HomeMy WebLinkAboutAgenda - 12-12-2017 - 6-e - Consideration of Approval of Additional Station for the Durham-Orange Light Rail Transit Project at Blackwell and Mangum Streets in Downtown Durham 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: December 12, 2017
Action Agenda
Item No. 6-e
SUBJECT: Consideration of Approval of Additional Station for the Durham-Orange Light
Rail Transit Project at Blackwell and Mangum Streets in Downtown Durham
DEPARTMENT: Manager
ATTACHMENT(S): INFORMATION CONTACT:
GoTriangle Memorandum on Blackwell/Mangum Matthew Clark, GoTriangle Government
Station Addition Affairs Manager, 919-270-7858
PURPOSE: To consider approving an additional station for the Durham-Orange Light Rail
Transit Project at Blackwell and Mangum Streets in downtown Durham. The Orange County
Transit Plan requires the Board of Commissioners to approve the addition or elimination of any
stations in the proposed system plan. This addition cannot increase the total cost of the project
and must be accommodated within the current budget.
BACKGROUND: At the Board's November 20, 2017 regular meeting, GoTriangle staff
introduced two potential station changes to the Durham-Orange Light Rail Transit Project. The
first proposed change would shift the Gateway station to the west in order to promote more
economic development opportunities, particularly in Orange County. The Orange County
Transit Plan contemplated this change. A change in the location of a station requires
consultation with the Board of Commissioners, but it does not require action.
The second proposed station change was the addition of a station at Blackwell and Mangum
Streets in downtown Durham. The Orange County Transit Plan requires that the addition or
elimination of any station must be approved by the Orange County Board of Commissioners,
Durham County Board of Commissioners, and DCHC MPO Policy Board, and the GoTriangle
Board. The Durham County Board of Commissioners will consider the item on December 11th
and both the MPO Policy Board and the GoTriangle Board will consider the addition on
December 13th
GoTriangle staff has supplied the attached memorandum to provide additional information on
the proposed Blackwell/Mangum station. The station is intended to improve access to the
Durham Performing Arts Center (DPAC), Durham Bulls Athletic Park, and other downtown
Durham attractions.
The Blackwell/Mangum station was not originally included in the project because it was not
technically feasible given the three car platform length featured in the original design. As part of
the engineering process, GoTriangle revisited the three car platform concept and has reduced
the platform size to a two car platform. The shortened platform length represents a cost
2
savings, but it allows sufficient room for the system to navigate between historic buildings in the
downtown Durham area, making the Blackwell/Mangum station technically feasible.
The addition of the Blackwell/Mangum station is expected to yield a net gain of approximately
600 trips per day according to GoTriangle's regional ridership modeling. The new station is
expected to cost approximately $2.5 million which is less than the estimated $8 million to shift
the Gateway station to the west. The new station costs less because it does not require any
changes to the rail alignment. The proposed Gateway update requires the addition of track and
a shift in the rail alignment while the new Blackwell/Mangum station is positioned along the
current rail alignment. GoTriangle staff report that the new station will add approximately
$150,000 in annual operations and maintenance costs and add less than a minute to end to end
travel time.
If the Blackwell/Mangum station is approved, it will be submitted for reevaluation by the Federal
Transit Administration (FTA) in January. If the FTA requires additional environmental analysis,
GoTriangle will complete that process prior to an amended Record of Decision from the FTA,
which is anticipated to be completed by the fall of 2019.
FINANCIAL IMPACT: There is no additional cost associated with this consideration. The
addition of the Blackwell/Mangum station to the Durham-Orange Light Rail Transit project must
be accommodated within the current project budget.
SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable
to this agenda item:
• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND
INEQUITY
The fair treatment and meaningful involvement of all people regardless of race or color;
religious or philosophical beliefs; sex, gender or sexual orientation; national origin or
ethnic background; age; military service; disability; and familial, residential or economic
status.
• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
The creation and preservation of infrastructure, policies, programs and funding necessary
for residents to provide shelter, food, clothing and medical care for themselves and their
dependents.
Public Transportation provides opportunity for access to jobs and services to many individuals.
RECOMMENDATION(S): The Manager recommends the Board consider approving the
addition of a light rail station at Blackwell and Mangum streets in downtown Durham.
Page 4 of 25
3
o '71717771101777(7 or„A7 77
MEMORANDUM
TO: GoTriangle Planning & Legislative Committee
FROM: Capital Development: D-O LRT Project Team
DATE: November 1, 2017
SUBJECT: D-O LRT Project Request for Design Change Approval: Addition of a
Blackwell/Mangum Street Station in Downtown Durham
Strategic Objective or Initiative Supported
This item supports Strategic Objective 1.1: Increase number of customers served with Sustainable
Transportation Services.
Action Requested
Staff requests that the Committee recommend that the Board adopt the addition of a D-O LRT
station between Blackwell and Mangum Streets along Pettigrew Street in downtown Durham.
Background and Purpose
At the July 26, 2017, meeting, the Board of Trustees approved the Design Change Approval Policy
(Policy) for the D-O LRT Project. The Policy established three Categories of changes:
• Category 1 includes changes which would require approval by each signatory board of the
Transit Plans: the Durham Board of County Commissioners, the Orange Board of County
Commissioners, the DCHC-MPO Policy Board, and the GoTriangle Board of Trustees.
