Loading...
HomeMy WebLinkAboutAgenda - 06-27-2006-9e1ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: ,tune 27, 2006 Action Agenda Item No. ... C :'.,. SUBJECT: The Orchard -Preliminary Plan DEPARTMENT: Planning & Inspections PUBLIC HEARING: (YIN) 0 ATTACHMENTS: 1) Resolution of Approval 2) Application 3) Vicinity Map 4) Preliminary Plan 5) Agency Comments 6) Fiscal Impact Analysis 7) Jan. 11, Feb. 1, & May 3, 2006 PB Minutes INFORMATION CONTACT: Craig Benedict, 245 2592 Robert Davis, 245 2580 PURPOSE: Consideration of the Preliminary Plan for The Orchard Subdivision. BACKGROUND: Reauest -Preliminary Plan Applicant: J. Bruce Ballentine, agent for Black Diamond Properties Owners: Yukio and Yasuko Tanaka and Kathy Cheek and Karen Andrews Subdivision follows the Conservation-Cluster Option of Flexible Development • Total acreage is 61.12 acres, including public road right-of-way • 18 single family residential lots • Lot sizes range from 2.01 to 2.16 acres, with a 2.045 average. • The percentage of open space is 34,80% • Maximum to actual lot ratio (MTAR) is 1.06 • Gross density is 3.41 acres per lot. Number of Average Lot Percent of .Acres in Open Subdivision Type <Lots Size 0 en8 ace . S ace Conservation-Cluster 18 2A45 34,80 21.28 Flexible O tion Net Subdivision Land Area 61.12 acres Area in ublic road r.o.w. 3.02 acres Area outside of ublic road r.o.w. 58.10 acres Platted lot area 36.82 acres Area in common o ens ace 21.28 acres 34.80% Location North side of.lones Ferry Road at Damascus Church Road in Chapel Hill Township, Existing and Proposed Conditions Existing: • Zoning: Rural Buffer (RB) (Property is located within University Lake Protected Watershed) • Minimum zoning lot size for University Lake Protected Watershed is two acres, Density limitation in the University Lake Protected Watershed is up to, but no more than, five lots with a density of one dwelling per two acres and a density of five acres for all lots thereafter. The developer could conceivably create up to 18 new lots under a conventional subdivision. • Maximum impervious surface in the University Lake watershed is 6% of the gross acreage. Physical Features: • Gently rolling land draining northerly into Neville Creek, • A small tributary of Neville Creek drains the eastern edge of the property, • Predominately wooded, The Andrews Cheek Tract (eastern half) was timbered ten to fifteen years ago. • The Tanaka Tract has significant tree species planted in an orchard setting along the Orchard Lane as it enters the subdivision.. Adjacent Land Use: • Single family residential, with lot sizes ranging from one to six acres in older subdivisions to the south and west, agricultural and forest lands mainly to the north and east, • The Perry estate properties to the north • The Poplar Hill and Granpian Hills subdivisions to the west and the Springhill Forest subdivision to the south • The parcel directly to the east contains over 19 acres. • 36 of the 66 tax parcels (54%), to which staff mailed notices of the December 19, 2005 Neighborhood Meeting are less than 3,40 acres (the density of the proposed subdivision). This is the proposed lot density with the common open space included, Proposed: Roads: • Access to subdivision is from a proposed 2,177-foot long cul-de-sac, Orchard Trail, off Jones Ferry Road (SR 1942), a paved, public road in Chapel Hill Township. The total length of the public road r.o,w, is 2,625 feet, as the r.o.w. is extended to the east property line, beyond the cul-de-sac, NCDOT has provided an email memo of approval for Orchard Lane, • All roads shall be constructed to NCDOT (and County) requirements • Neville Creek floodplain and steep valley slopes to Sesame Road, about 900 feet to the north, do not make future road extensions to the north feasible or advisable, Flexible Development Option • Eighteen (18) single-family residential lots under the flexible subdivision option, • Average lot size = 2,045 acres Actual to minimum lot ratio: 1.00 Open Space: • Minimum open space required for Conservation-Cluster Option is 33% of site acreage, 3 • The developer proposes to provide 34.88% open space. • Nearly 40% of the dedicated open space consists of regulated floodplains, land with slopes over 25%, and mature upland forests. • Over 60% of the dedicated open space is forested, but not in a regulated floodplain or on slopes over 25%. • The Home Owners Association will own all of the dedicated open space, Recreation Space: Public Recreation Space: • Chapel Hill Township District Park (per the Recreation Service Area Boundaries Map) • No physical dedication is warranted because neither County Recreation has identified sites nor has ERCD identified conservation sites for this area, The payment in-lieu option would require the developer to pay cash in the amount of $8,190 (18 units x $455.00 per unit) to Orange County, Private Recreation • Acreage required to be set aside: 1 J1 acres (61.12 x ,028) • Applicant will provide an approximate 4,600-foot long footpath within the subdivision and a total of 8.82 acres of private recreation space. Certification of Adequate Public Schools (CAPS) As per their letter, the Chapel Hill-Carrboro City School District has awarded a Certificate of Adequate Public Schools for 18 housing units, (See attached memo dated March 6, 2006.) Fire Suppression Applicant will install a water withdrawal facility in Moore Pond along Deerfield Trail for the purposes of a source of emergency water for fire suppression. Flexible Development (Conservation-Cluster Option) • Every proposed lot has afifty-foot perimeter setback buffer and every building site has at least a 100••foot building buffer from the subdivision perimeter, plus additional sideyard setback areas, • Developer provided a landscape plan showing primary and secondary tree protection. • 34.80% of the property is in common open space (40% of which is primary and 60% is secondary open space. No platted lots contain primary open space, Water -Sewer: Individual well and septic disposal systems will serve all lots, The Orange County Environmental Health Department has determined that there are 18 accepfable private septic disposal fields and replacement fields. Please refer to the attached letter from Alan Clapp, The applicant is negotiating an agreement with OWASA to use University Lake as a water source for fire suppression. (Please refer to the attached letter.) Development Process, Schedule, and Action Planning Board • First Action: Concept Plan approved on February 1, 2006 with the following conditions: 1, Because of existing and projected traffic volumes on Jones Ferry Road, provide a right turn deceleration lane on the north side of Jones Ferry Road to the east of the entrance, 2, Submit a plan to address land-clearing debris handling with the preliminary plan application. County regulations allow no burning of construction materials or land clearing debris on-site, which are associated with subdivision activities. • Second Action: The Planning Board consider approval of the preliminary plat • Third Action: The County Board of Commissioners considers approval of the preliminary plat to allow the applicant to begin work on the required public improvements. COMMENTS FROM THE MAY 3, 2006 PLANNING BOARD MEETING (Staff response in italics) • The yield analysis is different when the original lots of record are not considered, Why has not Planning staff applied the required open space percentage (33%) to the lots of record, rather than just the proposed subdivided parcels? Open space is calculated on the actual subdivision acreage, not on acreage outside of the plan, Are the fire suppression recommendations aCounty requirement? • This falls under the general category of `insuring the public health, safety and welfare ; which is a valid subdivision issue, • What authority does the Planning Board have regarding the use of groundwater resulting from subdivided lots and what are the appropriate thresholds? • The Planning Board and staff determine basic subdivision density and impervious cover using zoning district minimum lot sizes and watershed density formulas. In lieu of more specific groundwater usage standards, these density regulations indirectly address groundwater usage rates, There is no county agency with explicit authority to regulate groundwater usage. • The issues of swapping impervious cover on lots within a platted subdivision. • Impervious surface is calculated for the entire gross acreage and maybe allocated, within the subdivision, on a lot-by-fot basis, This figure is disclosed on the final plat and also in the Declarations of Development Restrictions and Requirements. FISCAL IMPACT: The Fiscal Impact Analysis is included as an attachment. STAFF FINDINGS: 1. The proposed development is compatible with the use and densities suggested in the Land Use Element of the Comprehensive Plan. 2, The proposed development complies with the Subdivision standards relating to open space percentage and acres, the type of open space and roadway design. 3, The proposed development complies with the Zoning Ordinance regarding minimum lot size, impervious cover, and density. 