HomeMy WebLinkAboutAgenda - 06-06-1991ORANGE COUNTY BOARD OF COMMISSIONERS
WORK SESSION
JUNE 4, 1991
The Orange County Board of Commissioners met jointly with the
Hillsborough Town Commissioners at 7:30 p.m. in the Agricultural
and Planning Building in Hillsborough.
COUNTY COMMISSIONERS PRESENT: Chairman Moses Carey, Jr., and
Commissioners Alice Gordon, Don Willhoit and Verla Insko (arrived
at 8:45).
COUNTY ATTORNEY PRESENT: Geoffrey Gledhill
COUNTY STAFF PRESENT: County Manager John M. Link, Jr., Clerk
to the Board Beverly A. Blythe, Planning Director Marvin Collins,
and Planner Gene Bell.
TOWN OF HILLSBOROUGH COMMISSIONERS AND STAFF: Town
Commissioners Bob Rose, Remus Smith and Allen Lloyd, Mayor Horace
Johnson, Town Clerk Agatha Johnson and Planner .
A. OPENING COMMENTS FROMMAYOR JOHNSON AND CHAIRMAN CAREY
Both officials commended the work group for their deligence
and hard work in putting together this proposal. Mayor Johnson
feels this cooperative planning zone will determine the future
growth for Hillsborough which will depend on the availability of
water and sewer. There are a few minor concerns they want to
discuss this evening. Chairman Carey stated that the group tried
to recognize and pursue the interest of both the County and the
Town and at the same time perserve the integrity of the Orange
County Comprehensive Plan. There will be details to discuss
further. However, those issues which have been discussed are the
basic ones the group felt it was important to reach agreement on
before moving ahead. If there is consensus on these issues, the
County Attorney will be directed to draw up an agreement for
consideration by the Town and the County governmental boards. Once
it is approved, the planning boards can begin to work on developing
the standards to implement the agreement. Some of the concepts can
be addressed at this time and some will be addressed at some point
in the future.
B. OVERVIEW OF THE COOPERATIVE PLANNING ZONE PROPOSAL FOLLOWED
BY DISCUSSION
Mayor Johnson noted two areas they would like the County to
consider including in the twenty year transistion area. The first
area is on Dimmocks Mill Road at Orange Grove Road. The Town
already has two inch lines extended to the road leading to
Moorefields and the Department of Transportation has put two sleves
over the bridge so that if there is any growth in that area, the
Town would not need to pay the cost of going under the highway.
Chairman Carey indicated this would need to be dealt with in the
future. The reason the line was moved to the east of Dimmocks Mill
Road will become clear when talking about watershed protection in
that part of the County.
Marvin Collins explained the different areas on the map and
why the lines are placed where they are based on a consensus
reached by the work group. The map is in the permanent agenda file
in the Clerk's Office. He explained that extension of water and
sewer could be made in the water /sewer service area but that they
would be made in accordance with the Rural Character Study
guidelines which have been developed by the County.
Bob Rose clarified that issue ,#3 means that the Town will not
extend water and sewer into an area they cannot pay for but that
the developer would need to pay that expense. Hillsborough needs
to have the option whether or not to allow the extension of water
and sewer. They won't make any extensions as long as the water is
needed in town.
Bob Rose explained that Davis Road forms the northern boundary
of the watershed. What this means is that this line does not go
along the entire length of Davis Road.
Chair Carey stated that one thing not expressly written in the
proposal is that in the transition area it would be expected that
when Hillsborough annexes this area that they will provide all the
required services that are in an urban area.
Both Boards generally agreed with the boundary lines of the
water /sewer service area as shown on the map. Bob Rose identified
two areas they would like for the County to include in the twenty
year transition area. The first area is at the I -40 and old 86
intersection. One side is in the twenty year transition and the
town asked that this be extended to the other side of 1 -40. The
other parcel is located at where Highway 70 and 70A split at the
Wayside Baptist Church. If these two areas are included, the Town
would be ready to accept the map.
John Link explained that the County Planning Board and the
Economic Development Board are looking at the area on 1 -40 they are
talking about.
Everyone agreed that further discussion needs to take place
on these two areas of concerns.
Commissioner Gordon suggested that the water /sewer area be
called "Open Space District ". This will be decided at a later
time.
Commissioner Insko
The County Attorney will write an agreement on the points on
which a consensus was reached. The agreement can be amended when
consensus is reached on the two areas identified as concerns by the
Town of Hillsborough.
C. DISCUSSION OF ITEMS OF MUTUAL INTEREST
Commissioner Willhoit expressed a concern about Durham's long
range plan for extension of water and sewer into Orange County.
A meeting with Durham County may need to be scheduled to clarify
Durham's intent for this area.
Bob Rose made reference to the 16" waterline from Chapel Hill
to Hillsborough and asked that the County assist them in getting
the use of this line. It would help Hillsborough with their
water pressure and allow for additional tapons. This would save
Hillsborough a lot of money, time and effort if they could use this
line. There would need to be a valve installed which could be
opened if water was to go through to Chapel Hill or from Chapel
Hill to Hillsborough.
