HomeMy WebLinkAboutAgenda - 06-15-2017 - 2.1 Attachment 1 Revisions to Capital Investment Plan Projects Attachment 1
Orange County Capital Investment Plan- Plan Summary - RECOMMENDED (with All Revisions)
Fiscal Years 2017-22
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Appropriations
County Capital Projects 17,265,878 14,202,058 27,018,300 24,241,917 7,684,380 11,927,330 85,073,985 71,026,550
Bond Referendum Projects 2,500,000 2,500,000 2,500,000
Total County Capital Projects 19,765,878 14,202,058 29,518,300 24,241,917 7,684,380 11,927,330 87,573,985 71,026,550
Proprietary Capital Projects
Water&Sewer Utilities 120,000 350,000 2,220,000
Solid Waste 667,665 990,268 1,301,941 2,186,688 1,337,049 2,154,938 7,970,884 7,646,198
Sportsplex 320,000 465,000 415,000 180,000 1,450,000 420,000 2,930,000 3,046,000
Schools Capital Projects
Chapel Hill Carrboro City Schools 4,615,927 -89,035 4,866,008 4,945,191 5,026,659 4,509,490 24,136,383 23,893,484
Deferred Maintenance Projects 34,970,659
Bond Referendum Projects 24,036,000 24,036,000 24,036,000 48,072,000
Total Chapel Hill Carrboro City Schools 28,651,927 4,789,035 28,902,009 4,945,191 29,062,659 4,509,490 72,208,384 58,864,143
Orange County Schools 3,043,644 3,179,409 _ 3,230,510 3,283,080 3,337,166 2,993,821 16,023,986 15,862,729
Deferred Maintenance Projects 22,418,212
Bond Referendum Projects 15,964,000 15,964,000 15,964,000 31,928,000
Total Orange County Schools 19,007,644 3,179,409 19,194,510 3,283,080 19,301,166 2,993,821 47,951,986 38,280,941
Durham Tech Community College(Orange Co Campus) 547,911 - - - - 547,911 20,000,000
Total 68,533,114 24,495,770 79,879,671 34,836,876 59,185,254 24,225,580 222,623,151 198,863,832
Revenues/Funding Source
Available Project Balances -
Transfer from Other Funds 100,000 100,000
Transfer from General Fund-County 887,500 741,000 505,000 1,250,000 770,000 880,000 4,146,000 4,250,000
Transfer from General Fund-W&S Utilities -
Transfer from General Fund-Schools 3,799,346 - - - - - - -
Transfer from other Capital Projects 260,000 100,000 100,000
County Capital Fund Balance -
Visitors Bureau Fund Balance -
Solid Waste Fund Balance 100,000 297,314 891,941 1,575,888 1,337,049 1,481,538 5,583,730 7,646,198
Sportsplex Fund Balance 320,000 465,000 415,000 180,000 475,000 420,000 1,955,000 1,630,000
Solid Waste Programs Fee
Lottery Proceeds 1,356,362 1,356,362 1,356,362 1,356,362 1,356,362 1,356,362 6,781,810 6,781,810
QSCBs
Register of Deeds Fees 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
9-1-1 Funds -
State 9-1-1 Funds 600,000 -
Medicaid Maximization Funds 3,629,500 3,629,500
Grants&Contributions 827,500 15,000 1,175,000 3,535,000 500,000 125,000 5,350,000 1,762,500
NCDEQ Reimbursement Funds 50,000 1,500,000 1,550,000
Grants-Solid Waste Fund 219,235 -
User Fees/Donations -
Article 46 Sales Tax Proceeds-Schools 1,503,863 • 1,755,746 1,825,976 1,899,015 1,974,975 2,053,976 - 9,509,688 11,569,988
Article 46 Sales Tax Proceeds-W&S 120,000 90,000 90,000
State Revolving Loan Funds -
Financing:
Debt Financing-County Capital 14,610,878 13,316,058 25,058,300 14,247,417 6,334,380 10,842,330 69,798,485 64,614,050
Debt Financing-W&S Utilities 780,000 350,000 2,220,000 3,350,000
