HomeMy WebLinkAboutAgenda - 09-12-2006-9aORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 12, 2006 Action Agenda Item No. ~••q SUBJECT: County-Funded Sustainable Design Elements for Community College Campus Building DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No Services & Planning Department ATTACHMENT (S): August 22, 2006 Abstract MLB Cost Quote for Parking Lot Alternates INFORMATION CONTACT: Pam Janes, (919) 245-2652 Craiq Benedict, (919) 245-2590 Karen Lincoln, (919) 245-2594 PURPOSE: To consider authorizing the expenditure of funds for sustainable design elements for the Durham Technical Community College (DTCC), Satellite Campus Building One, BACKGROUND: At the August 22, 2006 Commissioners meeting, the Board received information regarding the bid amounts and life cycle cost payback of sustainable design elements that have been bid far the DTCC campus building, Additional information regarding the affordability of these elements was included in the information discussed during the August 31, 2006 worksession, DTCC has already signed contracts with MLB Construction Company, the low bidder for the project, However, the specifications required that the contractor hold pricing for the alternates for 90-days past the .tune 29 bid opening in order far the Commissioners to determine which elements should be funded and subsequently be incorporated into the construction contract. As a reminder, the sustainable design elements, with the bid amount and associated life cycle cast payback are as follows: Alternate Sustainable Design Life-Cycle Cost Bid Amount Element Pa back Alternate Aluminum Light Shelves Over 40 years $124,000 #2 Alternate Photovoltaic Array Over 40 years $ 16,800 #3 Alternate Domestic Water Solar Over 50 years $ 35,600 ', #4 S stem Alternate Rainwater Collection System Over 100 Years $195,000 #5 Alternate Waterless Urinals Less than 5 years $ 700 #6 Alternate Operable Windows Not calculated $ 36,800 #7 Total Bid Cost: Sustainable Desi n Elements $408,900 Life Cycle Cost (LCC) calculations are based on current rates and capacity of utilities. As supplies diminish, it is assumed that market adjustments will be made accordingly. The degree of modification will certainly effect the payback period, Park and Ride Lot Construction A 125-vehicle paved park-and-ride lot was bid at $341,000 as Alternate #8, A CMAQ grant will partially fund the construction cost. At the Board's request, MLB Construction Services, the low bidder for the project, has provided cost information as follows for, • A 125-vehicle gravel lot ($320,830); • A 75-vehicle, paved lot ($253,650); • A 75-vehicle, gravel lot ($225,000) Staff will comment during the presentation of this item about possible future expansion of parking should additional funding become available, FINANCIAL IMPACT: County and DTCC staffs have explored the amount of funding that may be available through the grant program available to Community College campuses statewide far construction projects. DTCC stands ready to submit grant funding for approximately $375,000, $204,450 of which supports 50% of the amount of funding for the sustainable design elements and $170,500 of which represents 50% of the cost of the parking lot development. The parking lot will be needed by DTCC as overflow parking for their evening classes. The grant program requires a 50% match, therefore Orange County would be responsible for providing the additional approximately $375,000, Based on the County's projected debt capacity over the next four-to-five years, as presented during the August 31, 2006 work session, this amount could be accommodated through the issuance of additional debt, Although application does not guarantee success, DTCC reports that the projects ranks well within the criteria set for grant funding. Information on the outcome of the funding request will not be received until after the bid expiration date, RECOMMENDATION (S): The Manager recommends that the Board cite the sustainable design elements that it wishes to be included in the DTCC project; and authorize staff to notify DTCC of the contract amendment details. ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: (August 22, 2006 ~,/ Action Agent~a Item No. `-~ b SUBJECT: County-Funded Sustainable Design Elements for Community College Campus DEPARTMENT: Purchasing and Central Services & Planning Department PUBLIC HEARING: (YIN) No ATTACHMENT (S): CRZ Letter INFORMATION CONTACT: Pam Janes, (919) 245-2652 Craig Benedict, (919) 245-2590 Karen Lincoln, (919) 245-2594 PURPOSE: To consider authorizing the expenditure of funds for sustainable design elements in the Durham Technical Community College (DTCC), Satellite Campus Building One, BACKGROUND: In November 2005, the Board was presented with a list of sustainable design elements that could be included in the first building under design for the DTCC Satellite Campus in Orange County. Based on bids for the project received on June 29, 2006, Corley Redfoot Zack (CRZ), the project architect, has provided life cycle cost information on the attached letter and summarized below: Alternate Sustainable Desi n Element Life-C cle Cost Pa back Alternate #2 Aluminum Li ht Shelves Over 40 ears Alternate #3 Photovoltaic Arra Over 40 ears Alternate #4 Domestic Water Solar S stem Over 50 ears Alternate #5 Rainwater Collection S stem Over 100 Years Alternate #6 Waterless Urinals Less than 5 ears Alternate #7 O erable Windows Not calculated Alternate #8 125-Vehicle Park and Ride Lot * Life Cycle Cost (LCC) calculations are based on current rates and capacity of utilities. As supplies diminish, it is assumed that market adjustments will be made accordingly, The degree of modification will certainly effect the payback period. DTCC has already signed contracts with MLB Construction Company, the low bidder for the project. The specifications required that the contractor hold pricing for the alternates for 90- days past the June 29 bid opening in order for the Commissioners to determine the extent of additional funding for the sustainable elements. The Alternates funded by the Board will be incorporated into the Construction Contract with the DTCC as an amendment to the Contract. FINANCIAL IMPACT: During long-range capital plan and future debt discussions this past spring, staff identified the DTCC satellite campus green building initiatives, along with several other County and school related projects, as either un- or under funded Board priorities. At that time, Commissioners directed staff to report to the Board at its August 31, 2006 work session regarding the affordability of all of these projects. Should the Board wish to fund one or more of the alternates outlined in the chart above, staff will incorporate the corresponding cost into information being prepared for the August 31, 2006 work session. The chart below compares the original architect's cost estimates with the actual bid amounts. (:mm~arison of Sustainable Feature Costs Sustainable Feature Architect Estimate Actual Bid Alternate #2 -Aluminum Light $42,500 $124,000 Shelves Alternate #3 -Photovoltaic Array $30,000 $16,800 Alternate #4 -Domestic Water $30,000 $35,600 Solar S stem Alternate #5 -Rainwater $120,000 $195,000 Collection System Alternate #6 -Waterless Urinals none given $700 Alternate #7 -Operable Windows none given $36,800 Alternate #8 - 125 Vehicle Park & $341,000 Ride Lot ~~~ _ __ __ Total 222, 0 $ 50 $749,900 ~'~ This bid reflects the total cost of a 125-vehicle Park & Ride Lot and does not reflect offsetting grant funds ($111,261) or currently available County pay-as-you-go funds ($50,000) Park and Ride Lot The lowest bid received for the 125-vehicle park and ride lot totaled $341,000. The proposed lot would serve as off-site parking for the County's downtown campus and would be served by a County operated shuttle service. The County has approximately $161,000 in available funding to offset the total cost of the park and ride lot. The chart below identifies those currently available revenues for construction of the park and ride lot: Available Funding for Construction of a 125-Vehicle Park and Ride Lot Located at DTCC Satellite Campus NCDOT CMAQ Capital Grant $11 t,26t County Match for CMAQ Grant "~ $50,000 Total Available Funding $161,261 ~'~ Funding for fiscal year 2006-07 as included in the Manager's Recommended 2006-16 Capital Investment Plan The purpose of the NCDOT Congestion Mitigation and Air Quality (CMAQ) capital grant funds, outlined above, is to offset construction costs associated with the park and ride lot as well as to install two transit shelters (one at the lot and one in downtown Hillsborough). The shortfall between currently available funding and actual bids is about $180,000 ($341,000 bid for park and ride lot construction less $161,261 available revenue), A major contributing factor for the difference in projected costs and actual costs lies in the fact that material costs have increased significantly over the last year to eighteen months -for example, the cost of asphalt used in paving has increased about 80 percent over the last year, Some options for closing the gap between bid costs and available funding include building a smaller park and ride lot of 75 spaces or constructing a gravel lot. It is important to note that once the lot is completed, the County would need to purchase buses and annually fund the costs of operating the shuttle service between the satellite campus and downtown Hillsborough, The future cost impact of the new service will depend greatly on the number of trips needed to accommodate riders, Staff is analyzing the full cost of the service, To that end, NCDOT and the Federal Highway Administration have agreed to provide an additional $297,000 over athree-year period to offset the annual operational costs that are anticipated to come as the shuttle begins service from the new lot. The County has been informed by Durham Tech President Phail Wynn that additional funding may become available far some of the sustainable design elements. A grant program has been established by the State to allocate additional funds to Community Colleges for construction projects. Dr. Wynn is a member of the evaluation team that will make the allocations, Further, due to the favorable bids received for the project, Dr, Wynn indicates that additional funding may be available within the existing project budget to offset the cost of some of the sustainable elements. However, while some additional funds appear probable, it is premature to cite the specific amount. Staff recommends that the Board cite the preferred sustainable design elements at the pricing stated. The corresponding costs will be included in the affordability assessment that will be part of the August 31, 2006 work session, along with any additional information available by that time regarding the specific amount of additional funds that may be at the County's disposal for this project. The contract for construction of the sustainable design elements must be finalized by mid-September in order for the contractor to hold the current pricing. RECOMMENDATION(S): The Manager recommends that the Board cite the sustainable design elements that it wishes to be included in the DTCC project, subject to affordability as determined during the August 31, 2006 work session; and authorize staff to notify DTCC of the contract amendment details following the August 31, 2006 work session. ~ CORLEY IZEDFOOT SACK L\t A hi. H 17ECTS • E k G l NF F.R 5• Pt A \~^<ERS August ii, 2006 Ms. Pamela K. Jones, Director Pwchasing & Cenh°al 5ervices Orange County GLENN D. CORLE1,aA PO BOY SLSI i rrsi~ieuf. CCO Hillsborough, NC 27278 Kr:NNEiH E. REUFOOT, AtA l'in• Prt>idcn; mARx zACR, alA RF_: Orange County Off-Campus Center Classroom Buikiinl; vice Prcaldn:: Durham Tedmiail Community Celllege nun{AEU. rlrn,n,Ensu;r,rE \Naterstone Development, Hillsborough, NC Priacip;,t CRZ #0506 LavRENCe,v nuncls,AtA CERTIFIED BID TABULATION REVIEW OF ALTERNATES A=s"cinle ANDRE,nn.cmmcRSxnNI:„v7,L Deal' Ms. Jones: tssvd:d: cxanrrNEE nANLEV,nIn As you know, bids evere received and opened on June 29, 200ti, for the above- a=c~~+~rr-~ referenced project, 4Ne have attadred a copy of the bid tabulation for your use. DACID M T.4YLDR, AIA ~t,ed;rrt• We are pleased to report that the lore Base Bid amount of 55,555,000, submitted xnnxrn,,tENSeN by IvIL.B Construction Services, I,L,C, in addition to Alternate #1 B, the science Fl`s0t;t"I~ classroom upfit, at $243,000, is the basis for the awrard of the construction IcENNE-ra E swrx contract behveen DTCC.' and 1~tL.B, the single Prime General Contractor for the ~t.;<".