Loading...
HomeMy WebLinkAboutAgenda - 12-05-2016-13-5 - Information Item - City of Mebane’s Comprehensive Land Development Plan INFORMATION ITEM PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Special Projects 131 W. Margaret Lane (919) 245-2575 Suite 201 (919) 644-3002 (FAX) 0[ " ,' w„ VU a P. O. Box 8181 www.orangecountync.gov NR r i i : �l1 A Hillsborough, NC 27278 lair i%ifiir/1%"lii/r1 k110y1117 y a r ��UIIIV r, , ll1A' � 1 4 p Ell sir i 111'r" II 411111 i �; luu 'W'° p `i I��'�"P�� fig,'!�' h '+ °'aP D aA� ��umiom m uomuuu uN�r �IIV� '. 0 ” LL ,rr MEMORANDUM TO: Orange County Board of Commissioners CC: Craig N. Benedict, AICP, Planning & Inspections Director FROM: Perdita Holtz, AICP, Planner III DATE: November 11, 2016 SUBJECT: City of Mebane's Comprehensive Land Development Plan At the September 15, 2016 joint BOCC/City of Mebane meeting, the local governing boards received an update from City staff on the status of the City's Comprehensive Land Development Plan. Orange County planning staff, primarily Perdita Holtz, has been participating on the committee guiding development of the plan. A draft plan has been completed and committee members are currently reviewing and commenting on the draft. Additional information on the City's planning effort is available at: http://www.mebanebydesign.net/ Approximately 35-40% of the geographic extent of the study area is located within Orange County. Two "primary growth areas" have been identified within the Orange County portion of the study area: • The Buckhorn EDD corridor • A Mixed Use area along Highway 70, at the western boundary of Orange County, which is within current municipal limits All other lands within the Orange County portion of the study area are "secondary growth areas" which are defined as "areas with access or potential access to City infrastructure and urban services or that are already developed." The attached map shows the growth strategy areas of the entire study area. Staff is anticipating that the BOCC will be invited to review and provide comments on the next draft of the plan at the January 24, 2017 BOCC meeting. City staff, or the City's consultant, will be presenting the draft plan at the meeting. Mebane By Design Growth Strategy Areas ______,,...1.•`)----, ---- County Line ®Municipal Limits If `� �``-! ETJ {r. ;� `\� ---• Proposed NC-119 Bypass r I .."....rf r 10 / , i5 f 11G l ) I.- r J r LY r . �t. � � I ? `� I + � l i 1 — — --- — r ,[ , ,J �85 "..--...,—,. .41.1:,,, ti t+ o 1, I f iv . \ i� .J 4 * � -� Growth Strategy Areas r_) i k i f ,- G-1,Mixed-use �<1., r _r G-1,Industrial • G-2,Industrial , 1,,,,.0 0-2, Residential J---_� G-3,Mixed-use '--s---' J` .- G-4, Secondary Growth Area Green Infrastructure(Preservation)