Chairman Carey suggested that the Town and County meet with
OWASA to discuss Hillsborough using this line.
Chairman Carey adjourned the meeting at 8:55 p.m. The next
regular meeting of the Board will be held on June 25, 1991 at 7:30
p.m. in the courtroom of the old Post Office in Chapel Hill.
Moses Carey, Jr., Chair
Beverly A. Blythe, Clerk
Moses Cci.rey, Jr.
Alice M. Gordon
Stephen H. Halkiotis
Verla I. Insko
Don Willhoit
ORANGE COUNTY COMMISSIONERS
P.O. Box 8181
HILLSBOROUGH N.C.
27278
AGENDA
ORANGE COUNTY BOARD OF COMMISSIONERS
AND
THE TOWN OF HILLSBOROUGH
JUNE 4, 1991
7:30 P.M.
732 -8181
968 -4501
688 -7331
227 -2031
644 -3004 (Fax)
THIS MEETING WILL BE HELD IN THE AGRICULTURAL AND PLANNING BUILDING
ON REVERE ROAD IN HILLSBOROUGH IN MEETING ROOM #1.
A. OPENING COMMENTS FROM MAYOR HORACE JOHNSON AND COMMISSIONER
MOSES CAREY, JR.
B. OVERVIEW OF THE COOPERATIVE PLANNING ZONE PROPOSAL FOLLOWED
BY DISCUSSION.
C. DISCUSSION OF ANY ITEM OF MUTUAL INTEREST
D. ADJOURNMENT
YOU COUNT IN ORANGE COUNTY!
�, 6
M M a ff 7
HILLSBOROUGH CPZ
PROPOSAL
PROCESS STATEMENT:
A joint work group of two persons from each elected board has
reviewed and discussed the objectives and issues inherent in a
cooperative planning and land use agreement. The process included
sharing drafts of maps and proposals for resolving issues raised
by other elected board members, each planning board chair, and the
Rural Character Study Committee Chairman. Issues have been
reasonably resolved so as to achieve the goals of the Town of
Hillsborough while preserving the intent of the Orange County
Comprehensive Plan. This document does not provide a complete list
of Hillsborough goals or a summary of relevant county comprehensive
plan components. However, a list of issues resolved through mutual
agreement of the work group members is included.
CONCEPTUAL FRAMEWORK
It is proposed to approach CPZ planning and agreement in two
phases. Phase I Rural Character alternative and Phase II Transit
Corridor Alternative will be discussed in that order. When
agreement is reached, the elected boards will set a time frame for
implementing Phase I. The staff and planning boards will develop
the appropriate development standards and land use recommendations
for elected board approval. Phase II would serve only as a basis
for discussion and agreement on issues necessary to pursuing town
and /or county economic development, transportation planning, land
use or other goals.
PHASE I - RURAL CHARACTER ALTERNATIVE
The Rural Character Study Committee has recommended strategies
which could serve to address Hillsborough's concerns and still
preserve the intent of the County Comprehensive Plan. The basic
strategy is to allow public water /sewer extension in designated
rural areas outside the transition area but only to serve those
development which preserve rural character by providing large
amounts of open space in exchange for density bonuses. Five
development options have been recommended and have been summarized
in attachment A. This designated rural area is identified as a
Rural Character
The rationale for establishing a Rural Character District to
the south and east of Hillsborough is found in the comprehensive
plan. The plan suggests the establishment of a land use
designation for the purpose of creating a "buffer" between
developing urban areas.
M M a ff 7
0A
Creating a "Rural Character District" and a larger minimum lot size
requirement sends a clear signal that increased density and non
residential development will not be permitted except through
approved rural character preservation strategies.
For the Rural Character alternative to be effective,
Hillsborough must agree not to annex property in the water /sewer
service area beyond the transition area boundary. Hillsborough
must also agree not to extend public water and sewer beyond the
transition area boundary except in accord with the rural character
strategies adopted by Orange County.
PRASE II - TRANSIT CORRIDOR ALTERNATIVE
In a recent report, the Research Triangle Regional Transit
Land Use Study, strategies were outlined for the development of a
fixed guideway transit system consisting of light rail people
mover, dual -mode bus, and /or busway facilities. The strategies
included have long -range implications for Orange County. The land
use transit strategies (which will not be summarized here) address
a number of issues which are currently being discussed by the
County's Economic Development Commission and Planning Board. These
can be the focus of subsequent County /Town planning agreements.
CONSENSUS ISSUES
The joint work group reached consensus on the following issues
and the supporting map #7 -- exhibit B attached.
1. Hillsborough will not annex beyond the transition area
limits within the next 20 years.
2. Growth within the transition area will be non -
concentric, eg. dispersed growth based on ability to
extend gravity sewer and the demand for service around
major transportation corridors.
3. Public water and sewer extensions beyond transition area
boundaries will be limited to large developments or a
combination of smaller developments with the expense of
such extensions borne by the developer(s).
