Loading...
HomeMy WebLinkAbout2017-569-E ES - Federal Engineering to amend radio project including VIPER analysis DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B ORANGE COUNTY AMENDMENT TO SERVICES AGREEMENT NORTH CAROLINA THIS AMENDMENT, made and entered into this the 10th day of October, 2017, by and between the County of Orange, a body politic and corporate of the State of North Carolina, ("County"), and Federal Engineering, Inc. ("Provider"); WITNES SETH: WHEREAS, the County and Provider entered into a Services Agreement dated, October 4, 2016, to provide services to be rendered by Provider to County("Original Agreement"); and WHEREAS, the County and Provider desire to amend the Original Agreement, while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration for the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: See Attachment A,which is hereby incoprorated into this Agreement as if written herein. Except for the changes made Attachment A herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event that there is a conflict between the Original Agreement and this Amendment, this Amendment shall control. IN WITNESS WHEREOF, Orange County and the Consultant have signed this Amendment, effective this the 10th day of October, 2017. FOR ORANr_c rnr 1rr-ry FOR PR I . rE2teLVLA,DocuSignedbr�yyy: A9 5A211111 041 CIMAIVAVSt can 5r9 By: By: County lvianagerE477 . Ron Bosco � , res'i ent Revised December 2016 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B ^ua r Federal Engineering, Inc. / q 111 / ;1 10600 Arrowhead Drive lon Fairfax, VA 22030 e r1 ® 703-359-8200 STATEMENT OF WORK (SOW) ATTACHMENT TO Issued: August 14, 2017 CONSULTING SERVICES AGREEMENT Revised: September 6, 2017 Dated: OCTOBER 4, 2016 Amendment#1: April 25, 2017 Amendment#2: June 26, 2017 AMENDMENT 3 PROJECT ORNC-PSMR-OTS-TM ORANGE COUNTY, NORTH CAROLINA COUNTYWIDE RADIO COMMUNICATIONS INTEROPERABILITY AND SYSTEMS ENGINEERING ON-CALL TECHNICAL SUPPORT CONSULTING SERVICES VOICE INTEROPERABILITY PLAN FOR EMERGENCY RESPONDERS (VIPER) EXPANSION ALTERNATIVES ANALYSIS 1. INTRODUCTION AND ISSUES Orange County, North Carolina (County) retained Federal Engineering, Inc. (FE) to provide countywide radio communications interoperability and systems engineering consulting services. On May 2, 2017, FE presented a radio system alternatives analysis to the Board of County Commissioners (BOCC). Following the presentation and subsequent discussion among BOCC Members and County Emergency Services, the County held a meeting with the North Carolina State Highway Patrol (NCSHP) to discuss the feasibility of expanding the State's Voice Interoperability Plan for Emergency Responders (VIPER) radio communications system for the County's day-to-day use. Resulting from the meeting, the County desires FE to perform technical, financial, and programmatic analysis to assist with determining the costs and benefits of expanding VIPER for day-to-day County use. 2. TASKS TO BE PERFORMED In response to the County's request, FE will perform the tasks that the following subsections call out. Page 1 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B 2.1 Task 1 - Collect Existing VIPER System Data To begin the analysis, FE will prepare an email requesting the following radio communications system information from the NCSHP for the VIPER system currently serving the County's geographic area: • Radio communications tower and equipment shelter elevation and layout drawings • Radio communications tower structural analyses • Supporting infrastructure equipment capacities including heating, ventilation, and air- conditioning (HVAC), electrical systems, emergency backup power systems • Channel/talkgroup capacity data • Radio communications site lease costs • Additional equipment and services available from VIPER FE will review the information provided by NCSHP, prepare an email requesting clarification and/or additional information, and incorporate the information in our analysis. 2.2 Task 2 — Conduct VIPER Expansion Analysis FE's VIPER expansion analysis will investigate the technical, financial, and programmatic attributes that the County must understand to make an informed decision on migrating from their existing radio communications systems to a replacement solution. Leveraging the results and framework of the analyses that FE provided in the Countywide Radio Communications Needs Assessment and Alternatives Report, we will develop an addendum to the Report addressing the VIPER expansion attributes that the following subsections define. 2.2.1 Task 2.1 — VIPER Expansion Radio Frequency Analysis FE will review the VIPER radio frequency licenses for the County's geographic area to verify sufficient availability along with determining the viability of their use by County public safety and public service agencies. We will develop a matrix identifying the radio frequency licenses available for use by County agencies who may migrate to an expanded VIPER system. 