HomeMy WebLinkAboutAgenda - 04-18-2006-7cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 18, 2006 Action Agenda Item No. 7- G SUBJECT: Solid Waste Operations Center Design DEPARTMENT: Solid Waste Management PUBLIC HEARING: (Y/N) No ATTACHMENT(S): 4/12/06 Dixon Weinstein Memo Excerpt - TJCOG High Performance Guidelines INFORMATION CONTACT: Gayle Wilson, Solid Waste Director 919-968-2885 Alternate Building Design Schemes PURPOSE: To receive additional information about the proposed Solid Waste Operations Center and to consider providing conceptual approval of the building design. BACKGROUND: At the March 15, 2006 work session on solid waste matters, the architectural firm of Dixon Weinstein provided the Board of Commissioners with a presentation on the proposed design of the new Solid Waste Operations Center to be located on the south side of Eubanks Road, immediately adjacent and to the west of the County's mixed solid waste (MSW) landfill. The Solid Waste Advisory Board (SWAB) had received a brief presentation from the architects at their March 2 meeting and had given a favorable review to the planning efforts to date, The Board of Commissioners provided feedback regarding the proposed design, and asked the architects to prepare some additional information for subsequent presentation, Commissioners asked for an assessment of the energy exchange loss of the current design configuration compared to a more compact design with less exterior wall space. The architects have prepared the accompanying memo responding to the Board's March 15 comments and questions, and are ready to respond to this and any other BOCC observations. The next step after BOCC conceptual approval is to proceed to a meeting with community representatives, in collaboration with the Solid Waste Advisory Board, to review with them the BOCC's proposed design for the facility. The project timeline at this point contemplates soliciting and awarding constnaction bids in late summer or early fall 2006, with move-in to the new facility targeted for mid-2007. FINANCIAL IMPACT: Funding for the design and construction of the new facility will be addressed through debt financing to be repaid from revenues earmarked to the Solid Waste/Landfill Operations Enterprise Fund. RECOMMENDATION(S): The Manager recommends that the Board receive the additional information, provide conceptual approval of the facility design, and instruct staff and architects to present the Board's design at a community meeting and to report back to the Board on feedback received from the community,. Dixon \Neinslein A,cli lie cl,. `G A11111 Dale 04/12/06 To Orange County board of Commissioners From. Ken Friedein, AIA Dixon Weinstein Archilecls Project Solid Waste Operations Center AI the Board's March 1.5 working session on solid waste matters, Dixon Weinstein Archilecls presented the proposed Schematic Design of the Solid Waste Operations Censer on Eubanks Road Several questions arose concerning the configuration of the building, particularly with respect Io whether the relatively extensive perimeter shown was an efficient approach to building design The following discussion and diagrams are in response to Those concerns Perimeter area certainly is one factor to consider in building design A building's perimeter is where inside space meets outside space, and Therefore where conditioned air has relative higher opportunity to exchange wish unconditioned air Considering that issue alone, one approach Io building design would be to minimize perimeter by configuring a relatively deep, (hick footprint, which locales considerable occupied space on the inferior of the building, away from exterior walls Perimeter is not all negative, however Particularly in recent years, as building envelopes have become more efficient and Thermal exchange rases have been reduced, great benefits in humon comfort have been realized by increasing, and even maximizing, building perimeter. Specifically daylighling, ventilation, individual Thermal control and exterior views all are increased by providing sufficient perimeter to locale a high percentage of occupied spaces adjacent to exterior walls These benefits, which are associated with well documented decreases in fighting costs and increases in personal productivity, are all elements of the sustainable building strategy Thal was the philosophy and approach Taken in the proposed design of the SWOC Orange County's August, 2004, Request for Qualifications seeking archilecls for the design of the Solid Waste Management Administrative Building tiled the County's commitment Io sustainable design and asked architects to be familiar with high performance building principles The Request said, in part: "Orange County has a strong commitment Io be good stewards of the environment One such example is embodied in our desire to construct sustainable facilities that minimally impact or even improve the environment, both during and after construction The Triangle J Council of Governments led a collaborative effort among many local archilecls and government representatives to develop and publish the High Performance Guidelines Triangle Region Public Facilities in 2001 These guidelines are provided as a roadmap for the design and construction of efficient, cost effective, durable and environmentally sound buildings and landscapes " a 25 Tha Cowtyard d 31 W fionklin Sheet Chopel Hill. N C 27516 919 966 8333 9I9 968 0473 Fox www dixomvainstoincom 3 The Triangle J Guidelines specifically include daylighling and direct views from inside Io outside spaces as sustainable building strategies Guideline 6 10 (see attached copy) stoles the following intent: "Achieve a quality of Iighl Thal is