning Text Amendments
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) Yes
ATTACHMENT(S):
1. Watershed Options
2. Issues relating to mapping of the
Upper Eno Critical Watershed Area
3. Proposed Zoning text amendments
4. Minutes of the August 2, and
September 6, 2006 Planning Board
meetings
5. Map — Upper Eno Critical Area 2006
INFORMATION CONTACT:
Craig Benedict, 245 2592
Glenn Bowles, 245 2577
Michael Harvey, 245 2607
PURPOSE: To consider making amendments to the Zoning Ordinance text regarding the
Upper Eno Critical Watershed Areas.
BACKGROUND: At their regular meetings of August 2 and September 6, 2006 the Planning
Board discussed issues relating to mapping concerns in the Upper Eno Critical Watershed
Area. This was requested by the Board of Adjustment whom recently reviewed a case
regarding the ambiguity of the watershed text and maps. In addition this issue was to be
forwarded to the BOCC.
Existing Zoning Ordinance text does not correspond to the map of what the BOCC actually
viewed in 1994, when the original watershed regulations were adopted.
The Planning Board recommended that the BOCC consider the text revisions, which more
accurately reflect the Upper Eno Critical Watershed Area maps adopted in 1994 and also to
eventually use the best available technology to change the maps when.upd a*ting the mapped
watershed boundaries. Due to other ongoing comprehensive planning land use research,
watershed boundary mapping is not proposed to be considered at this time.
Options 1, 2, and 3 were discussed with the Planning Board.
FINANCIAL IMPACT: There is no direct economic impact. Staff time has been accounted for
in the departmental budget.
RECOMMENDATION: The Administration recommends that the proposed text
amendments (Option 2) be referred to the Planning Board for a recommendation to be
returned to the County Board of Commissioners no sooner than February 6, 2007.
Planning T)W%GENE.--2000 Public 70 QPTI'Vipper Eno Too:
2
ca O ()
C-
0-0 C
_ N o
0) 0 :3 0 0 ca ti es
a� ?_ z z
a)
o
Iz C) Q-
Z u cCL
CD
C '
U z z �-
a)
ca
O 0) v =3 \ ca \ ca
CL j 4p z
J + N
® z� �z }z
to (U
L
CY
U z
>)
x
a)
H
a) o 0
0 ca t� M Co
C: co >, 7>
.c y,U U) C �
z -� C —)
a) a) vi C
a� U) I a) a) U)
ca ca Y a) ca E A ca E
L U L ` x
C UOS 'o 'o
O I Co m i o° i
N U M '�
L _ CL U O p 0 V
C/) •�0- N 7+ �
N CL CL C 0 rL
00 L- 00C O��
a
Watershed Critical Area Mapping Options 3
11/14/2006
Issues Relating to Mapping of the Upper Eno Critical Watershed Areas
The original 1994 zoning and watershed maps did not illustrate the associated zoning
text, which is typically the operative aspect of regulations. The maps do not reflect the
text for the following reasons:
1. Topographic mapping had less elevation refinement leading to more spatial
variation when trying to determine distances from existing or future watershed
impoundment sites and the associated normal pool elevation (NPE). For example,
the Lake Orange NPE is 615', but the Orange County topographic information, at
that time, only displayed the 610' and 620' topographic contours. We now have
five-foot topographic data available and can better interpolate the map buffer.
2. Some proposed impoundments, such as the West Fork of the Eno River did not
have a determined NPE, so a map approximation was made. We now know the
proposed Phase 2 NPE is 634'.
3. Some impoundments half -mile buffers were shown on the map but the NPE that
established the area buffered was not described or unnamed in the zoning text.
For example, the proposed Eno River Impoundment above McGowan Creek was
map buffered but not named in the text. We can more accurately establish an
area buffer along the Eno River above Corporation Lake to protect the proposed
Eno River above McGowan Creek Reservoir at the 580' NPE.
4. Originally, the Lake Orange NPE was 614', but an additional one -foot of
freeboard was added. The official NPE is now 615'.
5. Lake Ben Johnson is not presently listed in the zoning text. We can map the
impoundment with its 515 " NPE accurately.