Debt Financing-Solid Waste 348,430 692,954 410,000 610,800 673,400 2,387,154
Debt Financing-Sportsplex 975,000 975,000 1,416,000
Debt Financing-Special Revenue Funds - - -
Debt Financing-E-9-1-1 -
DebtFinancing-Affordable Housing(BondProi 2,500,000 2,500,000 2,500,000
Debt Financing-Schools(Bond Proceeds) 40,000,000 40,000,000 40,000,000 80,000,000
Debt Financing-Durham Tech(Orange Co.Campus) 547,911 - - - 547,911 20,000,000
Debt Financing-Schools Capital 1,000,000 1,000,000 2,870,517 4,972,894 5,032,488 4,092,974 17,968,873 78,793,286
Debt Financing-2/3 Net Debt Bonds(Schools) 3,856,336 2,043,664 5,900,000
Total 68,533,114 24,495,770 79,879,671 34,836,876 59,185,254 24,225,580 222,623,151 198,863,832
Attachment 1
County Capital Projects Summary - RECOMMENDED (with All Revisions)
Fiscal Years 2017-22
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Projects 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Appropriations
Affordable Housing Land Banking 1,000,000 -
Affordable Housing Bond Projects 2,500,000 2,500,000 2,500,000
Court Street Annex - 100,000
Detention Facility 500,000 622,114 12,500,000 7,469,217 20,591,331
Environment and Agriculture Center 3,384,500 3,384,500
Facility Accessibility and Security Improvements 319,000 30,000 114,500 111,500 150,000 25,000 431,000 74,000
Generator Projects 375,000 130,000 130,000
Government Services Center Annex 350,000 350,000
Historic Rogers Road Neighborhood Infrastructure 5,680,000 -
HVAC Projects 122,000 142,000 162,000 150,000 576,000 1,070,000
Lower Link Center Up-Fit 15,000 160,000 175,000
Main Branch Library-Remodel - - 1,200,000
Old Courthouse Square-Building/Grounds Impr. 40,000 85,000 185,000 205,000 260,000 735,000
Parking Lot Improvements 50,000 - 50,000 1,625,000
Passmore Center Renovation 550,000 -
Roofing and Building Facade Projects 206,700 102,444 381,800 148,200 484,380 722,330 1,839,154 1,299,200
Orange County Southern Branch Library 5,625,000 750,000 6,375,000
Southern Orange Campus Expansion 1,290,000 4,000,000 5,185,000 9,185,000
Whiffed Building 319,000 319,000
Information Technology Broadband Connectivity 60,000 500,000 500,000
Information Technology Fiber Connectivity 1,160,000 1,160,000 2,091,350
Information Technologies Goverance Council Initiat 500,000 510,000 500,000 500,000 1,510,000 2,500,000
Information Technologies Infrastructure 550,000 750,000 500,000 500,000 500,000 500,000 2,750,000 2,500,000
Communication System Improvements 166,000 920,000 805,000 1,725,000
EMS Substations 520,000 845,000 1,500,000 700,000 3,045,000 2,100,000
Orange County Radio/Paging System Upgrades - MI - 27,300,000
911 Center Improvements and Backup Capability 980,000
Register of Deeds Automation 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
Land Acquisition-Greene Tract(County owned poi 668,178 -
Blackwood Farm Park 1,260,000 100,000 1,795,000 70,000 1,965,000 3,102,000
Bingham District Park - 7,000,000
Cedar Grove Park Phase II 60,000 1,740,000 1,740,000
Conservation Easements 1,000,000 1,000,000 1,000,000 2,000,000 3,000,000
Upper Eno Nature Preserve-Public Access Area 110,000 430,000 540,000