4. Orange County will have full control over zoning in the
extended water /sewer service areas (Rural Character
District) with Hillsborough providing service only where
feasible.
5. The Town will be primarily responsible for processing
development applications in the transition area while the
County will be primarily responsible for processing
development applications outside the transition area.
Details for joint or courtesy review must be developed.
6. The Land use and Comprehensive Plan in the CPZ area will
be reviewed at least every five years.
7. All land use and zoning changes in the transition area
must be approved by both the County and the Town.
DaGlffq
3
8. The proposed water and sewer service area will not extend
into the Rural Buffer of the Orange County - Chapel Hill -
Carrboro Joint Planning Area.
9. The proposed water and sewer service area will not
encompass the entire Davis Road Area.
10. The proposed water and sewer service area will be limited
so as not to extend into a portion of the Upper Eno
Protected Watershed (PW -II) district along Orange Grove
and Dimmocks Mill Road.
CONSENSUS ISSUES WHICH MUST BE ADDRESSED BY DEVELOPMENT PERFORMANCE
STANDARDS AND POLICY CHANGES
1. Protection of the Eno Division of Duke Forest. This can
be accomplished by limiting extensions of water and sewer
through the tract and developing performance standards
applicable to proposed projects on adjoining property.
This would insulate Duke Forest from adverse impacts and
insure the preservation of wildlife /forest habitat.
2. Orange County's Comprehensive Plan and Water and Sewer
Policy will have to be changed to reflect the distinction
between "urban growth area" and a "water /sewer service
area ", a major policy change for the County.
3. Maintenance of Rural Character District between
Hillsborough and Durham City to mitigate against
potential impact of proposed water line and water sales
agreement between Hillsborough and Durham City. This is
compatible with the Phase I - Rural Character
Alternative.
W
2.
3.
4.
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
OPTION A
Option A allows for two -acre lot single -- family _
residential subdivisions, as permitted currently in the
Rural Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE * *: 0%
OPTION B
Option B allows for five -acre lot single- family
residential subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally - sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: 0%
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
OPTION C
Option C allows for a clustered 1 -acre lot single- family
development where 40% of the tract is left in open space
(either agricultural or natural).
AVERAGE LOT* SIZE:
REQUIRED OPEN SPACE * *:
OPTION D
0.92 ACRES
40% OF TRACT
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two - thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 67% OF TRACT
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost - effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
5. OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small -scale
village -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four - fifths, or 80 %, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and - collector roadways and
feasible public utility-extension to create a
logical, cost- effective and easily- defined
corridor where such developments would be
encouraged.
Rural Village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways.
�` Aw4a
The Commercial /znstitut�_onGl core of the Rural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single- family residential lots only.
** - Roadways and easements, except pre - existing utility
easements, cannot be placed in or subtracted from open
space set- asides.
IILLSBOROUGH GPZ - TRANSITION AREAS
peaty an 7: Rase Proposal (Revised) Exhibit B
Illl,in °,.. a'i�i
.�.. ,arri�! . w�
I.
2.
3.
4.
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
OPTION A
Option A allows for two -acre lot single - family _
residential subdivisions, as permitted currently in the
Rural Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE": 0%
Option B allows for five -acre lot single - family
residential subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally - sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: 0%
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
OPTION C
Option C allows for a clustered 1 -acre lot singly:- family
development where 40% of the tract is left in open space
(either agricultural or natural).
AVERAGE LOT* SIZE: 0.92 ACRES
REQUIRED OPEN SPACE * *: 40% OF TRACT
OPTION D
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two - thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
W �� .:
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 57% OF TRACT
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost - effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
5. OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small -scale ..
village -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four- fifths, or 80 %, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and - collector roadways and
feasible public utility extension to create a
logical, cost - effective and easily- defined
corridor where such developments would be
encouraged.
Rural Village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways.
r
r
The Commercial /Institutional core of the Fural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single- family residential lots only.
** - Roadways and easements, except pre - existing utility
easements, cannot be placed in or subtracted from open
space set - asides.
�» �r .
!. p,,
HILLSBOROUGH CPZ - TRANSITION AREAS ,
Option t 7: Rose Proposal (Revised) Exhibit B
Skf L
H GH'
I
LATlytR 5�
A. At, 1 lctw6 rr.
bly. CT. yl V
I I
Now
57
0 1332
q,
z
U
c
BURKE
1556
A,
«: a
1397
`,.t?�r,�;�����
e
.
'I Lena
that
/4.
19
To IT" RENCAEP 51
-\1
&
4 VOOCLA�k
rf 'LAM, AdL,
•
I
j. orohon
HOLIDAY
SCN. &US
IARACE RD.
Eno
A
Skf L
H GH'
I
LATlytR 5�
A. At, 1 lctw6 rr.
bly. CT. yl V
I I
. I / I
q,
0
«: a
8�
`,.t?�r,�;�����
e
.
p Y ,
. I / I
1.
