Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda - 10-03-2017 - 6-c - Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Alternatives Analysis
1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 3, 2017 Action Agenda Item No. 6-c SUBJECT: Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Alternatives Analysis DEPARTMENT: Planning and Inspections ATTACHMENT(S): INFORMATION CONTACT: (919) 1. PowerPoint Presentation Andy Henry, MPO Senior Transportation 2. Orange County Highway Projects Planner, 560-4366 (x36419) 3. OUTBoard Comments Tom Altieri, Comprehensive Planning 4. Background Information — SPOT 4.0 Supervisor, 919-245-2579 Projects, Including Those Funded Craig Benedict, Planning Director, 919- 245-2592 PURPOSE: To receive a presentation from Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO) staff on the 2045 Metropolitan Transportation Plan (MTP) Alternatives Analysis, and potentially endorse comments from the Orange Unified Transportation Board (OUTBoard). BACKGROUND: The DCHC MPO, which is responsible for long range transportation planning for Durham County and parts of Orange and Chatham counties, is updating its MTP. The MTP, which is required by Federal law, recommends major transportation projects, policies and strategies designed to maintain existing transportation systems and serve the region's future travel needs. The Plan must be fiscally constrained, which means that projected revenues must cover the anticipated costs. Projects must be in the 2045 MTP to receive any state and federal transportation funding through the State Transportation Improvement Program (STIP). Projects are drawn from the MTP and put forward to the State's prioritization process for inclusion in the STIP, which is a 10-year funding program. Alternatives Analysis An Alternative is a combination of a transportation network, which includes a set of highway, transit and other transportation improvements, and a land use scenario that depicts the distribution of population and employment for the year 2045. These Alternatives are then analyzed using the Triangle Regional Model (TRM) which forecasts future travel statistics based on assumptions concerning the highway network, transit service and other transportation facilities. It is very unlikely that one of the Alternatives in its entirety would be advanced as the Preferred Option. Most likely, the final MTP will be a combination of the various Alternatives. Due to the length and depth of the Alternatives Analysis, staff has prepared a presentation (Attachment 1) that summarizes some key areas of interest to Orange County. Greater detail on the Analysis and other process components can be found on the DCHC MPO website: http://www.dchcmpo.org/programs/transport/2045mtp.asp#tabs7 2 Attachment 2 is a list of Orange County (including municipal) major highway projects in the Alternatives Analysis. Any specific comments on the list are welcome at this time and may assist with the selection of highway projects to be included in the Preferred Option (draft 2045 Plan). The MPO staff has identified the projects least likely to be included in the draft 2045 Plan at the bottom of the first page and continuing to the second page of Attachment 2. In October, the MPO Board will decide on the list of projects to be included in the draft 2045 MTP that gets released for public comment. Transit, bicycle and pedestrian project lists are not yet available from the MPO. However, it is expected that the Orange County transit projects, which are to be funded through a combination of state, local, and federal funds, will be taken from the Orange County Transit Plan (2017). Orange Unified Transportation Board (OUTBoard) Comments The OUTBoard received a presentation from MPO staff at its September 20, 2017 meeting. Its comments are summarized in Attachment 3. Comments collected from the OUTBoard and any added by the Board of County Commissioners (BOCC) will be conveyed to the DCHC MPO Board, which also has a representative and alternate from the Orange County BOCC. MPO Next Steps The Alternatives Analysis has been released for public comment. Over the next few months, the DCHC MPO Board will use comments collected from the public and local governments to direct the development of a Preferred Option. The Preferred Option is the draft 2045 MTP which will be released in October 2017. The final 2045 MTP is scheduled to be adopted by the MPO Board in December 2017. Review of Projects Currently Funded Attachment 4 provides a list of the County's transportation projects considered during the last prioritization process (SPOT 4.0) and indicates, with shading, the five projects currently funded in the 2018-2027 STIP. During SPOT 3.0, only one of Orange County's projects from its original list was funded in the 2016-2025 STIP. This project was the Hillsborough Train Station, which is scheduled for construction in 2021. Each STIP includes a schedule of the work type (activity) that is to occur each fiscal year for purposes of tracking a project through Project Development and Environmental Analysis, Design, Property Acquisition, and Construction. Following is a link to a new online tool developed and maintained by NCDOT for viewing STIP projects: https://connect.ncdot.gov/projects/planning/pages/state-transportation-improvement- program.aspx Orange County Transportation Planning staff developed project tracking flowcharts during the SPOT 4.0 process that it used to share information with the BOCC and public. However, the flowchart did not and does not include tracking of County projects from the previous SPOT 3.0 process or the SPOT 5.0 process, which has just begun. Over the course of the next several weeks, Transportation Planning staff will be working to expand upon its flowchart concept in hope to provide a more sophisticated project tracking tool that includes the County's projects submitted over multiple SPOT/STIP cycles with linkages to the specific work type and schedule that is provided in each STIP. FINANCIAL IMPACT: There is no immediate financial impact associated with this item. SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated with this item. 3 RECOMMENDATION(S): The Manager recommends that the Board: 1. Receive the presentation; 2. Discuss as appropriate; and 3. Endorse the OUTBoard comments (Attachment 3) as written or modify as appropriate to reflect BOCC comments for staff to convey to the DCHC MPO Board. 4 Attachment 1 DCI-IC .13„,,c11„Cr„..,,,..r, Today's Objective �1.17171176 r.si.rr.x Tnd.r r•lannin6 i.m°rr.a.i°det ■ Understand role of Durham-Chapel Hill- Metropolitan Carrboro Metropolitan Plan Organization Transportation Plan (DCHC MPO). g County ■ Transportation nsporrtation PI nn(MTP) and how to Orange Count Board of County Commissioners review it. October 3,2017 ► Provide any feedback to DCHC MPO and Orange County staff. ift www.dchcmpo.org DCHC What is the DCHC MPO? DCHC What is the DCHC MPO? P 1.nnin6 i°m°rr.a.T°d.y P1.nnin6 i°m°rr°n iod.} (continued) Durham-Chapel Hill Carrboro - Metropolitan Planning Organization .._ 1" / ■ Most funding designated in ■ Responsible for long range transportation planning f cooperation with NCDOT, but some e in T discretionary funding Durham City and County,and is distributed based Parts of Orange County and Chatham County. € { on the MPOs policy ■ Federal mandate- MPO must plan and approve use �.. framework. of federal transportation funding ■ All urbanized area ,_m-iti, must be in the MPO ■ Policy Board--Composed mostly of local elected - - ;� ,, planning boundary. officials from member jurisdictions and counties. I -- • Barry Jacobs-Member I 0 .