Soccer.com Soccer Center Phase II 300,000 4,589,000 4,889,000
Lands Legacy 500,000 500,000 500,000 1,500,000 2,500,000
Millhouse Road Park 300,000 6,400,000 6,700,000
Mountains to Sea Trail 521,000 693,000 20,000 713,000 450,000
Hollow Rock Nature Park(New Hope Preserve) 235,000 10,000 10,000 165,000
Northeast District Park 350,000 350,000 7,650,000
River Park Phase II 50,000 -
Twin Creeks Park Campus Phase II 220,000 3,780,000 4,000,000 4,000,000
Little River Park Phase II 100,000 50,000 250,000 300,000
Fairview Park Improvements 325,000 50,000 1,500,000 1,500,000 3,050,000
Cedar Grove Community Center 75,000 75,000
Historic Rogers Road Community Center -
Efland-Cheeks Community Center Upfit 35,000 100,000 1,000,000 1,100,000
Parks and Rec Facility Renovations and Repairs 195,000 191,000 180,000 180,000 180,000 180,000 911,000 900,000
Total 19,765,878 14,202,058 29,518,300 24,241,917 7,684,380 11,927,330 87,573,985 71,026,550
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Projects 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Revenues/Funding Source
Available Project Balances -
Transfer from Other Funds 100,000 100,000
Transfer from General Fund 887,500 741,000 505,000 1,250,000 770,000 880,000 4,146,000 4,250,000
Transfer from Other Projects 260,000 100,000 100,000
Register of Deeds Fees 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
User Fees/Donations -
County Capital Fund Balance -
Visitors Bureau Fund Balance -
9-1-1 Funds 600,000 -
State 9-1-1 Funds -
Medicaid Maximization Funds 3,629,500 3,629,500
Grant Funding 65,000 65,000
Grant Funding from State/Fed for Parks 650,000 1,000,000 260,000 500,000 1,760,000 1,680,000
NCDEQ reimbursement Funds 50,000 1,500,000 1,550,000
Contributions from Other Infrastructure Partners 177,500 15,000 175,000 3,210,000 125,000 3,525,000 82,500
Debt Financing-Affordable Housing Bond Proceed 2,500,000 2,500,000 2,500,000
Debt Financing-Special Revenue Funds -
Debt Financing-E-9-1-1 -
Debt Financing 14,610,878 13,316,058 25,058,300 14,247,417 6,334,380 10,842,330 69,798,485 64,614,050
Total 19,765,878 14,202,058 29,518,300 24,241,917 7,684,380 11,927,330 87,573,985 71,026,550
Attachment 1
Water& Sewer Utilities Capital Projects Summary- RECOMMENDED (with All Revisions)
Fiscal Years 2017-22
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Projects Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Appropriations
Central Efland/North Buckhorn Sewer 3,793,900 -
Buckhorn EDD-Ef/and Sewer to Mebane 4,973,000 - - - - - - -
Hillsborough EDD 1,150,000 - 380,000 - - - - 380,000
Eno EDD 1,315,000 120,000 490,000 - - - - 490,000
Buckhorn-Mebane EDD Phase 3&4 - - - - 350,000 2,220,000 2,570,000
Total 11,231,900 120,000 870,000 - - 350,000 2,220,000 3,440,000
Revenues/Funding Source
Transfer from General Fund 445,201 -
Transfer from Other Projects(30017) -
General Fund-Debt Service Payments -
Article 46 Sales Tax-Debt Service -
EPA Special Appropriations Grant 1,348,400 -
Article 46 Sales Tax Proceeds 505,000 120,000 90,000 - - 90,000
CDBG Grant -
State Revolving Loan Funds 2,351,899 -
Debt Financing-Article 46 Sales Tax 6,581,400 780,000 350,000 2,220,000 3,350,000 -
Total 11,231,900 120,000 870,000 - - 350,000 2,220,000 3,440,000
