ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 27, 2006
Action Agenda
Item No. q - ~
SUBJECT: Contract with Coulter .Jewell Thames for Engineering and Design Services for
Northern Park and Twin Creeks Park (Phase 1)
DEPARTMENT: Purchasing, ERCD, Recreation PUBLIC HEARING: (Y/N) No
& Parks
ATTACHMENT(S): INFORMATION CONTACT:
Pam Jones, 245-2650
Cost Proposal David Stancil, 245-2590
Organization Chart Lori Taft, 245-2660
Marabeth Carr. 960-3880
PURPOSE: To consider authorizing the Chair to execute a contract with Coulter .Jewell
Thames (CJT) for park pre-construction design and engineering services to secure permits,
conduct engineering work, and create construction drawings and specifications for bid
documents for Northern Park and Twin Creeks Park (Phase 1).
BACKGROUND: During 2005, the Board considered and approved master plans for two new
parks that would be constructed using proceeds from the voter~approved 2001 Parks and Open
Space Bond -Northern Park on NC 86 North (adjoining the Northern Human Services Center)
and Twin Creeks Park (Phase 1) on Old 86 north of Carrboro.
As both projects were at a similar phase of pre-construction, staff proposed in early 2006 to
solicit proposals from firms to conduct the needed permit approvals, engineering work and other
actions to create construction drawings and construction bid documents for the two parks
simultaneously, The concept of using one firm to perform the work for both projects was
proposed to simplify administration of the projects, and ptarsue potential cost savings,
In May 2006, a Request for Proposal was conveyed to professional engineering and design
firms to solicit interest, Six firms responded with proposals, and a Project Design Team was
convened to interview four firms, The Project Design Team included Chair Barry Jacobs, Twin
Creeks master plan committee member and Planning Board Ghair .lay Bryan, Northern Park
Master Plan participant Hattie Vanhaok, and staff members Pam Jones, Lori Taft, David Stancil
and Marabeth Carr. Carrboro Mayor Mark Chilton was invited to participate but was unable to
attend,
The four firms invited to interview were Site Solutions of Charlotte; MANA/Burger/Kempinski of
Hillsborough; Susan Hatchell/Corley, Redfoot and Zack of Raleigh/Chapel Hill; and Coulter
Jewell Thames of Durham, All interviews were conducted on Monday, June 5.
After interviewing the four firms, the Project Team recommended that Coulter Jewell Thames
(CJT) be selected to conduct the two projects. CJT has, within their firm, two areas of specific
expertise: landscape architecture and civil engineering, The Landscape Architecture group,
headed by Dan Jewell, President of CJT, would carry out this project, Staff highlighted on the
attached organizational chart would carry out the work. In addition, ERCD's Mara Beth Carr,
who is also a licensed landscape architect, would provide primary project management to
ensure this phase of development is carried out in a timely and quality manner.
Knowledge of and experience with the Town of Carrboro's Conditional Use Permit Process was
a strong consideration in the selection recommendation. Dan .Jewell has over the past 20 years
successfully obtained or is presently working to obtain Conditional Use Permits in Carrboro for
such projects as: Lake Hogan Farms (various phases since 1994), Harmony Farms and 300
East Main Street project in Downtown Carrboro,
In addition to Mr. Jewell, Mr, Steven Bailey, P,E., who will serve as the lead designer for the
Twin Creeks District Park, has gained extensive knowledge with the Conditional Use Permit
process while working with developers on the Lake Hogan Farms and Jones Property
Subdivision in Carrboro, These subdivisions are located near the Twin Creeks District Park,
Mr. Bailey has gained extensive knowledge of utilities, storm drainage and roads in this area
and the process that will be required to extend utilities, storm drainage and roads into and
around the Twin Creeks District Park, This knowledge will directly benefit the work to be carried
out under the proposed contract.
Assuming a June 27, 2006 approval date, the contract work would begin during the summer.