4. Aright turn deceleration lane is appropriate far the entrance into Jones Ferry Road. RECOMMENDATIONS: Administration recommends Approval of the Preliminary Plan in accordance with the attached Resolution of Approval. Planning Board recommends Approval of the Preliminary Plan in accordance with the attached Resolution of Approval. Board of County Commissioners Proposal Revised June 20, 2006 RESOLUTION OF THE ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS Date of Meeting: .Tune 27, 2006 Name of Subdivision: The Orchard Owner/Applicant: Bruce Ballentine, agent for Black Diamond Properties The Orange County (the County) Board of County Commissioners hereby approves its Resolution for The Orchard Subdivision preliminary plan, dated February 22, 2006, Revised April 10, 2006, and containing eighteen lots, subject to the fulfillment of requirements specified as follows: The applicant shall irrevocably dedicate Orchard Trail, the public road including its cut-de-sac to the general public and construct the road to North Carolina Department of Transportation (NCDOT) standards. The approval of this resolution authorizes and directs the County Manager to accept for The County and on behalf of the public generally, the offer of dedication of the public road. The County acceptance of the dedication to the general public of the public road shat] be without maintenance responsibility. The owner/applicant shall maintain Orchazd Trail including its cut-de-sac until such time as the NCDOT or some other governmental body accepts the road for maintenance. Before the applicant can record The Orchard Subdivision Final Plat (hereafter the "Final Plat"), the owner/applicant shall address following items: A. Sewage Disposal 1. Each residential lot shall contain an adequate area for aconventionally-sized septic disposal system, and its associated repair area, approved by the County Division of Environmental Health. 2. The septic system location may restrict the size and location of improvements. This disclosure shall be included in a document describing development restriction to be recorded concurrently with the Final Plat, The document shall also disclose that information regazding the tentative location of septic systems is available from the County Health Department, Division of Environmental Health. Each lot that does not contain a siiitable building site shall be designated on the Final Plat as being of restricted development potential and by instrument recorded in the Orange County registry as set forth in Section IV-B-2 of the Orange County Subdivision Regulations. 3. The owner/applicant shall not destroy trees, inventoried and located within the primary tree save area for any reason including to install on-site waste disposal system drain or repair fields, B. Roads and Access 1. The owner/applicant shall construct, prior to the approval and recording of the Final Plat, Orchard Trail to NCDOT standazds, within afifty-foot (50')right-of--way, with ten-foot (10') utility easements on each side, and with NCDOT construction inspection and approval. OR Board of Counfy Commissioners Proposal 6 Revised June 20, 2006 The owner/applicant shall submit a letter of credit or cash to secure construction of Orchard Trail to NC.DOT standazds. A certified/licensed engineer or grading contractor shall submit an estimate, as specified in Section III-E-2 of the Orange County Subdivision Regulations, of the construction cost to the Planning and Inspections Department (the Planning Depaztment), The financial guarantee shall reflect 110% of that construction cost estimate and an accredited financial institution licensed to conduct business in North Carolina shall issue such financial guazantee, The financial guarantee shall be effective for 372 days after the Certificate of Improvements is signed by the County Manager. The document describing development restrictions to be recorded with the Final Plat shall state that The County shall not release the financial guarantee until NCDOT inspects and approves the road construction and provides written certification of such approvah 2, The Final Plat shall state that all lots shall receive access from Orchard Trail, and no driveways shall be permitted within fifty feet (50') of the intersection of Orchazd Trail with Jones Ferry Road. 3. The owner/applicant shall submit to the County Erosion Control Division for review and approval, before any land disturbing activity on the site, an erosion control plan for construction of Orchad Trail, private recreation activities, and drainage improvements. 4. The owner/applicant shall erect an approved street name sign at the intersection with .Tones Ferry Road according to the provisions of Section N-B-3-c-12 of the Orange County Subdivision Regulations before Planning Department signatures on the Final Plat. 5. Before any construction or alteration of any existing access within the .Tones Ferry right- of=way, the owner/applicant shall secure a driveway permit from the NCDOT District Offices, Owner/applicant shall submit a copy of such NCDOT approval permit and letter to the Planning Department at the same time as the request for Plam~ing Department signatures on the Final Plat. The owner/applicant shall perform no work in the Orchard Trail or Jones Ferry Road right-of--ways before issuance of approved NCDOT driveway permits and encroachment agreements, 6. Sight triangles, ten feet by seventy feet (10' x 70'), shall be shown on the Final Plat at the Jones Ferry intersection. The sight distance triangle shall be exclusive of the proposed sign easement. 7. Dedicate, in fee simple, additional right-of--way sufficient to provide fifty feet (50') of right-of--way from the existing .lones Ferry Road centerline, along the subdivision frontage.. Said dedication shall meet major collector right-of--way standards, as identified in the Land Use Element of the Comprehensive Plan acrd required in Section N-B-3-c-1 of the Subdivision Regulations. 8. Within the dedicated Jones Ferry Road, the owner/applicant shall construct a deceleration lane built or secured by letter of credit to NCDOT standazds before the Final Plat is submitted. 9. A sign, between three (3) and four (4) square feet in azea, shall be placed at the terminus of Orchard Trail indicating that the street is subject to future extension. Orchard Trai] shall be clearly indicated on the Final Plat with the words "Subject to future extension." 10. The owner/applicant shall prepare a deed to Orange County conveying a 50-feet stubout area to be held by Orange County for possible future extension of Orchard Trail to the eastern property line,. The deed shall be prepared on a form approved by the County Attorney, provide for atwenty-foot (20') temporary construction easements on each side of the 50-feet stubout, and be recorded contemporaneously with the recording of the Final Board of County Commissioners Proposal ~ Revised June 20, 2006 Plat. Developer shall show the twenty-foot temporary construction easements on the final plat. C. Land Use Buffers and Landscaping 1. The owner/applicant shall install or preserve landscaping on the approved landscape plan (open space and pathways plan), and the Planning Department shall inspect and approve such landscaping before signatures on the Final Plat. No pazt of the landscaping shall encroach into the ten-foot by seventy-foot (10' x 70') sight triangles at the .Tones Ferry intersection, OR Guazanteed financially through a letter of credit or cash submitted to secure required landscape installation and preservation. The owner/applicant shall provide, as specified in Section IV-B-8-b-9 of the Orange county Subdivision Regulations, an estimate of the cost for required preservation, plantings and their installation, The financial guarantee shall reflect 110% of the estimate and be issued by an accredited financial institution licensed to do business in North Carolina, 2, Provision for protection of existing trees as shown on the approved landscape plan shall be included in a document describing development restrictions and requirements that Planning Depaztment staff' prepared and recorded concurrently with the Final Plat. Clear cutting or other removal of any trees or other vegetation on individual lots is prohibited as specified in Section IV-B-8-c of the Orange County Subdivision Regulations, 3, The owner/applicant shall provide a Type A Land Use Buffer along Orchard Trail and .Tones Ferry Road, as shown on the Preliminary Plan. The buffer shall be thirty feet (30') wide and shall be composed of deciduous and/or evergreen vegetation, forming semi-opaque intermittent visual obstructions from the ground to a height of at least thirty feet (.30'). Said buffer shall be so noted on the plat, and detailed in a document describing development restrictions and requirements prepared by Plarming Depaztment staff and recorded concurrently with the Final Plat. The owner/applicant shall convey athirty-foot (30') buffer easement along Orchard Trail and .Tones Ferry Road to the Homeowner's Association (HOA) for enforcement and maintenance. 4. The stream buffer areas along the rear of Lots 10, 11, and 12 shall have similar development limitations and permitted uses as the adjacent HOA open space, D. Drainage 1, Locate all drainage easements on the Final Plat, as required following Erosion Control Plan review and approval. 2. The owner/applicant shall size and locate all drainage culverts as required by NCDOT and a North Carolina licensed Professional Engineer, E. Parkland 1, The owner/applicant shall pay cash in the amount of $8,190 (18 units x $455..00 per unit) to the County as payment in-lieu-of parkland dedication for the eighteen platted lots before Planning Department signatures on the Final Plat. 2, The owner/applicant shall provide private recreational open space as specified in Section IV-B-7-b of the County Subdivision Regulations and in Article 5.1.1 in the Zoning Ordinance. The owner/applicant has set aside 21.28 acres as open space, within which an Board of County Commissioners Proposal Revised .June 23, 2006 approximately 4,600 linear-feet long footpath (hereafter the "footpath") will be constructed. The HOA shall maintain the Pedestrian Open Space Areas (hereafter the "POSA's"), footpath and open space area. 3. The HOA shall obtain an approved NCDOT eneroaclmrent agreement for the footpath that falls within the Orchard Trail right-of--way before construction. 4. No activities are allowed in prescribed open space, except recreational facilities. 