00
0
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
OPTION A
Option A allows for two -acre lot single - family _
residential subdivisions, as permitted currently in the
Rural. Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE * *: 0%
OPTION B
Option B allows for five -acre lot single - family
residential subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally -- sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: 0%
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
A!W001ZM
Option C allows for a
development.where 40%
(either agricultural
AVERAGE LOT* SIZE:
REQUIRED OPEN SPACE **
4. OPTION D
clustered 1 -acre lot single- family
of the tract is left in open space
or natural).
0.92 ACRES
40% OF TRACT
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two- thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 67% OF TRACT
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost -- effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
5. OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small -scale
village -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four - fifths, or 80 %, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and- collector roadways and
feasible public utility extension to create a
logical, cost- effective and easily- defined
corridor where such developments would be
encouraged.
Rural Village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways.
The Commercial /Institutional core of the Rural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single- family residential lots only.
** - Roadways and easements, except pre - existing utility
easements, cannot be placed in or subtracted from open
space set - asides.
MI LLSBOROUGH CPZ - TRANSITION AREAS
Option Z 7: Rose Proposal (Revised) Exhibit B
OfqAOPGL
cR05$h%u
C" RD ■ ENE
0 86 57 10
1 .p 1332
CN
6m
CD
01 BURKE
'w 1556
I TREEIm TREE c a
4 WOOD.AWN
WKNER ST ENS q ^ OR
KH. bu$
'0
64R.AGE RD,
1,,>Orohon
Z
ME,
7 GH
C]
j. H R
WING ST.
19T'Vdw
UI -1 TD
Ctv R 114
'?fXo
SEX END br. RD. U.S'70
114$
BUS
1'r 10
AqQ CATE i .
ILEWkEUF it
CL
4
Luts 0
T -A up No
cy
b IM
Cr
a ID Lk
/yy CR.
� 0
7
z
2:
�
En q
RD.
I. �p.
J
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
1. OPTION A
Option A allows for two -acre lot single - family
residential subdivisions, as permitted currently in the
Rural Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE * *: 0%
2. OPTION B
Option B allows for five -acre lot single- family
residential subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally - sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: OAS
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
3. OPTION C
Option C allows for a clustered 1 --acre lot single- family
development where 40% of the tract is left in open space
(either agricultural or natural).
AVERAGE LOT* SIZE: 0.92 ACRES
REQUIRED OPEN .SPACE * *: 40% OF TRACT
4. OPTION D
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two - thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 67% OF TRACT -
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost- effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
5. OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small - -scale . -
village- -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four - fifths, or 80%, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and - collector roadways and
feasible public utility-extension to create a
logical, cost - effective and easily- defined
corridor where such developments would be
encouraged.
Rural Village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways.
The Commercial /Institutional core of the Rural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single - family residential lots only.
** - Roadways and easements, except pre - existing utility
easements, cannot be placed in or subtracted from open
space set - asides.
HILLSBOROUGH CPZ - TRANSITION AREAS
Option t 7: Rase Proposal (Revised) Exhibit B
ORANGE COUNTY COMMISSIONERS
P.O. Box 8181
HILLSBOROUGH, N.C.
27278
Moses Carey, Jr.
Alice M. Gordon
Stephen H. Halkiotis
Verla I. Insko
Don Willhoit
MEMORANDUM
TO: Commissioner Verla Insko
FROM: Chairman Moses Carey, Jr.
DATE: April 11,.:1991
RE: CPZ PROPOSAL
732 -8181
968 -4501
688 -7331
227 -2031
644 -3004 (Fax)
The attachment; is ;a summary; =of the discussion and agreements
of the Joint CPZ Work <.droup. -It is:also the document which will
serve as the focus'. forrr further discussion with,, the Hillsborough
Town Board and;the Orange County .Board-- ,�oE'Commissioners. I will
proceed to set up a joint: meeting, as soon as possible. If you have
any comments or changes, pleasw,-let me' =know.
cc: John M. Link,,Jr:'
Geoff Gledhill
County Commissioners.
YOU COUNT IN ORANGE COUNTY !
QI
1
HILLSBOROUGH CPZ
PROPOSAL
PROCESS STATEMENT:
A joint work group of two persons from each elected board has
reviewed and discussed the objectives and issues inherent in a
cooperative planning and land use agreement for several months.
The process has included periodically sharing drafts of maps and
means for resolving issues with other elected board members and
each planning board chair and the Rural Character Study Committee
Chairman for feedback. Issues have been resolved so as to
reasonably achieve the goals of the Town of Hillsborough while
preserving the intent of the Orange County Comprehensive Plan.
Neither a complete list of Hillsborough goals or a summary of
relevant comprehensive plan components will be provided herein.
However, a list of issues resolved through mutual agreement of the
work group members is included below.
CONCEPTUAL FRAMEWORK
It is proposed to approach CPZ planning and agreement in two
phases. Phase I Rural Character alternative and Phase II Transit
Corridor Alternative will be discussed in that order. When
agreement is reached, the elected boards will set a time frame for
implementing Phase I. The staff and planning boards will develop
the appropriate development standards and land use recommendations
for elected board approval. Phase II would serve only as issues
for discussion and agreement reached only as necessary to pursue
town and /or county economic development, transportation planning,
land use or other goals.