beneficial fo building activities and occupants to provide a connection between indoor spaces and the outdoor environment Through the introduction of sunlight and views into the occupied areas of the building " As a resuh, the Triangle.] Guidelines suggest approaches Thal "maximize direct line of sight and orient buildings to maximize daylighling options "Among the specific steps, the Guidelines urge designers to "consider shallow or narrow building fool prints" and to "employ courtyards, atriums, clerestory windows, skylights and light shelves to achieve daylight penetration "Providing 90% of occupied spaces with direct views is a staled goal of the Guidelines These considerations, among others, led Io the approach that produced a design for the SWOC design Thal consisted of Iwo volumes, each with offices along a double loaded corridor, rather Than a single volume Iha1 buried Iwo rows of offices on the interior The design is similar in many respects to schools and other public buildings thol array occupied spaces along central corridors, each space having both interior and exterior walls In response Io the Board's questions, and for purposes of This follow-up discussion, Dixon Weinstein diagrammed a single volume Alternate Scheme to compare with the proposed Schematic Design The diagrams and comparisons appear on the following page, and are summarized below: Schematic Design Healed area: 8,100 sf Healed perimeter. 676 linear ft Occupied area: 74% Circulation/service: 26% Spaces w/direct views: 96% X26 of 271 2 Ahernale Scheme Healed area: 7,800 sf Healed perimeter: 430 linear ft Occupied: 73% Circulation/service: 27% Spaces w/ direct views 56% (15 of 271 Additionally, Dixon Weinstein's building performance consuhanls on the SWOC project, Environmental Quality Control of Chapel Hill, compared energy Toads of the Schematic Design and the Alternate The consuhanls assigned an additional lighting requirement to the interior portion of the Ahernale to compensate for its reduced daylighling EOC's analysis showed that the additional lighting reduced the Ahernale's healing requirement in the winter buI increased its summer cooling requirement to the point That cooling was identical to the Schematic Design More elaborate and extensive life-cycle cost comparisons of the Iwo approaches are possible with additional design work, if the Commissioners choose to seek (hose services Based on our experience, however, we are satisfied that the proposed Schematic Design represents a sound sustainable building approach that balances the costs of building perimeter with the benefits it affords 25 The Gvutlyvrd 43I W Frmkliv Srrem Chapel Hill. N C 27516 9I9 96H H333 919 969 0477 Fax www dixanwainslein cvm G><zidelines Lulaar Fnrirauunf: G.10 Daytigluing anJ Vicw•s (5-11 Points) l ntcnt of rrauircmcnts: Acltieae a ymtliry of light chat is beneficial tta building activities and occu• pants and provide a connection between indcxar spaces and the uutdour errviromncn[ dtrough dtc introduction at sunlight and cicws inro the oc- cupied areas oC the builJing jjiquirrmcnn: (G Points-) ^ 6 G 1 Achieve a minimum Daylight Factor of 2°/ (excluding all direct sunlight pcnetndon), without creating cooling problems due to excessive glaring, in 7S'% of all space occupied for critical visual tasks, not includ- ing copy rooms, storage areas, mechanical, Inundr}t and other low occu- pane}'supporz areas- Hxcepdons include those spaces where casks u•auld be hindered by the use of daylight ur where accomplishing the specific tasks within a space would 6c enhanced by the direct penetration of sunlight, (S Points) ^ G-102 Aclticvc a Jicecr line of sight to vision glazing from 9G'/o of all re},nalarly occupied spaces, not including copy rooms, stortge arms, me- chanical, laundry, and ocher low occupant}' support areas. l'crhnnlnf~ica and strotrnicr. Lnplentau design stntcgits to provide access to da}•light and cicws to the outdoors in a glare-Free way through proper sizing and orientation of windows, confi};vntion and massing of facility, exterior sun shading, interior light shch•es, and/or window treaunents. Dfa:cimizc direct line of sight and orient buildings to maximize daylighting options. Consider sh:dluw or narrow building footprints. Gmplvy court}ards, atriums, clcrc- storywindows, sk}'lights,and light shelves to achieve daylight pcnctndon (from other than diract effect or direct ra}'s @om tlac sun) deep into regularly ocnrpicd areas of the building. l;se appropratc reflective mato- rials anJ surfetcs, provide appropriate anahicn[ light levels aubmtcntcd widt tuk lights Avoid glare. Arnngc lixtuns to support use patterns. Usc diffusers that rcducc glare and illuminate eeiHng~ :uxl umlls similar to Ja}'lighting. Use lamps drat provide appropriate color rendition. Usc electronic ballast to rcducc flicker and noise. (~ivctnl?lcs: ^ Provide drnudngs with s narrative highlighting critical visual task areas and t}'pical room sections highlighting shading devices Cor diced sun con- trol. (G10_t) ^ Include area calculations defining the Jaydigh[ zone and daylight predio- Lion calculations demonstrating a minimum Daylight Pactor of 2% in these arcae (G.10-1) OR Vcreinn 2.0 High Performance Guidchnca: Triangle Region Public Faciliticx 0 C' "G 75 Orange County Solid Waste Operations Center Dixon Weinstein Architects 13 April 2OOb l./ _. a occupied restroom/utility storage (unheated( circulation Healed area: Heated perimeter. % Occupied: % Circulation/service: Spaces w/direct views: 8,100 sf 676 linear ft 74% 26% ~~ Alternate Scheme Heated area: Heated perimeter: 9e Occupied: % Circulation/service: Spaces w/direct views: 7,800 sf 430 linear ft 73% 27% Sb% (1S of 27) Schematic Plan