5. Except for construction of the footpath and stonnwater improvements, all areas in reserved open space shall remain in their natural condition. F. Miscellaneous 1. The Final Plat shall contain a title block and vicinity map according to standards found in Section V-D-2 and V-D-3 of the County Subdivision Regulations. 2. The Final Plat shall reflect the drainage easements as required in D.1 above. 3. The owner/applicant shall convey all open space into the HOA. 4. Before installation of lighting within the subdivision, the ovmer/applica<it shall submit a lighting plan to the Pluming Department for review and approval. 5. The Plamiing and Solid Waste Departments shall review and approve a plan for the collection uid proper disposal of all tree stumps and fallen logs before the Final Plat approval. 6. The owner/applicant shall note impervious cover square footage limits for each lot on the Final Plat. 7, Clean wood waste, scrap metal, and corrugated cardboard, must be recycled. 8. All haulers of constnrction waste shall have proper licensing. 9. Before any on-site construction activity, the owner/applicant shall hold apse-construction conference with the County Solid Waste staff. This maybe the same meeting held with other development officials, 10. Before installation of a subdivision sign, County Plamiing shall review and approve a site plan and construction drawings. 1 L The owner/applicant shall install a water withdrawal system for emergency fre suppression in Moore Pond (a private pond) off of Deerfield Trail with signage acceptable to the Orange County Fire Marshal. 12. The owner shall file, with the Plam~ing Department and record with the Final Plat, a declaration of covenants and restrictions, articles of incorporation, where required, and/or by-laws, all as approved by the County Attorney, that will govern the maintenance and control of the improvements as set forth in Article III-E of the Orange County Subdivision Regulations. Said documents shall provide for ownership of Open Space by the HOA, and the dedication of easements to the HOA to access in-lot POSA's, drainage easements and buffers, for maintenance. 1.3. The maximum imperviousness surface coverage that may be allocated to the individual lots shall be 107,26.3 square feet. This figure is exclusive of Orchard Lane right-of--way. G. Certifications 1. The owner/applicant shall have notarized on the face of the Final Plat a Certificate of Survey and Accuracy signed by a Professional Land Surveyor. 2. The owner/applicant shall sign a Certification of Declaration uid Maintenance in the form provided in Section V-D-6-b of the County Subdivision Regulations on the face of the plat and shall record concurrently with the Final Plat a document describing development restrictions.. Board of Counfy Commissioners Proposal Revised June 23, 2006 3. The NCDOT shall certify approval of Orchard Trail bas been entirely constructed to NCDOT standards or that construction plans have been approved before Plarming Department signatures on the Final Plat. 4. The Plamting Department shall sign a Certificate of Approval. NOW THEREFORE BE IT RESOLVED by the Board of Orange County Commissioners that The Orchard Subdivision Preliminary Plan is approved in accordance with the above mentioned conditions and attached Preliminary Plat, dated February 22, 2006, and revised on April 5 and 22, 2006. Upon motion of Commissioner ,seconded by Commissioner , the for°egoing resolution was adopted this the day of , 2006. I, Donna S. Baker, Clerk to the Board of Conm~issioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on , 2006 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in Minute Book No. _ of the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2006. Clerk to the Board of Connnissioners - AppLIC~ ON FOR PRELIMINARY PLF -' APPROVAL 10 MAJOR SUBpIV1~lON ORANGE COUNTY - 5/05 }~ DATE: z2 FEB 2006 JASE TYPE OR PRINT {INK DNLY) ' The Orchard Subdivision SUBDNISION NAME: North Side of Intersection o£ Jones Ferry Road & Damascus Church Road LOCATIDN- Developer: Hlack Diamond Properties ~ er Z,` ICathyoCheek/Karen Andrews OWNER/DEVELOPER: ----------'- ADDRESS-.?21 Providence Road TELEPHONE Nt).: __ 919-929-0666 Chapel Hill, NC 27514 AGENT/CONTACT' Exuce Balleatine 221 Providence Road TELEPHONE NO.: 919-929-0886 ADDRESS: Chapel Hill, NC 27514 TMEL: 7, 117.10A & 7,117.11 A SUMMARY INFORMATION Chapel Hill Orange CounfyTax Map Block_ _ Lot(s) Township Zoning District(s): RB Total Number of Arras: 61.12 2. oo Ac Total Number of Lots; 1s Average Lot B'Ize: 2 . os AC Minimum Lot Size: NumberlType of Structures: (existing) o (propasod) lg Future Single .Family Resident Linear Feat in Stceats: lzoo Aeres in Opan Space: 21.ze Wafer Supply. - Gommunl x Indlvldusl well Puhlic (specify) ~ --'-Individual Communt x WastewaterDlsposal: Septic ~Puhlle(spectfy} ty Sehool Dtstrlet: Chanel Hill - Carrboro _ Fire Districk South Orange General Land Usexs to Area: sin le Family Residential x flood tone areas Critical Areas: _ streamtdrainageways _. P University Lake - Pw watershed (speeify)_ hlstorle sites other (oxplain) is the property to be subdivided currently and®r °farrrr use value taxation"? Yos , No x If °yes;' ptoase contact the Orange County Tax ORice. Subdivision of the property may require payment 4f deferred texas under "farm use value taxation." B All pints must be submitted on sheet no smatter Phan ono inch equals two-hundred foet (1"=2Ug') and no larger than° one inch equals twenty feet {t"=20') and must contain the following information: X x zoning of tract and adjacent subdivision name - - x properties x building setback lines by notation or _~ _~ name & address of owners} --i typical tot layout x x location and width of existing and __ name & address of subdivider - --- (If other than owner) proposed easements (drainage, utilltias, roads; eta) x x Existing, proposed and ad,{oining _ name of surveyor,'engtneer, Iandscapo -'-- ri hts-of-way Including dimensions architect or architect, address, and street names and State Road x ragistrat{on # 8 seat hurribars. Linoar feet of road (title) preliminary Plan x , _ scale, north arcow centerlines and appreatmate acreage x date of plan prepa2tton and revisions x of new street rights-ofway x Eownship, tax map-block-lot references - ~ existing and proposed utilities, x Parent Parcel Idant~cation # Including type, sizes, hydranfs, dead book and page # of property to be valves, manholes x subdividod x _ boundary described with bearings and _._ existing and proposed curbs, gutters distances and culverts. Including sizes and grades _ -~ x I .cation end width of alleys, 11 X' total acreage of tha t. .and acreage of ---~" " y aldawalks, bike lanes, transit -`""' '-- lots, Iriduding and excluding area within x systems, and bus stops ical street crosssecUons and X rlghts•of~vay _ control corner "-"~ typ _ Intersseflon details including design --- -"- ~ and width of travelway and ) x shoulders hoHzontal alignment, centerline X ~ proposed lotfines with dimensions _ radius, and general curve data on ail x lot & block numbers proposed streets iu. _- phasing line(s) X permanent features such as % y_ _ ~ topography at ten (10i foot intervals -- _ buildings, cemeteries, historic • X ~ water bodes,streams, floodways and landmarks X flaodpiains x rs '-'- ff b adjoining lot layout names of ~ adjoining property ovmera. IF X e u stream loeatloh and size.of parcels dodtcated for hal use or reserved tl subdivided, subdivision plat name, plat book 8 page number, and o publle use, reerea in common, with purpose noted g perimeter tot numbers. and size of lots of restrlded ti w,...::~ impervious surface data (if located in ~~~- '- ~~ on loca '- development potential end octagon "-""' ~ water supply watershed) on plat regarding same x stormwater detention andlor X _ viclNty map showing general location of --- _ retention sites and undisturbed '- _ subdivision with streets and roads areas for InflltraUon purposes (if identified by State Road number and located in water supply watershed) X name landscaping and buffer requirements Na Identifled natural areas and wildlife tai township, wrporate and oxtraterntorial -- " -'" corridors "- __. planning jurlsdict(on Imes which cross the property I, G OTHERSUBMITTAtREQU1REMENTS: t. Twenty-five (25) eoples of the Preliminary Plat arcels involved clearly marked). e full size copy of an Orange County Tax Map (with tax p e Preliminary Plat indicating Health Department O f U n r 2. Where munielpal or OWASA sewer is not avaliable, a copy o 3 . approval/dental for each tot show thereon. Wham a private road is proposed, a writEen statement 6y the applicant or his/her authortsubdlvlslon Regulations). 4 . sets for tha justlficaUon for a private reaared In accordance witty Section VI ofthis Ordinance which assure Auxiliary documents, in dreftform, p p 5 e r . covenants resfrlcUv oad maintenance ag a msnt and articlos of incorporation and as evidence that the sa a n to~ ' b b ~~~~~-~^.'~ ', ry r a priv tie required as neces m led e 1 r not parfaining to a homeowners association. These documents may ordinance requirements are being mat 6. Foe - 5544 plus 55.44 par (ot (one fee for Preliminary and Final Plat). llowing infom+ation f h shall 6a submitted with fhe appllcatlon: . o a 7. If the subdivision contains SO lots or morn, t 3 Years i a. Number of yeas to buildout. ilt during each year until buildout b 6 houses/year u s cox -vas b. Number of houses to be rice of houses including lots for each year to buildout S c. Average p 1 certify that to the best of my knowledge the information contained above, and In the supporting documents, is a factual representation s authorized, pureuantto N C. Gen~SFateSec on 15 e-380~tohimakeias~many'utspection of the sulb]ec# property as may be necessary to verify that the proposed work outlined herein is consistent with the provisions of a0 applicable State and local laws, ordinances and regulations. By signing this application, I acknowledge and agree that inspectorsozonfesen lion of pfoper cradentals,rlo enter the staff of tha Orange County Planning & Inspectlons Department have a right, W P ~^~ ~~~~ subject property at any reasonable hour for fhe purposes of Inspectlon o~r~bth~t~eer~enfq~rpleJmre'nt'a"'eftion. ~ '"1 p4 / ~ m° C" . ~. 