General Fund Related Operating Costs
Personnel Services
Operations 646,830 130,780 116,530 58,265 174,795
Recurring Capital
New/Addt'1 Revenue - -
Total Operating Costs 646,830 130,780 116,530 58,265 - - - 174,795
Attachment 1
Schools Capital Projects Summary- RECOMMENDED (with All Revisions)
Fiscal Years 2017-22
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Projects by School System Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Chapel Hill Carrboro City Schools
Long Range Capital
Debt Financing-Capital Projects° 2,283,027 1,124,181 2,387,709 2,423,525 2,459,877 8,395,293 12,864,051
Lottery Proceedst2l 828,330 815,174 815,174 815,174 815,174 815,174 4,075,870 4,075,870
Article 46 Sales Tax Proceeds(3) 903,670 1,055,203 1,097,411 1,141,308 1,186,960 1,234,439 5,715,322 6,953,563
Facility Improvements to Older Schools 600,900 601,000 601,000 601,000 601,000 2,404,000
2/3 Net Debt Bonds 2,317,658 1,228,242. 3,545,900
Deferred Maintenance Projects(4) 34,970,659
Bond Referendum Projects(5) 24,036,000 24,036,000 24,036,000 48,072,000
Total 28,651,927 4,789,035 28,902,009 4,945,191 29,062,659 4,509,490 72,208,385 58,864,143
Orange County Schools
Long Range Capital
Debt Financing-Capital Projects° 1,516,319 746,336 1,585,185 1,608,963 1,633,097 5,573,581 8,540,364
Lottery Proceeds(2) 528,032 541,188 541,188 541,188 541,188 541,188 2,705,940 2,705,940
Article 46 Sales Tax Proceeds(3) 600,193 700,543 728,564 757,707 788,015 819,536 3,794,365 4,616,425
Facility Improvements to Older Schools 399,100 399,000 399,000 399,000 399,000 1,596,000
2/3 Net Debt Bonds 1,538,678 I 815,422 2,354,100
Deferred Maintenance Projects(4) 22,418,212
Bond Referendum Projects(5) 15,964,000 15,964,000 15,964,000 31,928,000
Total 19,007,644 3,179,409 19,194,510 3,283,080 19,301,166 2,993,821 47,951,986 38,280,941
Durham Tech Community College(Orange County Campus)
Long Range Capital
State Bond-County Match(6) 547.911 547,911
Construction/Expansion Project° - - - 20,000,000
Total - - 547,911 - - - 547,911 20,000,000
Total all Schools 47,659,571 7,968,444 48,644,430 8,228,271 48,363,825 7,503,312 120,708,282 117,145,084
Revenues/Funding Source
General Fund(Pay-As-You-Go) 3,799,346 -
Lottery Proceeds 1,356,362 1,356,362 1,356,362 1,356,362 1,356,362 1,356,362 6,781,810 6,781,810
Article 46 Sales Tax Proceeds 1,503,863 I 1,755,746 1,825,976 1,899,015 1,974,975 2,053,976 9,509,689 11,569,988
Debt Financing-Durham Tech(Orange Co Campus) 547,911 - - - 547,911 20,000,000
Debt Financing-Bond Proceeds 40,000,000 - 40,000,000 - 40,000,000 - 80,000,000 -
Debt Financing-2/3 Net Debt Bonds 3,856,336 2,043,664 5,900,000
Debt Financing-School Capital/Facility Improvements 1,000,000 1,000,000 2,870,517 4,972,894 5,032,488 4,092,974 17,968,873 78,793,286
47,659,571 7,968,444 48,644,430 8,228,271 48,363,825 7,503,312 120,708,282 117,145,084
Note: School Construction is guided by the Schools Adequate Public Facilities Ordinance(SAPFO)projections of capacity and need. The FY 2017-22 CIP is based on the most recent
proposed SAPFO projections shared with the Board of County Commissioners in December 2016,scheduled to be certified in Spring 2017.
