Loading...
HomeMy WebLinkAboutAgenda - 02-15-2018 Item 1 - Park Construction and Funding Update ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: February 15, 2018 Action Agenda Item No. 1 SUBJECT: Park Construction and Funding Update DEPARTMENT: Environment, Agriculture, Parks & Recreation (DEAPR) ATTACHMENT(S): Table of Planned Park Projects Map of Current and Future Parks INFORMATION CONTACT: David Stancil, 919-245-2522 PURPOSE: To discuss the status of planned park construction projects and existing funding sources. BACKGROUND: At the December 12, 2017 BOCC meeting, the Board suggested that an update of park construction projects and funding sources be planned for the February work session. As shown on the attached table and map, the adopted Capital Investment Plan (CIP) – consistent with the County’s adopted 2030 Parks and Recreation Master Plan – includes a number of park projects. These include completion of several existing or partially-built facilities, as well as plans for parks with sites land-banked through the Lands Legacy Program, and a few facilities for which land has not yet been acquired. In general, Orange County parks and public open spaces fall into the following categories, which are elaborated on in the 2030 Master Plan: • Regional Parks (such as Little River and Blackwood Farm) • District Parks (such as Twin Creeks/Moniese Nomp) • Community Parks (such as Fairview Park and Cedar Grove Park) • Linear Parks (Trails – such as the portion of the Mountains to Sea Trail) • Nature Preserves / Nature Parks (such as Hollow Rock and Seven Mile Creek) There are a total of 13 projects listed in the CIP and shown on the attached table. The cost estimates shown are total projected cost, and do not include potential grants or partner funding amounts, which may significantly reduce the cost of the projects. It is also worth noting that many parks may be completed in phases. Twin Creeks Park, for example, was broken into three phases last year (Phase 1 is completed), while other large district parks like Northeast and Bingham have not yet progressed to that level of discussion. There is also the potential to scale back the scope of facilities and amenities planned. The cost estimates shown are based on 1 estimates prepared to date for a comparable park of the size and type, or by actual cost estimates created for the park in question. In some cases, land for an identified park need has been acquired using previously-approved general obligation bond funds. This “land-banking” program was a conscious and deliberate component of the Lands Legacy Program (created in 2000) to identify, evaluate, secure and protect good park sites while they still existed, in the aggressive real estate boom years before 2007. Acquisition of future park sites is but one of five areas of activity for the Lands Legacy Program. There are two projects where land acquisition is still needed – Bingham District Park and the Mountains to Sea Trail (MST). Funding for land acquisition is included within the Lands Legacy Fund or in the park project account, and work is underway to secure these lands at present. Looking at the timing of planned park construction projects, two significant projects are currently slated for funding in the upcoming FY 2018-19 (pending further Board discussion of the CIP later this spring). Construction of many of the planned facilities at Blackwood Farm Park is scheduled for next fiscal year, upon completion of infrastructure improvements needed. This infrastructure work (parking, turn lanes, entrance road) has been delayed pending the decision of the location for the Parks Operations Base, which was originally slated for this site. The Board will see an updated master plan in March as a prelude to the hiring of engineering and design consultants later this spring. The second phase of Cedar Grove Park is also scheduled for construction beginning in FY 2018-19. This would involve new baseball/softball fields, tennis