Loading...
HomeMy WebLinkAbout2018-010-E Solid Waste - SCS Engineering Professional ConsultingDocuSign Envelope ID: C9D6C691 -6B39- 4364 - 818E- OA5A639E9BCO SCOPE OF WORK FOR CONSULTING SERVICES BETWEEN SCS ENGINEERS AND ORANGE COUNTY, NC FOR SOLID WASTE MANAGEMENT PROFESSIONAL CONSULTING SERVICES SUPPLEMENTAL CONSULTING ACTIVITIES FOR FINANCIAL PRO FORMA/RATE STUDY AND DEVELOPMENT OF INITIAL PLANNING DOCUMENTS FOR AN INTEGRATED MATERIALS MANAGEMENT FACILITY SCOPE OF SERVICES TO BE PERFORMED: SCS Engineers' (SCS) engineering and consulting work for Orange County pertaining to solid waste planning involved additional activities beyond the scope of services identified in previous Work Orders. A summary of these supplemental work efforts, along with reference to the original Work Order and an explanation of the specific costs incurred by SCS, are presented below. Preparation of a Solid Waste Financial Plan Original Contract Title & Date: Preparation of a Solid Waste Financial Plan — 3/7/16 (SCS Project No. 02216202.00) As requested by the County, SCS performed the following work efforts in excess of the activities outlined in the original Work Order: • Presentation/delivery of the findings of the revised Financial Plan and Rate Study at a Board of Orange County Commissioners Meeting on February 16, 2017. This involved communications with County personnel and efforts to incorporate revisions to select portions of the deliverable report and powerpoint presentation as well as SCS' labor and travel expenses to attend the meeting. Preliminary Economic Feasibility Study Original Contract Title & Date: Development of Initial Planning Documents for an Integrated Materials Management Facility and Regional Framework Considerations — 2/20/17 (SCS Project No. 02216202.01 Task 2) Under Task 2 of this assignment, SCS prepared a Preliminary Economic Feasibility Study for purposes of assessing the feasibility of an IMMF Facility/Transfer Station (Facility) proposed to be located in Orange County. Over the course of the development of the Preliminary Financial Pro Forma, SCS performed analyses that were broader than anticipated under the scope of services outlined in the original Work Order, incurring costs stemming from the complexity and depth of the financial modeling effort. SCS found it necessary to identify and develop two separate financial structures; one in which Orange County serves as the sole owner of the Facility and another in which the ownership stake is split according to waste tonnage disposed between the 5 identified stakeholders. In addition, 11/16/17 DocuSign Envelope ID: C9D6C691 -6B39- 4364 - 818E- OA5A639E9BCO SCS believed that for the model to be truly helpful and robust, various scenarios in regards to growth/decline of waste quantities, rate cost increases, and financing structure had to be integrated into the model. These changes took additional time resources above and beyond what was expected and resulted in costs exceeding that originally outlined in the scope of services for the project. Solid Waste Reduction and Diversion Planning Original Contract Title & Date: General Engineering and Environmental Management Services — 5/22/17 (SCS Project No. 02216202.02) SCS met with County staff on 3/16/17 to brainstorm the action items and work efforts pertaining to the County's long -term waste reduction plan. SCS' understands the County is developing a scope /plan for future professional services related to Waste Reduction and Diversion to be delivered by SCS and the original intention was to commence services in Spring /Summer 2017. However, the County has delayed the schedule for these work efforts. SCS incurred costs associated with time and travel expenses to participate in the meeting as well as development of the listing of potential Scope of Work ideas that was submitted to the County. . COMPENSATION: SCS will be compensated for time and expenses in accordance with SCS' standard rates in effect at the time of performance. The budgetary fee estimate is as follows: • Preparation of a Solid Waste Financial Plan $3,000 • Preliminary Economic Feasibility Study $3,250 • Solid Waste Reduction and Diversion Planning $3,000 The total compensation for this Work Order will not exceed $9,250 without the County's authorization. A. AGREEMENT BY THE PARTIES: This scope of work is submitted pursuant to the terms of the Agreement dated May 22, 2017 between SCS Engineers and Orange County. D+ac+urS�igneed�by: `'_ 194T l L.�. d— SC gi fms ",Pc 12/8/2017 Date 2 11/16/17 DocuSign Envelope ID: C9D6C691 -6B39- 4364 - 818E- OA5A639E9BCO Authorization to Proceed: This scope of work is approved pursuant to the terms of the above - referenced Agreement. FOocuSigned by: Oe Dr VeA 12/8/2017 Solid swpRhrc (or designee) Date This instrument has been pre- audited in the manner required by the Local Government Budget and Fiscal Control Act: DocuSigned�gjy: Chie .ilffcofficer 1/5/2018 Date 3 11/16/17