PHASE I - RURAL CHARACTER ALTERNATIVE
Strategies have been recommended by the Rural Character Study
Committee which could serve to address Hillsborough's concerns and
still preserve the intent of the County Comprehensive Plan. The
basic strategy is to allow public water /sewer extension outside of
transition areas into rural areas but only to serve those
development which preserve rural character by providing large
amounts of open space in exchange for density bonuses. Five
development options have been recommended and have been summarized
in attachment A.
The rationale for extending a Rural Character District to the
south and east of Hillsborough is found in the comprehensive plan.
The plan suggests the establishment of a land use designation for
the purpose of creating a "buffer" between developing urban areas.
2
By creating a "Rural Character" district and a larger minimum lot
size requirement, it sends a clear signal that increased density
and non residential development will not be permitted except
through approved rural character preservation strategies.
For the Rural Character alternative to be effective,
Hillsborough must agree not to annex property in the water /sewer
service area beyond the transition area boundary. Hillsborough
must also agree not to extend public water and sewer beyond the
transition area boundary except in accord with the rural character
strategies adopted by Orange County.
PHASE II - TRANSIT CORRIDOR ALTERNATIVE
In a recent report, the Research Triangle Regional Transit
Land Use Study, strategies were outlined for the development of a
fixed guideway transit system consisting of light rail people
mover, dual --mode bus, and /or busway facilities. The strategies
included therein have long -range implications for Orange County.
Utilization of the land use transit strategies (which will not be
summarized here) will address a number of issues which are
currently being discussed by the County's. Economic Development
Commission and Planning Board. These can be the focus of
subsequent County /Town planning agreements.
CONSENSUS ISSUES
The joint work group reached consensus on the following issues
and the supporting map #7 - exhibit B attached.
I. Hillsborough would not annex beyond the transition area
limits within the next 20 years.
2. Growth within the transition area would be non -
concentric, eg. dispersed growth based on ability to
extend gravity sewer and the demand for service around
major transportation corridors.
3. Public water and sewer extensions beyond transition area
boundaries would be limited to large developments or a
combination of smaller developments with the expense of
such extensions borne by the developer(s).
4. Orange County would have full control over zoning in the
extended water /sewer service areas (Rural Character
Alternative) with Hillsborough providing service only
where feasible.
5. The Town would be primarily responsible for processing
development applications in the transition area while the
County would be primarily responsible for such outside
the transition area. Details for joint or courtesy
review must be developed.
6. The Land use and Comprehensive Plan in the CPZ area would
be reviewed at least every five years.
7. All land use and zoning changes in the transition area
must be approved by both the County and the Town.
3
S. The proposed water and sewer service area would not
extend into the Rural Buffer of the Orange County - Chapel
Hill - Carrboro Joint Planning Area.
9. The proposed water and sewer service area would not
extend so as to encompass the entire Davis Road Area.
10. The proposed water and sewer service area would be
limited so as not to extend into a portion of the Upper
Eno Protected Watershed (PW -II) district along orange
Grove and Dimmocks Mill Road.
CONSENSUS ISSUES WHICH MUST BE ADDRESSED BY DEVELOPMENT PERFORMANCE
STANDARDS AND POLICY CHANGES
1. Protection of the Eno Division of Duke Forest. This can
be accomplished by limiting extensions.of water and sewer
through the tract and developing performance standards
applicable to proposed projects on adjoining property.
This would insulate Duke Forest from adverse impacts and
insure the preservation of wildlife /forest habitat.
2. Orange County's Comprehensive Plan and Water and Sewer
Policy will have to be changed to reflect the distinction
between "urban growth area" and a "water /sewer service
area ", a major policy change for the County.
3. Maintenance of Rural Character District between
Hillsborough and Durham City to mitigate against
potential impact of proposed water line and water sales
agreement between Hillsborough and Durham City. This is
compatible with the Phase I - Rural Character
Alternative.
i i
1.
2.
3.
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
OPTION A
Option A allows for two -acre lot single - family _
residential subdivisions, as permitted currently in the
Rural Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE * *: 0%
Option B allows for five -acre lot single- family
residential subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally - sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: 0%
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
OPTION C
Option C allows for a
development where 40%
(either agricultural
AVERAGE LOT* SIZE:
REQUIRED OPEN SPACE **
!, �*S frm
clustered 1 -acre
of the tract is
or natural).
0.92 ACRES
40% OF TRACT
lot single - family
left in open space
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two- thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 67% OF TRACT
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost - effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
5. OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small -scale
village -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four - fifths, or 80 %, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and collector roadways and
feasible public utility extension to create a
logical, cost- effective and easily - defined
corridor where such developments would be
encouraged.
Rural village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways..
The Commercial /Institutional core of the Rural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single - family residential lots only.
** - Roadways and easements, except pre - existing utility
easements, cannot be placed in or subtracted from open
space set - asides.