courts, parking and other amenities. An update to this master plan will also be forthcoming to address a possible change in the type of ballfields planned, to help replace several small fields in Hillsborough that will be lost to development in 2020. On a smaller scale, funds are also proposed next fiscal year for Little River Park (to address the Laws House near the park entrance) and a waystation/trailhead for the MST at Seven Mile Creek Nature Park. Funding Sources Historically, funding for County parks has come from: • General obligation bonds approved by voters in 1997 and 2001; • State grants from sources such as the Parks and Recreation Trust Fund and the Regional Trails Program, and federal grants from the Land and Water Conservation Fund; • Funding from partner entities, including Durham County and the Town of Chapel Hill; • Payment-in-Lieu funds collected and used by district for park projects; and • Other general fund appropriations made by the Board These sources are expected to continue to be an important part of funding for parks, especially for the MST (which may also include the bond funds available from the State). FINANCIAL IMPACT: There is no financial impact associated with receiving the update. As noted above, the bulk of park construction funds to date have come from voter-approved 2 general obligation bonds augmented with grants, partner funding and payment-in-lieu funds. Some of the funds that originated in the 2001 Parks and Open Space Bond remain in a different form and are part of the designated funding sources in the CIP. However, much of the planned future funding for park construction would be from undesignated future sources. Staff plans to apply for grants for projects that are projected to stand the best chance for funding, from sources such as the Parks and Recreation Trust Fund (and in the case of the Mountains to Sea Trail, the Connect NC state bond). Depending on the location of the project, some payment-in- lieu funds will be available to help augment park construction, but these funds are not large enough to provide full funding for the park projects. Likewise, re-appropriation of funds from other capital projects (including Conservation Easements, Lands Legacy and other County capital projects) are not likely to provide significant funding assistance, as these accounts have a number of pending and encumbered funds awaiting action. SOCIAL JUSTICE IMPACT: The creation of public parks and open spaces are consistent with all five Social Justice Goals: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. • GOAL: CREATE A SAFE COMMUNITY The reduction of risks from vehicle/traffic accidents, childhood and senior injuries, gang activity, substance abuse and domestic violence. • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND ENVIRONMENTAL POLICIES The fair treatment and meaningful involvement of people of all races, cultures, incomes and educational levels with respect to the development and enforcement of environmental laws, regulations, policies, and decisions. Fair treatment means that no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental and commercial operations or policies. • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. Orange County has built and has plans to expand parks in historically underserved communities, which offer opportunities for improvement of public and personal health; safe settings for informal play and recreation for youth and adults; places where food distribution and other public services are provided; protection of the natural resources of the county within the park, fostering enjoyment and interaction with nature; and opportunities to volunteer both within County government as coaches and mentors but also with community groups that use parks to further their participatory goals. 3 RECOMMENDATION(S): The Manager recommends that the Board receive the update and presentation, and provide direction to the Manager and staff on priorities for park construction and funding. 