6. The original base maps are hand drawn on County cadastral maps. The map's
accuracy is not always reliable. The 1984 West Orange Study and 1987 Water
Supply Study base maps were hand -drawn on these cadastral maps. While as
accurate as possible at the time, the small -scale maps, which resulted, are not
accurate for large -scale property maps that developers use for platting. We have
digitized these maps and can refine the watershed boundary lines with state -of-
the -art watershed mapping provided by the State of North Carolina.
G:''(Compreherlsit" i'huuifng l')i `,Ci1.aT'2(Y)6 i'ut lir Ifearings'.\,;, '!0 Q111 H iPjxrfiflo 1'f:xi Anuiis'.hf ,kppintg Ofn:i,�a Cnmparisons.d,;t:
Watershed Critical Area Mapping Options
11/14/2006
Options
#1 Leave text and map
1. Zoning Ordinance text reflects previous policies and
alone.
I studies.
2. All reservoirs, existing and proposed, are approximately
described.
3. Case-by-case interpretive review.
4. No notifications required.
5. May require an interpretive position paper to clarify the
text.
6. Property owners and developers are familiar with present
regulations.
Text Aspects
Map Aspects
#2 Modifications to
1. Mailing out notifications to
1. No need to do
Zoning Ordinance text
every affected property owner
anything.
to, as closely as
is not a county requirement.
2. Accept a level of
possible, describe the
2. Legal notice in newspapers is
inaccurate mapping.
1994 watershed maps,
sufficient for text change.
3. Landowners and
as adopted.
3. Zoning text may be a better
developers are
reflection of the map BOCC
familiar with present
saw in 1994 with the
regulations.
assumption that the map was
the intent and not the text.
4. List normal pool elevations for
all existing and proposed
reservoirs.
5. Digitize old maps.
#3a Refine Zoning
1. More watershed protection
Ordinance text to
provided. Greater level
provide clarity. and
(number of acres and
properties) of watershed
protection.
2. Properties deleted from and
added to watershed
regulations.
3. Notifications must be mailed
for Zoning Map amendments.
#3b Amend Zoning
Map and Watershed
Regulations can take
Map by using the best
M
advantage of best available
available technology
technology to define
watersheds.
5. Gaps where zoning and
watershed lines should be the
same can be addressed.
G:%( ol7lpl-ojwl1qi%v Pill) I ic I Q V I+ I rexi �iwlis* mn pping Option Comparmii".doc
Watershed Critical Area Mapping Options 5
11/14/2006
Assumptions for 1. The 1984 West Orange Study citing groundwater
Options 1,2. "interflow" is not being considered
2. 1987 Water Supply Study for proposed impoundments of
the Eno River above McGowan Creek and Seven Mile
Creek is the basis for the critical area and watershed
delineations.
3. The BOCC wanted to buffer the river channel above the
Eno River above McGowan Creek Reservoir and the area
between Seven Mile Creek Dam and Lake Ben Johnston,
which was not listed in the Zoning Ordinance text.
4. The `stream order' system of stream classification is not
considered is not considered to capture higher order
streams flowing into existing or proposed impoundments
or public water supply intakes.
UT o;nprebewiM Planuhip, Pi "G.I.'s \i';`.2iH;G Public t tearhg,, N,,V 20 QPI P.i ;tiler F no Text Anufuc' :tylapping Option C, ±mpari,ons.dra:
Proposed Zoning Text Amendments
Zoning Definitions — Existing:
0
Critical Area - The land area within one -half mile of the normal pool of an existing or
proposed water supply impoundment, or the ridgeline of the watershed, whichever is less.
Water Supply Watershed (or Protected Watershed) Land that drains to existing
reservoirs which are public water supplies or potential reservoir sites or stream intakes
which have been designated for protection. All such lands have been classified by the
Environmental Management Commission as WS -II, WS -III or. WS -1V watersheds and
require protection in accordance with the State Mandate.
Proposed New Definitions:
Critical Area: The Land area within en half mile of the ..,., a p^^' an identified
Water Supply Watershed or a Protected Watershed that is within a specified distance, as
referenced within this Ordinance frorn the normal pool elevation of an existing or
proposed water supply inipoundffl.eRt, or the ridgeline
area reservoir, or reservoir intake area.