HILLSBOROUGH CPZ -- TRANSITION AREAS
Option Z 7: Rase Proposal (Revised) Exhibit B
3
.. J.
SECOND DRAFT (4- 29 -91)
HILLSBOROUGH CPZ
PROPOSAL
I
PROCESS STATEMENT:
A joint work group of two persons from each elected board has
reviewed and discussed the objectives and issues inherent in a
cooperative planning and land use agreement. The process included
sharing drafts of maps and proposals for resolving issues raised
by other elected board members, each planning board chair, and the
Rural Character Study Committee Chairman. Issues have been
reasonably resolved so as to achieve the goals of the Town of
Hillsborough while preserving the intent of the Orange County
Comprehensive Plan. This document does not provide a complete list
of Hillsborough goals or a summary of relevant county comprehensive
plan components. However, a list of issues resolved through mutual
agreement of the work group members is included.
CONCEPTUAL FRAMEWORK
It is proposed to approach CPZ planning and agreement in two
phases. Phase I Rural Character alternative and Phase II Transit
Corridor Alternative will be discussed in that order. When
agreement is reached, the elected boards will set a time frame for
implementing Phase I. The staff and planning boards will develop
the appropriate development standards and land use recommendations
for elected board approval. Phase II would serve only as a basis
for discussion and agreement on issues necessary to pursuing town
and /or county economic development, transportation planning, land
use or other goals.
PHASE I - RURAL CHARACTER ALTERNATIVE
The Rural Character Study Committee has recommended strategies
which could serve to address Hillsborough's concerns and still
preserve the intent of the County Comprehensive Plan. The basic
strategy is to allow public water /sewer extension in designated
rural areas outside the transition area but only to serve those
development which preserve rural character by providing large
amounts of open space in exchange for density bonuses. Five
development options have been recommended and have been summarized
in attachment A. This designated rural area is identified as a
Rural Character
The rationale for establishing a Rural Character District to
the south and east of Hillsborough is found in the comprehensive
plan. The plan suggests the establishment of a land use
designation for the purpose of creating a "buffer" between
2
developing urban areas.
Creating a "Rural Character District" and a larger minimum lot size
requirement sends a clear signal that increased density and non
residential development will not be permitted except through
approved rural character preservation strategies.
For the Rural Character alternative to be effective,
Hillsborough must agree not to annex property in the water /sewer
service area beyond the transition area boundary. Hillsborough
must also agree not to extend public water and sewer beyond the
transition area boundary except in accord with the rural character
strategies adopted by Orange County.
PHASE II - TRANSIT CORRIDOR ALTERNATIVE
In a recent report, the Research Triangle Regional Transit
Land Use Study, strategies were outlined for the development of a
fixed guideway transit system consisting of light rail people
mover, dual -mode bus, and /or busway facilities. The strategies
included have long -range implications for Orange County. The land
use transit strategies (which will not be summarized here) address
a number of issues which are currently being discussed by the
County's Economic Development Commission and Planning Board. These
can be the focus of subsequent County /Town planning agreements.
CONSENSUS ISSUES
The joint work group reached consensus on the following issues
and the supporting map #7 - exhibit B attached.
1. Hillsborough will not annex beyond the transition area
limits within the next 20 years.
2. Growth within the transition area will be non -
concentric, eg. dispersed growth based on ability to
extend gravity sewer and the demand for service around
major transportation corridors.
3. Public water and sewer extensions beyond transition area
boundaries will be limited to large developments or a
combination of smaller developments with the expense of
such extensions borne by the developer(s).
4. orange County will have full control over zoning in the
extended water /sewer service areas (Rural Character
District) with Hillsborough providing service only where
feasible.
5. The Town will be primarily responsible for processing
development applications in the transition area while the
County will be primarily responsible for processing
development applications outside the transition area.
Details for joint or courtesy review must be developed.
6. The Land use and Comprehensive Plan in the CPZ area will
be reviewed at least every five years.
7. All land use and zoning changes in the transition area
must be approved by both the County and the Town.
t3
8. The proposed water and sewer service area will not extend
into the Rural Buffer of the Orange County - Chapel Hill -
Carrboro Joint Planning Area.
9. The proposed water and sewer service area will not
encompass the entire Davis Road Area.
10. The proposed water and sewer service area will be limited
so as not to extend into a portion of the Upper Eno
Protected Watershed (PW -II) district along Orange Grove
and Dimmocks Mill Road.
CONSENSUS ISSUES WHICH MUST BE ADDRESSED BY DEVELOPMENT PERFORMANCE
STANDARDS AND POLICY CHANGES
1. Protection of the Eno Division of Duke Forest. This can
be accomplished by limiting extensions of water and sewer
through the tract and developing performance standards
applicable to proposed projects on adjoining property.
This would insulate Duke Forest from adverse impacts and
insure the preservation of wildlife /forest habitat.
2. Orange County's Comprehensive Plan and Water and sewer
Policy will have to be changed to reflect the distinction
between "urban growth area" and a "water /sewer service
area ", a major policy change for the County.