21 ~ 46 its vivv.r ..--.... _ 'DATE OWNER'S SIGNATURE ' A PLICANl"'S SIGNATURE DATE F., ,:~ 1 ~,..qd . ~ .:•.,~ . ..,,....,r ;; i,...,~. ~ Wpb ~ ~ ~ 22 celp~# .~.. .. ~ .• •~ qD ' -0ete Paid ~,' ~~ ~ ~ 1 i.... - ---- ---- X X NA X ^_ x _ X Jt __ I. i x t ---- i X I 14A 1 I C i I ~;,n..~rv:~ ~.. total acreage of thr ct and acreage of lots, Including, and excluding areawlthin rights.of~vay control comer proposed 1ot11nes with dimensions tot & block numbers phasing line(s) topograpfiy at ten (10) foot intervals water bodies, streams. fioodvraYs and floodplalns stream buffers location and size.of parcels dedicated for public use, recreatlonao$~ noted sorved Fn common, with purp impervious surface data Cf located in water supply watershed) vicinity map showing general IocaBon of '- subdivision with streeffi and roads identified by State Road number and name landscaping and buffer requirements -_ 'township, corporate and extratemtorial -- planning Jurisdiction Imes which cross the property OTHER SI j~BMil"1'AL RE4UIREMENTSc X "'""~' ~ a~ location and width of alleys, bike lanes, transit sidewalks X (a , systems, and bus stops l street crosssecflons and i ---"' ' ca typ - intersection details iriciuding design andwidfhoffravelwayand x shoulders horizontal alignnsent, centerline _ --"- _ ._ radius, and general curve data on all proposed streets x permanent features such as "'-- ~ ___ buildings, cemeteries, historic Iandmerirs X adjoining lot layout names of --' adjoining property owners. IF subdivided, subdivision plat name, plat book & page number, and X perimeter lot numbers. n and size of lots of resVicted fl -- o _ loea development potential and notation X on plat regarding same atormwater detention and/or '- -- retention sites and undisturbed areas forinflitraflon purposes (if located [n water supply watershed} NA Ideritifled natural areas and wildlife "-'- ~ -• corridors 1. Twenty-flue (25) copies of the Pcellmtnaty PIaL with tax parcels involved cleady marked). 2. Ono foil size copy of an Orange County Tax Map 3. Where municipal or OWASA sewer Is not available, a copy of tho Preliminary Plat indicating Health Department approvalidenialfcr each let show thereon. licant or hislher authorized representative which 4. Where a private road is proposed, a written stafamont by fhe aPP sots for the justification for a prNate raaared In accordance withlSectlo Vrl ofthts O dtnancedwhi h assuraafionsJ, 5. Auxlifary documents, in draflform, p p not be libmited to~a prfvafenroad maintenance agreement and artici s of incorporaf on andrrestrictlve covenants pertaining to a homeowners assoetation. These documents maybe required as necessary as evidence that tire ordinance requirements are being mat B. Fae - $500 plus ySAD per lot (one fse for Preliminary and Final Plat). 7., If the subdivision contains 101ots or more, the following information shall be subrnitfad with the application: a. Number of years to buildout, 3 Years 6 houses/year b. Number of houses to be built during each year until buildout 6 cox - 1M$ c. Average price of houses Including lots for each year to bulidout. $ I certify that to the bast of my knowledge the inforraetion contained above, and In the supporting documents, is a factual raprasentaGon s authored, pursuantto N C. Gen. SFaL Secti n 15 a~80, to Imake asmany iinspections F thte suibJect property as may be necesseryt to verify that the proposed work outlined herein is consisleht with the previsions of ag applicable State and local laws, ordinances and ragulaSons. E3y signlnH ihls application, I acknowledge and agree that inspectors. zoning officers, em~n control officers, and o er resentation of pfoper credentials, to enter the staff of the Orange County Planning ~ Ilupectlon n Die p~rirn pardon o a thereen Po emen~on• ~ 1 p4 subject property at any reasonable hour for the purp 11 Ob } C DATE ~ - A ptl(:ANT'S SIGNATURE 1. i ~ 1{ ,XFEEp• ~#rnount •`+`~~•r;.`^r•~p Date E'ald i I 22 ~-b Ofo .. Raceiptit .: ~, { _ 4 (. _ DATE 4:: .... ~Q~-O~S'~" - M o` d Ro pN~~S SESP ~ Rp a O 0 13 m Y O J 0~ S~Q~ ~. Y~ d arrr~ ~nr _ HOLLY CR EE K LIV iF~`~ a, o C F ~ ~ D ~ i a ~ ~`"`. pAMASCU Rp ' CHU~Gt-1 1 C~ ~~ ARD a 7~ W mutwensineaurxiwnaae ~, xmswaens ovim>ao aiu '~ E i p i ~ c: 14 _ A 3A A.~, _ e a 6 4 [p3 I~p a ~E~ 8i~ ~gAQ a 8~ #EEgpA ~g4p ~H~~~pp Ei ~~ ~ @8 y.d ~E5d ~ ~E a /~ > ~e :~> 5c 3 ;t E A 9 A A 4i yak M1EM1E ~°~ ~' (: '! a ~ ~~ z~¢~o c C i~x'ie~ E'~g 9~q g9J ~ ~ ~ s= ='~~ kd{ ~gg ge i~a~ ;4. 1 ~g~ 6p ~c 1 s~ a°q °n e.4 X °q a r./'° gv„ 5 ~9 T~ ~ ~::: ~53E~ ~' ~ Qg'r„~! ig~X ~. fr `a ny~ t' 6~ ~ fgUU~ ~ ~ ~ EE•yEvy~ ap g 9~ E g~''+YKp~9~y ~' 1 ,~~St `~\`/ egg~}c.33~~:~ p2 ~33 Ed~ E ~"~1 ~~ ~~ g gA k ~ ~Y@F ~ 7 gggG~XE €~6E S~~E ~~ ~ G~ ~~ ~ E' ~" 5` ~~i.\ ° `Y` g.ree.°q ,~. .B ~ d~ ~~ag~Xy ~ 4 q ~ - - C 9E 6 Ts 6.1 E KS :e gp ~~~.aA z ~ e~E ~~~ Ee p~ ~~~ E 4 _ i B _ >e •~ . eg • E ~' A ~ ss E~ ~~ii ~( Y~~~ ~ q°e~e E AA 'X ~8 g6~ es: 4 ~$ g Aeg:z~'t °. ~~ ~~~g~ ~ i~E~~ ~e Sr~EE E6A R' 'Edp q e P EE E stTE Y p ee 5e FA~i~~€ ~F ~B Y~~XS ael~png~ q'.~ X62~H ~~ ~E , E ~ @@ }} ~fe~3y~~~~g;~~~g ~~~~~~~~~~~~~°s~~ III1111'II~II illlil~1 ;III~II ~ t-°~~~;Iil~ 1'1 °°Ili;iil~ll~~l ~~! \ ab 7 \ prOtl N30MOB , E ~I ~, ' ~~ ~~ i ' ~1 i / 4 ~r e~ E! wl [o'as'~wv[tt[rt bm[erw 3m ~a>xa'w~t'-f"i"Irzx°so1 i~+maxw~s rmniWNeoe-~°++e m~nl\maloMx ~_ ~- t-eet 0 550 1,100 2,200 3,300 4,400 ~i US Interstate f~ Critical Area ~~`~~' City/Town Limits .. 7 r+ 1 inch equals 933 feet ~'~,~ US Highway t~ Protected Watershed ~ r~ ~Ua_Territorial Jurisdiction ~„r NC Highway f~ Unprotected Watershed ~,,8 School System Boundary /~ '~'~_~ Major Road [`~ Building o.•'~ / \ Township / \ /~/ Background ~ Zoning `~i i ///~~„~~ t n C N /~~~•~ Piedmont Electric Utilities _ ~~ .e Transition Area !;~ ,; y ou ~®t Sizes in ~"~~e ®rchard Subd, Neighborhood >5 16 Glen Bowles From: C. N. Edwards [cnedwards@dot.state.nc.us] Sent: Thu 3/23/2006 8:22 AM To: Glen Bowles Cc: Subject: Re: Preliminary Site Plan- The Orchard Subdivision Attachments: Using the criteria established in our driveway manual, no tum lanes are warrented. However, a right turn decel lane is desirable. NCDOT would have no objection to the construction of the lane if required by the County. The design must be reviewed and approved by NCDOT. Feel free to contact me if you have any questions. Glen Bowles wrote: Staff feels that a deceleration lane would be warrented. Will you concur on this improvement? From• C. N. Edwards [mailto•cnedwardsla~dot state.nc.us] Sent:• Wed 3/22/2006 10:51 AM To: Glen Bowles Cc: Craig Benedict Subject: Preliminary Site Plan- The Orchard Subdivision Glenn, Per your recent request, this office has reviewed the preliminary site plan for the proposed development located on SR 1942, )ones Ferry Road. We provide the following comments: The site is composed of 18 single family residential lots served by a single cul-de=sac roadway. The development is not expected to create a significant traffic impact to the adjacent roadway network. No turn lanes are warranted for this development. The proposed intersection location provides acceptable spacing with existing intersections. Acceptable intersection sight distance can be obtained with appropriate grading. If the Developer desires that Orchard Trail be a State maintained road, then the road must meet NCDOT subdivision road construction standards. Complete construction plans must be submitted to this hops://10.25.3.0,7/exchange/Gl3owles/Inbox/Re:%20Preliminary%20Site%20P1an %20T... 03/24/2006 17 office for review and approval. A 10' X 70' sight distance triangle easement is required a the proposed intersection. The sight distance triangle shall be exclusive of the proposed sign. easement. No work shall be performed in the roadway right of way prior to issunce of approved NCDOT driveway permits and encroachment agreeements. It will be necessary for an established duly authorized home owners association to obtain an approved NCDOT encroachment agreement for the proposed footpath that falls within the roadway right of way prior to road addition. Feel free to contact me if you need additional information. We will be happy to attend any planned technical review meeting as you deem necessary to provide comments on this or any other project. https://10..253.0.7/exchange/GBowles/Inbox/Re:%20Preliminary%20Site%20PIan %20T... 03/24/2006 18 Glen Bowles Sent: Fri 4/7/2006 10:15 AM From: Reynolds Ivins To: Glen Bowles Cc: Subject: The proposed Orchard subdivision Attachments: - ---=- - - - - -- Glenn, (have reviewed the plans and find them to be in general accordance with Erosion Control requirements. Please let me know if I can be Of further assistance. Reynolds 7. (Ren) Ivins Orange County, NC Erosion Control Supervisor WK (919)245-2586 Cell 215-0758 04/07/200f https://10.253.0. 