~i,,t~ project. Alternates #2 through #7 were created at the request of the Orange County Board. of Conurtissianers to add sustainable elements to the project, and these elements received individrsal bids, ML.B Construction Services quoted the following amounts for the alternates: Alternate #2: 5124,00(1 ro s~»'~~s This alternate adds exterior ahunv»un light shelves to the sorrth and U,,,p~t H;u vc z~ots-zaes west windows of the building. T1Te alternate also provides an integrated ?_''Z-Cloister court Lighting mntr'ol system with nahual light sensors to hmT off artificial c,h~~el Hsu. n~ z;t? zztz lights when daylight is adequate The lighting control system was added to this alternate at the request of thc~ North Caro}uTa State. Construction Office during their contract document review of the p'roject_ I The original estimated cost for the light shelves was $35,1100 As you can I see, the lighting control system added a significant amount of money to the altemate. Our life cVCle cost analysis of this eleLnent shows a YEARS pa}-back of over 40 years. II Alternate #3: S76,S00 T1Tis alternate adds a photovoltaic system. The electrical power created tnr91 aot-hssst. Telephone by this system would be fed back to the power grid to su}ply power to (~»?I .aasa3oK r~x . w,r,v corlevredEDOtzack. con, the facility. The payback for this system is aver 40 years. Ms. Pamela K. Jones August S, 200ti RF: P.eview of DTCC' Alternates page 2 Alternate #-1: ti35,ti00 17,is alternate adds asolar-ass-isfed domestic water heating system. The payback is well over all years Alternate ;i5: 5191,000 T1iis alternate adds a raimvatr.r collection and re-use system supplying non-potable water fur flushing pJmnbi,g fixtures throughout the facility, Tl1e payback on this s}=stem is over '100 years, Alternate ~6: SiD0 This alternate uses ivatcrless urinals, instead of conventionally plwnbed urinals Approval of this relatively small added cost ensures that water-conserving urinals will be installed Depending on usage and rvt3ter and sewer rates, Hie payback un this investment van be lctis than ~ years. Alternate 1#': S36S00 This alternate adds operable windows ur lieu of fixed windows in classrooms, Safety concerns and natural eentilation are considerationsnr acceptance of this alternate.. No payback numbers were generated since them. is no direct correlation to energy savings. As you lurow, payback pet°iods will decrease if the cost of providing electr'icih~/gas/water goes; up significantly, sirrce our life-cycle cost analyses are based on present rates with normal inflation INe understand Orange Countti='s rnmmitment to sustainable facilities as displayed in past projects, and we realize that the decision to fund alternates is not purely economic, especially since the high- perfornnmue system alternates add to the opportwniries for this educational facility to Uecomc a teaching tool for conservation of energy and water resources. Alternate #8: 5341,000 Also cretated at the request of the Board of Commissioners, this alternate adds a park and ride facility to the property adjacent to the proposed dassronm building. ]t is our understanding that grant-firndirng is available, and that buildung this alternate along with the rnllege's parking lots offers an oppor'hmitl= to ecinnomize on mobilization and material costs. It is our understanding that this infornnation will be discussed by the County Cemmnissioncrs wt ihc~ir August 22rnd meeting. Upon uur hearirng which alternates will be accepted and ttmded by floe BOCC, we will add those to the constntction contract with D4L.B to be incorporated into the overall project. Please contact me if you have any questions or cornunents, Sincerely, i" Kxr v7eth E l:edfortt, AlA ~"' Vice President KEP:e~ac/O~Oo-nli f-nckisuro cc: Richmd ~~klComai, f'& ~ ~ ~ COItLGY 1ZE~FUOT ZAC.K ~~~. bD d ^-~ ^C '~ ,^J R h V ~ V ~ ~ ~ Lt ~ C~J r~ U ,C v ~ C r ~ R. ~ N A hod.; N V ~ N .: o ~ ~ w ~ ~ w°~ :. „'~ p ~' ~ ^C t.