•ei-o• • Penny Rich-Alternate Dot+" ew..._ 3 1 w1-■ ! ° Transportation Planning Framework DCHC What is the 2045 Metropolitan "'"'""rs' ;„ ';`oa�; 5 DCIC,,,,,„ What is the 2045 (MTP) Process? :`;::::;',:,1",'....::::DIiC What is the Alternatives n..nlnk T..re...,.Ted•r iod•r Analysis? ■ A combination of a transportation network,which includes a set of highway,transit and other 6. Final MTP Dec.2017 transportation improvements,and a land use scenario that depicts the distribution of population 5. Preferred Option Oct.-Dec.2017 anployment(2045). I4. Alternatives Analysis�Ang.-oct.2017 3. Deficiency Analysis —we are Here! ∎ Alternatives run in the Triangle Regional Model (TRM)to produce metrics that describe how well 2. Socioeconomic Data(population and employment forecasts) Alternatives meet future travel demand. 1. Goals and Objectives ■ Final 2045 MTP expected to be a combination of projects and policies from the various Alternatives. For more on these steps: http://www.dchcmpo.orq/proqrams/transport/2045mtp.asP DCnC.,,,,„ What are the Alternatives? DCHC Land Use rl•nnlns t.m.r..,.*ea•+ rl•nnlns tnm.r.=,.*ea•+ SE Data Guide Totals* Pnvne..,.r County 2013 2045 2013-45 %change 2045 J�-L� Transportation Alternative Chatham` 41,543 72,110 30,567 74% /Steadypopulation Land Use Network Durham 286,210 475,091 188,881 66% / growth. Scenario ; Orange 139,289 194,867 55,578 40% Total 467,042 742,068 275,026 59% Four different Ui No r,,i Alternatives being F mpnt .on:na�nq reviewed. County 2013 2045 2013-45 %change Employment CommPlan_based on Transit Ino fi:ai.on:.a,nq Final Dian will be Chatham* 9,339 17,718 8,379 90% growth outpaces comprehensive land use hybrid of the Durham 192,877 342,910 150,033 78% population plan and policies. Moderate hybrid of Alternatives O OldtlOn growth. highway and transit Orange 64,212 107,791 43,579 68% AIMHiah:More density Total 266,428 468,419 201,991 76% and mined use at future *Only includes portion of Chatham County in the modeling area. rad station areas. www.bit.ly/DCHC-MTP-Alternatives DC* *C Congestion soon No-Build- ,,,,, What Information is Available? fir ~ Congestion Map �i•nnin�iom.r.e,.'iod•� vow , � ` Most major commute corridors at 120%of •'°^'•° ` capacity or higher 0-40, • I-85 U515 501 NC Triangle Regional Model Output �� 54) II Performance Measures -- °° 1 . • Many arterial roadway Travel lsochrones_-.-- �+ egmen overizo%. Travel Time > .� Congestion Maps(V/C) "', �- ��� 1� W e I l ,,ati , al Pr- Olk Alp 0,,........4 i e- • m..: and employment 2045 on " • yn«mei J current n[on the 12 V- e� n[transPorta0an network. 2 6 DC1-(ç Key Conclusions from Highways Sample Projects ..�..r•:'rod., Alternatives Analysis 1-40 widening and Demographics interchange • Orange County will continue improvements to experience population and Congestion • Alternatives show significant inSi widening and employment growth 9 interchange • Orange County employers will improvements in travel time improvements continue to attract commuters over the no-build scenario from outlying counties • Travel times will increase even US 15-501_widening, � _... with roadway improvements super streets and that are beyond the budget intersection/interchange - r^ Rail and Land Use improvements - • Light rail and other transit investments NC 54_superstreet and _—_. significantly increase non-motorized modes intersection in those corridors improvements • Higher density and mixed land uses in rail S Churton St widening station areas increases non-motorized f.•-' �� modes and improves travel time awe lme=nkery m be m 2045 Ml? kea Ime=ion:merea ror zoos MTP Black Ilne=rice gootl chance d being In 2045 MTP Tra i Sample Projects _ 'e-- ;m u DC11C Closing Based on the Orange County Transit Plan - -.C' , Any questions or comments? (adopted in 2014 and updated in 2017). r_---- ! Thank you cnaPN VIII a�:aaPlaransv:uoM-sou<n co„mo, 11.