Watersupply Watershed or Protected Watershed: Lands that draining to existing, or
potential, reservoirs, which are public water supplies or potential propos ed reservoir sites
or stream intakes, which Orange County has nave '-men designated for protection. All
such lands have been classified by the. Environmental Management Commission of the
State of North Carolina as WS -II, WS -III or WS -IV watersheds and require protection in
accordance with the State Mandate.
Contributing Watershed The catchment area for all precipitation flowing overland to a
defined point i.e., a reservoir dam.
Proposed Zoning Text Amendments
Section 4.2.27 Watershed Protection Overlay Districts — Intent — Existing:
DISTRICT
GENERAL LOCATION
UNIV -CA University Lake Critical Area
One -half mile from the normal pool of University
Overlay District
Lake, or to the ridgeline of the watershed,
whichever is less.
UNIV -PW
University Lake Protected
The portion of the drainage basin of University
Watershed Overlay District
Lake not covered by UNIV -CA.
CANE -CA
Cane Creek Critical Area
One -half mile from the normal pool of Cane Creek
Overlay District
Reservoir, or to the ridgeline of the watershed,
whichever is less.
CANE -PW
Cane Creek Protected
The portion of the drainage basin of Cane Creek
Watershed Overlay District
Reservoir not covered by CANE -CA.
U- ENO -CA
Upper Eno Critical Area
One -half mile from the normal pool of Lake
Overlay District
Orange, Corporation Lake, and potential reservoir
sites on the West Fork of the Upper Eno and Seven
Mile Creek, or to the ridgeline of the watershed,
whichever is less.
U- ENO -PW
Upper Eno Protected
The portion of the existing or potential drainage
Watershed Overlay
basins of Lake Orange, Corporation Lake, West
Fork of the Upper Eno and Seven -Mile Creek not
covered by U- ENO -CA.
L- ENO -PW
Lower Eno Protected
The Orange County portion of the Eno River
Watershed Overlay District
Watershed within ten miles of the City of Durham
Emergency Water Intake east of US 501 (Roxboro
Road).
LITTLE -PW
Little River Protected
The portion of drainage basin of the Little River
Watershed Overlay District
Reservoir which is located in Orange County.
BACK -PW
Back Creek Protected
The portion of the drainage basin of Back Creek
Watershed Overlay District
which is located in Orange County.
HYCO -PW
South Hyco Creek Protected
The portion of the drainage basin of South Hyco
Watershed Overlay District
Creek which is located in Orange County.
FLAT -PW
Flat River Protected
The portion of the drainage basin of the Flat River
Watershed Overlay District
which is located in Orange County.
HAW -PW
Haw River Protected
The portion of the drainage basin for the Haw River
Watershed Overlay District
which is located in Orange County.
JORDAN -PW
Jordan Lake Protected
The Orange County portion of the Jordan Lake
Watershed Overlay District
Watershed which extends five miles from the
normal pool elevation of the impoundment.
Proposed Zoning Text Amendments
Section 4.2.27 Watershed Protection Overlay Districts — Intent — Proposed:
DISTRICT
GENERAL LOCATION
T TT�T_ N CA
T T Take C+it; a 1- u�u
One half frem the ei:mal of Univ
Vy
-- - sity e
n< ,.1., . Dist ic4
mile pool
Lake, - +1, e water-shed,
to fidgeline of
whiehevef is less.
Protected
Areas:
UNIV -PW
University Lake Protected
Watershed Overlay District'
The portion of the drainage basin of University
Lake not covered by UNIV -CA.
r� nn l
Cane C 1 r 'ti 1 AT
Over-lay Dist aet
n 1, 1 f from the 1„„ i of
mi4e
C 1 n • to the idgeline „f +t
-
+ 1 .1 '4,' b less.
CANE -PW
Cane Creek Protected
Watershed Overlay District
The portion of the drainage basin of Cane Creek
Reservoir not covered by CANE -CA.
U- ENO -PW
Upper Eno Protected
Watershed Overlay .
The portion of the drainage basin of the Upper
d
84
Eno and Seven Mile Creek Reservoir not cover
by U- ENO -CA.
the dr-ainag(
The 13 offien of existiag or- -potential
b-asin-s- Lake Orange, CeEper-ation Lake, We
of
Fedc- Upper- Eno Seven Mile C-f
of the an4
eevered by TT laNO CA-.
