Loading...
HomeMy WebLinkAboutAgenda - 08-22-2006-9b I ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: August 22, 2006 Action Agen,�la Item No. y SUBJECT: County-Funded Sustainable Design Elements for Community College Campus Building DEPARTMENT: Purchasing and Central PUBLIC HEARING: (Y/N) No Services & Planning Department ATTACHMENT (S): INFORMATION CONTACT: Pam Jones, (919) 245-2652 CRZ Letter Craig Benedict, (919) 245-2590 Karen Lincoln, (919) 245-2594 PURPOSE: To consider authorizing the expenditure of funds for sustainable design elements in the Durham Technical Community College (DTCC), Satellite Campus Building One. BACKGROUND: In November 2005, the Board was presented with a list of sustainable design elements that could be included in the first building under design for the DTCC Satellite Campus in Orange County. Based on bids for the project received on .June 29, 2006, Corley Redfoot Zack (CRZ), the project architect, has provided life cycle cost information on the attached letter and summarized below: Alternate Sustainable Design Element Life-Cycle Cost Payback Alternate #2 Aluminum Light Shelves Over 40 years Alternate #3 Photovoltaic Array Over 40 years Alternate #4 Domestic Water Solar System Over 50 years Alternate #5 Rainwater Collection System Over 100 Years Alternate #6 Waterless Urinals Less than 5 years Alternate #7 Operable Windows Not calculated Alternate #8 125-Vehicle Park and Ride Lot * Life Cycle Cost (LCC) calculations are based on current rates and capacity of utilities. As supplies diminish, it is assumed that market adjustments will be made accordingly. The degree of modification will certainly effect the payback period. 2 DTCC has already signed contracts with MLB Construction Company, the low bidder for the project. The specifications required that the contractor hold pricing for the alternates for 90- days past the June 29 bid opening in order for the Commissioners to determine the extent of additional funding for the sustainable elements. The Alternates funded by the Board will be incorporated into the Construction Contract with the DTCC as an amendment to the Contract. FINANCIAL IMPACT: During long-range capital plan and future debt discussions this past spring, staff identified the DTCC satellite campus green building initiatives, along with several other County and school related projects, as either un- or under funded Board priorities. At that time, Commissioners directed staff to report to the Board at its August 31, 2006 work session regarding the affordability of all of these projects. Should the Board wish to fund one or more of the alternates outlined in the chart above, staff will incorporate the corresponding cost into information being prepared for the August 31, 2006 work session. The chart below compares the original architect's cast estimates with the actual bid amounts. Comparison of Sustainable Feature Costs Sustainable Feature Architect Actual Bid Estimate Alternate #2 - Aluminum Light $42,500 $124,000 Shelves Alternate #3 - Photovoltaic Array $30,000 $16,800 Alternate #4 - Domestic Water $30,000 $35,600 Solar System Alternate #5 - Rainwater $120,000 $195,000 Collection System Alternate #6 -Waterless Urinals none given $700 Alternate #7 - Operable Windows none given $36,800 Alternate #8 - 125 Vehicle Park & $341,000 Ride Lot(') Totall $222,500 $749,900 This bid reflects the total cost of a 125-vehicle Park & Ride Lot and does not reflect offsetting grant funds ($111,261) or currently available County pay-as-you-go funds ($50,000) Park and Ride Lot The lowest bid received for the 125-vehicle park and ride lot totaled $341,000. The proposed lot would serve as off-site parking for the County's downtown campus and would be served by a County operated shuttle service. The County has approximately $161,000 in available funding to offset the total cost of the park and ride lot. The chart below identifies those currently available revenues for construction of the park and ride lot: 3 Available Funding for Construction of a 125-Vehicle Park and Ride Lot Located at DTCC Satellite Campus NCDOT CMAQ Capital Grant $111,261 County Match for CMAQ Grant ' $50,000 Total Available Funding $161,261 Funding for fiscal year 2006-07 as included in the Manager's Recommended 2006-16 Capital Investment Plan The purpose of the NCDOT Congestion Mitigation and Air Quality (CMAQ) capital grant funds, outlined above, is to offset construction costs associated with the park and ride lot as well as to install two transit shelters (one at the lot and one in downtown Hillsborough). The shortfall between currently available funding and actual bids is about $180,000 ($341,000 bid for park and ride lot construction less $161,261 available revenue). A major contributing factor for the difference in projected costs and actual costs lies in the fact that material costs have increased significantly over the last year to eighteen months — for example, the