Loading...
HomeMy WebLinkAbout6-b - Potential Acquisition and Development of a Multi-Purpose County Campus ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: January 23, 2018 Action Agenda Item No. 6-b SUBJECT: Potential Acquisition and Development of a Multi-Purpose County Campus DEPARTMENT: County Manager’s Office; Asset Management Services (“AMS”) ATTACHMENT(S): 1 – Hwy 70 Site Assembly 2 – Letter from Hillsborough Dated November 29, 2017 3 – Purchase & Sale Agreements 4 – December 12, 2017 Presentation INFORMATION CONTACT: Bonnie Hammersley, 919-245-2306 Jeff Thompson, 919-245-2658 PURPOSE: To: 1) Ratify the Manager’s recommendation to pursue the acquisition of approximately 21 acres located with the Hillsborough Highway 70/Cornelius Street corridor known as the “Hwy 70 Site Assembly” for the development of a County Campus site that addresses multiple County Capital Investment Plan initiatives; and 2) Authorize the Manager to continue the site due diligence and examination process to include pursuing necessary future land use and zoning amendments with the Town of Hillsborough. BACKGROUND: In the spring of 2017, the County began to investigate alternative locations for the new Detention Center after ground lease negotiations with the State failed to produce acceptable lease terms on the Orange Correctional site. During the same spring time period, the Board asked staff to investigate potential sites along the Highway 70/Cornelius Corridor (the area around Highway 70 between West Hill Avenue and Saint Mary’s Road) for the Environment and Agricultural Center as an alternative to remodeling the current facility. The Detention Center site assessment initially included two sites in downtown Hillsborough, the existing jail location and the parking lot adjacent to the Courthouse. However, preliminary findings revealed several significant challenges related to those sites, so the assessment area was expanded to include sites outside of the downtown area. Highlights of this assessment are as follows: 1. Existing detention site (north of Margaret Lane). The existing site poses significant development issues and was not recommended: a. Costs associated with deconstruction and temporary off-site housing of detainees (off-site housing is estimated to cost $5.48 million during the construction timeframe); 1 b. Site restrictions prevent future expansion; c. Significant concerns voiced by the Town of Hillsborough staff to siting a new detention facility downtown; d. A time intensive and potentially costly zoning compliance and permitting process; e. Current cost estimates exceed budgeted amount. 2. Detention facility sited adjacent to Justice Facility (south of Margaret Lane). This site also poses significant development issues and was not recommended: a. Costs associated with the need to re-locate the District Attorney’s Office and David Price Market House to alternative locations; b. Park visibility and access; c. Historic features on the site limit facility positioning and orientation; d. Site restrictions prevent future expansion; e. Significant concerns voiced by the Town of Hillsborough staff to siting a new detention facility downtown; f. A time intensive and potentially costly zoning compliance and permitting process; g. Current cost estimates exceed budgeted amount. 3. Major Business Forms site (Hwy 86 North, near Coleman Loop Road). This estimated 20 acre parcel had been under contract to purchase and had been studied by staff and consultants over the past few weeks. The parcel includes a 40,000 square foot manufacturing and storage facility. The use as a government services campus including detention and agricultural center is feasible, expandable, and is supported by the Town of Hillsborough. The property is properly zoned for these uses. The current budget could support construction on this site. However, the site was not recommended for the following reasons: a. Sewer infrastructure would need to be extended to the site at an estimated cost of $700,000-800,000; b. The purchase price ($2,310,000) for a facility originally built in 1974; c. The existing building is oversized given the County’s space needs for the Environment and Agriculture Center and/or Parks Operations facility; d. The existing facility would require extensive renovation for any County use; e. The location would cause a more challenging operational environment