L- ENO -PW
Lower Eno Protected
Watershed Overlay District
The Orange County portion of the Eno River
Watershed within ten miles of the City of Durham
Emergency Water Intake east of US 501
(Roxboro Road).
Critical Areas:
CANE -CA
Cane Creek Critical Area
One half %z mile radial from the normal
)ol.
Overlay District
elevation of existing, ado ted or poten
ial
impoundment areas or the contributing watersl..ed
divide which ever is greater.
UNIV -CA
University Lake Critical Area
One half %z mile radial from the normal
of
Overlay District
elevation of existing adopted, or potential
iiWoundinent areas or the contributing
watershed divide which ever is greater.
Proposed Zoning Text Amendments
0
DISTRICT
GENERAL LOCATION
U- ENO -CA
Upper Eno Critical Area
One -half mile form the normal pool of Lake
Overlay District
Orange (Elevation 615' NPE), Lake Ben Johnson
(Elevation 515' NPE), Corporation Lake
(Elevation 538' NPE), and potential
sites on the West Fork of on the U Eno
(Elevation 640' NPE) and proposed reservoir sites
on Seven Mile Creek (Elevation 581' NPE) and
Eno River above McGowan Creek (Elevation
585' NPE), or to the ridgeline of the contributing
watershed, whichever is less.
LITTLE -PW
Little River Protected
The portion of drainage basin of the Little River
Watershed Overlay District
Reservoir w- is located in Orange County.
BACK -PW
Back Creek Protected
The portion of the drainage basin of Back Creek
Watershed Overlay District
is located in Orange County.
HYCO -PW
South Hyco Creek Protected
The portion of the drainage basin of South Hyco
Watershed Overlay District
Creek ,.phis located in Orange County.
FLAT -PW
Flat River Protected
The portion of the drainage basin of the Flat River
Watershed Overlay District
vgrieh is located in Orange County.
HAW -PW
Haw River Protected
The the dr-ainage basin for the 14aw
per-tion of
Watershed Overlay District
"' . „' :eh is leea._a in `:`range Count-,,. The
Orange County portion of the Haw River
Watershed within ten miles of the Town of
Pittsboro's Water Intake site.
JORDAN -PW
Jordan Lake Protected
Watershed Overlay District
The Orange County portion of the Jordan Lake
Watershed whieh extending five miles from the
normal pool elevation of the impoundment.
10
MINUTES
ORANGE COUNTY PLANNING BOARD
AUGUST 2, 2006
REGULAR MEETING
MEMBERS PRESENT: Jay Bryan, Chapel Hill Representative (Chair); Brian Crawford; Eno
Township At- Large; Brian Dobyns, Cheeks Representative; Craufurd Goodwin, Hillsborough
Representative; Michelle Kempinski, Cedar Grove Township At- Large; Joel Knight, Little River
Representative; Sam Lasris, Cedar Grove Township At- Large; Bernadette Pelissier; Bingham
Township; Renee Price- Saunders, Hillsborough Township At -Large (Vice Chair); Sandra
Johnson Quinn, Eno Township
MEMBERS ABSENT: Jeffrey Schmitt, Cedar Grove Township At- Large; Judith Wegner,
Bingham Township At -Large
STAFF PRESENT: Craig Benedict, Planning Director; Tom Altieri, Comprehensive Planning
Supervisor; Robert Davis, Current Planning Supervisor; Sherri Ingersoll, Administrative
Assistant R
ADDITIONAL INFORMATIONAL ITEMS: Recent Board of Adjustment Ruling on
Watersheds
Craig Benedict: The Board of Adjustment recently had a ruling about the size and shape
of the watersheds in the County, and a developer challenged the Staff determination of
the location of the boundary. The Board of Adjustment affirmed Staff's position on the
way the Zoning Ordinance reads, and also that they would like to see a re -look at the
watershed shapes and the text by the Planning Board and Commissioners to either change
the maps or to make the text stronger. I just wanted to let you know that this is
happening. The text is not as specific as it could be, and different people can interpret it
differently, as happens with various sections of the Code. Next month, I'll bring more of
a formal presentation to you about the issue of %Z mile from the normal flood pool of
existing or proposed reservoirs, and using the new technology available to conform the
language and maps. Better information is constantly available.
Jay Bryan: Was this a result of a court decision?
