HomeMy WebLinkAboutAgenda - 05-16-2006-9dORANGE COUNTY BAARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 16, 2006 Action Agen~l~ Item No. CC~~(( SUBJECT: Contract for Design Work for Homestead Center Sewer Connection DEPARTMENT: Manager/Purchasing PUBLIC HEARING: (Y/N) No ATTACHMENT(S): Design Proposal INFORMATION CONTACT: Rod Visser/Paul Thames, 919-245-2300 Pam Jones, 919-245-2652 PURPOSE: To approve an agreement with Corley Redfoot Zack, Inc. to complete the design of sewer lines at the Homestead Community Center and to coordinate installation of a sewer connection from the Homestead Center to OWASA's sanitary sewer system, at a cost not to exceed $10,000, BACKGROUND: The septic system at the Homestead Center began failing several years ago and the facility has continued to operate under a temporary pump and haul certificate. The BOCC appropriated $90,000 in two-thirds net debt reduction bonds to enable the connection of the building to the Orange Water and Sewer Authority's (OWASA) sanitary sewer system., The Board is requested to approve the accompanying proposal from Corley Redfoot Zack (CRZ) to complete the design of the sewer connection, Some of the preliminary design work has been completed in the County Engineer's office, but as outlined on the attached CRZ proposal, a significant body of work remains. Some of the more time intensive elements include documents for the North Carolina Department of Transportation (NCDOT) Encroachment Agreement and the work required by OWASA bath for their approval and the as-built plans following construction. CRTs proposal includes construction administration of the project. However, some or all of the construction administration may be accomplished through the County Engineer's office, contingent upon the staff resources needed to provide construction supervision of the Buckhorn Sewer Project.. CRZ will bill construction administration hours only as the County may need them. North Carolina General Statutes (NCGS § 143, Article 3D) allow counties to exempt themselves from a selection process for this type of professional service on any project if the professional fee will be less than $30,000. In order to expedite the work, more closely comply with the terms of the temporary pump and haul certificate, and since the cost of work is well under the $30,000 threshold, staff recommend that the County exempt this project from a more formal selection process. FINANCIAL IMPACT: Funding to complete this work has already been appropriated by the Board in the Homestead Community Center Repairs Capital Project Ordinance, RECOMMENDATION(S): The Manager recommends that the Board: 1) authorize an agreement, contingent upon Attorney and staff review, with Corley Redfoot Zack for the completion of the design of sewer lines to serve the Homestead Community Center, with such agreement not to exceed $10,000; 2) pursuant to NCGS § 143, Article 3D, exempt this work from the selection process prescribed for this type of professional services; and 3) authorize the County Manager to sign an agreement that reflects the content of the attached proposal, ~~~ ~ , ® CORLEY REDFOOT ZACK EVC ARCHITECT 5 ENGINEERS PLANNER S May '12, 2006 GLENN D. CORLEY, AiA President, CEO Mr, Rod VISSE'.I Orange Colmty Plannnlg Department KENNErf[E.. REDF001, AiA Vice President PO BOX 8151 Hillsborough, NC 27278 Mnxx zncx, niA Vice President ~~ Homestead Community Center Sanitary Sewer Extension MicxnELr.HnMMEnsLeY,rs Principnt bake Hogan Farm Road, Chapel Hill, NC LAURENCE W. HUNCH, AIA Associate Dear Mr. Vfsser: ANDREW R. CRUICKSHANK,A[A Assocrnte Corley Redfoot Zack, Inc., is pleased to provide a fee proposal for the Civil CHARLENE E. HANLEY, AIA Engineering design services to complete the design and installation of Assocrnte approximately 500 LF of 8" sanitary sewer for the Homestead CommLmity nnvtD M. rnnon, nin Center in Chapel Hill Assocrnte HARRY M,JENSEN This sanitary sewer system will be designed in accordance with the Orange Associate Water & Sewer Authority Standards and Specifications. These design services xENNErN E.SMirH assume that the electronic survey and layout provided on 5/10/06 are Associate compatible with our Autocadd system and that no changes in the proposed location are needed. The design fee for all services will not exceed $10,000. A breakdown of the fee proposal is attached for your use. We appreciate the opporhmity to work PO Dox 2368 Chapel Hill, NC 27515-2368 222 Cloister Court Chapel Hill, NC 27514-2212 YEARS ~~ ~i Sincerely, PE on this important project, (919) 401-8586 Telephone (919) 493-7306 Fax www corleyredfootzack.eom Homestead Community Center Sanitary Sewer Extension Lake FIogan Farm Road, Chapel Hill, NC Breakdown of Proposed Fee for Professional Civil Engineering Design Services: Design Services: Plvr/Profile Sheet General Notes and Details OWASA approval NC'DOT Encroaclunent Permit Project Administration/Meetings Subtotal: $ 7,000 Construction Services: Pre-construction and Pre-bid Meetings Construction Adnunistration OWASA As-bunts Subtotal: 3,000 Not-to-Exceed Total: $10,000 This proposal does not include costs £oz the following: Surveying Geotechnical Services OWASA Construction and review fees I:egal fees Advertisement and formal biddilg process 0613-pro 5/'12/06 "\\`\\\` ~ ~ ~ CORLHY REDPOOT ZACK,.r