FINANCIAL IMPACT: The negotiated price of the services to be conducted for Northern Park
is a maximum of $105,000($8,000 constitutes additional services far which need will be
determined as the project progresses), and for Twin Creeks (Phase 1) a maximum of $219,500
($59,500 constitutes additional services for which need will be determined as the project
progresses), A cost proposal outlining mare specifically the services to be provided is attached
to this abstract, Funding from the 2001 Parks and Qpen Space Bond is appropriated in
previous budgets for this work, including $1,200,000 for Northern Park and $1,850,000 for Twin
Creeks, Phase 1,
RECOMMENDATION(S): The Manager recommends that the Board approve the contract with
Coulter Jewell Thames as cited herein; and authorize the Chair to sign on behalf of the Board,
subject to final review by staff and the County Attorney,
3
iff WE61 MAIN STREET
DURHAM, NORTH CAROLINA 1]]61
p919 662 9]68 1919 696 5646
P i s a l,. ~. i_ i h q Gulls ~~ e
LETTER OF PROPOSAL
made this 19th day of )une, 2006
To The OWNER
Orange County Purchasing Department
PO Box 8181
Hillsborough, NC 27278
Attn: Pamela Jones
By The SITE CONSULTANT
Coulter Jewell Thames, P..A,
11 I West Main Street
Durham, North Carolina 27701
Por Landscape Architecture and Civil Engineering Services
On Phase One of the Northern Community Park, Cedar Grove, and Phase One of the Twin Creeks District
Park, Carrboro
Description
This proposal is for Landscape Architecture, Civil Engineering, Site Plan Approval, Bidding and
Construction Observation services related to the site work associated with Phase One of each project A
Project Limits Map for each location is attached to this Proposal.
SCOPE OF BAS[C SERVICES:
A. NORTRERN COMMUNITY PARK
1. Pre~submittal Phase
1.01 Work with Owner and stakeholders to refine scope and general parameters of site design
1.02 Determine Storm Drainage and Utility Requirements
1.03 Meet with Orange County Planning, Engineering, Fire and Inspections to determine relevant
issues and approval process
1.04 Work with Owner to Develop Opinions of Construction Costs
1.05 Conduct a Sustainability Workshop with the Owner and stakeholders
1.06 Delineate jurisdictional wetlands on the property, prepare a map showing these wetlands, file
with USACOE
1.07 Provide Geotechnical Investigation to determine general soil conditions, depth to any bedrock
less than 20' deep, pavement design recommendations and buildmg footing design
recommendations
1.08 Work with Owner to select pre-engineered building type for restroom/shelter building
2, Design Development/Site Plan Approval
2.01 Prepare a detailed Site Plans for approval by the Orange County Planning and Engineering
departments, showing all of the Phase One requirements including but not limited to the
following:
• Existing conditions showing zoning, resource protection ordinance requirements, setbacks,
buffers, and any tabular site data
• Preliminary General Demolition Plan showing structures, pavements and known utilities
to be rcmoved/relocated
• Preliminary layout Plan of pavements, fields, pedestrian and vehicular circulation,
structures and other Phase One Improvements
• Preliminary Grading Plan for site, including spot elevations, Storm water Study, storm
drainage systems layout and support calculations
• Preliminary Erosion Control Plan detailing any NCDENR requirements
• Preliminary Utility Plan showing plan views of water and sewer connection to existing
system (System currently being designed and bid by Orange county)
• Preliminary Civil Related Site Details as required for Site Plan Approval
• Any supplementary storm drainage calculations and analysis as needed for Site Plan
Approval
• Preliminary Site Lighting Plan
• Preliminary Landscape Plan
2.02 Attend progress meetings with the Owner to coordinate site plan Drawings
2.0.3 Site visits as necessary to determine site conditions
2 04 Submit Plans to Orange County Planning Department for review and approval
2.05 Attend Staff Review Meetings
2.06 Revise Plans as necessary to receive Site Plan Approval
2.07 Develop Opinion of Probable Construction Costs
3. Construction Documentation
3.01 Prepare plans, specifications and support calculations suitable for approvals, pricing and
Construction of site elements
• General Demolition Plan showing structures, pavements and known utilities to be removed
and relocated
• Layout Plan showing pedestian and vehicular pavements, building locations, fields,
recreation areas
• Grading and storm drainage plan including necessary storm water BMP's
• Sports Fields including appurtenances, irzigation and design of water supply (well or
existing lake)
• Site Lighting
• Erosion Conhol Plan
• Water and Sewer Utility Plans including connection to existing water supply and
wastewater treatment facility, as well as a small sewer pump for the restrooms
• Vehicular and Pedestrian pavements
• Sitc Construction Details
• Specify a combination picnic shelter/restroom building with associated water/sewer/power
connections
.3,02 Prepare detailed plan/profile drawings for on-site water and sanitary sewer design..
.3,0.3 Design and documentation for storm drainage piping, erosion control and other support data and
details suitable for bidding, approval from all regulatory agencies (NCDOT, local engineering,
NCDENR) and construction.