2.2.2 Task 2.2— VIPER Expansion Radio Coverage Analysis FE will perform radio coverage analysis for expanding VIPER's land mobile radio (LMR) coverage within the County's geographic area and Project 25 (P25) paging/alerting coverage. FE's VIPER system LMR coverage analysis will result in the following three coverage prediction maps, enabling the County to compare existing and expanded system coverage levels: • Existing VIPER nine-site mobile and portable on-street coverage and in-building portable coverage • Expanded VIPER 700/800 MHz P25 Phase 1 mobile and portable on-street coverage and in-building portable coverage Page 2 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B • Expanded VIPER 700/800 MHz P25 Phase 2 mobile and portable on-street coverage and in-building portable coverage Complementing the VIPER system LMR coverage prediction maps, FE's two P25 paging/alerting maps will show the differences in coverage between implementing a potential P25 paging/alerting system using the existing nine VIPER sites and from an expanded VIPER system using additional sites. The County's existing VHF High Band LMR and paging/alerting systems, primarily used by fire service agencies, are an integral part of emergency communications within the County and their use will continue for the foreseeable future. FE will develop the following four radio coverage prediction maps comparing existing and expanded VHF High Band LMR and paging/alerting coverage: • Existing VHF High Band on-street and in-building LMR coverage • Expanded VHF High Band on-street and in-building LMR coverage from an expanded VIPER system using additional sites • Existing two-site analog VHF High Band on-street and in-building paging/alerting radio coverage • Expanded VHF High Band on-street and in-building paging/alerting radio coverage from an expanded VIPER system using additional sites 2.2.3 Task 2.3— VIPER Expansion Capacity Analysis FE will perform VIPER expansion capacity analysis to estimate the number of radio frequency channels needed to provide public safety grade of service using both P25 Phases 1 and 2 formats, given that VIPER operates using P25 Phase 1. 2.2.4 Task 2.4— VIPER Expansion System Features Analysis FE will research the ability of the VIPER system to provide system features including encryption, over-the-air-rekeying (OTAR), over-the-air-programming (OTAP), and location services. Inclusive of FEs research, we will evaluate the degree to which the County is able to locally manage VIPER system features and channels/talkgroups. FE will also determine whether the County's existing Motorola Solutions MCC7500 IP Dispatch Consoles will support VIPER feature enhancements. 2.2.5 Task 2.5— VIPER Expansion Backhaul Analysis FE will review the County's options to provide backhaul connectivity for an expanded VIPER system, including the use of microwave radio and leveraging the existing Microelectronic Center of North Carolina's (MCNC) North Carolina Research and Education Network (NCREN). FEs research will identify where NCREN has optical fiber points-of-presence (POPs) geographically located that may potentially be leveraged to expand the VIPER system for the County's day-to- day use. Page 3 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B 2.2.6 Task 2.6- VIPER Expansion Migration Plan and Budgetary Cost Analysis Expanding VIPER for use by additional County agencies to improve radio coverage and the potential implementation of an expanded or upgraded paging/alerting system requires the development of a high-level agency migration plan considering the timelines, dependencies, infrastructure and subscriber equipment costs. FE will develop a high-level migration plan and budgetary cost estimate to expand VIPER for day-to-day use by the County. Our budgetary cost estimate will consider the following factors: • Expanded VIPER infrastructure, subscriber, and interface costs • Expanded VIPER P25 Phases 1 and 2 configurations • New 700/800 MHz P25 paging/alerting system using the VIPER system sites • Expanded VHF High Band LMR and paging/alerting system NCSHP outlined two models that the County could use to procure infrastructure equipment for an expanded VIPER system. FE will compare the estimated cost for the County to purchase, retain, and maintain the expanded VIPER system infrastructure equipment with the estimated cost for the County to purchase the equipment and transfer of ownership of the equipment to the NCSHP/State of North Carolina, who would assume maintenance responsibilities. 2.3 Task 3 — Develop VIPER Expansion Analysis Addendum FE will include the results of our analysis in Tasks 1 and 2 within the VIPER Expansion Analysis Addendum to the Countywide Radio Communications Needs Assessment and Alternatives Report and deliver it to the County for review. We will then finalize the addendum based on the County's review and issue a final version. 2.4 Task 4 — Present VIPER Expansion Analysis Addendum FE will prepare a Microsoft® PowerPoint presentation highlighting key findings from our analysis and present them to the County during an onsite meeting. 2.5 Optional Tasks Should the County desire, FE can perform the following optional tasks on a time and materials or fixed-price basis: • Prepare and provide the radio coverage prediction modeling parameters including the radio communications site, transmit and receive antenna, and loss data used to develop the coverage maps • Using different sites and/or site counts and different coverage layers, perform additional radio coverage prediction analysis to create maps other than those identified in Task 2.2 • Prepare and present the VIPER Expansion Analysis Addendum to the BOCC Page 4 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B 3. ESTIMATED SCHEDULE Upon executing this Amendment, the County's Project Manager and FE's Project Manager will mutually agree on a schedule for tasks to be performed. 4. STAFFING/ORGANIZATION Mr. Clifton Brown, FEs Orange County Project Manager, will lead the project with subject matter expert (SME) support from other FE staff as necessary. 