4 Current Planned Park Capital Projects (Listed alphabetically…from the adopted FY 2017-22 Capital Investment Plan) Park Approved Master Plan? Design Year and Funding Construction Year and Funding Comments Bingham District Park 60-120 acres TBA in Bingham Township No FY 22-23 ($300,000) FY 23-24 ($6.7 million)1 Land to be acquired. Located along MST route? Mix of active and low-impact recreation. Blackwood Farm Park 152 acres between Hillsborough and Chapel Hill. Opened under limited facilities (Phase 1) and hours June 2015. Yes Existing FY 18-19 (1.8 million) FY 23-24 (602,000) Infrastructure in 2018, Phase 2 in 18-19; Phase 3 in 23-24. Low-impact recreation, nature center, open fields, house repairs, disc golf. (Parks Op Base removed.) Cedar Grove Park 44 acres on NC 86 North. Adjacent to community center Yes FY 18-19 (100,000) FY 18-19 (1.64 million) Phase 2: Ballfields, walking track, trails. Revise master plan to show smaller baseball/softball fields. Fairview Park 50-acre park site in north Hillsborough, contains large former Town “landfill.” Yes (update needed by 2020) FY 20-21 (In House?) FY 21-22 (1.5 million) Landfill site assessment underway, potentially followed by mitigation FY 19- 20 (State funded). Possible park improvements – scale dependent on results of study. Update plan in 2020. Hollow Rock Nature Park 72-acre public access area within larger New Hope Preserve. Located south of Erwin Road along New Hope Creek, in Durham and Orange counties. Yes In House FY 18-19 - ?1 Ca FY 24-25 (165,000) Opened June 2016. Joint Orange County/Durham County. Additional work could be done in 2019 if state grant received. Further improvements (shown as FY 24-25) if Pickett Road closed. Little River Regional Park Joint park with Durham County, operated by Orange. Off Guess Road, 391 acres along county line. Yes 2 In House FY 18-19 (50,000) FY 21-22 (250,000) Trails, picnic shelters, nature areas and programs. FY 18-19 funds for Laws house. New playground and trail improvements planned in FY 21-22. Durham County 50% funding. 1 This park could be split into phases. Grant funding may be pursued, or partner funding may exist to offset County costs. 2 A master plan was completed in 2002 for the developed portion of the park. OC and DC staffs are working on updated plan to cover entirety of park. 5 Millhouse Road Park 79 acres on Millhouse Road. Current Parks Op Base. Expected partner project with Chapel Hill No (internal sketches) FY 20-21 (300,000) FY 21-22 (6.4 million)1 (Proposed 50% cost- share with Town of Chapel Hill) Proposed to be soccer complex with trails and low-impact recreation adj Duke Forest to west. Phasing? Partner project with Town of Chapel Hill. Possible “home park” on 8-10 acres? Mountains to Sea Trail Segment 11 from Occoneechee Mountain to Alamance County Yes In House FY 18-19 (100,000) FY 19-20 (390,000)1 FY 24-25 (623,000) 3 (includes land and construction) Funding assistance from State Parks. Trail assistance from Friends of MST. Work underway on Occ Mtn south to Seven Mile. Seven Mile waystation in FY 18-19. Buckhorn Road to Alamance in FY 19-20. Buckhorn to Seven Mile as final section Northeast District Park 142 acres bordering on Schley and Mincey Roads. Land-banked, leased for cattle grazing. No (Preliminary Concept Plan) FY 21-22 (350,000) FY 22-23 (7.65 million)1 Mix of active and low-impact recreation. Possible baseball/softball complex. Includes Solid Waste convenience center, other possible uses River Park Approximately 10 acres between Courthouse and Eno River. Includes Riverwalk (MST) section Yes Existing Existing Riverwalk bridge, performance shell, trail connections, new entrance from Churton Street and stormwater improvements from existing funds Soccer.com Center 75 acres on West Ten Road south of Efland, adjacent to Gravelly Hill Middle. Yes (update in 2018) Existing FY 19-20 (4.5 million)1 Expansion of the facility would include new