3 04 Compliance with all design criteria's established by local, state and federal regulatory agencies
3.05 Develop Opinion of Probable Conshuc[ion Costs
5
4, Engineering and Regulatory Agency Approvals
4,01 NCDENR Erosion Confrol Permit for land disturbing operations for grading of site
4.02 NCDOT Driveway Permits as required for driveway modifications at NC 86
4,03 Coordinate with Environmental I-Iealth for new well
4,04 Prepare and submit plans and documents for submittal and approval [o Orange County for
Site Construction Plans
5. Bidding and Negotiation
5 O1 Dishibute plans and specifications to prospective bidders for pricing, following all applicable
state laws that govern the formal bid process for construction contracts involved with
public monies..
5.02 Conduct aPre-Bid Conference at a time and place selected by the Owner.
5.0.3 Prepare Bid Tabulations and Certification of Bid results For Owner.
5.04 Recommendation of Award of low, responsible, responsive bidder to the Owner
5,05 Assist Owner with preparing aConhact with selected utility conhactor.
6. Construction Observation/As-Built Drawings
6 O1 Make site visits, attend project meetings, provide clarification drawings while the site
construction is in progress to assist the contractor in interpreting the contract documents and to
ascertain the contractor's conformance with plans, and inform the Owner of any discrepancies.
6.02 Review project submittals and Change Orders.
6.0.3 Review contractors' applications for payment.
6.04 Perform substanfial completion and final completion inspections.
6.05 Provide final certification of water and sewer construction as required by the State.
6.06 Revise drawings based on As-Built survey, and submit As-Built elevations
for any Water and Sewer extensions.
7. Additional Services not included in Basic Scope of Services, which can be performed at the
direction of the Owner
7.01 Delineate jurisdictional wetlands on the property, prepare a map showing these wetlands, file
with USACOE
7.02 Construction Observation or daily inspections beyond details stipulated in 6,01
7.03 Re-designs authorized by the Owner including:
- Re-design of the Site Plan requested by the Owner after' plans are submitted to Orange
County for Site Plan Approval
- Re-design of the Site Construction Plans after Site Construction Drawings are submitted to
Orange County for Site Consfruc[ion Plan Approval except for city requested changes
7 04 Re-designs due to unknown or unanticipated field problems including, but not limited to
unsuitable soil and undiscovered utilities,
7.05 Water Feature Design
7.06 Field measurement of quantities of unsuitable materials
7.07 Laboratory testing of materials, borings, and specialized geological studies beyond those
services described in 1.07 above
7.08 Assistance in negotiating for land and easement rights..
7.09 Construction documents for buildings (proposal assumes pre-engineered buildings)
7.10 Preparation of building elevations as may be required for the site plan
7.11 Traffic Impact Analysis
7.12 Conshuction stake-out of any site features or details
7.1.3 Permit Application Fees, Site Plan Fees, Re-review Fees
7.14 Design of any water or sewer disposal or hea[ment facilities
Z.I S Plats and easement maps
7.16 Off-site road improvements
7..17 Environmental assessments other than Wetlands Delineation
7.18 Wetlands/Stream Disturbance Permitting
7. I9 Surveying other ilran Wetlands Mapping
7..20 Flood Studies and FEMA permitting
7.21 Stream determination
B, TWIN CREEKS DISTRICT PARK
1. Pre-submittal Phase
1.01 Work with Owner and stakeholders to refine scope and general parameters of site design
1.02 Determine Storm Drainage and Utility Requirements
1,0.3 Meet with Town oYCarrboro Planning, Public Works, Sungate Engineering, Fire and
Inspections to determine relevant issues and approval process
1.04 Work with Owner to Develop Opinions of Constmction Costs
1.05 Conduct a Sustainability Workshop with the Owner and stakeholders
1.06 Delinea[ejurisdictiona) wetlands on the property, prepare a map showing these wetlands, file
with USACOE
1.07 Meet on-site with Town of Carrboro/Sungate design to determine extents of jurisdictional
streams and stream buffer. Map locations of streams
1.07 Provide Geotechnical Investigation to determine general soil conditions, depth to any bedrock
less than 30' deep, pavement design recommendations and buildmg footing design
recommendations
1.08 Work with Owner to select pre-engineered building type for picnic shelters
1.09 Mee[ with the design Consultants for the proposed new elementary school to the north, and the
proposed Ballentine subdivision by MI homes to the south [o coordinate locations of trails,
streets and utilities
2, Design Development/Site Plan Approval