Cl)Debt Financing is assumed to be utilized beginning in Year 2 for School Capital Projects instead of previously used Pay-As-You-Go funds;reflects a 1.5%annual growth throughout
the years of the CIP.
(2)Lottery Proceeds are assumed at the same amount throughout the remaining CIP period,based on the most recent lottery estimates from the State. The County uses Lottery
Proceeds towards school debt service and substitutes that amount of proceeds as additional PAYG funds to each school system based on the Average Daily Membership(ADM).
(3)Article 46 Sales Tax Proceeds reflect a 4.0%annual growth throughout the years of the CIP.
(4)Includes deferred maintenance items related to the Facilities Assessment findings from both school systems.
(5)Bond Referendum approved by voters in November 2016,with first issuance in Fall 2017,based on current ADM.
(6)Includes the County match for the Durham Technical Community College-Orange County Campus,based on the voter approved March 2016 State Bond.
PI Includes construction of a Health Technology Building(56,000 square foot)and surface parking of 250 spaces.
Attachment 1
Parking Lot Improvements
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New
Area: Award Date:
Department: Asset Management Starting Date: 07/01/15 Expansion
Services
Project Number: 30029 Completion Date: Ongoing Renovation X
Replacement X
Project Description/Justification: Funding requested in FY2018-19 -
is for asphalt repairs, gravel and site work necessary to improve safety • ` ;` •;4s;•'•
,•<. ms 410t; J
and capacity for the Sheriffs Office and OPT vehicle fleets. This y - ,,�� , ,��:, ,•
includes improvments to the evidence storage area managed by the
Sheriffs Office. The$1,500,000 designated in Years 6-10 would ,
provide major parking and circulation improvements for the planned
•
increase in Orange Public Transportation (OPT) bus units. .=_
� - y _
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building
Construction/Repairs/Renovations
Government Services Annex/Link Ctr -
District Attorney Building -
Efland-Cheeks Community Center - -
AMS North/OPT 50.000 - 50,000 1,500.000
501/503 W Franklin St 120,000 -
EMS Station-Revere Road -
Passmore/Adult Day - - 125.000
Total Project Budget: 120,000 - - 50,000 - - - 50,000 1,625,000
Funding Sources
Transfer from General Fund -
Transfer from Other Projects
Debt Financing 120,000 - 50.000 - - - 50,000 1,625,000
Total 120,000 - - 50,000 - - - 50,000 1,625,000
Impact on Operating Budget
Personnel Services
Operations
Recurring Capital
New/Add'I Revenue -
Total Operating Costs - - - - - - - - -
Attachment 1
Southern Campus Expansion
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New
Area: Award Date:
Department: Asset Management Starting Date: 7/1/11 Expansion X
Services
Project Number: New Completion Date: 7/1/21 Renovation
Replacement
Project Description/Justification: Southern Orange Campus Expansion combines three current projects--
Southern Campus Expansion, Southern Human Service Center Expansion, and Seymour Center Renovations/
additional parking. This combination provides heightened safety, construction efficiency and cost effectiveness.
The project includes an expanded Commissioner's meeting facility, a dental clinic, expanded health and human
service areas, Seymour Center programmable space and expanded parking. The addition of dental clinic space
in this facility fulfills the County's commitment to provide dental services in Southern Orange County.