fields, parking, road, restrooms maintenance and stormwater work. Tennis courts? Twin Creeks Park (Moniese Nomp) Aka Chapel Hill Township District Park. 96-acre park adjoining schools campus along Old 86 north of Carrboro. Phase 1 built 2011. Yes Ph 2 FY19-20 (220,000) Ph 3 FY26-27 (220,000) FY 20-21 (3.78 million)1 FY 27-28 (3.78 million) Park will require access road. Mix of active and low-impact recreation, connecting to schools. Planned as three phase construction, Phase 1 complete. Upper Eno Nature Preserve – Nature Parks 1) Seven Mile Creek 2) McGowan Creek No (Preliminary Concept Plan) In House FY 20-21 (400,000) Seven Mile Creek Nature Park work underway (MST). McGowan Creek in FY 20- 21 pending NCDOT transportation improvements 3 Phases 2 and 3 in adopted CIP proposed to be shifted to reflect landowner interest and trail opportunities 6 Projects By Year (as shown in CIP) Project FY 18-19 FY 19-20 FY 20-21 FY 21-22 FY 22-23 “Out Years” (FY 23-28) Bingham Park $300,000 $6,700,000 Blackwood Farm Park $1,795,000 $602,000 Cedar Grove Park 1,740,000 Fairview Park 1,500,000 Hollow Rock Nature Park 165,000 Little River Regional Park 50,000 250,000 Millhouse Road Park $300,000 6,400,000 Mountains to Sea Trail 100,000 $390,000 623,000 Northeast District Park 350,000 7,650,000 River Park Soccer.com Center 4,500,000 Twin Creeks Park (Moniese Nomp) 220,000 3,780,000 4,000,000 Upper Eno Nature Preserve Nature Parks 400,000 Not all funds shown are County funds. Does not include grant funds, or partner funds. Does not reflect potential phasing (except for Twin Creeks and Mountains to Sea Trail). 7 §¨¦I85 §¨¦I40 10 CHAPEL HILL MEBANE CARRBORO HILLSBOROUGH DURHAM I 85 I 4 0 NC 57 N C 8 6 S NC 86 N US 70 SCHL E Y R D NC 49 H W Y 5 4 W NEW S H A R O N C H R D OLD GREENSBO R O R D OL D N C 8 6 GUESS RD ST MA R Y S R D MT SINAI RD DAIRYLA N D R D O L D N C 1 0 B U C K H O R N R D E F L A N D - C E D A R G R O V E R D OR A N G E G R O V E R D US 70-A E MILL E R R D W I L K E R S O N R D KI G E R R D MT W I L L I N G R D C A R R S T O R E R D N C 1 5 7 W JONE S F E R R Y R D US 70 W HIG H R O C K R D WHITFIELD RD LEBANON RD H A R M O N Y C H R D 133 4 US 70 E WA L N U T G R O V E C H R D DO D S O N S C R O S S R O A D S EUBANKS RD PLE A S A N T G R E E N R D HEBRON C H R D OA K G R O V E C H R D BU T L E R R D HOMESTEAD R D ER W I N R D LA W R E N C E R D SAWMILL R D BRADSHAW QUARRY RD SM I T H L E V E L R D U N I O N G R O V E C H R D ME B A N E O A K S R D SUPPER CLUB RD H O L L Y R I D G E R D MT C A R M E L C H R D UN I V E R S I T Y S T A T I O N R D BR O O K H O L L O W R D YARBO R O U G H R D NE V I L L E R D HI G H L A N D F A R M R D WEST TEN RD C O R B E T T R I D G E R D BA L D W I N R D F E R G U S O N R D NEW H O P E C H R D CA R L D U R H A M R D BILL P O O L E R D COR N W A L L I S R D WH I T E C R O S S R D BE R R Y R D C O L E M A N L P M A T T R E S S F A C T O R Y R D MT H E R M O N C H R D O L D C H A P E L H I L L - H I L L S B O R O ARTHUR MINNIS RD BETH E L - H I C K O R Y G R O V E C H R BOWMAN R D LYNC H S T O R E R D ALBERT RD ERW I N R D ORA N G E G R O V E R D I 40 ARTHUR MINNIS RD ST MARYS RD N C 8 6 N I 85 N C 8 6 N US 7 0 E US 70 E N C 8 6 N B U C K H O R N R D HWY 54 W LEBANON RD O L D N C 8 6 ORA N G E G R O V E R D US 70 W HWY 54 W HWY 54 W P L E A S A N T G R E E N R D NC 4 9 N C 8 6 S US 70 ST MAR Y S R D OLD NC 10 HARMONY CH R D US 70 U S 7 0 E 9 3 7 8 5 2 4 6 1 11 µ CIP Park Project Locations DEAPRMap prepared by Land Records/GIS Division2/28/2013 Update 3/27/2017<OC 220K O:\gishome\gisproj\land_resources\CIP_PkPrjLocations.mxd 1 in = 2 miles Legend Main roads LakesMunicipal ETJsTowns Existing Parks1. Cedar Grove Park2. Little River Regional Park3. Soccer.com Center4. River Park5. Fairview Park8. Blackwood Farm Park9. Hollow Rock Nature Park Future Parks 6. Twin Creeks (Moniese Nomp) Park 7. Millhouse Road Park10. Upper Eno Nature Preserves11. Northeast District Park Proposed Mountains to Sea Trail 8