2AI Prepare a detailed Site Plans for approval by the Town of Carrboro, showing all of the Phase
One requirements including but not limited fo the following:
• Conditional Use Permit Application including Plans ,calculations and support documents
• Existing conditions showing zoning, resource protection ordinance requirements, setbacks,
buffers, and any tabular site data
• Preliminary General Demolition Plan showing structures, pavements and known utilities
to be removed/relocated
• Preliminary layout Plan of pavements, fields, pedestrian and vehicrdar circulation,
sfructures and other Phase One Improvements
• Preliminary Grading Plan for site, including spot elevations, Storm water Study, storm
drainage systems layout and support calculations
• Preliminary Erosion Conhol Plan detailing any NCDENR requirements
• Preliminary Utility Plan showing plan views of water and sewer connection to existing
system
• Preliminary Civil Related Site Details as required for Site Plan Approval
• Any supplementary storm drainage calculations and analysis as needed for Site Plan
Approval
• Preliminary Site Lighting Plan
• Preliminary Landscape Plan
2,08 Attend progress meetings with the Owner to coordinate site plan Drawings
2.09 Site visits as necessary to determine site conditions
2.10 Submit Conditional Use permit Application to Town of Carrboro for review and approval
2.11 Advertise and Facilitate Neighborhood Information Meeting
2.12 Attend Staff Review Meetings
2.1.3 Revise Plans as directed by Staff to receive recommendation for Conditional Use Permit
Approval
2.14 Present to Town Advisory Boards at a Courtesy Review
2..15 Present to Town Advisory Boards for final plan recommendations
2.16 Present to Board of Aldermen for CUP Approval
2.17 Develop Opinion of Probable Conshuetion Costs
3. Construction Documentation
.3,06 Prepare plans, specifications and support calculations suitable for approvals, pricing and
Conshuetion of site elements
• General Demolition Plan showing structures, pavements and known utilities to be removed
and relocated
• Layout Plan showing pedestrian and vehicular pavements, building locations, fields,
recreation azeas
• Grading and storm drainage plan including necessary storm water BMP's
• Sports Fields including irrigation and design of water supply (well or existing lake)
• Site Lighting
• Erosion Confiol Plan
• Water and Sewer Utility Plans including connection to existing water supply and
wastewater heatment facility, as well as a small sewer pump for the resfiooms
• Vehicular and Pedestrian pavements
• Site Construction Details
• Specify a combination picnic shelter/resfioom building with associated water/sewer/power
connections
3.07 Prepare detailed plan/profile drawings for on-site water and sanitary sewer design.
.3.08 Design and documentation for storm drainage piping, erosion conhol and other support data and
details suitable for bidding, approval from all regulatory agencies (NCDOT, local engineering,
NCDENR) and construction.
3.09 Compliance with all design criteria's established by local, state and federal regulatory agencies
3.10 Develop Opinion of Probable Construction Costs
4. Engineering and Regulatory Agency Approvals
4 OS NCDENR Erosion Confiol Permit for land disturbing operations for grading of site
4 06 NCDOT Driveway Permits as required for driveway modifications at NC 86
4 07 Coordinate with Environmental Health for new imgation system well
4.08 Prepare and submit plans and documents for submittal and approval to the Town of Carrboro for
Site Conshuetion Plans
5. Bidding and Negotiation
5.01 Distribute plans and specifications to prospective bidders for pricing, following all applicable
state laws [hat govern the formal bid process for construction contracts involved with
public monies.
5.02 Conduct aPre-Bid Conference at a time and place selected by the Owner.
5.03 Prepare Bid Tabulations and Certification of Bid results for Owner.
5,04 Recommendation of Award of low, responsible, responsive bidder to the Owner.
5.05 Assist Owner with preparing aContrac[ with selected utility contractor.
6. Construction Observation/As-Built Drawings
6.01 Make site visits, attend project meetings, provide clarification drawings while the site
construction is in progress to assist [he contractor in interpreting the contract documents and to
ascertain the contractor's conformance with plans, and inform the Owner of any discrepancies,
6.02 Review project submittals and Change Orders.
6.03 Review contractors' applications for payment.
6.04 Perform substantial completion and final completion inspections.
6.05 Provide final certification of water and sewer conshuction as required by the State.
6.06 Revise drawings based on As-Built survey, and submit As-Built elevations
for any Water and Sewer extensions.