5. ESTIMATED COST FE will conduct the Tasks in Section 2 on a time and materials basis in accordance with the Contract hourly rates. Amendment 3 initially authorizes a maximum of$31,900 which includes labor, travel, and other direct costs as Table 1 details. Table 1 — Estimated Cost Task Number Task Name Estimated Cost 1 Collect Existing VIPER System Data $2,045 2 Conduct VIPER Expansion Analysis $19,975 3 Develop VIPER Expansion Analysis Addendum $7,390 4 Present VIPER Expansion Analysis Addendum $2,490 TOTAL COST ESTIMATE $31,900 5.1 Invoicing Monthly invoices will detail FE's Project Team personnel working on the tasks authorized in this Amendment and the number of hours charged as well as details regarding travel and other direct costs. FE's Project Manager will notify the County should additional funding be required to complete the approved tasks. The authorized funding will be increased by a written modification to this task duly executed by both the County and FE. 6. BASIS FOR OUR SCOPE OF WORK 1. Federal Engineering, Inc., shall perform the tasks as provided in Section 2 (excluding any optional or additional tasks). Any addition, modification or deletion of a task or significant change in scope of one or more tasks may affect the overall price. 2. The County and its constituents shall provide the information necessary for FE to perform the tasks in Section 2, including the VIPER system information. If the County or its constituents are unable to provide one or more pieces of required information, FE will notify the County's Project Manager of the issue and will work with the County to develop an additional statement of work to be performed on a time and materials basis in accordance with the Contract hourly rates or on a fixed-price basis to collect the information. Page 5 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B 3. The data collected and information analyzed by FE to develop the Countywide Radio Communications Needs Assessment and Alternatives Report delivered in final version to the County on March 6, 2017 will be used to perform this analysis. Should FE discover that the data and information requires updating, FE will notify the County's Project Manager of the issue and will work with the County to develop an additional statement of work to be performed in accordance with the Contract hourly rates or on a fixed-price basis to collect the information. 4. The following site configurations shall be used for the radio coverage prediction maps that Task 2.2 defines: a. FE's 700/800 MHz P25 Phase 1 paging/alerting system coverage prediction map for the existing VIPER system will use the same nine sites currently in operation by the County b. FE's 700/800 MHz P25 Phase 1 and 2 paging/alerting system coverage prediction maps for the expanded VIPER system will use the same radio communications sites modeled for the expanded LMR system As specified in Section 2.5, Optional Tasks, FE can also perform radio coverage prediction studies using different site configurations and site counts along with depicting other coverage layers for the County for an additional fee on a fixed-price basis. 5. FE's Project Manager will present the VIPER Expansion Analysis Addendum to the County during a meeting scheduled on a single business day. At the County's request and if necessary, FE can provide additional presentation and meeting support in accordance with the Contract hourly rates or on a fixed-price basis as mutually agreed to in an additional Amendment by the County and FE. 6. FE's ability to fulfill these tasks depends, in part, on the willingness and ability of the County, the County's participants, equipment vendors, service providers, third parties, and others to provide information in a timely manner, and upon the accuracy of the information as supplied. The accuracy of input data, whether provided in electronic or hard copy form, and the recommendations, actions, system designs, software, and license filings resulting therefrom cannot, therefore, be warranted by FE nor can the performance, suitability, or reliability of said systems be warranted by FE. FE accepts no responsibility or liability to any third party in respect to any information or related content delivered by FE. This information is subjective in certain respects, and, thus, susceptible to multiple interpretations and may be in need of periodic revisions based on actual experience and subsequent developments. 7. This proposal is based upon a start date on or before October 16, 2017. Upon receiving notice to proceed, FE will develop a mutually agreeable schedule with the County. Delays to the project schedule due to actions or lack of actions on the part of the County, the County's participants, third parties, and others including, but not limited to vendor protests, protracted contract negotiations, vendor delays that impact the program schedule and/or costs to the County will be brought to the attention of the County's Page 6 of 7 DocuSign Envelope ID: 7E04793C-F1 E5-454A-9C8D-DCEFB370370B project manager in a timely manner, and will be reduced to writing via a mutually agreed- upon contract amendment. 8. Amendment 3 assumes that the County's Project Manager will schedule meetings and teleconferences, provide meeting and teleconferencing facilities, notify attendees, and arrange for onsite meetings and inspections. 9. FE will provide draft and final deliverables electronically to the County. 10. Any additional task will be authorized by written agreement signed by both Parties. Such tasking will be performed on a time and materials basis in accordance with the Cost Proposal Section of the County's Contract with FE. Submitted by FE: Authorization to begin work: Orange County, North Carolina (Signature) (Signature) John E. Murray, Executive Vice President Bonnie Hammersley, County Manager (Printed name and title) (Printed name and title) (Date) (Date) Page 7 of 7