• Category 2, includes changes which would require approval by the GoTriangle Board of
Trustees. For changes in this category, GoTriangle staff will provide the Durham and
Orange Boards of County Commissioners and the DCHC-MPO Policy Board with the
opportunity to review and provide input on the change prior to bringing the change to
the GoTriangle Board of Trustees for final approval.
• Category 3, generally includes all other proposed design changes and establishes that the
D-O LRT Project Director has approval authority for design changes within this Category.
However, the D-O LRT Project Director and/or Executive Oversight Team may choose to
recommend that design changes in Category 3 should be elevated to the GoTriangle
Board of Trustees for approval.
This design change,which falls within Category 1 as it would add a station to the Project, requires
approval by the Durham Board of County Commissioners, Orange Board of County
Commissioners, DCHC-MPO Policy Board, and GoTriangle Board of Trustees.
10101 m1111111111111111111111111111111111111111
III " n /V f tTMi ( .01"
1I000111111111111111111111111111111111011111100 n
°
Page 5 of 25
4
In their comments on the Draft Environmental Impact Statement(DEIS), both the City of Durham
and the Durham County Board of Commissioners requested that GoTriangle carefully evaluate
the feasibility of a City Center Station between Blackwell and Mangum Streets along Pettigrew
Street during the project's Engineering Phase. In response to these comments, in the Combined
FEIS/ROD, GoTriangle committed to continuing its work with Durham to evaluate the feasibility
of a City Center Station during the Engineering Phase. With a reduction in platform length made
possible by a move to two-car platforms, GoTriangle determined that a station platform could
feasibly fit between Blackwell and Mangum Streets. As a result of reducing the platform length,
the area between Blackwell and Mangum streets could accommodate a station platform without
resulting in a potential impact on the Bull Durham building.
The purpose of the proposed Blackwell/Mangum Street Station is to offer more direct access to
the city center of downtown Durham and event-based destinations in and around the American
Tobacco campus, including the Durham Performing Arts Center and Durham Bulls Athletic Park.
If the four boards approve this refinement, GoTriangle staff will submit an environmental re-
evaluation to the FTA to compare the environmental effects of the proposed refinement to the
effects previously disclosed in the Draft Environmental Impact Statement (DEIS) and determine
if the commitments outlined in the Amended Record of Decision mitigate the effects. FTA will
then determine if additional environmental documentation is needed (e.g., NCCU Supplemental
Environmental Assessment) or if the existing environmental documentation is sufficient.
Financial Impact
The cost estimate for the proposed change is approximately $2.5 million Year of Expenditure
(YOE) more than the baseline design.
As part of FTA-required cost management practices, changes to the base cost estimate (both
savings and increases) associated with changes in the project design are tracked throughout
Engineering and considered together. Although the overall project budget is set at entry into
Engineering at $2.476 billion, it is typical to shift expenditures between FTA cost categories to
meet the needs of the project. In other words, savings in one area can cover additional
expenditures in another area.This allows the agency and the project team to use the final design
process to better align spending with goals and values.
Attachments
• Map showing the proposed location for the Blackwell/Mangum Street Station.
Staff Contact
• Danny Rogers, 919-485-7579, e r; g !r` C° g; l;pia!r,igl! ; !rg,
/rrr
WW
114111111,1111I111111111111111111111I1d1111111111111111111111111111111I1111111111,11,11,111,1,11,111 , j , ,
.. IP I 1I '1/(+ m o
a V 2 Z
;�; 0 •�
• a a, cos
Y(* i 11 II �# 1 C o 2
5 a
I1. U w O■
volonor-
W.
." •�I i N I.4. W ( o u l a(I
III r ltr 1 �..'^" - i�."
,
rr. N i i� I ii
1• I . (
4:: �I�rtfilllll d1 = c
r A 6 it 1 , 11J,w!,-
i,...,_
ra co 91, ,a r 1, r,, $r
„T" t II i /d �[ 0 '
Pill? M Ii'. ,,;.,i 1 d7. _ l n L Q
_ 2
»1. ,l x: • cv
' 'r 1'' "i`` , j, it 11 Ira Q CO CL
171�� E 1,
x'
sti. i . u- .....
r' , �U g �S t Jai �..�
raw
{ X111 1�, ,. � 4 (a
. u
., Z �a
.%4- • ,,` i I', 3 r. m
Y i vl c r
4.1 9 4 > 1 �,t'—�.1
QD
y.. - h1I a1 i 2 �'_1 , 1L..:' ail .
_ 11J � � II ii = r
l lc
O
ilit(444" :ill'dr
a O
Y
~r
0E '5 T.)
J
f (
) Q O_ N d�Vt �
t 1 f J J
d
i 0 Q
�i w�
r go - pi.;"' r 0 0
s�} N.+ t
.P�1 tf1 Iri1 _.a ,vr 7 7
-. 1'n f t 1r V V a` a`
`, Y }� to i.r. I. .. _
j�,
I R
I p
L �.A -Y s "� I 1 JA 1 I , •
p/ III�"•' Y,` I : f' L?, Y
L- .