7, Additional Services not included in Basic Scope of Services, which can be performed at the
direction of the Owner
7.01 Expanded Conditional Use Permit - Expand Conditional Use Permit to include Phase 2
improvements as shown on the attached map (2 additional soccer fields, 2 baseball fields, Tennis
Courts, basketball courts, volleyball courts, tot lot, Park base, associated parking,
restroom/concession building, roller hockey and associated drives, trails, storm and utilities
(this is not a construction or bid level package) Submitted at the same time as Phase One
7.01 Boundary Survey
7,02 Meet on-site widr Town of Carrboro/Sungate design to determine extents of jurisdictional
streams and stream buffer. Map locations of streams.
7.04 Delineate jurisdictional wetlands on the property; prepare a map showing these wetlands, file
with USACOE
Other Additional Services;
7.05 Construction Observation or daily inspections beyond details stipulated in 6.01
7.06 Re-designs authorized by the Owner including:
- Re-design of the Site Plan requested by the Owner after plans are submitted to Orange
County for Site Plan Approval
- Re-design of the Site Construction Plans after Site conshuction Drawings are submitted to
Orange County for Site Construction Plan Approval except for city requested changes
7.07 Re-designs due to unknown or unanticipated field problems including, but not limited to
unsuitable soil and undiscovered utilities.
7.08 Water Feature Design
7.09 Field measurement of quantities of unsuitable materials
7.10 Laboratory testing of materials, borings, and specialized geological studies beyond those
services described in 1.07 above
7..1 I Assistance in negotiating for land and easement rights.
7..12 Construction documents for buildings (proposal assumes pre-engineered buildings)
7..13 Preparation of building elevations as may be required for the site plan
7.14 Traffic Impact Analysis
Z 15 Flood studies or FEMA permitting
7.16 Construction stake-out of any site features or details
7.17 Permit Application Fees, Site Plan Fees, Re-review Fees
7,18 Design of any water or sewer disposal or neatment facilities
7.19 Plats and easement maps
7.20 Off-site road improvements
721 Environmental assessments other than Wetlands Delineation
722 Wetlands/stream disturbance permitting
7..2.3 Surveying
714 Design and Engineeringof the main road from Old NC 86
The Site Consultant will not be responsible for or have control or charge of construction means, methods,
techniques sequences or procedures or for safety precautions and programs in connection with the work,
and will not be responsible for the contractors failure to carry out the work in accordance with the conftact
documents.. The Si[e Consultant will not be responsible for or have control or charge over the acts or
omissions of the contractor, subcontractors or any other agents or employees or any other persons
performing any of the work. It will be the responsibility of the contractor to verify the depth and location
of all underground utilities prior to starting conshuction. Should any underground utility not be located as
shown on the drawings, the conttactor will notify the Site Consultant immediately before starting any
construction for a resolution of the discrepancy, The Site Consultant will be saved harmless from any
damaged utility during conshuction with the cost for repairing any underground utility borne by the
connactor
OWNER RESPONSIBILITIES:
The Owner will appoint a representative through which all communications with the Site Consultant will
take place.. The Site Consultant will be allowed access to the site at all times. The Owner will be
responsible for payment of any and all permit and application fees. The Owner will keep the Site
Consultant apprised of all relevant information that could affect the work. The Owner will also be
responsible for' any fees charged by utility locating services. The Owner shall also provide the Site
Consultant with a sealed professional survey of the sites..
COMPENSATION:
Compensation for basic services as outlined in the above scope of~work will be provided for the stipulated
sums listed below plus reimbursable expenses as listed in the attached schedule. Additional Services will
be performed as requested according to the hourly rate schedule.