cost of asphalt used in paving has increased about 80 percent over the last year. Some options for closing the gap between bid costs and available funding include building a smaller park and ride lot of 75 spaces or constructing a gravel lot. It is important to note that once the lot is completed, the County would need to purchase buses and annually fund the costs of operating the shuttle service between the satellite campus and downtown Hillsborough. The future cost impact of the new service will depend greatly on the number of trips needed to accommodate riders. Staff is analyzing the full cost of the service. To that end, NCDOT and the Federal Highway Administration have agreed to provide an additional $297,000 over a three-year period to offset the annual operational costs that are anticipated to come as the shuttle begins service from the new lot. The County has been informed by Durham Tech President Phail Wynn that additional funding may become available for some of the sustainable design elements. A grant program has been established by the State to allocate additional funds to Community Colleges for construction projects. Dr. Wynn is a member of the evaluation team that will make the allocations. Further, due to the favorable bids received for the project, Dr. Wynn indicates that additional funding may be available within the existing project budget to offset the cost of some of the sustainable elements. However, while some additional funds appear probable, it is premature to cite the specific amount. Staff recommends that the Board cite the preferred sustainable design elements at the pricing stated. The corresponding costs will be included in the affordability assessment that will be part of the August 31, 2006 work session, along with any additional information available by that time regarding the specific amount of additional funds that may be at the County's disposal for this project. The contract for construction of the sustainable design elements must be finalized by mid-September in order for the contractor to hold the current pricing. RECOMMENDATION(S): The Manager recommends that the Board cite the sustainable design elements that it wishes to be included in the DTCC project, subject to affordability as determined during the August 31, 2006 work session; and authorize staff to notify DTCC of the contract amendment details following the August 31, 2006 work session. ���� ��� ��� A�,�� "�~�-y����i� l JL�����-����`/�� � �_�1�8~^�� /n. A R // / */ rcr ' ^ F '< c / * /' r v r / N 17 / � August 8' 20U6 Ms. Pn000la {{. Jones, Director Purchasing &c Central Services GLENN cmuo,^u Orange County csn P() Box 8l81 Hillsborough,oENwonEnEorooT,m^ Dsomu"u � MARK zxcx, ^u RE: Orange [^mnt` (]8f-Cannpoy [cnh,cC!nssnxnnBuilding n^',/aidex/ Du/6unuTcc6u)cal [mn/nuoity (u||Cg, mm/Aa/ n^mmmnm,I'll \\/ahecstoue Development, UiDs6oroo66, N{ 8=cip.71 CRZ #0506 uoxcxcswxoxoH,m^ CERTIFIED BID TABULATION REVIEW 0FALTERNATES xu'u~x ^nuxcvxrxuvCKSxAwK,^m [)oarK1s Jones: �ym°u o/AxIcxcFn^xus,uA /\s YOU know, bids neze received and opened ^u June Z4, ZUo6 for the above- referenced p'vjecLlVchavea1iadhcdacop? nfrhebidtabolahmn6oyournsc DAVID x TAYLOR,m^ A�`*h'h' VVe are pleased tozepod that the low Base Bid amount vf $5,555,000, Submitted /mxx,w /ErSEx byKJLB Construction Services, iL[, io addition to Alternate P1B, the science, A^^«m/' classroom oP8i, utS24J,8O0, is the basis for the unazJnfthe conqUu,hno RExwrrocm/zH contract between DTC[ and MLB, the single Prio`o General [un/n`ck`/ for tile project- Alternates #2 through #7 were created at the. iequest of the Orange Count\ 8uardnfCnmousaionrotuadJsuotainablcrienovnbtoL6op/oject, nndthesc elements received individual bids, I�ALR [uootruchonSCrViCes quoted tile following amounts [oi the alternates: Alternate #2: S124 000 o,,x This alternate adds cxterin| aluminum {i�kLsi}c|rcp |vUlrsou(�� and o`"y'/ uio n( 27ni9z3w west windows of tile building Thc alternate also provides ao into 7/a\ud 222noi*',Co"n lighting control system with natural light Sensors to {un1 off artificial (myr/ xio N( 27,514-2212 |i&hb when daylight isadequate the lighting cooUn\ syytcco °/a^ added k/ this a|tennnhat the request cf the North Carolina State Construction Office druin.ty their Contract document run iew of the ploject The. od | cshnoa�c6 �nx� 6`/ H�c |ickt ��,\rr� v/o� 9�8jkX) ks }�m (au see, tile U�|lbn� control s�sioni added asigoi6cnoi amount n/ nx"neyh` the alternate ()ur life c?c}, cost analvsisof [his element shows a payback n[ over 40Yeats Alternate #3: $16,800 This alternate adds a photovoltaic »;stecn The electrical pop/mcico(»6 (vi9} 4(n'H5x6ldop|xm" (//y) 493_73,o^ Fax by this systOoov,Mild be fed back h` the pow,r grid k` supply power hn nw`y Corte y,cJ foot mCkc^n` the facility ]]�� payha�kk// \bi� sysb.