- . y�7- — _ :. ,",: `. _.: Contact: ; :�s ti7 • Andy Henry, DCHC MPO, 919-560-4366 ext. 36419,andrew.henry@durhamnc.gov —_� • Tom Altieri,Orange County Planning, 919-245- 1; I • .Durham-Orange Light Rail Transit(D-O LRT)between 2579,taltieri @orangecountync.gov ' 1 Chapel Hill and Durham. - + V •Bus Rapid Transit(BRT)North-South corridor in Chapel Hill. •Expanded fixed-route and express bus service. T .Funding for vehicle and eI ts,trans. vvvvw•bit.ly/DCHC—M 1 P .Funding for park-and-ride lots,transit centers,bus stop improvements,and transit emphasis corridor. 3 2045 Metropolitan Transportation Plan (MTP) Attachment 2 7 Orange County Roadways Existing Proposed Improvement Length Completion Project Name From To Lanes Lanes Type* (Miles) Estimated Cost Year Eno Mountain Rd realignment Mayo St Eno Mountain Rd - 2 New Location 0.3 $ 2,015,000 2036-2045 Eubanks Rd MLK Blvd(NC 86) Millhouse Rd 2 4 Widening 0.8 $ 7,487,000 2025 Fordham Blvd (US 15-501) 1-40 Franklin St 4 4 Modernization 1.6 $ 2,052,000 2025 Fordham Blvd (US 15-501) NC 54 Franklin Street 4 4 Modernization 2.1 $ 45,498,000 2026-2035 Fordham Blvd (US 15-501) NC 54 US 15-501 4 4 Modernization 2.2 $ 49,832,000 2026-2035 Fordham Blvd/Raleigh Rd Interchange improvement -- -- -- Interchange -- $ 14,800,000 2026-2035 Fordham Blvd/S Columbia St Interchange improvement -- -- -- Interchange -- $ 35,000,000 2026-2035 Fordham Blvd/Ephesus Ch Rd Intersection improvement -- -- -- Intersection -- $ 2,170,000 2019 Freeland Memorial Extension S Churton St New Collector Rd - 2 New Location 0.5 $ 3,203,000 2025 Homestead Rd Old NC 86 Rogers Rd 2 2 Modernization 2.1 $ 10,234,000 2026-2035 Homestead Rd Rogers Rd NC 86 2 2 Modernization 1.3 $ 6,855,000 2026-2035 1-40 NC 86 1-85 4 6 Widening 7.8 $ 58,784,000 2026-2035 1-40 US 15-501 NC 86 4 6 Widening 3.9 $ 29,316,000 2026-2035 1-40/NC 86 Interchange improvement -- -- -- Interchange -- $ 16,500,000 2025 D 1-85 US 70 1-40 4 6 Widening 7.1 $ 197,378,000 2036-2045 1-85 Sparger Rd US 70 4 6 Widening 3.0 $ 39,118,000 2036-2045 0 1-85/S Chruton St Interchange improvement -- -- -- Interchange -- $ 20,700,000 2026-2035 3 Lake Hogan Farms Rd Eubanks Rd Legends Way - 2 New Location 0.7 $ 4,407,000 2026-2035 CD Legion Rd Ext Legion Rd Fordham Blvd - 2 New Location 0.1 $ 1,500,000 2025 N Mt Carmel Ch Rd US 15-501 Bennett Rd 2 2 Modernization 0.4 $ 1,997,000 2036-2045 NC 54 Old Fayetteville Rd MPO Boundary 2 3 Widening 2.9 $ 14,457,000 2023 NC 54 Fordham Blvd (US 15-501) Barbee Chapel Rd 6 6 Modernization 1.2 $ 32,106,000 2026-2035 NC 86 Old NC 10 US 70 Business 2 4 Widening 0.9 $ 7,259,000 2036-2045 New Collector Rd Orange Grove Rd Ext Becketts Ridge Rd - 2 New Location 0.8 $ 7,232,000 2025 New Hope Commons Dr Extension Eastowne Dr New Hope Commons Dr - 2 New Location 0.4 $ 4,588,000 2026-2035 Orange Grove Connector Orange Grove Rd US 70 - 2 New Location 0.4 $ 5,299,000 2023 Purefoy Rd Ext Sandberg Ln Weaver Dairy Rd - 2 New Location 0.6 $ 3,777,000 2025 S Churton St US 70 Business 1-40 2 4 Widening 2.4 $ 31,825,000 2026-2035 S Elliot Rd Ext Fordham Blvd Ephesus Church Rd - 2 New Location 0.3 $ 4,230,000 2025 Project that are unlikely to be in the 2045 MTP Erwin Rd NC 751 Whitfield Rd 2 4 Widening 3.1 $ 25,084,000 Not in MTP Erwin Rd Whitfield Rd US 15-501 2 2 Modernization 2.6 $ 15,025,000 Not in MTP Estes Dr NC 86 Seawell School Rd 2 4 Modernization 0.8 $ 5,976,000 Not in MTP Estes Dr Seawell School Rd Greensboro Rd 2 2 Modernization 0.9 $ 5,128,000 Not in MTP Orange County projects located outside municipal planning jurisdictions in whole or in part. * Modernization might include lane and/or shoulder widening,turning lanes,and bicycle and pedestrian facilities. It does not include additional travel lanes. Page 1 2045 Metropolitan Transportation Plan (MTP) 8 Orange County Roadways Existing Proposed Improvement Length Completion Project Name From To Lanes Lanes Type* (Miles) Estimated Cost Year Hillsborough Rd Old NC 86 Estes Dr 2 2 IModernization 2.0 1 $ 10,796,000 Not in MTP 1-40 Managed Lanes US 15-501 NC 86 6 8 Widening 8.3 $ 156,227,000 Not in MTP 1-40 Managed Lanes NC 86 1-85 6 8 Widening 7.2 $ 238,906,000 Not in MTP Mt Carmel Church Rd Bennett Rd Old Farrington