19 CARRBORO FIRE DEPARTMENT ~ ~! ®{ ~~~x~; CARRBOR.O, NORTH CAROLINA June 13, 2006 To: Glen Bowles, Orange County Planning Department From: Travis L. Crabtree, Deputy Fir~ief Carrboro Fire Department ~ ~-`` Re: The Orchard Subdivision The fire suppression request that I made to the Orange County Fire Marshall, Mike Tapp, in regard to The Orchard Subdivision review is being nlet. A pond has been located in the Deerfield Subdivision within 1-1/2 miles from The Orchard and the owners of the pond have given the Town of Carrboro permission to use their pond for fire suppression. They do not want a pipe intake installed but have agreed to allow us to install a sign. The developer of The Orchard is having this sign prepared (plus an additional sign for another pond) and the Town of Carrboro Fire Department will leave it installed. We have no further review comments in regard to The Orchard Subdivision. cc, Mike Tapp, Orange County Fire Marshal .30I West Main Street, Carrboro, North Carolina 27510 Phone (919) 918-7.349 Fax (919) 932-5359 An Equal Opportunity Employer Ll. .. i 20 Glen Bowles From: Mike Tapp Sent: Tue 6/13/2006 9:49 AM To: Glen Bowles Cc: Subject: The Orchard Subdivision Attachments: Glen, I have been in contact with Deputy Chief Crabtree at the Carrboro Fire Department and have had several discussions in regards to the water supply requests for the Orchard Subdivision. We are satisfied with the water supply arrangements far the subdivision. If you need additional information, please contact me. Mike Tapp Deputy Director/Fire Marshal Orange County Emergency Management Post Office Box 8181 Hillsborough, NC 2'7278 phone: 919-968-2050 fax: 919-968-4066 pager: 919-216-9580 https://10.25.3.0,7/exchange/GBowles/Inbox/The%200rchard%20Subdivision.EML?Cmd=open 06(1.3/2006 ~i MEMORANDUM Date: March 16, 2006 ~ ~ To: Glen Bowles, Orange County Planning s~' From: Marty Roupe, and Members of Planning Department Staff ';' Subject: Courtesy Review Comments Project: The Orchard (Feb. 23, 2006 transmittal} The purpose of this memo is to provide comments for the proposed referenced subdivision which is within the Joint Planning Area. 1. Consider street connectivity to other parcels. The Town of Carrboro's regulations would require stubbing road to the East, rather than just a R/V1f to the boundary, In addition connectivity to Sesame Rd. to the North could be considered, 2. Consider requiring applicant to provide pedestrian access to the open space north of lots 9-1 5. 3. It may be advisable to have all privately owned lot areas be platted outside of any required open space or stream buffers, PAGE 7 OF'1 OC COURTESY REV THE ORCHARD 031606 22 pRANGE COUNTY ENVIRONMENT AND RESOURCE CONSERVAT[AN DEPARTMENT MEMORANDUM To: Glen Bowles, Current P/annex From: Rich Shaw, ERCD Land Conser~atlon Manager Date: March 1, 2006 Subject: The Orchard Subdivision Proposal Thank. you far the opporhmity to review a Preliminary Plat for "The orchard Subdivision" proposal. ERCD comments on subdivisions are generally to a) address any concerns with respect to potential impacts on important natural or cultural resources, and b) identify any areas that might be desirable for possible dedication to the County for public recreation/open space pursuant to Section N-B-7-b of the orange County Subdivision Ordinance. My earlier comments (November 28, 2005 memo) were based on an examination of the Concept Plan (dated 11/16/05) and ERCD's comprehensive resource database. The Preliminary Plat (dated 2/22/06) appears to have addressed those earlier comments. I have no further comments on this subdivision proposal. If you have any questions, feel free to contact me at 245-2591. cc: David Stancil Environment and Resource Conservation PO Box 8181 / 306-A Revere Road Hillsborough, NC 27278 (919) 245-2590 2.3 Orange Soil and Water Conservation P.O, Box 8181 Hillsborough, NC 27278 919-245-2750 March 1, 2006 To: Glenn Bowles Orange County Planning Dept. ,^, From: Gail Hughes ~~ k~J~ Orange Soil and Water Cons ation District RE: The Orchard According to the Orange County Soil Survery, the following soils are located on this site: EnC Enon loam: 6-12% slope (C) GeB-Georgeville silt loam: 2-6% slope (B) GeC-Georgeville silt loam: 6-10% slope (C) HeB-Helena sandy loam: 2-8% slope (B) HrB-Herndon silt loam: 2-6 % slope (B) HrC-Herndon silt loam: 6-10% slope (C) TaD- Tatum silt loam: 8-15% slope (D) These soils have different capabilities for septic tank use, building sites, recreationai uses, streets, and landscaping, and shallow excavations. Attached are the capability classes for each soil. This soil information is to be used as a general reference. An on-site investigation by the Environmental Health Dept. should determine possibilities and exact locations of septic tanks. 24 EL ~-IILL- .,~; .AR1~BC~RO ,, ~~" CITY SCHOOLS To: Neil Pedersen Superintendent From: Steve Scroggs Assistant Superintendent for Support Services Re: Certificate of Adequate Public Schools (CAPS) Daze: Mazch 6, 2006 Ballentine Associates has requested that a Certificate of Adequate Public Schools be issued for the Orchard subdivision development project. This 18 unit, single family detached complex is located aff Tones Ferry Road past the current intersection of Old School Road. This request is in compliance with the Schools Adequate Public Facilities Ordinance (SAPFO), enacted in July of 2003. The requested subdivision will have 18 units, all single family houses. The request qualifies for a CAPS using the existing capacity and student generation rates as approved by the Orange County Commissioners. The spreadsheet used in that determination is attached. Occupancy is expected to take place during 2007. As this request has been made during the 2005-2006 school year, and as the current school capacity has been approved by the County Commissioners during the 2004-2005 school year, Support Services recommends that the Board of Education award CAPS Number CH 0010 to The Orchard. As occupancy is expected in the 2007-2008 school yeaz, additional high school capacity will be available at high school #3. Resolution: Be it, therefore, resolved that the Board of Education awards a Certificate of Adequate Public Schools to The Orchard, for 18 housing units, as described above. Be it, further resolved, that the Board of Education directs the administration to sign and authorize all appropriate documents related to the above-mentioned request. Lincoln Center, 750 5 lAerritt ivtill Road • Ghaa°°-I Nili, NC 27515-2678• (919) 967-8211 •'m~.vv+.chccs.kl2.ncus Mazch 3, ' 76 ORANGECOUN7Y HEALTH DEPARTMENT Rosemary L Summers, MPH, DrPH Health Director Richard E. Whiffed Human 6ervirns Center 30D WestTryon Street Post 0(tice Box 8161 Hillsborough, NC 27278 Phohe: (919) 24s-2911 Fax: (919) 644-30D7 www m oranoe nc us/hea/th Animal Control Services Central Administrative Services Dental Health Services Environmental Health Services Health Promotion and Education Services Personal Health Services w 3D6{ Revere Road r^ PDBox6181 y Hillsborough, NC 27278 SOIL/SITE Evalrlation Summary for: The Orchard Subdivision Chapel Hill Township, Map 117, Lot 10 Map Date Revised February 24, 2006 Lot # DESIGN FLOW . 1 600 gpd 2 600 gpd 3 600 gpd 4 600 gpd 5 600 gpd 6 600 gpd 7 600 gpd g 600 gpd 9 600 gpd 10 600 gpd 11 600 gpd 12 600 gpd 1; 600 gpd 14 600 gpd i3 15 600 gpd 16 600 gpd 17 600 gpd lg 600 gpd m .. Phone: (919) 245-7361 a~i FAX: (919) 644-3006 ~ 0 c w SYSTEM TYPE Shallow Trench Conventional Ultra Shallow Innovative Trench Shallow Trench Conventional Shallow Trench Conventional Conventional Shallow Trench Conventional Shallow Trench Conventional Shallow Trench Conventional Conventional innovative Trench with pump Shallow Trench Conventionai Shallow Trench Conventional Shallow Trench Conventional Shallow bench Conventional Conventional Innovative Trench with pump Innovative Trench with pump Innovative Ttench with pump 25 NOTES: 26 The design flow is based upon the number of bedrooms applied for by flee property owner or developer. The design flow for a bedroom is 120 gallons/day (gpd). (e.g. 600 gpd = 5 bedrooms) Proposed house locations are provided by the property owner or developer as required by 15A NCAC 18A .1900 - .1964 (The Laws and Rules for Sewage Treatment and Disposal Systems)_ The design flow, type system, and pump requirement are subject to change based upon the application and site plan or plat submitted for the Wastewater Construction Authorization, The blocked aeeas on the accompanying plat are the limits of the provisionally suitable soils as evaluated by the Orange County Health Department. It should be noted that all lots having aconventional-type drain field with pump aze reviewed at a minimum of every five years by the health department as required by 15A NCAC 18A .1961 .. (Maintenance of Sewage Systems). Ultra Shallow Trench Conventional Systems aze placed in areas with 24 inches or more of provisionally suitable soillsite chazacteristics and a 6-10" soil cap is placed over the trenches.. Shallow Trench Conventional Systems aze placed in areas with 30 inches or more of provisionally suitable soillsite chazacteristics. Conventional Trench Systems aze placed in areas with .36" inches or more of provisionally suitable soillsite characteristics. Innovative Trench Systems can be used in areas with 24-.36 "of provisionally suitable soillsite characteristics, The approved septic areas should be kept free of vehicular traffic, lodging, grading, and compacting activities. It is the responsrbrl~ty of the property owner or developer to mamtazn the integrity of the septic aeeas prior to system construction and installation. No pazking, cutting or filling shall be allowed in or around the drain field aeeas. Drainage ways and easements should be utilized to convey storm water run-off to the stone water retention areas, These conveyances should not be located through designated septic drain field aeeas. This report is for planning purposes only and does not constitute any approval. Lot approval is granted by the health department only in the farm of an Improvement Permit. RESIDENTIAL FISCAL IMPAC. _°MPLATE: SERVICE STANDARD MET. J Bureau of Economic & Business Research -University of Florida Modified 4115197 -Orange County, NC Planning Department SECTION 1 -PROJECT DATA: ENTER THE FOLLOWING DATA FOR EACH PROJECT: School District: ~ School Attendance: I Middle School 23% SECTION 2 -LOCAL GOVERNMENT AND SCHOOL DISTRICT DATA 14192353 117.33 Miscellaneous 1287756 10.65 27 SCtI00L DISTRICT DATA: ENTER "1" IN ( )BESIDE SCHOOL DISTRICT IN WHICH PROJECT IS TO I ~~ LOCATED TO GENERATE STUDENT DISTRIBUTION BY SCHOOL TYPE. COUNTY PER CAPITA REVENUES ($)' REVENUES PER CAPITA ~ COUNTY PER CAPITA EXPENc.. URES ($): .PENDITURE PER CAPITA and Management , General Services Governing , 17352989 ' 143.45 , ..._,u ~_,"._... ~ W._._.... ... Public Safety 13925289 1 15 12 & Environment+ Culture & Recreation Community 6560300 54.23 _ .. ___ .