Loading...
HomeMy WebLinkAboutAgenda - 12-12-2017-12-4 - Information Item - Memorandum - Mountains to Sea Trail (MST) – Petition and Next Steps 1 INFORMATION ITEM ORANGE COUNTY V\lP \IAC Department of Environment, Agriculture, Parks Recreation MEMORANDUM To: Board of Commissioners Bonnie Hammersley, County Manager From: David Stancil, DEAPR Director Date: December 12, 2017 Re: Mountains to Sea Trail (MST) — Petition and Next Steps On December 4, 2017, a petition was presented to the Board of Commissioners relating to the Mountains to Sea Trail (MST) in Orange County. Provided as attachments to this memorandum are 1) the December 4 petition, 2) the October 27 memorandum on MST next steps previously conveyed to the Board, and 3) a map showing the Proposed MST route from the September 19 meeting and October 27 memo. The Manager and staff propose to respond to this petition (and the related ideas and proposals from the October 27 memo to the Board), by recommending the following actions: 1. Pursue the Actions of the October 27 Memorandum The October 27 memorandum to the Board outlined several proposed actions for the Board's assent. In summary, these were to: a. Pursue a communications plan to inform residents along the Proposed Trail route and other interested parties of the status of the project, and provide periodic updates over the course of the project. b. Begin work on Phase 11.1 (Occoneechee Mountain to Seven Mile Creek) for easement acquisition and trail construction; and conduct (or continue) a series of discussions with other related parties to the MST, including the Friends of the MST (FMST). 2 c. Reflect a second connection from the Proposed Trail as per discussions with Alamance County staff for the trail to enter Alamance County, along Morrow Mill Road. This would be shown in addition to the original Saxapahaw-Bethlehem Church Road route. d. Meet with landowners who express interest in trail easements or other trail components in the portion of the Proposed Trail near Cane Creek Reservoir, with the intention of formalizing these documents where mutual interest dictates - for the Board's future consideration. e. Meet with OWASA staff to explore flexibility in their adopted conditions for the trail on their land, as it may arise. f. Create a joint staff team with representatives from several disciplines to gather information about the concept of a Chapel Hill- Carrboro to Hillsborough multi-modal trail (and other current transportation topics such as sidewalks) as a prelude to a community meeting on the topic in the future. Unless instructed differently, staff will proceed with these planned actions, some of which address parts of the December 4 MST Petition as shown below. Regarding the petition points, the following is recommended: 2. Addressing the December 4 Petition a. For item #1 (adopt a trail route map) in the petition, the Manager and staff recommend that the County: i. Approve the trail route concurrent with the CIP discussions this spring, at which time the Manager and staff will have recommendations on timing and phasing of the future sub- segments of the MST, and the Board would deliberate and adopt both a map and the timing and phasing options. ii. Interested residents could weigh in on the trail adoption at that time, or if desired convey their interests prior to that time. As suggested in the petition, if there is interest in a different approach to trail approval, the Board could also adopt the Proposed Trail route as shown on the attached map (the red dashed line). b. Item #2 (accept offered easements in the Cane Creek area) - this could be accomplished as it is consistent with the proposed activities identified above in working with the interested landowners. Staff has been in touch with several landowners in this area (including those referenced in the petition). However, completion by the February 2018 date in the petition is too ambitious given the needed legal and staff review that will be required. 3 c. Item #3 (establish relationship with the Friends of the MST) - this is underway. Staff had a previously-scheduled meeting with the Executive Director of the FMST last week on this subject, and a draft MOU between the County and FMST is being worked on for trail building and other assistance. A date for approval of the MOU would need to be determined after legal review and approval schedule. If I may provide further information, please let me know. 4 ORANGE COUNTY V\lP \IAC Department of Environment, Agriculture, Parks Recreation MEMORANDUM To: Board of Commissioners Bonnie Hammersley, County Manager From: David Stancil, DEAPR Director Date: October 27, 2017 Re: Mountains to Sea Trail — Next Steps On September 19, the Board of Commissioners received a report on the Mountains to Sea Trail (MST) "Segment 11" trail planning initiative. After reviewing the comments from the meeting and the directions provided by the Board, the following is my interpretation of the next steps that we received as feedback and instruction: 1. Ongoing Communications The Board asked that staff look at ways to improve communication with landowners that might potentially be affected by an MST trail route. (There will need to be a separate communication strategy for the multi-modal Chapel Hill/Carrboro to Hillsborough trail alternative, addressed in a subsection below). The "Proposed Trail" route that was shown on the attached map presented at the September 19 meeting has 51 discrete landowners along the line shown on the map. An additional 328 landowners own land within 1000 feet of the Proposed Trail, for a total of 379. For the segment of the trail on which the Board approved action (Occoneechee Mountain State Natural Area — or OMSNA - to Seven Mile Creek preserve) there are likely four landowners. (To distinguish among other future trail subsegments, we are calling this first part of the trail effort "Phase 11.1.") 