�ui� nv�r40 }'co/s 5 Ms. Pamela K Jones August 8, 2006 RE: Reviero of DTCC Alternates page 2 Altemate #-I: $35,00 Phis alternate adds a solar-assisted domestic water heating system. The payback is well oeet 50 wars Alternate #5: 519,5,1100 This alternate adds a roinwator collection and rc-use system supple, ink non-potable mater for Flushing plumbing fixtures throughout the facility The payback on this system is ovm 100 years, Alternate #6: 5700 this alternate uses waterless urinals, instead of conventionally plumbed urinals Appr oval of this relatively small added cost ensures that router-conserving w°inals iNill be installed, Depending on usage and water and scroer rates, the payback on this investment can he lays•, than 5 years. Alternate #7: $36,500 Ibis alternate adds operable windows in lieu of fixed windows in classrooms Safehv concerns and natural ventilation no considerations in acceptance of this alternate No payback members were generated since there is no direct correlation to energy savings- As you know, payback periods wi0 decrease if the cost of providing electricit /gas/water goers up significantly, since our life-cycle cost analyses are based on present rates with normal inflation. We understand Grange County's commitment to sustainable facilities as display=ed in past projects, and we realize that the decision to fund alternates is not purely economic, etspecialh since the high- performance system alternates add to the opportunities for this educational facility to become a teaching tool for conservation of energy and water resources. Alternate 418: 5341,000 Also created at the request of the Board of Commissioners, this alternate adds a park and ride facility to the property adjacent to the proposed classroom building It is our understanding that grant-f Lind ung is available, and that building this alternate along with the college's parking lots offers an opportunity to economize on mobitiZation and material costs it is our understanding that this information will be discussed by the Couch' Commissioners at their August 22nd meeting. Upon our hearing which alternates will be accepted and funded by the BOCC, we will add those to the construction contract with ML.B to be incorporated into the overall project. Please contact me if you have any questions or continents Sincerely, y, s / 1--lZx meth F Redfoot, AIA Vice President KIT:,", ,0h06-alt flnrlo�un:• tt Richard iMcKoncn. I'17. r � � Cnrtt_e� Rt::ntcxn Z:r�K ., Bid Tabulation for the Durham Technical Community College Orange County Off-Campus Center Classroom Building DCC# 1499 File# 05-06376-01 Bids Received: June 29, 2006 Single-Prime Bid Min. Add. Alternate mlA Alternate#lb Altemate#2 General Contractors Lic. # Bond Bus. Recd. Base Bid Wood Science Wood/Steel Aluminum Casework Science Cswk. Light Shelves J.H. Allen, Inc. 3921 • • • $5,672,000.00 $214,000.00 $251,000.00 S155,000.00 American South 34536 • • • $5,829,000.00 $212,000,00 $224,000.00 S116,000.00 Barnhill Contracting Co. 3194 • • • $5,839,000.00 $208,000.00 $247,000.00 SI07,000.00 R. L. Casey, Inc. 10137 • • • $5,692,214.00 $241,784.00 $108,450.00 $45,324.00 Centurion Construction Co. 12332 • • • $6,199,000.00 $208,800.00 $273,200.00 $54,000.00 Harrod and Assoc. 32"91 • • • $5,776,000.00 $218,000.00 $263,000.00 S 139,000.00 ML13 Const. Services 56418 • • • $5,555,000.00 5205,000.00 $243,000.00 $124,000.00 N. C. Monroe Const. Co. 2393 • • • $5,980,000.00 5240,400.00 $255,000.00 $118,000.00 C.T. Wilson Constriction 2443 • • • $5,611,309.00 5224,380.00 $261,694.00 5126,617,00 Bids as shown above, received at 3:00 pm,Thursday,June 29, 2006,00/w have been checked,validated°a;i�o9rjl�ereby certified as correct. o ��L ``••"". Q.h nri WrKe . th foot,AIA 656 14a3a:e31��t Bid Tabulation for the Durham Technical Community College Orange County Off-Campus Center Classroom Building DCC#1499 File#05-06376-01 Bids Received: June 29,2006 Single-Prime Alternate 43 Alternate 94 Alternate#5 Alternate#6 Alternate#7 Alternate#8 Alternate#9 General Contractors Photovoltaic Solar Water Rainwater Waterless Operable Park&Ride Eliminate System Heating System Reuse System Urinals Window Vents Facilities info Kiosk 1.H.Allen,Inc. $18,000.00 $37,000.00 $205,000.00 $4,000.00 578,000.00 S362,000.00 (S 16,800.00) American South $8,500.00 $54,000.00 $213,000.00 3700.00 $39,000.00 S355,000.00 ($18,000.00) Barnhill Contracting Co. 514,000.00 535,000.00 5195,000.00 $500.00 $40,000.00 $351,000.00 ($25,000.00) R.L.Casey,lnc. $14,240.00 $34,121.00 $166.964.00 $3,121.00 539,634.00 $299,417.00 ($15,765.00) Centurion Construction Co. $16,700.00 $34,700.00 $192,100.00 $400.00 $38,500.00 5307,700.00 (532,400.00) Harrod and Assoc. $8,300.00 S28,000.00 $209,000.00 5400.00 555,000.00 $320,000.00 (537,000.00) vILB Const.Services $16,800.00 535,600.00 $195,000.00 5700.00 $36,800.00 5341,000.00 ($21,500.00) N.C.Monroe Const.Co. $17,600.00 $35,000.00 $199,000.00 ' (S400.00) $73,200.00 $444,000.00 (521,800.00) C.T.Wilson Construction $14,950.00 $34,729.00 5193,226.00 ($403.00) $77,577.00 $397,583.00 ($19,777.00)