~ 32129721 265.61 Human Services --- - - Educapon (Reciimng Capital) ~ .. _ -- 2290258 - - -- -- 18.93 ' Non-Departmental 27617021 228.31 COUNTY PER EMPLOYEE EXPENDITURE ($): EXPENDITURE PER EMPLOYEE General Services, Governing and Management 17352989 -- 99075.02'.. Public Safety _. 13925289 - ' 68766.86 ~ _ _'- ' Community & Environment+ Culture & Recreation - 6560300 83432.53 ' --" ~ Human Services __„_, _ 32129721 - 109225.32 SCHOOL DISTRICT PER STUDENT EXPENDITURES ($): EXPENDITURE PER STUDENT County Government _ _ „ ,_ ,_ _ _ _49981296 455826_'. `--"" 30372967 2769,99 School District - - -_ SCHOOL DISTRICT PER EMPLOYEE EXPENDITURES ($): EXPENDITURE PER EMPLOYEE County_Government_ ' ;' 49981296 28079:38' _. __ __ School District 30372967 17063 46 TAX DATA: ENTER APPLICABLE ASSESSMENT RATIO AND ELDERLY EXEMPTION: County Tax Rafe ($) ezctudes 0 3028 to scfiools 0.8430 Per $100 Assessed Valuation School District Tax Rate _($) includes 0.3028 from O C 0 1843 Per $100 Assessed Valuation Assessment Ratio _ 100.00 _.. _ _.. _ 0 $11.000 Where Applicable SECTION 3 -DEMOGRAPHIC PROJECTIONS BASED ON PROJECT DATA YEAR 2006' 2007 HAUSING UNITS 6'' 12 POPULATION 15': 31 SCHOOL CHILDREN Elementary 0.95{ 1.90 Middle `~ 0.50` 0 99 High School 0.6,9j 1.38 TOTAL 2 4 COUNTY GOVERNMENT ADDITIONAL EMPLOYEES General Government 0.021 0.04 Public Safety 0.03: 0 OS ' Public Works 0.01'; 0.02 Human Services 0:04: 0 07 TOTAL 0.11); 0.19 28 DISTRICT 0.23 0.45 JAL EMPLOYEES SECTION 4 -PROJECTED FIS1. ~ IMPACT OF PROJECT ON COUNTY G .ERNMENT 29 2006 2007; 20081 ~ YEAR ff TAX BASE ($1000) I 4200 , 8711 ( :13550 ? I t ~ r ~ i ~ REVENUES ($) ~ I Property Tax 35406 ', 73432 k 114226: ~ 3707 "Ir1959'~ 7688 [ I Other Taxes „ „ r Intergovernmental i ( 1802 ? 3736 ~ 5614 G t 1'128 i 384D 2340 Service Charges W I , ~ t ~ ,' ' Miscellaneous 'I 164 339 i u 528. i ' ~ TOTAL ($) ~ '' 422071 '136168 { 87537 ~ k '~ ~ ~ ~ ~ IXPENDITURES ($) General Government f , t < 2203 r 4570 i ~ ; 7109 y i i j 1768 3667 57D4 i Public Safety Public Works ~ - 833 ~ 1728 ~ ~ 2687. ~ , Human Services { "" ~ 4080 13162 `; 8461 ! ` : ~ ~ ~` "10137 r 21023 t " 327D2 ~ ( ` ~ ~ ~' Education i <' 3507 .. ~ 11313 7273 ~ Non-Departmental ( ~ { i ~ TOTAL ($) 22528 ~ 72677 , 46723 f ~ ! ~ r ? NET FISCAL IMPACT ($) f ~ 19679 I 40814 f .. ~ - 834881 ~ , .. SECTION 5 -PROJECTED FISCAL IMPACT OF PROJECT ON SCHOOL DISTRICT YEAR i 2D06 2007' 2D08 ( ~ f REVENUES ($) ! ~ ~ ' ~ 10137 ' 21023 ~ 327D2 County I ~ 7741 24972. 16054 School District , ! ~ State ~ 5277, 10944 ~ ~ 17024 , I ~ OTAL $ ~ ' 23154+~ ' 48022 6 74698 I ( ) T ~; ~ ( r" r ~ ~ EXPENDITURES ($) ! ~ ! ~ 10137 E t ~ 21023 ~ 32702 County , , 5983: 12409 f 19302 a , School District ~ 2 7024 ~ i i ti ! State 77 1 ~ 5 1 10944 _ , ~ ~ ~ i TOTAL ($) i 21397 ~ S 89028 44377 ~ ~ r '~ NET FISCAL IMPACT ($) j ~`. 1757 ~~ 3645 5670 FrnnN a .SUMMARY OF Ph. JECTED DEMOGRAPHIC/FISCAL IMPA .i YEAR ~ 20061 2007 ~ ~ 2008 , 6 j 12 i 18 HOUSING UNITS ~ , 46 POPULATION 15 ~ 31 I { E l SCHOOL CHILDREN ' ' Elementary ~ 1 ~ 2 3 ~ Middle 4 0 1 1~ s 1, ,w 4 ; 1 ~ 1 ~ ~ High School ~ s 2 4~ 6i TOTAL ~ r ~ COUNTY EMPLOYEES ~ D10a 019 ' 029! , SCHOOL EMPLOYEES ( 0 23~ 0 454 ;~ 0 68a TAX BASE ($1000) ~ ~ 4200' 8711 f ~ 13550 { 4 COUNTY BUDGET ($) ~ ~ ~ _, Revenues ~ 42207 87537 ~ N136166j ~ I 22528+ 46723 I - 72677 ~ . Expenditures 19679' ~ ` ' 40814 f 63488 ; , BALANCE , . ~ SCHOOL DISTRICT BUDGE T ($~ ~ ~ ' : II ~ ` Revenues 23154 ; 48022 f ~- ° 74698 ~ , Expenditures f ~ ~ 21397 ~ 44377 4 IIII 69028 , ~ ~ 1757 ? 3645 ~ 567D G BALANCE ~ COMBINED BUDGETS ($) ~ ~~ ~ ~ ~ ~ 21D864 ~ i Revenues 65361; 136559 ,i Expenditures ~ - 43925:? 91100 ~ 141706 21436`:::! 44459 ~ ' 69159. ~ ~ BALANCE ~ , - SECTION 7 -SUMMARY OF PROJECTED PUBLIC SCHOOL CAPACITY IMPACTS 30 31 MIlVUI'ES ORANGE COUNTY PLANNING BOARD JANUARY 11, 2006 REGULAR MEETING MEMBERS PRESENT: Jay Bryan, Chapel Hill Representative (Chair); Craufurd Goodwin, Hillsborough Representative; Michelle Kempinski, Cedar Grove Township at Large; Sam Lasris, Cedar Grove Township At Large; Renee Price-Saunders, Hillsborough Township at Lazge; Sandra .Iohnson Quinn, Eno Township; Jeffrey Schmitt, Cedaz Grove Township at Large; Theodore (Ted) W. Triebel (Vice-Chair), Little River Representative MEMBERS ABSENT: Brian Dobyns, Cheeks Township Representative; Bernadette Pelissier, Bingham Township STAFF PRESENT: Craig Benedict, Planning Director; Tom Altieri, Comprehensive Planning Supervisor; Robert Davis, Current Planning Supervisor; Sherri Ingersoll, Administrative Assistant II; Glenn Bowles, Planner II AGENDA ITEM #9: CONSIDERATION OF THE ORCHARD SUBDIVISION CONCEPT PLAN Presenter: Glenn Bowles, Planner II Glenn Bowles: I am the liaison for the Orchazd Subdivision project. This is a 19 lot subdivision on 84 square acres, There are two parcels of land with two landowners. This has a flexible design option with 19 lots, and the open space is approximately 39%. The largest lot is 19 acres, Besides that lot, the average lot size is 2.2 acres. The density is based on the first five lots of each pazcel being two acres in size, and any lot thereafter being five acres, The fust 37 acres have 10 lots, and the other 48 acres could have 22 lots. You could potentially get 22 total allowable lots, The land is generally rolling and feeds into Neville Creek, a part of Phil's Creek, There are some large trees of'value, and we would like the lazgest trees to be saved. Most of the adjacent area is small subdivision/residential or forestry. It will be accessed by a public cul-de-sac road, There is limited connectivity feasible. Staff fmdings are basically that the topography suggests flexible development. There are some interesting exotic tree species to be saved, One, USGS study is about the minimum infiltration rate/recharge rates in the basin (which is not site specific) uses about 65 gallons/day/person. Most engineers suggest 100 gallons, The 65 gallon rate is comparable to Madison, WI. The Fire Marshal would like to see a reusable water source for fire suppression, There are two existing ponds that might serve that purpose.. Regarding solid waste, they will recycle products during construction, and will offer curbside recycling.. A tree survey is needed, and we would like add a note not to disturb the trees in the open space. We would also like to see the details of the open space uses. Michelle Kempinski: In your information, there were 19 lots shown but there were 20 lots on the site plan, Glenn Bowles: The 20s' lot will be recombined Michelle Kempinski: Is that included in the acreage? Glenn Bowles: Yes, Renee Price-Saunders: Why is the 20s' lot not included in the colored azea? 32 Glenn Bowles: When the preliminary plan for the subdivision is done, this lot will be severed and recombined. Renee Price-Saunders: How does the light green area fit in? Glenn Bowles: It establishes minimum setbacks if stmctures are built.. Renee Price-Saunders: Why is the Tanaka tract included? Glenn Bowles: I don't know that answer. The developer can explain that. Craufur'd Goodwin: Does the inclusion of the Tanaka tract skew the average lot size calculations? Glenn Bowles: I can only speculate but I don't know the answer to that. Sam Lasris: Can the Tanaka be subdivided? Glenn Bowles: Possibly only one more lot could be created. Renee Price-Saunders: Can the water resources in the area support this many lots? Craig Benedict: The perk test showed there was a weak potential on lots 18 and 19. Sam Lasris: Plus 15-17 may have to be reconfigured,. Glenn Bowles: The perk tests will determine the actual number of lots with the preliminary plat. This is the maximum number of lots possible at this phase. Michelle Kempinski: With the Concept Plan, what percentage of suitable soils must be identified? Robert Davis: Soil scientists have stated 50% to make sure the design was reasonable. Enviromnental Health doesn't do preliminary testing. Also, having aRight-Of--Way on the large tract provides a roadside buffer. Craufurd Goodwin: If lot 19 were not included, would this be approvable? Glenn Bowles: Yes. The Concept plan shows that. They have the proper protection and density. We need to see the soil tests. Jay Bryan: L,et's let the developer speak. Ted Triebel: Just to reconfirm on the perk test, is this a theoretical number? Glenn Bowles: Yes, it is theoretical. Ted Triebel: Then lot 19 seems to be anon-issue. Renee Price-Saunders: If'lot 19 is not included, why not require a roadside buffer? 33 Glenn Bowles: If the Tanaka lot is severed from the subdivision, the road buffer would not be there. Robert Davis: The Ordinance requires 50% of lots, and they provided more lots than needed. The Preliminary Plan will show the actual locations. Renee Price-Saunders: I just don't understand why it's there. Robert Davis: The benefit is that there would be a roadside buffer. Sam Lasris: fflots 15-17 aze reconfigured, why not reconfigure the road for connectivity and have more access options? How faz aze we from Sesame Grove? Glenn Bowles: I may be '/a mile with interesting topography. Connectivity is not really an option. Bruce Ballentine: Regarding the soils report, we wanted to get a realistic feel of the situation for the Concept Plan, We hired a soils specialist and had to reconfigure the numbers based on their findings. The original plan is different than the original concept, which changed the road layout. We have applied for a site evaluation and staked the properties on the site. The Health Department will do the analysis. We aze proposing looking at what is existing, which is currently two lots. The existing property needs to be shown for legal purposes, This will help define the buffers. Michelle Kempinski: Will lot 18, the Tanaka tract, be cut off' before the other subdivision is created? Bruce Ballentine: It might be, but it is immaterial at this point Michelle Kempinski: Lot 15 -12 are in the upper portion. There is a boundary on the NW side and 2 lines drawn for' the lots that is identified as open space. Which lines were used to calculate open space versus lot size? Bruce Ballentine: The inner boundary (pink area) is deeded to the owner. The outside area is owned by the Homeowners' Association. Some of the open space is owned by the lot owners and the Homeowners Association. Michelle Kempinski: So, the total open space includes the open space owned by lot owners? When the lot size was calculated, does that include open space? Bruce Ballentine: Yes. It will be deeded to a buyer with a restricted use. Michelle Kempinski: If the hatched area is included in the lot size and the open space, isn't this double counting? Bruce Ballentine: Yes.. Robert Davis: 33% open space is needed. 