Conceptual site and space plans are attached. The replacement of the Southern Human Services Center
(SHSC) roof has been included within this project, if funding is not appropriated for this project, the SHSC roof
will be added to the roofing projects for replacement in FY2019-20.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Professional Services-Design 75,000 -
SHSC 300,000 -
Seymour Center Modifications 100,000 -
Campus Site 400,000 400,000
Construction/Repairs/Renovations - -
SHSC 5,185,000 5,185,000
Seymour Center Modifications 585,000 -
Campus Site 3,600,000 3,600,000
Seymour Additional Parking - 270,000 -
Health Clinic&DSS Renovations 180,000 -
Proposed for emergency HVAC rooftop
replacement 75,000
Site Master Plan 400,000
Equipment/Furnishings 35,000 -
TotalProjectBudget 730,000 1,290,000 4,000,000 - 5,185,000 - - 9,185,000
Funding Sources
Transfer from General Fund - - - - - - - -
Medicaid Maximization Funds 3,629,500 3,629,500
Transfer from Other Projects
Debt Financing 730,000 1,290,000 4,000,000 - 1,555,500 - - 5,555,500
Total 730,000 1,290,000 4,000,000 - 5,185,000 - - 9,185,000
Impact on Operating Budget
Personnel Services 40,884 40,884 81,768 204,420
Operations 58,700 58,700 117,400 293,500
Recurring Capital
New/Add'1 Revenue -
Total Operating Costs - - - - - 99,584 99,584 199,168 497,920
Attachment 1
Information Technologies Fiber Connectivity
Project Category: County Capital Project Status: New Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Information Technology Starting Date: TBD Expansion X
Project Number: 30007 Completion Date: TBD Renovation
Replacement
Project Description/Justification: Funding in FY2017-18 includes
$1,160,000 in fiber connectivity within the Town of Hillsborough, and
$2,091,350in funding in Years 6-10 for expansion county-wide.
During FY 2016-17, Information Technologies undertook a fiber inventory Q
and assessment project by hiring a fiber needs assessment consultant to
estimate how much it would cost to run fiber to those county facilities
currently supplied by Time Warner with network connections which are
billed monthly at approximately$17,000 per month. The $3,251,350
proposed fiber backbone will extend from Cedar Grove to Carrboro and run
east west from Efland to potential economic development zones to the east along Highway 70. After connecting
county facilities, any excess fiber could be offered to other units of government, government agencies, schools
and businesses as a means of maintenance cost sharing. This fiber request also may be offset with potential
construction cost sharing agreements with the Town of Hillsborough and other partners.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Professional Services
Equipment
Fiber Connectivity 1,160,000 - - 1,160,000 2,091,350
Total Project Budget - - 1,160,000 - - - - 1,160,000 2,091,350
Funding Sources
Transfer from General Fund - -
Transfer from Other Projects -
Funding from Partners
Debt Financing 1,160,000 - - 1,160,000 2,091,350
Total - - 1,160,000 - - - - 1,160,000 2,091,350
Impact on Operating Budget
Personnel Services
Operations (15,706) (15,706) (15,706) (15,706) (62,824) (366,790)
Recurring Capital
New/Add?Revenues -
Total Operating Costs - - - (15,706) (15,706) (15,706) (15,706) (62,824) (366,790)
Attachment 1
Information Technologies Governance Council Initiatives
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Information Technology Starting Date: N/A Expansion X
Project Number: 30007 Completion Date: N/A Renovation
Replacement X
Project Description/Justification: Funding in FY2017-18 includes
$510,000 in technology related initiatives recommended through the
Information Technology Governannce Council (ITGC). Examples of FY - _
2017-18 initatives are the following: Crisis Damage Assessment -
Application, Sheriffs Office and Jail Video technology, Electronic Health
Record and Billing software, Laserfiche Licensing upgrade, Automatic
Vehicles locators for Animal Services, and Fleet Maintenance software.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Professional Services
Library Management Systems Software 250,000
Central Permitting System 800,000
IT Governance Council Initiatives 378,100 500,000 510,000 - 500,000 - 500,000 1,510,000 2,500,000
Total Project Budget 1,428,100 500,000 510,000 - 500,000 - 500,000 1,510,000 2,500,000
Funding Sources