for a Detention Center; f. Removal of the property from the commercial tax base. 4. Hwy 70 Assembly (Hwy 70 West, near West Hill Avenue; see Attachment 1). This estimated 21 acre assembly of three parcels is currently under contract to purchase by the County (as of December 7, 2017) and could continue to be studied by staff and consultants over the next several weeks. The parcel is located along the Cornelius corridor in the western entry into Hillsborough. The contract purchase price is $394,050 or $18,500 per acre. The use as a government services campus including detention and agricultural center appears feasible, expandable, and is supported by the Town of Hillsborough. The site has been recommended for the following reasons: a. The location is operationally more desirable and has excellent access to the Courts campus and Interstate 85; b. Financially feasible within the current appropriated Capital Investment Plan; 2 c. There are adequate water and sewer services immediately adjacent to the site (to be fully analyzed by County staff and consultants); d. Supported by the Town of Hillsborough, although the parcels will need a future land use and zoning amendment through a reasonable legislative process to secure the designations that will support the government services campus plan (see Attachment 2, “Letter from Hillsborough dated 11/29/17” – please note paragraph 5, page 2 ); e. More efficient detainee transportation routes; f. No existing structures, so the site is more versatile; g. If a campus model is adopted to include other uses, infrastructure (and related mobilization costs) could be more efficient than constructing individual projects on different timeframes and locations. Due Diligence Update and Estimated Timeline. Should the Board ratify this recommendation, staff will proceed with its efforts in examining the parcels and participating in the land use amendment process governed by the Town of Hillsborough. Below is the relative timeframe for completion, and an overall schedule of events that will take place over the next several weeks. Land Records Assessment In progress, estimated completion January 2018 The assembly and analysis of the current site survey, deed research, title and surety considerations, easements and restrictions. Physical Investigations In progress, estimated completion February 2018 Site-civil engineering, surface and sub-surface characteristics, utility availability, storm water flow, delineated streams, ponds & wetlands, environmental assessments, transportation, egress and circulation assessment, off-site considerations, and public safety considerations are being conducted and evaluated by a team of professional services firms that specialize in each of these areas. Land Use Considerations In progress, pertinent schedule below The parcels are within the Town of Hillsborough Extra-Territorial Jurisdiction (“ETJ”), governed by the Hillsborough Unified Development Ordinance (“UDO”), and are currently zoned Rural Residential. With the support of the Hillsborough Town Manager and Planning Director/Assistant Town Manager, Orange County has applied for a “Suburban Office” Future Land Use Amendment as well as an Economic Development District (“EDD”) Zoning Amendment. These designations will allow all of the contemplated uses within this government services campus to include an Orange County Detention Center, the Environment and Agriculture Center, the Park Operations Base, potential recreation areas, a potential park & ride facility, and multi-use facilities and infrastructure (meeting facilities, parking, utilities, storage). Hillsborough is arranging a public process to accommodate the County’s application and desire for a decision on the land use amendments well within the outside acquisition date for the property. Voluntary annexation may be considered by the County at a future time and is not an action required for this future land use and zoning amendment process. 