Rd 2 3 Widening 3.6 $ 18,033,000 Not in MTP Mt Willig Rd 1-40/1-85 US 70 2 2 Modernization 0.7 $ 3,577,000 Not in MTP N Greensboro St Estes Dr E Main St 2 2 Modernization 0.6 $ 3,131,000 Not in MTP NC 86 Cornelius St(US 70 Bypass) NC 57 2 4 Widening 0.3 $ 2,742,000 Not in MTP Old NC 86 1-40 Hillsborough Rd 2 2 Modernization 7.5 $ 41,491,000 Not in MTP S Greensboro St E Main St NC 54 2 2 Modernization 0.6 $ 3,401,000 Not in MTP US 70 NC 86 1-85(exit 170) 2 4 Widening 6.0 $ 48,232,000 Not in MTP US 70 I-85/US 70 Connector NC 86 2 4 Widening 2.7 $ 21,616,000 Not in MTP Orange County projects located outside municipal planning jurisdictions in whole or in part. * Modernization might include lane and/or shoulder widening,turning lanes,and bicycle and pedestrian facilities. It does not include additional travel lanes. Page 2 Attachment 3 9 Orange Unified Transportation Board Memorandum Date: September 21 , 2017 To: Orange County Board of County Commissioners From: Orange Unified Transportation Board Subject: Comments Regarding the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization's 2045 Metropolitan Transportation Plan The Orange Unified Transportation Board (OUTBoard) met Wednesday, September 20, 2017 and received a presentation from the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO) staff regarding the Alternatives Analysis for the DCHC MPO 2045 Metropolitan Transportation Plan (MTP). The following comments are conveyed: • Define the term "non-motorized modes" in presentations or state more simply as bicycle and pedestrian. • Commuter Rail, which is currently in the Comprehensive Transportation Plan (CTP), should be revisited for inclusion in the 2050 MTP. • The MPO should be vigilant with regard to the advancements in technology to come, such as autonomous vehicles. • The MPO should further explore the Managed Motorways Concept* and look for opportunities to implement as an alternative to widening projects. • It would be helpful for review if there were a way to quantify the cost versus benefit for each project. • Presentation materials should include project length in miles. *The DCHC MPO Board received a presentation on the concept at its June 14, 2017 meeting. The Managed Motorways Concept involves a collection of strategies and technologies that work in concert with each other to provide a holistic and integrated corridor management system that increases on-road outcomes. The flow of traffic is monitored and managed using a combination of ramp meters, sensors, incident detection, command and control software, and human intervention at a control center. This type of management increases the capacity of the roadway. 10 Attachment 4 Project Table - SPOT P4.0 Projects Funded Projects Shaded Number Submitted Project Project Description ALL MPO/RPO PROJECTS South Churton Street(Old NC 86)from 1-40 to Widen South Churton Street (SR 1009) from 1-40 to Eno River to 1 Eno River Improvements multiple lanes with congestion management,limited access,bicycle and pedestrian,and aesthetic improvements. 2 U.S.70 East/I-85/I-40 Connector Modify the 1-85/1-40 Connector(SR 1239)interchange at U.S.70 to provide access from all directions. 3 1-40 Widening from 1-40/1-85 interchange to NC Widen 1-40 from four(4) lanes to six (6) lanes from the 1-40/1-85 86 interchange to NC 86. Realign the intersection of Eno Mountain Road(SR 1148)and Mayo 4 Eno Mountain Road/Mayo Street at Orange Street (SR 1192) with Orange Grove Road (SR 1006) and make Grove Road safety improvements. 5 1-85/NC 86 Interchange Improvements Reconstruct interchange at 1-85 and NC 86 to accommodate increased traffic. 