Transfer from General Fund -
Transfer from Other Projects -
Available Project Balance
Debt Financing 1,428,100 500,000 510,000 - 500,000 - 500,000 1,510,000 2,500,000
Total 1,428,100 500,000 510,000 - 500,000 - 500,000 1,510,000 2,500,000
Impact on Operating Budget
Personnel Services
Operations -
Recurring Capital
New/Add'1 Revenues -
Total Operating Costs - - - - - - - -
Attachment 1
Emergency Services Substations
Project Category: County Capital Project Status: Active Project Type
Functional Service Public Safety Proposed Bid TBD New X
Area: Award Date:
Department: Emergency Services Starting Date: 7/1/16 Expansion X
Project Number: 10053 Completion Date: 6/30/22 Renovation X
Replacement
Project Description/Justification: The request for FY 2017-18 includes funding for a location study for all subsequent
co-locations and independent EMS stations.Also included is funding for architectural designs for the upcoming standalone
station in the Buckhorn/Efland area in FY 2018-19 and the Northern Corridor area in Years 6-10. In order to ensure
compliance to the Fire Code, upfits for two existing EMS Stations with required Fire Suppression Systems is needed. The
systems will be added to EMS Station 1 on Revere Road and Eno Fire Station 2 which will house the Medic 5 ambulance
and crew. The request for one of the co-located stations previously in FY 2017-18 has been moved to Years 6-10 to ensure
the stations are in the best locations based on the location study. The new EMS stations will be strategically located in
developing districts that are experiencing increasing call volume and service demand. The architectural design of the
stations will allow for one drive through bay(with expansion for an additional drive through bay), secure storage for narcotics,
a decontamination area, equipment room with washer/dryer,sleeping quarters, training/conference room, office area,
restrooms and shower, and public area separate from the secure area of the crew quarters. The cost of the colocation
stations represents efficiencies gained from sharing of kitchen, training, and other common areas. The operating costs of the
colocated facilites will also be shared.
FY 2017-18: Co-Location with Orange Rural Fire Department at Waterstone
FY 2018-19: Independent station in the Buckhorn/Efland area to be determined by location study
FY 2021-22: Co-Location (Location to be determined by location study with fire departments)$100,000 added for
architectural design for stand alone in Years 6-10
Years 6-10: Independent EMS station in the Northern corridor of the County to be determined by location study
Years 6-10: Co-Location(Location to be determined by location study with fire departments)
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Construction/Repairs/Renovations 30,000 - 45,000 45,000
Professional Services -
Location Study 50,000 50,000
Architectural Design for Stand Alone Stations 150,000 - 100,000 250,000
Land/Building -
Glen Lennox-Chapel Hill FS#2 520,000 -
Waterstone-Orange Rural FD 600,000 600,000
Buckhord/Efland-OCES Stand Alone 1,500,000 1,500,000
Co-Location TBD - 600,000 600,000
Northern Corridor-OCES Stand Alone - - 1,500,000
Co-Location TBD - - 600,000
Total Project Budget: 30,000 520,000 845,000 1,500,000 - - 700,000 3,045,000 2,100,000
Funding Sources
Transfer from General Fund 30,000 20,000 200,000 - 200,000
Transfer from Other Projects
Debt Financing 500,000 645,000 1,500,000 - - 700,000 2,845,000 2,100,000
Total 30,000 520,000 845,000 1,500,000 - - 700,000 3,045,000 2,100,000
Impact on Operating Budget
Personnel Services -
Operations 6,000 12,000 24,000 24,000 24,000 30,000 114,000 228,000
Recurring Capital
New/Addfl Revenue -
Total Operating Costs 6,000 12,000 24,000 24,000 24,000 30,000 114,000 228,000
Attachment 1
Orange County Radio/Paging Systems Upgrade
Project Category: County Capital Project Status: Active Project Type
Functional Service Public Safety Proposed Bid TBD New X
Area: Award Date:
Department: Emergency Services Starting Date: TBD Expansion X
Project Number: 30060 Completion Date: TBD Renovation
Replacement X
Project Description/Justification: In 2012,the Orange County Board of Commissioners
approved the Emergency Services Workgroup to provide recommendations to the Board on how to ,
best improve public safety and the emergency services delivery system in Orange County. During " 'v.--