34 Bruce Ballentine: The sketch (in the packet) shows the table of open space.. Lots 1-14 are used to count as open space areas, Lots 9-1.3 includes a POSA (Pedestrian Open Space Access) to complete a pedestrian loop around the properties, Michelle Kempinski: The minimum requirement based on 33% open space is 28 acres, Bruce Ballentine: The lot yield due to density doesn't include open space. Math shows that one could get 22 lots. Sandra Quinn: Regarding individual wells and septic, what is the average square footage of the proposed homes? Bruce Ballentine: That will be up to the builder. It is estimated to be 4,000 squaze foot homes costing $600-700,000, Robert Davis: 3.3% of total land needs to be owned by the Homeowners' Association. Craig Benedict: You need 33% open space outside the minimum lot size. I recommend these concerns be tabled until the preliminary plan. Renee Price-Saunders: Will the open space connect to .Jones Ferry Road? Will this be open to the public? Bruce Ballentine: No, it will be owned by the Homeowners' Association. The road is public. Renee Price-Saunders: What about the stream? Bruce Ballentine: Improvements will be the responsibility of the HOA.. Jay Bryan: Is Staff recommending approval? Craig Benedict: If what is heard tonight is correct, the 33% requirement might not be met, and the plan would need to be changed before it could be approved,. MOTION made by Sam Lasris to table the discussion. Jeffrey Schmitt seconded. VOTE: Unanimous 35 MINUTES ORANGE COUNTY PLANNING BOARD FEBRUARY 1, 2006 REGULAR MEETING MEMBERS PRESENT: Jay Bryan, Chapel Hil] Representative (Chair); Theodore (Ted) W. Triebel (Vice-Chair), Little River Representative; Craufurd Goodwin, Hillsborough Representative; Michelle Kernpinski, Cedar Grove Township at Lazge; Sam Lasris, Cedar Grove Township At Lazge; Renee Price-Saunders, Hillsborough Township at Large; Brian Dobyns, Cheeks Township Representative; Bernadette Pelissier, Bingham Township; Jeffrey Schmitt, Cedar Grove Township MEMBERS ABSENT: Sandra Johnson Quinn, Eno Township STAFF PRESENT: Craig Benedict, Planning Director; Tom Altieri, Comprehensive Planning Supervisor; Robert Davis, Current Planning Supervisor; Sherri Ingersoll, Administrative Assistant II; Glenn Bowles, Planner II, Eddie Kirk, Planner II Other Attendees: George McFazley, Asst, Superintendent, Orange County Schools; Michael Hammersley, Corley, Redfoot and Zack; Ken Redfoot, Corley, Redfoot and Zack; Jean Corbett, Citizen; Christopher Tadevich, Citizen; Barry Corbett, Citizen AGENDA ITEM #S: CONSIDERATION OF 7HE ORCHARD SUBDIVISION CONCEPT PLAN Presenter: Glenn Bowles, Planner II Jay Bryan: Thanks, Glenn, for summarizing the changes. Glenn Bowles: This item was tabled last month, so that the applicant could make some adjustments to the plan. Now, the development is 61.5 acres. The Tanaka tract is not included in the plan, and the other parcel has been recombined, so the parcels have new tax id numbers, Excluding public right of ways, we have 59,5 acres of land, roughly. There are 22.1 acres of open space, which is just under 36% of the site. This map shows how the parcels were combined, in terms of how the property was platted many yeazs ago, There are two different types of topo lines. Along the streams, there aze 2' contour intervals, and the rest is mapped at 5' contour intervals, so things appear more dense and steeper. We asked the applicant to show the actual steep slopes. The other areas are slopes between 15-25%, which by definition, are considered as secondary open space. We must first consider all primary open space, the hazdwoods, steep slopes, and the floodplain, which is roughly 6-8 acres. The rest of'the open space is secondary open space (wooded areas, floodplain buffers, corridor buffers), which can be in platted lots, The orchard effect, trees and bamboo thickets, will be preserved. Our findings changed slightly from the last meeting, We are recommending approval, as the density, including the open space, is similar and consistent with at least''/z of the neighboring developed areas. Not all of the lots are the same size, We are recommending that the road be extended along the east lot line for potential future connectivity. Connectivity from other areas is not appropriate, due to the hazdwoods. Lots 9, 10, 11, 12 have been reoriented to stay out of steep open areas. Staff recommends approval of the concept plan. Jeff Schmitt: Why is the road extension being proposed? Glenn Bowles: For future connectivity. It was suggested by the Town of Carrboro to help with potential future development of adjoining areas. 36 Michelle Kempinski: On page 002 under existing, the appropriate number of lots should be 18. This is also noted on p. 003 at the bottom -there is no reduction of lots with the new design. Glenn Bowles: It was suggested that the density was transferred from the lazger tract, but as you can see, when the tract was cut off, the density was not really affected under the flexible development. Robert Davis: This abstract was prepared before the other property changes were made. Michelle Kempinski: Is the hatched area considered as open space? Glenn Bowles: It is not ,considered as open space, but the developer has considered some lot restrictions. Number 3 and 2 in the staff conditions show that we want to keep the open space areas in their existing natural conditions, except a possible trail. This will be further defined in the preliminary plan. Ted Triebel: So, the total acreage is 61.5 acres. On page 4 regarding water recharge rates, it shows 67 acres. What's the difference? GlennBowles: The number of households did change. There is one less house Ted Triebel: Are these national averages? Glenn Bowles: I used numbers which were from Madison, WI for total residential consumption, not total consumption. Also, the State of the Environment 2004 report reflects that as average. Ted Triebel: My gut feeling is that 65 is low, and there is potential for a problem. Glenn Bowles: 100 is frequently recommended, but that reflects total consumption. I feel confident about the 65. Bernadette Pelissier: When you take an average of all households, this development is for rather wealthy people, and wealthy people often use more water due to landscaping, etc. There is no data available reflecting varying average by income levels or size of houses, The actual usage will probably be higher than what is shown here. Craufurd Goodwin: I'd like to point out that recommendation #2 on p. 004 makes no sense. There is a duplication of words. Glenn Bowles: We will make that change. Michelle Kempinski: On #6 of the recommendations -why was only Gayle Wilson's attachment addressed, and not the other comments? Glenn Bowles: The other comments were already incorporated into the recommendations. Bernadette Pelissier: On recommendation #7 regarding traffic. Does this pertain specifically to this development? 3Z Glenn Bowles: Yes, NCDOT will be reviewing the plans to make certain that the traffic provisions aze adequate for the development, Ted Triebel: Recommendation #9 -The County does allow open burning, Robert Davis: The County allows no burning in relation to construction activities, Ted Triebel: Please clarify that in the recommendations. Jay Bryan: Is there a greenway plan for this part of the County? Glenn Bowles: Yes, there is one proposed along Phil's Creek, but not specifically here along Tones Ferry or Neville Branch, Bruce Ballentine: Regazding the road extensions, they aze always desired by municipal areas to provide access to land-locked areas. The adjoining property has extensive access to Tones Ferry Road, so it is not really needed, If it is your decision, or the BOCC.'s decision to dedicate the open space, we can accommodate that, rather than have an extended right-of--way. Jay Bryan: Would any members of the public like to speak? Jean Corbett: In looking at the Orange County State of the Environment report, the data on water consumption shows an increase in consumption from 124 gallons per day in 1985 to 145 gallons per day, which is a major increase. The estimate of 65 gallons per day per person seems unreasonable. I'm very concerned about the water, Chris Tadevich: My property is located northwest of the proposed development. We have a 600' well, that drawers water at %: gallon per minute, The neighborhood varies greatly, though, My concern is with the 65 gallon estimate, I used with work with community wells in California, and average consumption was 45,000 gallons per month, mainly for landscaping. I'm concerned about the homeowner restrictions for the landowners regarding landscaping and lawn maintenance in the development, since they will be upper income and will use more water to keep their lawns nice. I question the woodland accuracy. There is over 100' of old trees; and these plans do not seem to accurately show that. I'd like to understand how the woodland areas will be protected, and if encroachment will occur.. Also, the developer talked about trails, to encourage people to enjoy the forests. While I appreciate that, what type of requirements will be in place to maintain control of the open space areas? Open access space can cause problems with regard to the neighboring activities and disruption of the property. Could there be some type of fencing, or some method to maintain some level of control of the people using the space? Renee Price-Saunders: With regard to the public access, I had asked previously if this azea was open to the public, I understood that the trails would be used only by the homeowners, not for public use. Chris Tadevich: It would be Homeowner's Association land, but there would not necessarily be control over that space if it goes out to the frontage road, There would be an encouragement to go off into the wooded areas, which could attract a nuisance. Renee Price-Saunders Would people have a place to park to access the trail? 