Craig Benedict: This was a challenge through our Board of Adjustment of the Zoning
Officer's determination.
Jay Bryan: Did the Board of Adjustment rule on the challenge?
Craig Benedict: Yes, they affirmed that Staff had made the right determination. The
developer can still take it to court.
Jay Bryan: Was there any thought given to sharing this issue with Geof Gledhill?
Craig Benedict: He was at the meeting and suggested that the language be revised to
reflect the intent. My determination was based on the text, which is typically better than
11
a map. We've learned some things even since that meeting, which I'll also update you
on.
Michelle Kempinski: Was this a critical watershed?
Craig Benedict: Yes, it's the boundary of the critical watershed, and is part of Seven -
Mile Creek. Based on the Efland - Mebane Task Force report, there's question that, in the
future, if it is taken off the proposed watershed impoundment list, than that critical
watershed area will change dramatically. The new language will need to keep that in
mind, that with proposed watershed impoundments and if the area is no longer in the
watershed, you need something very sanctioned by the Board to change the maps. The
critical area lines can move several hundred feet just by using better technology.
DRAFT 12
1 MINUTES
2 ORANGE COUNTY PLANNING BOARD
3 SEPTEMBER 6, 2006
4 REGULAR MEETING
5
6 MEMBERS PRESENT: Jay Bryan, Chapel Hill Representative (Chair); Brian Dobyns, Cheeks
7 Township Representative; Craufurd Goodwin, Hillsborough Representative; Michelle
8 Kempinski, Cedar Grove Township At- Large; Joel Knight, Little River Representative;
9 Bernadette Pelissier, Bingham Representative; Sandra Quinn, Eno Representative; Renee Price -
10 Saunders, Hillsborough Representative (Vice- Chair); Jeff Schmitt, Cedar Grove Township At-
11 Large; Judith Wegner, Bingham Township At -Large
12
13 MEMBERS ABSENT: Brian Crawford, Eno Township At- Large; Sam Lasris, Cedar Grove
14 Township At -Large
15
16 OTHERS PRESENT: Craig Benedict, Planning Director; Robert Davis, Current Planning
17 Supervisor; Tom Altieri, Comprehensive Planning Supervisor; Glenn Bowles, Planner 11;
18 Jennifer Leaf, Planner I; Sherri Ingersoll, Administrative Assistant II; Brian Carson, GIS
19 Technician; Allan Rosen, citizen; Rick Perry, builder /developer
20
21 AGENDA ITEM #11 -WATERSHED BOUNDARY DISCUSSION
22
23 Craig Benedict: This issue may have to spin off into a special subcommittee. This item is based
24 on a recommendation that the Board of Adjustment made about a month ago where there was a
25 challenge of the boundary line of the Critical Area of the Upper Eno Watershed versus the
26 Protected Area. Staff ruled one way and the applicant disagreed. The BOA agreed with the
27 Staff determination, and recommended that the Planning Board and the BOCC understand the
28 issue.
29 (PowerPoint presentation)
30
31 Presently, our Zoning Ordinance section 4.2.27 describes the Upper Eno Critical Area as `%2 mile
32 from the normal pool of Lake Orange, Corporation Lake and potential reservoir sites in the West
33 Fork of the Upper Eno and Seven Mile Creek or the ridgeline of the watershed, whichever is
34 less.' We also have a map that was created in 1994, which attempted to take this text and put it
35 on a map. Since 1994, the map.and the text describe two different things. For example, Lake
36 Ben Johnston is not listed, but yet we have it buffered. The Upper Eno impoundment above
37 McGowan Creek is on the map, but not described. Which should we go by? It was
38 recommended by Staff and the County Attorney that even though there is interpretation ability
39 possible by the Zoning Officer to try to reconcile differences, that it's better to clarify the text to
40 conform to the map. Otherwise, if we change the map to a large degree, there's a large
41 notification problem.
42
43 The issue really goes back to 1984. In 1984 when they did the West Orange Reservoir Study,
44 they mentioned interflow, which is different. It will be easier to modify the text, because we
45 don't need to notify residents. Then, if there's interest, the map may need to be changed to
12
FIT., .
V W-
13
46 properly reflect the 1994 data and use the technology we have in 2006 to define what %2 mile is.