3 To enhance and complement Hillsborough’s process, the County will finance public hearing notice mailings extending to 1000 feet of the property line. This is in addition to Hillsborough’s standard 500 foot notice for this type of application. The County will also hold a public information session prior to the Town public hearing that is not required by the Town. The anticipated schedule is as follows. All of these events subsequent to the January 23, 2018 BOCC regular meeting will be widely announced through the Orange County Department of Community Relations: Orange County public notice of intent regarding the property: January 23, 2018 Area resident mailing (1000 foot radius - County policy)*: January 26, 2018 County Public Information Session*: February 6, 2018 Hillsborough Public Hearing-Future Land Use, Zoning February 15, 2018 Hillsborough Planning Board Meeting March 15, 2018 Hillsborough Town Board Land Use Decision March or Early April, 2018 BOCC approval to acquire parcels April, 2018 Acquisition April, 2018 Design, Construction Manager at Risk Scope and Spring-Fall, 2018 Guaranteed Maximum Price (GMP) Construction, commissioning, transition, occupation Winter 2018-Fall 2020 *Activities that are in addition to the requirements required by the Town of Hillsborough Based upon this analysis and recommendation, the County has entered into Purchase & Sale Agreements (Attachment 3) with the owners of the parcels, subject to and contingent upon a rigorous examination period and final BOCC approval to settle the transaction and acquire the property. FINANCIAL IMPACT : Adequate funds have been appropriated for this initiative within the Detention Center and Environment and Agriculture Center Capital Projects, assuming that the contemplated appropriation for the Parks Operations Base in Year 6 is moved forward to FY2018-19 because of the efficiencies of the joint use of this site. Assuming that the due diligence exercises yield favorable information regarding the site and its conditions, the combined appropriations of $28.10 million are adequate to support the land acquisition as well as provide for adequate project contingency funds. SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable to this item: • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND INEQUITY The fair treatment and meaningful involvement of all people regardless of race or color; religious or philosophical beliefs; sex, gender or sexual orientation; national origin or ethnic background; age; military service; disability; and familial, residential or economic status. • GOAL: ENSURE ECONIOMIC SELF-SUFFICIENCY The creation and preservation of infrastructure, policies, programs and funding necessary for residents to provide shelter, food, clothing and medical care for themselves and their dependents. 4 • GOAL: ENABLE FULL CIVIC PARTICIPATION Ensure that Orange County residents are able to engage government through voting and volunteering by eliminating disparities in participation and barriers to participation. RECOMMENDATION(S): The Manager recommends the Board 1) Ratify the Manager’s recommendation to pursue the acquisition of approximately 21 acres located with the Hillsborough Cornelius Street corridor known as the “Hwy 70 Site Assembly” for the development of a County Campus site that addresses multiple County Capital Investment Plan initiatives; and 2) Authorize the Manager to continue the site due diligence and examination process to include pursuing necessary preliminary future land use and zoning amendments with the Town of Hillsborough. 5 I§ 2 ac. 10.33 ac. 8.39 ac. WESTHILLAVEN ORANGE HEIGHTS LOOP R O S E W O O D R D B E N N E TTS MOBILEH O M E P A R K GoTriangle Bus Route Existing Water Existing Sewer Parcels 2' Contours (NCDOT)·Orange County Planning and InspectionsBrian Carson (7/21/2017) 0 100Feet 1 in = 200 feet 9864397758: Across from Highway Patrol 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Detention Center Siting Feasibility Discussion December 12, 2017 38 •Present and discuss options for siting new Detention Facility; and Agriculture & Environmental Center (AEC) •Gather feedback for final staff recommendations to the Board in December, 2017 Purpose 39 •Early 2017 –State Decision regarding Ground Lease •Disallowance of Detention Facility as collateral for financing –Existing Site Feasibility Study with Designer •Two options: –Existing Detention Site (north of Margaret Lane) –Adjacent to Justice Facility (south of Margaret Lane) •Staff feasibility work through summer, fall •Board small group discussions in November, 2017 Background 40 Potential Downtown Detenton Sites Existing Site Justice Site 41 Potential Downtown Detenton Sites Existing Site: Advantages: •County owned property •Proximity to courthouses, l aw enforcement center •Prescribed land use •Potential