5 Staff proposes to undertake the following means of communication: a) An initial mailing to all 379 landowners along or within 1000 feet of the "Proposed Trail" informing them of the results of the community meetings, and the next steps to be taken from the Board's September 19 direction. (Since this mailing will cost an estimated $186, we will also attempt to solicit email addresses for future communications. Notices of any future formal actions would still be sent by mail). b) Send the same communication to our 273-person current email interest list. (There will likely be duplicates with above list.) c) Work with the Community Relations Director for a regular video and/or blog ("This Month on the Orange MST" or similar name) that would be shared and posted to the County website informing residents of MST activities underway and what is planned in the near future. d) This video/blog will also be posted using our social media accounts. As noted at the meeting, the actual trail location may alter as we secure the trail location over the years. Some landowners may decline to sell/convey an easement or land for the MST along our route, requiring a shift in one direction or another. This type of route shift may change the list of landowners along the way. As there was no direction on September 19 to develop a trail on the alternate routes (excepting the multi-modal Chapel Hill-Carrboro to Hillsborough dialogue addressed in Section 4 below), staff does not plan to include these landowners in the mailings, since there are no plans for the trail in their area. If this should change at some point in the future, these landowners could be added to the list. 2. Beginning Phase 11.1 Acquisition and Planning for Trail Construction and Infrastructure The 3-mile segment from Occoneechee Mountain State Natural Area (OMSNA) to the County's Seven Mile Creek (Upper Eno) Nature Preserve has been identified as a logical first step for the MST in Orange County jurisdiction. Funding for trail land, construction and amenities is in the County's Capital Investment Plan and the first installment of these funds is now available. The Board authorized staff on September 19 to begin the process of securing the trail land, addressing needed infrastructure and appurtenances, and constructing the trail for this subsegment, which staff is calling Phase 11.1. The County's Land Conservation Manager will begin the process of meeting with the landowners along this Phase and discussing trail easements (or if the landowner prefers, purchase of a trail corridor"strip"). During and after this process, staff will begin other steps toward completing Phase 1.1, including but not limited to: 6 MST Proposed Route OMSNA to Seven Mile ...... ...... Proposed Mountains-to-Sea Trail(Segment 11)-OCOoneea.heeMtn.Natural Area to Seven Mlle Creek Preserve 0,.t ii jl .__. ...... 11 l II ,, � �J , � l � q r( i - gi d1 ` �� " {,_Le4 }�P� � . � ` ? �4 , ,i r, i " � f � �■ 1 0"" ^- 44 I 1, ,, ,ca ) N 'c� , it:c..,1L-2;.°0,4'. "c \. I' 7,„,,I.,,,.,,,„,,,t., i v t r z r� i P, ..S .', I (A () * 1 F/ m ('4,A,(,)p ua ess d 4 u ,t � )"A, u I � —''''cr"wu o � , � 'err r ' ` �r � { ( prr tf/I �ly .�t „ rYA a pppe ;. y ll, i 0 eJ or _. .. 1.1 J L 1 1 � a) Discussion with NCDOT District Engineer and County Transportation Planners on the planned traverse of the 1-40/1-85 bridge on Dimmocks Mill Road, including safety, signage and other issues. b) Discussion with NC State Parks about the connections to the OMSNA trail network. c) Discussion with the Town of Hillsborough on the planned timetable for the connection of the Town's Riverwalk to OMSNA. d) Discussions with the Friends of the Mountains to Sea Trail about a Memorandum of Agreement on coordinated trail construction. e) A signage plan for Phase 11.1 to determine the type and location of needed signs, and a trail perspective showing the topographic and physical nature of the trail alignment. f) A site plan for the trailhead/waystation at Seven Mile Creek preserve, consistent with constructed trails and already-underway parking area at the preserve, which includes planned amenities. g) An assessment of any trail augmentation, such as bridges or boardwalk that may be needed. h) An Emergency Action Plan, as required, for this section of the trail; and Staff has already been in contact with the agencies and groups involved in items b), c) and d). Staff met last week with the Friends of the MST and we are working to coordinate future trail construction that will incorporate the Friends extensive group of trail- 7 building volunteers into our efforts. In addition, a meeting with Alamance County staff was held to keep them informed of our status. As a result of that meeting, Alamance County has suggested a slight change to the MST Proposed Route on our map as the trail would enter Alamance County from the Oaks crossroads. They have proposed that the