3. Maintenance of Rural Character District between
Hillsborough and Durham City to mitigate against
potential impact of proposed water line and water sales
agreement between Hillsborough and Durham City. This is
compatible with the Phase I - Rural Character
Alternative.
Moses Carey, Jr.
Alice M. Gordon
Stephen H. Halkiotis
Verla I. Insko
Don Willhoit
ORANGE COUNTY COMMISSIONERS
P.O. Box 8181
HILLSBOROUGH, N.C.
27278
AGENDA
ORANGE COUNTY BOARD OF COMMISSIONERS
AND
THE TOWN OF HILLSBOROUGH
JUNE 4, 1991
7:30 P.M.
732 -8181
968.4501
688 -7331
227.2031
644 -3004 (Fax)
THIS MEETING WILL BE HELD IN THE AGRICULTURAL AND PLANNING BUILDING
ON REVERE ROAD IN HILLSBOROUGH IN MEETING ROOM #1.
A. OPENING COMMENTS FROM MAYOR HORACE JOHNSON AND COMMISSIONER
MOSES CAREY, JR.
B. OVERVIEW OF THE COOPERATIVE PLANNING ZONE PROPOSAL FOLLOWED
BY DISCUSSION.
C. DISCUSSION OF ANY ITEM OF MUTUAL INTEREST
D. ADJOURNMENT
YOU COUNT IN ORANGE COUNTY!
MML%T 7
HILLSBOROUGH CPZ
PROPOSAL
FI
PROCESS STATEMENT:
A joint work group of two persons from each elected board has
reviewed and discussed the objectives and issues inherent in a
cooperative planning and land use agreement. The process included
sharing drafts of maps and proposals for resolving issues raised
by other elected board members, each planning board chair, and the
Rural Character Study Committee Chairman. Issues have been
reasonably resolved so as to achieve the goals of the Town of
Hillsborough while preserving the intent of the Orange County
Comprehensive Plan. This document does not provide a complete.list
of Hillsborough goals or a summary of relevant county comprehensive
plan components. However, a list of issues resolved through mutual
agreement of the work group members is included.
CONCEPTUAL FRAMEWORK
It is proposed to approach CPZ planning and agreement in two
phases. Phase I Rural Character alternative and Phase II Transit
Corridor Alternative will be discussed in that order. When
agreement is reached, the elected boards will set a time frame for
implementing Phase I. The staff and planning boards will develop
the appropriate development standards and land use recommendations
for elected board approval. Phase II would serve only as a basis
for discussion and agreement on issues necessary to pursuing town
and /or county economic development, transportation planning, land
use or other goals.
PHASE I - RURAL CHARACTER ALTERNATIVE
The Rural Character Study Committee has recommended strategies
which could serve to address Hillsborough's concerns and still
preserve the intent of the County Comprehensive Plan. The basic
strategy is to allow public water /sewer extension in designated
rural areas outside the transition area but only to serve those
development which preserve rural character by providing large
amounts of open space in exchange for density bonuses. Five
development options have been recommended and have been summarized
in attachment A. This designated rural area is identified as a
Rural Character
The rationale for establishing a Rural Character District to
the south and east of Hillsborough is found in the comprehensive
plan. The plan suggests the establishment of a land use
designation for the purpose of creating a "buffer" between
developing urban areas.
�• J
M M a ff 7
2
Creating a "Rural Character District" and a larger minimum lot size
requirement sends a clear signal that increased density and non
residential development will not be permitted except through
approved rural character preservation strategies.
For the Rural Character alternative to be effective,
Hillsborough must agree not to annex property in the water /sewer
service area beyond the transition area boundary. Hillsborough
must also agree not to extend public water and sewer beyond the
transition area boundary except in accord with the rural character
strategies adopted by Orange County.
PHASE II - TRANSIT CORRIDOR ALTERNATIVE
In a recent report, the Research Triangle Regional Transit
Land Use Study, strategies were outlined for the development of a
fixed guideway transit system consisting of light rail people
mover, dual -mode bus, and /or busway facilities. The-strategies
included have long -range implications for Orange County. The land
use transit strategies (which will not be summarized here) address
a number of issues which are currently being discussed by the
County's Economic Development Commission and Planning Board. These
can be the focus of subsequent County /Town planning agreements.
CONSENSUS ISSUES
The joint work group reached consensus on the following issues
and the supporting map #7 - exhibit B attached.
1. Hillsborough will not annex beyond the transition area
limits within the next 20 years.
2. Growth within the transition area will be non -
concentric, eg. dispersed growth based on ability to
extend gravity sewer and the demand for service around
major transportation corridors.
3. Public water and sewer extensions beyond transition area
boundaries will be limited to large developments or a
combination of smaller developments with the expense of
such extensions borne by the developer(s).
4. Orange County will have full control over zoning in the
extended water /sewer service areas (Rural Character
District) with Hillsborough providing service only where
feasible.
5. The Town will be primarily responsible for processing
development applications in the transition area while the
County will be primarily responsible for processing
development applications outside the transition area.