~ y o ~ . .'Y ~ V' u ,2Z ~ ti G ~ ~~ ~ N ~ () ~ 'd N t~ ;~ aaOAPa _~ 0 O O 4 O O O a ~> O O 0 O ° d ^ O o o ~ ~ O O O O O O C~ ~~~ :/7 O O O ~ p O O O ~ ~ V" "Z "~ ~ ~ ~ ~ v~ ~ cFS r~ ca ; ~ cn , cn x O O O O O O O O O ~ ~ O O O O -... "'' ° rq U O O O O O ~!1 O O O O O O V ^~ N O O O O O `7 N O O V" "3 ^^ O N N 6 N fil ~ 64 N 69 N fi3 N e/i N K N ~ N3 9 Q V O O O O .x O O O O O O O O O ~k ~ 0 0 0 0 ~ ° ~ v M ~ 0 0 0 ~ a o b ~ d N oo" .-~ oo O ~ O VO' N o La ' O~ N N N N N N N N . - i tir r es vs cf1 c,5 s4 V3 t r1 o ° ° o° °o °o °o o °o ,~ O o, O o , O ~ , O O ~ o O O N O O O O O O O to N m b ~ ~ rn ~ Rl ~ o O ~ ~n an 69 v~ 69 vi 59 ~? ff3 v~ S9 ~n 64 vi f/d vy 5R 69 '~O ~ • • • • • • • • • Q ~ • s • • • • • • • zw ;o ~ • • • • • • • • • ~ O ~~ .-~ ~ `1 M M O+ 0O M M ~ n, _ ^n ~ '3' O~ V M _ M O N M ~ N N a M -i . U ° o o U o ~ ~ ~ y ° a U V 'n r~ v ~ ~ a d 'rJ ~ q ~ ° ~'' v U O ~ O >+ ~ "l7 N ~ ~ r ~ ~ (~ 'C -o CJ ~ r h~J ~ O ~ 1 C ~ C.J F• . .- ~ C7 ' i x ~ ~ ~ U x 5 2 U v i V N G 0 V VJ CJ U t.". .J tom' ~ ~~ ~ ~y j o ~ ~~ ~ V $ ~ ,~ +C Z6) VVV~~~, t~Arrtr4~ a °°s~~ ~ G~ ~~~ -a ~eprxrnaaaapN°o as x ° a U N ,D b O O N N ~' O O M :y b >`` ~' 1 ~o GA 0 d d O ~ V ~yay "O b F O ~ U ~, r y H qV u y d y ~ U ~ y "~' C` O ~ R. ~ N A ~ -~ o~ C, ~ ~ N .~Uo d ~.. yy ~ q H ~" y y wp"~.~ O ~' ~ 'b u ct p ~ L'+ U Vim' U ,n ~, +-+ d bu qty' 'ti ~ U :a paOA~t'' u ,x o 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O .., u~ ~ cs O O ° ° ° E 'G a°i o o ~ v o ° o ow r w ..' y„ ~ °~ N .~. M th~1 hl N ^ ,^y. W ~ cA vi u w v: ~, ca cs y ca u ~: b o O 0 4 0 O 0 O 0 O 0 O 0 O 0 O 0 ~ ~ v~ a o 0 o r o 0 0 o 0 M ~~~ °0 0 0 -3^ 0 ~ 0 0 0 0 0 ~ ~ w ~ vii ~n p°~. o N <r ~ rn C a ~ cMn ~ sNS ~ ~ ~ ~ ~ m r` x^ u~ 0 0 0 0 0 0 0 0 0 a b o0 0~ o rn oo v~ ~ m t~ ~' ~ ^ H ~ &~5 6M9 4MA 6M9 ~ K ~ ~ N p O O O O O O O O V c O O O O O eAe y G 'C p O O O O .^N-. O O O O O O 0 Q 4 b w ~ O 3 ~ y v O O o o O O O O O ~ Q H O O O b O O O O N ~ O o O Q~ ^' O O O N N ~G ~ O M ~ a O a OMi ^~ py U N N ~ ^ N ~ 4 ~/ v? R9 V3 :li H3 v3 V) (ff V3 ~~ ~ H p p O O O O O O O .u. ca ~ M3 o 0 0 ~ o ~ o y ~ L ~.,, '~t ~ d' 7 ai v~ ~n 7 M .y 0 ,y V] ' M f5 ~/'1 GA M !~ M 64 M V3 N lA M d! M ~ M ~ L M J ;y p ~ O C O ~ O O O „ ^ ~ ° ~' ° ° o ° ° ° °o °o ° p N o O O o O v N o [~ ~ ~ ~ a O Vl ~ 4p ~. ~ ~ W ~ ~ ,~i as ~ ~ . ~ ~ ~ ~ ~ ~ ~ U d o d ~ O u 0 ~ U ~ u ~ w o C ~ n ~ w y v U U i ti o . o y ~ N O rj o T U -p v. `~ N ~ b s" ~ _~ U G b U ~ ~ , °° °p ~ v ~ "a m ~ ~ U FN °' ~ V" ; CA w' U w ~ ~ v ~ mlb Construction Services Thursday, August 31, 2006 Mr. Ken Redfoot Corley Redfoot Zack, Inc P O Box 2368 Chapel Hill, NC 27515-2368 via email & Fax 493-7306 RE: DTCC Orange County Off-Campus Center Classroom Building SCO # 050637601 MLB Project #06-031 Deaz Mr. Redfoot, MLB is pleased to provide the following proposals for Modifications to the original Alternate #8 -Park-and-Ride Facilities per sketches SK082806A & B dated 8/28/06. All provisions for the original Alternate 8 remain the same unless otherwise noted; Alternate 8A- Provide an asphalt parking lot for 75 parking spaces per SK082806A: ADD $253,650. Alternate 8B- Provide a gravel parking lot for 125 parking spaces per SK082806B: ADD $320,830. Alternate 8C- Provide a gravel pazking lot for 75 pazking spaces: ADD $225,000. Clarifications to our proposal: 1,) No landscaping is included at the "landscaped islands" - no landscaping shown. Topsoil and seed included only, 2,) Landscaping atbio-retention azea #2 included to be similar in plant material and density to bio-retention area #1 based on planting quantity per square foot shown for Bio retention azea #l. 3.) This proposal remains valid for 30 days. Respectfully, MLB Construction Services, LLC Scott Drebitko General Manager sdrebitko@mlbind.com c~aniFite MLB Construction Services, LLC MLB Construction Services, LLC 1351 US Highway 64 West, Sulte 104 One Stone Break Road Apex, NC 27523 Maita, NY 12020 (97 9) 387-4647 (51 a) 269-i 371 FAX (919) 307-1277 FAX (518) 269-7 MLB ~o