47 The technology has changed a lot in the last few years.
48
49 In 1994 we did not have the geographical information, so we used the tax maps, which were not
50 to scale. Some watershed lines were put on the maps, based on staff's estimation of the location,
51 and many of the lines were changed over time using pencil or white out. In 1999 when I came, I
52 said `we can do better than this. We have the technology available.' Since 1999 we've attempted
53 to get better GIS maps and properly apply the text. For example, the West Fork Reservoir is
54 actually larger than was originally assumed on the 1994 map. Also, there was a 1987 Water
55 Supply Study that was adopted which reflected the Seven -Mile Creek and Eno River around the
56 impoundment area that I didn't even know about. We believe that the 1994 map reflected this
57 area, rather than the current impoundment. Several approximations were used, that influence the
58 potential flooding area.
59
60 Jeff Schmitt: The developers were using the text language for their subdivision applications,
61 which stated 1/2 mile or the ridgeline. This issue came to the Board of Adjustment because of the
62 maps that the developers had understood had been approved by the BOCC.
63
64 Craig Benedict: What we think was shown to the BOCC in 1994 was a hand drawn scale of the
65 entire County, not just this area. Then, that map's scale was transposed onto these maps, and this
66 has acted as the official Zoning Atlas since 1994. We were trying to update these maps, and
67 found irregularities. As Jeff mentioned, the interpretation of 1/2 mile from the normal pool or the
68 ridgeline of the watershed was the issue. My interpretation was that the ridgeline means the
69 ridgeline of watersheds (a grey line) on approved zoning watershed maps. There also is a sub -
70 basin ridgeline that isn't in the zoning text, which is different. The applicant's interpretation was
71 that the Critical Area should not go %2 mile from the grey line; it should be pulled back to the
72 sub -basin ridgeline. I saw no operative language in our zoning code that talked about pulling
73 back to the sub -basin ridgeline.
74
75 Crauf ird Goodwin: Which were the reservoirs that you knew existed?
76
77 Craig Benedict: The Eno River above McGowan Creek. That was approved, and was indicated
78 in the book that when Site B was selected, that this site should also be buffered. In 2003 when
79 we tried to reflect that definition, we looked at the Eno River going up to the two reservoirs, and
80 buffered %2 mile from the river. So, in that case, the 1994 map was larger than the 2003 map.
81
82 Brian Dobyns: Is the Critical Area definition Orange County's? It's different than the State
83 Critical Area definition.
84
85 Craig Benedict: That's correct. In the 1994 reproduced map, the State definitions of Critical
86 Areas only include %2 mile from the intake of Lake Ben Johnston and V2 mile from the intake of,
87 Corporation Lake.
88
89 Brian Dobyns: It also includes %2 mile from the normal pool of elevation of the reservoirs, but
90 excludes land that does not drain into those impoundments.
91
13
DRAFT 14
92 Craig Benedict: Yes, it is just based on those intake points. Both the West Pork and Lake
93 Orange are not considered as intake points from State definition, it's only where they pull water
94 out of the impoundment. So, only Lake Ben Johnston and Corporation Lake are included in the
95 State definition. Our definition is much more inclusive than the State definition.
96
97 Jay Bryan: Since it's getting late, could you please summarize what the Planning Board is being
98 asked to do. We're convinced that there is a problem.
99
100 Craig Benedict: So, looking at the two maps overlaid, the question for the Board is, would you
101 prefer to change the definition of the text to reflect the 1994 mapped version, or suggest a map
102 change to reflect the assumptions, using the sub -basin ridgelines as the operative definition.
103
104 Jeff Schmitt: Regardless of which way we go, the definitions between the text and the map need
105 to be consistent, and what is made available to the public and potential developers needs to be
106 the same thing.
107
108 Brian Dobyns: I agree. I have some GIS Critical Area data that's different from either of your
109 maps. They need to be consistent.
110
111 Craig Benedict: The different interpretations are a big problem for Staff. There's hundreds of
112 acres difference between the definitions. It expands and contracts in many areas.
113
114 Michelle Kempinski: So, for clarification, the red line shows 1994 assumptions. The yellow
115 area represents what is in the text.
116
117 Craig Benedict: Yes, that's the digitized version of the 1994 map. The yellow line reflects both
118 text and better topographic data explaining the normal pool definitions.