MST enter south of NC 54 on Saxapahaw- Bethlehem Church Road and then Morrow Mill Road, rather than taking Saxapahaw-Bethlehem Church Road all the way to Saxapahaw, as previously planned. Map 2 below illustrates this proposed minor change (please see the bottom left of the map) as a second line into Alamance as the Proposed Route comes to Alamance County. Once in Alamance on Morrow Mill Road, the MST would continue west toward the Haw River in Alamance County. Alamance staff indicated this is much preferred to match with their trail work on the other side of the county line. (Note: this proposed change would not re-enter Orange County on Morrow Mill Road as it curves back into Orange). Mountains to Sea Trail—Proposed Route for Segment 11 Proposed Mountains-to-Sea Trail(Segment 11) Or u5 ru I rMf mom- p 7n �� art_ /.r^' a. J E1 �y„lUW `% iiikrcesaORauerri —., va:Gn EM bdE r)1l /1 114 4 (U G � "p 4 o r`'� > f ric' gyp, a " p a sa, \ J � �I Nbdi FfUl2 IN\ ,,) foo PoyrMf F<17 Exfstlny 4rnil Wif VEI rn lxl)aealY If P,Po dnfn r � I���f ca ;,,;, Gaunty V�+ n8nacrr space w �t f aFw ko� 1, �� �UlU1JP1J i n til I c f u r llr � Man Cwn4y parkland 8 aµen sp., ')WASA Omnd ' f r; :{1f!S Fk J���� .�jj F"� Glow,tniat ftldp»CzmP,k R'etxea9 Gto ,,- re r a•a � I r 8 Lastly, it is worth noting that are a myriad of smaller issues and items, too numerous to mention here, that will need to be addressed to plan for and construct this part of the trail. Some of these additional needs may come out of the negotiations for trail easements or corridor and will be shared as they arise. 3. Continuing Discussions — OWASA, Alamance County, Adjoining Landowners About the Trail Alignment on OWASA Lands and Connecting to Alamance County In addition to the work on Phase 11.1, the Board asked that staff convene a meeting with landowners interested in trail easements or other trail amenities in the area of the planned route around Cane Creek Reservoir and connecting to Alamance County. Staff will set a meeting in the near future and invite interested parties and OWASA to meet and discuss interests. While this is not the primary area of activity at present, staff will be willing to discuss future options with landowners who express interest. The Board also asked that a separate meeting be held with OWASA to review the approved conditions adopted by the OWASA Board in August 2016 regarding potential "flexibility" in the conditions where needs may arise. The Manager will work with OWASA and staff to convene a meeting to this purpose. 4. Parallel Track Dialogue — Multi-Modal Trail Connecting Chapel Hill, Carrboro to Hillsborough While noting that this is a separate discussion and trail from the progress on Segment 11 of the MST described above, the Board also directed that a parallel track of conversation be initiated to pursue and explore the concept of a paved trail connecting Chapel Hill and/or Carrboro to Hillsborough. There are a number of different ideas on what form this connection might take, including a roadside trail, connecting public and private open spaces and parks along the route, and the potential for a "rail-to-trail" alternative along the University Station spur rail line from Carrboro to the connection with the North Carolina Railroad (operated by Norfolk and Southern Inc.) east of Hillsborough. (The spur line is also operated by Norfolk and Southern). This is a topic that addresses not only recreational trail use but also incorporates transportation planning and other aspects. Staff proposes to form a joint staff project team to a) gather and develop information about this concept to share with the public, and b) conduct a community meeting where all interested persons can come together and discuss these ideas and options. Because of the wide scope and breadth of this topic, a facilitator for these meetings may be useful. 9 In closing, please feel free to contact Kim Livingston (klivinsgton(c oran ecountync. ov) or myself (dstancil(c oran ecountync. ov ) if you have any questions or thoughts regarding this gameplan, or if this summary of next steps is inconsistent with your understanding of what we should be doing. Copies: Board of Commissioners Travis Myren, Deputy County Manager Kim Livingston, Land Conservation Manager Marabeth Carr, Landscape Architect Dan Derby, Superintendent of Parks MST Staff Team Ruth Rouse, Planning and Development Manager, OWASA Smith Raynor, State Trails Planner, NC Division of State Parks Chuck Edwards, District Engineer, NC DOT Proposed Mountains-to-Sea Trail (Segment 11) 10 USA °< co rn � r ���� ■ m T1' o US70W .1/ . / � e- , p j/1 z MIILLSBQROUG WEST TEN 1)14� i w II, FL RCN /°' U / s' U C 4� 110',0107 C �, � .3.°o / r r J i � ee oi o �: r F V n acQe ,sue C ® s -34, O c"° era 2 ARTHUR rIN c� ..� r� ARTHUR MINNIS o j` �sv RD i 0 cn \ ,,,,,,,,,,,,,,, ,,,,, SHAW ' r2`1 ,:,:. �..... `� „„„,,,,i BRA ��� QUA �'� ire �� �O�'k Exists g rail v p \-- ' Pr sed Trail 0 0 w C w County parkland&open space z SAXAPAHAW / �r o Non-County parkland&open space ■ BETHLEHEM �” CHURCH RD,,,,,,k. ✓ CW4SA land � P A Chestnut Ridge Camp&Retreat Ctr 1 6 � R4` II �... I , i i I , , , 1 Iles 0 025 0.5 1 M' a / 1 00 es_E �-._ ` ' S� ••�.,�" a 00 Orange County DEAPR 9 H �,i i , Q ((,�, j M Jones Land Records OIS Div.1262017 ,, C') OC1290 0:\glshome\glsprol\land p,� "�` - I,ry� Q v resource',ntnsea trlmxd P���� \ r ��.; � 1 � r � NWv�. ._ i c s