for courts related space improvements Disadvantages: •Detainee relocation costs •Deconstruction costs •Challenging Hillsborough entitlement process •Space restricted site; lack of expansion 42 Potential Downtown Detention Sites Justice Site: Advantages: •County owned property •Proximity to courthouses, l aw enforcement center •Prescribed land use •Potential for courts related space improvements Disadvantages: •Need to relocate DA, Price Market House •Required two level facility •Parking replacement •Perceived River Park obstruction; historic markers •Challenging Hillsborough entitlement process •Lack of expansion 43 Potential Downtown Detention Sites Costs possibly prohibitive: Existing Site: Budget 21.85M Expense 27.26M Deficit (5.41M) Justice Site: Budget 21.85M Expense 22.63M Deficit (.78M) 44 •March 2017 – Board Direction for Cornelius Corridor Siting of Ag Center, Park Operations Site •June 2017 – Appropriation of Revere Road Site Major Renovation as option to consider •Staff work on Cornelius Corridor through summer, fall Add’l Background – Ag Center 45 Potential Perimeter Sites Cornelius Corridor Area of Study 46 Potential Perimeter Sites Cornelius Corridor Area of Study 47 Major Business Forms Advantages: •21 acre parcel (expansion, availability of other uses) •Prescribed land use •County planning jurisdiction •40,000 sq. ft. existing facility •Under contract to purchase - $2.3MM •Hillsborough Support Disadvantages: •Needs est. $700K sewer extension investment •Age, layout of building 48 Major Business Forms – W&S Service Boundary 49 Gray = Parking & Storm Water Green = DEAPR Orange = Future Expansion Purple = Detention Future Sewer Connection Point Storm water Management Detention Facility Potential Land Plan-MBF (Detention only) 50 Gray = Parking & Storm Water Green = DEAPR Orange = Future Expansion Purple = Detention Future Sewer Connection Point EAC, Park Operations Parking Storm water Management Detention Facility Yard, Storage & Expansion Demonstration for Gardens Animal Husbandry, etc. Education/Pavilion Potential Land Plan-MBF (Detention, EAC, Park Ops) 51 “DMV” Property Advantages: •20.5 acre parcel (expansion, availability of other uses) •Water and sewer present •Excellent access to Justice Facility, roadways •Hillsborough support •Under Contract - $394,050 ($18,500/acre) Disadvantages: •Needs land use code revision for use 52 Potential Land Plan-DMV Water & Sewer Service Boundary 53 Gray = Parking & Storm Water Green = DEAPR Orange = Future Expansion Purple = Detention Storm water Management Detention Facility Potential Land Plan-DMV (Detention only) 54 EAC, Park Operations Gray = Parking & Storm Water Green = DEAPR Orange = Future Expansion Purple = Detention Future Expansion Storm water Management Detention Facility Yard, Storage & Expansion Demonstration for Gardens, Animal Husbandry, etc. Education/Pavilion Park & Ride Potential Land Plan-DMV (Detention, EAC, Park Ops) Parking 55 •Shared Land Acquisition •Shared Infrastructure –Storm water management –Utilities –Site amenities –Security •Shared common areas (storage & training areas) •Lower cost advantage for shared elements •Master planning advantages •Expansion capabilities •Potential for Park Ops on site Advantages of Detention & Ag Campus 56 MBF-Jail DMV-Jail MBF/DEAPR/ Park Ops DMV/DEAPR/ Park Ops Appropriated $21.85M $21.85M $28.10M $28.10M Expense $21.50M $18.90M $26.70M $27.10M Under/Over $350K $2.95M $1.40M $1.00M Cost Comparisons -Detention probable cost estimates based upon designer feasibility studies -Contingency is 10% of probable construction costs 57 Downtown MBF DMV Costs OVER WITHIN WITHIN Operations IDEAL CHALLENGE GOOD Entitlements Hillsborough BOA, HDC County Hillsborough land use amendment Hillsborough Support NO YES YES Sheriff Support YES 2nd choice 1st choice DEAPR Support YES Key Factors Comparison: 58 •December –Contract site control •December-January –Continued land planning, schematic design, land use amendment process, physical due diligence •Spring-Summer 2018 –Site acquisition, design, site plan approval process, pricing exercises, bidding •Fall-Winter, 2018 –Final design, bidding, construction start •Winter, 2018—Fall, 2020 –Construction, commissioning, transition, occupation Estimated Timeline 59 •Discuss options and answer questions •Receive feedback •Continue due diligence process •BOCC action for future meeting Next Steps 60