6 1-40 Widening from NC 86 to U.S.15-501 Widen 1-40 from four(4)lanes to six(6)lanes from NC 86 to U.S.15- 501/Durham County line. 7 1-40 and NC 86 Interchange Improvements Improve interchange at 1-40 and NC 86. Orange Grove Road Extension (Orange Grove Road to US 70)with 8 Extend SR-1006(Orange Grove Road)from SR- 8 and Bicycle Lanes. Construct grade separation at 1006(Orange Grove Road)to US 70A intersection of Orange Grove Road Extension and NCRR. 9 NC 54 and Neville Road Intersection Improve the intersection of NC 54 and Neville Road. Improvements 10 NC 86 Improvements North of Hillsborough Widen NC 86 from U.S.70 Bypass to north of NC 57 to four(4)lanes with intersection improvements at U.S.70 Bypass and NC 57. 1-85 from Mt.Herman Church to Durham County 11 Line Widening Widen one lane in each direction 1-85 from 1-85/1-40 Split to east of the NC 86 12 Widen one lane in each direction and improve interchanges Interchange Widening Improve Homestead Road(SR 1777)from Old NC 86(SR 1009)to 13 Homestead Road Bike Lanes and Sidewalks NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. Improve current Dimmocks Mill Rd (#735154S) grade separation 14 Dimmocks Mill Road Rail Crossing Improvement and close Bellevue St(#735152D)Cost information does not exist at and Bellevue Street Closure this time and a placeholder value of $1 was used in the cost estimating screen Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to 15 Buckhorn Road(SR 1114)Widening multiple lanes with bicycle and pedestrian facilities. 16 Mattress Factory Road Interchange Construct a new interchange at the existing grade-separated crossing of Mattress Factory Road and 1-85/1-40. Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to 17 Mattress Factory Road Extension to U.S.70 intersect U.S.70 and close the existing railroad crossover road connecting East Washington Street and U.S.70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. NC 54 Operational Improvements(Orange Grove Operational improvements along the corridor with bicycle and 18 Road-originally Dodsons Crossroads-to Old Fayetteville Road) pedestrian accommodations. = Funded Project 11 Attachment 3 Number Submitted Project Project Description Widen Efland-Cedar Grove Road(SR 1004)from Highland Farm Road(SR 1332)to the northern property line of the U.S.Post Office 19 Efland-Cedar Grove Road Improvements: north of Carr Store Road(SR 1352)from a two(2)-lane,20-foot cross section to a 24-foot cross section with straightening of the roadway where needed,improvements to turn lanes,and the incorporation of bicycle facilities. Widen Old Greensboro Road(SR 1005)from Carrboro's extra- 20 Old Greensboro Road Paved Shoulders territorial jurisdiction(ET.1)to the Orange/Alamance County line to include four(4)-foot paved shoulders. 21 NC 54 Widening(NC 119 in Alamance County to Widen roadway from a two-lane undivided cross-section to a four- Orange Grove Road) lane divided boulevard to mitigate anticipated congestion issues. 22 NC 54 and Orange Grove Road Intersection Improve intersection at NC 54 and Orange Grove Road Improvements Widen Orange Grove Road(SR 1006)from Dairy land Road(SR 1177) 23 Orange Grove Road/Buckhorn Road Paved to Buckhorn Road(SR 1114)and Buckhorn Road(SR 1114)from Shoulders Orange Grove Road(SR 1006)to West Ten Road(SR 1144)to include four(4)-foot paved shoulders. 24 1-85/Old NC 86(SR-1009-South Churton Street) Reconstruct interchange at 1-85 and Old NC 86. Interchange Improvements = Funded Project All Orange County P4.0 Projects 12 Caswell Co. ------------------ r G N m W TRYON ST E T RYON ST i Pers•n o. „ ■ ��mm1m 7,.. --) ,,,s_o_se--- ■ i ..... 71 ii■ u DIMS 4Y O © �70A 4'1;1* 0 I- —1-- 0' © � m 41/ <'? „.EDRif 6 A % tri • Al, .0, lial n IV 411°W� I �_ ilili, ``� 1 II(A Mebar> m ,5,, . 1 '� 'gym I See Inset k` Alamance Co. m m Allip-*e ,� W Durham Co. €tl‘— —} -z-S- I ir' ' i Durham 41. O J/ � 1 a l�el �Si► �® ® ill m `,►4W'AN IVO t 2018-2027 STIP Project Stat � 14 1y' Unfunded ~ I ' ■i- —INEM — Or I i • Funded ---- L---__ TARPO Boundary --�- / 1 DCHC MPO Boundary Chatham Co. i 1 in=3 miles B-G MPO Boundary 1v� > 0 1 ry 4 S.,s ICI Miles Municipal Boundaries I J Orange County Planning and Inspections Max Bushell(02/22/2017) ` /