119
120 Jeff Schmitt: I'm not sure that text could make the distinction of the sub -basin ridgeline.
121
122 Renee Price- Saunders: But the text also does not mention Lake Ben Johnston.
123
124 Craig Benedict: Yes.
125
126 Jeff Schmitt: Is that within the purview of the County?
127
128 Craig Benedict: Yes, we are buffering it.
129.
130 Michelle Kempinski: So, those water impoundments need to be added to the text so that it
131 actually reflects the actual number of impoundments we have.
132
133 Jay Bryan: Well, one way to do is would be to update the GIS map using the up -to -date
134 technology and then change the language to reflect those changes. There are lots of
135 consequences to doing that. If you do that type of analysis, then that could lead to some map
136 changes. It's a level of clarity that's based on data.
137
14
DRAFT 15
138 Jeff Schmitt: If I were doing this, I would suggest % mile or the ridgeline if farther than %a mile
139 from where it drains into it. I would make it more onerous than the way it's been interpreted
140 here. What has to happen if either the map or language is changed?
141
142 Craig Benedict: If you change the zoning text and leave the map the same, you would have to
143 have a Public Hearing to change the text. You would not have to notify the residents besides a
144 newspaper advertisement. If you do a map change, then you have to notify individuals, which
145 would be extensive since there are 34 miles of boundary just around this one watershed. This
146 problem exists in other watersheds too.
147
148 Michelle Kempinski: Shouldn't the map be a reflection of the text?
149
150 Craig Benedict: That was my determination. I went by the text. For the next meeting, I can
151 make a report on the implications and choices for changing the text, or if the map should be
152 changed. Changing watershed lines was a challenge in 1994, and we're uncertain if they (the
153 BOCC) are willing to address that again.
154
155 Judith Wegner: How do the other counties do their interpretation? Do they use historical maps
156 that may be inaccurate or the new maps that are available?
157
158 Robert Davis: Many used the centerline roads near ridgelines and the State definitions, rather
159 than ridgelines so they do not have this issue..
160
161 Craufurd Goodwin: Regarding the owners in the Seven -Mile Creek area; if it's rejected, why are
162 we being buffered?
163
164 Craig Benedict: This came up in the Efland -Mebane Small Area Plan Task Force.
165
166 Craufurd Goodwin: The land valuations will change with any map changes.
167
168 Brian .Dobyns: Where the boundaries are must be accurate. Will we be asked to clarify the
169 definition?
170
171 Craig Benedict: It could be wrapped into a work product by this Board.
172
173
174
175
176
15
0
0
4
Eno River above
McGowan Ceek(Sit. B)
586 NPE (actual)
Corporation Lake
, 535'NPE
(538' actual NPE)
Seven Mile Creek (proposed)'
580' NPE
(581' actual proposed NPE)
WE
I
� -- Y-- 16
Upper Eno/
Critical Area
------ 2006 fN
Le /en�
jf 1/2 mile buffer West Fork
@ 640' NPE (643' actual)
1/2 mile buffer of Lake Orange
2 @ 615' NPE (actual)
i/2 mile buffer of Eno River
between West Fork dam
and 'Eno River above McGowan
Creek'
1/2 mile buffer of proposed
ij Lake Orange 'Eno River above McGowan Creek'
6151 NPE @ 585' NPE (actual)
(actual) 1/2 mile buffer of Corporation Lake
minus ridgeline area at the dam
(State DEM)
1/2 mile buffer of Lake Ben Johnston
and stream below Corporation Lake
intake point to Lake Ben Johnston
(State DEM)
1/2 mile buffer of stream
0 between Lake Ben Johnston
and Seven Mile Creek (prop)
F-107 1/2 mile buffer or proposed
Seven Mile Creek @ 580'
1/2 mile buffer of Rocky Run
Fill stream for t * he last 6011 feet
before entering Lake Ben Johnston
1994 Adopted Upper Eno Critical Area
�f
Water supply watershed
Hillsborough ETJ; City Limits
Streams
r.) (54'r Streams between Impoundments
— Rocky Run - 6011'
Existing Impoundments
S1 Proposed imundments
--7N� 7-8 177=17-1Z1V1-11Vpo1,4,
WMVF
Lake Ben Johnston
515' NPE
SW.
r.