Details for joint or courtesy review must be developed.
6. The Land use and Comprehensive Plan in the CPZ area will
be reviewed at least every five years.
7. All land use and zoning changes in the transition area
must be approved by both the County and the Town.
L.
.�
"Dapff4
K3
8. The proposed water and sewer service area will not extend
into the Rural Buffer of the Orange County -- Chapel Hill -
Carrboro Joint Planning Area.
9. The proposed water and sewer service area will not
encompass the entire Davis Road Area.
10. The proposed water and sewer service area will be limited
so as not to extend into a portion of the Upper Eno
Protected Watershed (PW -II) district along Orange Grove
and Dimmocks Mill Road.
CONSENSUS ISSUES WHICH MUST BE ADDRESSED BY DEVELOPMENT PERFORMANCE
STANDARDS AND POLICY CHANGES
1. Protection of the Eno Division of Duke Forest. This can
be accomplished by limiting extensions of water and sewer
through the tract and developing performance standards
applicable to proposed projects on adjoining property.
This would insulate Duke Forest from adverse impacts and
insure the preservation of wildlife /forest habitat.
2. Orange County's Comprehensive Plan and Water and Sewer
Policy will have to be changed to reflect the distinction
between "urban growth area" and a "water /sewer service
area ", a major policy change for the County.
3. Maintenance of Rural Character District between
Hillsborough and Durham City to mitigate against
potential impact of proposed water line and water sales
agreement between Hillsborough and Durham City. This is
compatible with the Phase I - Rural Character
Alternative.
1.
2.
3.
up
EXHIBIT A
RURAL CHARACTER DEVELOPMENT OPTIONS
Option A allows for two -acre lot single- family _
residential subdivisions, as permitted currently in the
Rural Buffer. Natural resources would be protected
through voluntary conservation and environmentally -
sensitive design.
AVERAGE LOT* SIZE: 1.84 ACRES
REQUIRED OPEN SPACE * *: 0%
OPTION B
Option B allows for five -acre lot single- family
residential, subdivisions, to be treated as Minor
Subdivisions with an expedited review process, the
option of private roads, and lower fees as incentives.
Resources would be protected through voluntary
conservation and environmentally - sensitive design.
AVERAGE LOT* SIZE: 4.59 ACRES
REQUIRED OPEN SPACE * *: 0%
SPECIAL CONDITIONS: The maximum tract size for
development with the Option B incentive package is 200
acres. Option B developments of greater than 200 acres
in size would be permitted in accordance with the
provisions of "major subdivisions ".
OPTION C
Option C allows for a clustered 1 -acre lot single- family
development where 40% of the tract is left in open space
(either agricultural or natural).
AVERAGE LOT* SIZE:
REQUIRED OPEN SPACE * *:
OPTION D
0.92 ACRES
40% OF TRACT
Option D allows for a planned residential development
with a density of 0.72 (72 units per 100 acres) where
two -- thirds, or 67 %, of the tract is left in open space
(either agricultural or natural).
I
4
5.
NUMBER OF UNITS: 72 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 67% OF TRACT
SPECIAL CONDITIONS: Option D developments should
utilize public water and sewer where possible. Where
public water and sewer extension is not cost - effective,
the use of community alternative wastewater systems
would be permitted. The use of such systems would be
contingent on participation in a Monitoring and
Maintenance program adopted by the County, and such
systems should also be built to public specifications.
OPTION E (RURAL VILLAGE)
Allows for the development of a "Rural Village ", a
planned residential community with a small -scale
village -level commercial /service core. The overall
residential density of this Rural Village would be 0.84
(84 units per 100 acres). In order to develop under
this option, four- fifths, or 80 %, of the tract must be
left in open space (either agricultural or natural).
NUMBER OF UNITS: 84 UNITS PER 100 ACRES
(DENSITY)
REQUIRED OPEN SPACE * *: 80% OF TRACT
SPECIAL CONDITIONS: Option E is significantly different
from other residential options, and should therefore, be
permitted with the following conditions:
A minimum tract size of 200 acres shall be
required for development of a Rural Village.
Public water and sewer extension is required.
Rural Village developments shall be permitted
only within a defined "Development Sector ", to
be analyzed and defined in the future through
cooperation with local governments and utility
entities. Such a sector would factor in the
location of arterial and - collector roadways and
feasible public utility-extension to create a
logical, cost - effective and easily- defined
corridor where such developments would be
encouraged.
Rural Village developments should be located
within one -mile of arterial or collector road-
ways for traffic management reasons. Such
developments should not be located on inter-
sections, and should be buffered from roadways.
r "�
The Commercial /Institutional core of the Rural
Village should be designed at the village level.
This should include a road network designed to
protect the visual resources of the rural
character and discourage passer -by activity.
* - Single- family residential lots only.
** - Roadways and easements, except pre-existing utility
easements, cannot be placed in or subtracted from open
space set - asides.
r,
Option :: 7: Rase Proposal (Revised) Exhibit B