38 Chris Tadevich: There is open pazking available along Jones Ferry Road, and it is a highly used area for cyclists. Michelle Kempinski: Regarding the Corbett property next door, would you (Jean Corbett) consider a conservation easement? That may answer some of your concerns Jean Corbett: I've thought about it. Craufi>rd Goodwin: I'm confused about the various rates used for water usage. Glenn Bowles: There is a big difference beiween the consumption used for homes, rather than businesses or schools. Madison's numbers seem to be more consistent with experience. Craufiud Goodwin: These would not be metered wells. People can use as much water as they want.. Jay Bryan: My suggestion would be to address this at the next meeting, As a part of the March 1 report, could Staff give us some background about these figures and other studies to support the numbers used, that we can consider when evaluating proposals. Sam Lasris: What's the difference between flexible and conventional subdivisions? Glenn Bowles: Conventional subdivisions do not have open space requirements; flexible subdivisions do. Sam Lasris: We evaluate both, correct? Glenn Bowles: Yes, Flexible subdivisions have more flexibility rgazding lot size and open space, MOTION by Craufurd Goodwin to accept the Staff findings, with the exception of rewording #2 for coherence, and #9 with respect to open burning, Seconded by Sam Lasris. VOTE: Unanimous. 39 MINUTES ORANGE COUNTY PLANNING $OARD MAY 3, 2006 REGULAR MEETING MEMBERS PRESENT: Jay Bryan, Chapel Hill Representative (Chair); Brian Dobyns, Cheeks Township Representative; Craufurd Goodwin, Hillsborough Representative; Michelle Kempinski, Cedar Grove Township at Large; Joel Knight, Little River Representative; Bernadette Pelissier, Bingham Township; Renee Price-Saunders, Hillsborough Township at Lazge; Sandra Johnson Quinn, Eno Township MEMBERS ABSENT: Sam Lasris, Cedar Grove Township At Lazge; Jeffrey Schmitt, Cedaz Grove Township at Large STAFF PRESENT: Robert Davis, Current Planning Supervisor; Sherri Ingersoll, Administrative Assistant II; Eddie Kirk, Planner II; Michael Harvey, Planner II; Glenn Bowles, Planner II AGENDA ITEM #i: CALL TO ORDER AND ROLL CALL AGENDA ITEM #8: PRELIMINARY PLAN FOR THE ORCHARD SUBDMSION (VOTING ITEM) Presenter: Glenn $owles, Planner II Planning Boazd to hear Staff Report to make recommendation to the County Commissioners regazding the Preliminary Plan application for the Orchard Subdivision. Glenn Bowles: (Reviewed Abstract). I,ot numbers 10 and I 1 have been reoriented so that all the platted land is not in primary open space as the concept plan approval required. As a result of the Fire Marshal's comments, the developer has approached OWASA to use the University Lake as a source of water for fire suppression, OWASA has agreed but the specifics or design have not been completed, The Carrboro Courtesy Review requested a trail system azound the property, but Staff does not°agree because of the concern for erosion on steep slopes and maintaining the pristine environment. Also, they requested that the cul-de-sac be constructed to the eastern edge of the property. Staff was concerned about extending the road because the non-use of the road, the expected deterioration of the road due to no use, and there is question if and when the adjacent property may be developed and at what grade the road on the other side would be. Staff did not want the road to be paved twice if the grades do not match, Michelle Kempinski: Originally there was a question if'the Tanaka property should be considered as part of this subdivision when determining the number of allowable lots, When the subdivision was redrawn to exclude the Tanaka tract, was the number of allowable lots readjusted? The number of lots is pertinent, as it comes up with one less lot. Jay Bryan: Your question to Glenn is how was the 181ots determined? Michelle Kempinski: Yes. My calculation is lower. Jay Bryan: Would it be helpful to have the developer explain the calculations or the staff? Bruce Ballentine: The calculations are not only based on density. The underlying density is based on the parent tracts of land as of October 2, 1989. When the regulations changed in the County, you calculate the density by going back to legal lots on that date (2 tracts), multiplied by 5 acres and the rest at 5 acres; the Tanaka/Bennett original property was 47.91 acres, and was part of the parent tract. An additional calculation is the yield analysis. Michelle Kempinski: Are you using the 85-acre tract to calculate the number of lots? Bruce Ballentine: The density of the two parent tracts is included. Michelle Kempinski: Previously we used different numbers when calculating the open space. Why not use the same numbers? Glenn Bowles: These can be considered estate lots, which use different calculations, The residual lot can be considered as an estate lot, and al] open space in it. We based the open space calculation on the subdivision as submitted. The Tanaka tract is not actually a part of the preliminary subdivision, but since it is a part of the parent tract, the area cannot be further subdivided. Robert Davis: This is no longer part of the subdivision. Bruce Ballentine: 22 lots is the absolute maximum that could ever be developed on the two pazent tracts. Glenn Bowles: The Ordinance specifies the order to check the numbers. Step 1 is to calculate the yield analysis. Once the subdivision is established, step 2 is to calculate open space of the subdivision, Renee Price-Saunders: So, by removing the Tanaka tract from the subdivision, it cannot be further subdivided ih the future? Robert Davis; The density only allows one or two lots on the Tanaka tract, which will not change, The density calculation including the Tanaka tract was used in determining the density, That goes with the iot of record. Judith Wegner: What power does the Planning Board have regarding the assumptions for sustainable water supply and usage? Glenn Bowles: North Carolina water laws prescnbe a reasonable use dochine. Existing and future potential property owners have reasonable expectations of use of the groundwater, State law does not specify those levels. Judith Wegner: I understand the rights issue, I'm questioning more the linkage between the regulatory capacity and use as it applies to the allowable density, How does the water draw apply? Glenn Bowles: We use the USGS Study that was done in the 1990s that suggested that density of 2-3 acres per lot could be sustained under natural conditions based on nonnal groundwater flow, Judith Wegner: It would seem we have the density protocol regulations that don't say for us to try to regulate water usage. Jay Bryan: We don't have water regulatory authority. Renee Price-Saunders: We are waiting ko heaz from Geoff' Gledhill, County Attorney as to what we can do about establishing thresholds for water usage, As we've seen from the various presentations, this is a complicated subject, 40 41 Michelle Kempinski: Are there provisions for swapping impervious surface requirements? Is that allowable and legal? Bruce Ballentine: We had a similar situation in Meadowmont. The developer was tackling the issues of using the impervious requirements for all of all lots. With each building permit, the cumulative impervious surface azea is counted and recorded, so it can be determined by the neighborhoods. There are situations when this could be of benefit. Robert Davis: Impervious surface amounts need to be recorded on the final plat, and are redone on each request, Glenn Bowles: On a 2-acre lot, it's hard to hit 6%. The average impervious cover on 2-acre lots in Orange county is less than 4% Robert Davis: We don't encourage moving around the impervious limitations between properties, Jay Bryan: We can't solve that issue tonight. We may want to review the policy on impervious surface sharing at a later time. Bruce Ballentine: This is the third time this subdivision has been presented. We have made the requested changes, and this is essentially the same as the approved concept plan. Michelle Kempinski: Do we get to review the homeowner association covenants? Robert Davis: The County Attorney has these and they are being reviewed to check for conflicts. Jay Bryan: The Planning Board doesn't review these.. Renee Price• Saunders: The Carrboro review with trails and slopes, do we need to consider this? Glenn'Bowles: No. Jay Bryan: Regarding the use of University Lake as a source of water, what needs to be done? Bruce Ballentine: There are details relating to signage and traffic safety, OWASA is outlining the process. Is that a requirement for subdivisions in Orange County? I'm not sure why we're being requested to do this, and it will be quite an expense, Glenn Bowles: It was included in the Fve Marshal's comments. It is not a staff regulation but it is encouraged if the Fire Marshal recommends it. MOTION made by Craufurd Goodwin to accept the staff recommendations. Brian Dobyns seconded, VOTE: 9 ayes; 0 nay