A, Northern Community Park Basic Services:
1. Pre-submittal $25,000
(includes $ 16,000 Geotech)
2 Design DevelopmenUSite Plan Approval $25,000
3. Construction Drawings $19,000
4. Engineering and Regulatory Permitting $ 4,000
5 Bidding Phase $ 4,000
6.. Construction Phase Services $20.000
Total $ 97,000
7.. Additional Services if needed and requested by the Owner
7.01 Wetlands delineation and mapping $ 8,000
7.02 - 721 Hourly at the Standard rates
B. Twin Creeks District Park Basic Services:
1. Pre-submittal $30,000
(includes $19,000 Geotech)
2, Design DevelopmenUSite Plan Approval $82,000
3. Construction Drawings $10,000
4. Engineering and Regulatory Permitting $ 7,000
5. Bidding Phase $ 4,000
6. Construction Phase Services $27.000
To tal $160,000
7. Additional Services if needed and requested by the Owner
7.01 Expanded Conditional Use Permit $25,000
7.02Boundary/Recombination Survey $17,500
io
7 0.3Carrboro Stream Delineation $ 5,000
7.04Wetlands delineation and mapping 512,000
7.05 -7.24 Hourly at the Standard rates
Standard Hourly Rates
Licensed Professional Engineer _.... „_... _.. .. $ 110.00/hour
Licensed Professional Landscape Architect _._._ _. _..... $ IIO.OOArour
Licensed Professional Consultant ...._. ..... _... _..... $ t0000/Irour
Survey Field Crew _.. _. _... _ _.... $ 120,OOPoour
Engineer-in-7mming _.. _... _.. _...__ _.. . _...... $ 75.OOPoour
Survey Crcw, _..... _.. ..._. __. _.. $ 95.OOPoour
AutoCAD Technician, _... _,... _. __., ..... $ 6000Atour
Secretarial,,... _.. .. __. _._.. . ... $ 25.OOAtour
Environmental Consultant _.._. _.,, .. $ IOO.OOArour
Standard Reimbursable Expenses
Blueprints $L50/sheet
Mylar Sepias S10 00/sheet
Photocopies $0.10/page
Out of Town Mileage $0 30 /mile
Plotting $10,00/sheet
Postage, Express Mail cost
Long Distance Phone cost
Film and Photo processing cos[
Out of Town Travel Expenses cost
BILLING AND PAYMENT:
The Site Consultant shall bill the Owner monthly for the percentage of each phase completed since the
previous billing period.
Respectfully tendered this t9`h day of June, 2006
ror The Consultant
COULTER JEWGLL THAMES, P,A.
Daniel A. Jewell, RLA, ASLA President
ATTEST
Eric O. Staehle, RL.A, ASLA Vice President
Date: Date:
COULTER JEWELL THAMES P.A. ORGANIZATIONAL CHART
**Note: Highlighted area indicates personnel nssigned to County Project.
PRINCIPAL OWNERS OF COULTER JEWELL'I'HAMES Y.A.
Daniel A, Jewell R.L.A. -Landscape Architect James W, Thames P.E. -Civil Engineer
President, Officer, Director Vice President, Treasurer, Officer, Director
Oversees the Following: Private Developments, Parks, Oversees the Following: Municipal Projects, such as
Greenway Trails, Subdivision Designs Waterlines, Sanitary Sewers, Pump Stations, Roads
25 Years Experience 26 Years Experience
MINOR SHAREHOLDERS IN COULTER JEWELL THAMES P.A.
Eric O, Staehle R,L,A, -Landscape Architect Andrew M. Oakley P,E. -Civil Engineer
Lead Designer Lead Designer
Project Landscape Architect Project Engineer
9 Years Ex erience 10 Years Ex erience
Steven P. Bailey P,E. -Civil Engineer Jeffrey P. Williams R.L.S. -Surveyor
Lead Designer Oversees all Land and Field Surveying Operations
Project Engineer 20 Years Experience
7 Years Ex erience
STAFF PROFESSIONALS
Thomas R, Kagarise P.E. -Civil Engineer Wendi L. Ramsden R.L.A. -Landscape Architect
Assist Lead Designers Assist Lead Designers
Consnvction Administration 8 Years Experience
31 Years Experience
Thomas W, Fore P.E. -Electrical Engineer
Oversees all Electrical Designs, Power Distributions, Inshumentation
40 Years Experience. Works with Lead Designers
TECHNICAL S UPPORT STAFF
John P. Dornblazer-Engineering Intern Mark A. Hamlett -Engineering Intern
Graduate Civil Engineer Graduate Civil Engineer
Provides Technical Support, Drafting Provides Technical Support, Drafting
28 Years Ex erience 3 Yeazs L•x erience
Stacy C, Patrick -Engineering Intern Ashley H. Moore -Engineering Technician
Graduate Civil Engineer Provides Technical Support, Drafting
Provides Technical Support, Drafting 8 Years Experience
2 Years Ex erience
Kevin M. Burke -Engineering Technician Jeanie R, Chandrasurin - AutoCAD Technician
Provides Technical Support, Drafting 7 Years Experience
22 Years Ex erience
Jeffrey D. Jennings - AutoCAD Technician Catherine L. Jenkins - AutoCAD Technician
William J. Butner- Survey Crew Bradley J, Geereken -Survey Crew