the workgroup meetings the topic of the VIPER System,which is still the current radio
communication system in Orange County for all responders,was discussed and recommendations
were made starting with upgrading the number of channels on each tower to increase capacity.As
additional issues were discovered in regards to poor coverage in specific areas of the County as
well as an antiquated paging system,the project was continuously refined based on identifying the +�
growth of the population and challenges of coverage,capacity and the age of the existing
equipment.The County and Municipalities(Emergency Services,Chapel Hill Police Department,
Chapel Hill Fire Department,Orange County Fire Departments,Orange County Sheriffs Office,
Hillsborough Fire Department,Carrboro Police Department,Carrboro Fire Department and South _
Orange Rescue Squad)formed a committee to work with a selected consultant(Federal
Engineering)to design a radio system and interoperability plan which would address: 1)Expanding
user needs;2)Existing equipment limitations; 3)Insufficient capacity of VIPER to accommodate _
current users or future growth;and,4)Changes in coverage,interoperability and user expectations. r�
The committee,in conjunction with Federal Engineering,has determined the general design of a system that will address all of these
concerns.The design,which involves a cost-saving partnership with Durham County to share the use of their core control equipment,
includes the number of approximate placement of towers needed to provide public safety grade radio service throughout the county.The
design also includes a plan for building the radio system in discrete steps that provide measurable improvements to radio service for first
responders across the county. In the first step,during FY17-18,the selected vendor will create a detailed system design including all parts of
the completed system. Current available funds within this project are adequate to cover the cost of this first step.
Note: Cost share has not been included in these figures, and the committee is currently working towards a proposed formula to present to
all of the stakeholders regarding the share.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Countywide Radio Communications
Interoperability and Systems Engineering 543,750 -
Design,Engineering,and Towers 1,000,000 - - - - - - 27,300,000
Total Project Budget 1,543,750 - - - - - - - 27,300,000
Funding Sources
General Fund-Debt Service - - - - - - - -
Capital Projects Fund Balance
Debt Financing 1,543,750 - - - - - - 27,300,000
Total 1,543,750 - - - - - - - 27,300,000
Impact on Operating Budget
Personnel Services
Operations - 875,000
Recurring Capital
New/Addt'l Revenue -
Total Operating Costs - - - - - - - - 875,000
Attachment 1
Register of Deeds Automation
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Asset Management Starting Date: N/A Expansion
Services
Project Number: 30009 Completion Date: N/A Renovation
Replacement X
Project Description/Justification: Funding of$80,000 in each fiscal year throughout the plan is for the
acquisition of technology for the preservation and storage of public records in the Register of Deeds Office.
The Register of Deeds Automation project is funded with fees collected by the Register of Deeds. The funding is
mandated by NC General Statute 161-11.3 which requires all Counties to reserve ten percent of revenue
collected and retained by the County in a nonreverting Automation Enhancement and Preservation Fund.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Professional Services
Construction/Repairs/Renovations
Equipment/Furnishings 1,175,514 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
Total Project Budget 1,175,514 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
Funding Sources
Transfer from General Fund
Register of Deeds Fees 1,175,514 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
Debt Financing
Total 1,175,514 80,000 80,000 80,000 80,000 80,000 80,000 400,000 400,000
Impact on Operating Budget
Personnel Services
Operations
Recurring Capital
New/Add?Revenue
Total Operating Costs - - - - - -
Attachment 1
Millhouse Road Park
Project Category: County Capital Project Status: Active Project Type
Functional Service Community Services Proposed Bid TBD New X
Area: Award Date:
Department: DEAPR Starting Date: 7/1/16 Expansion
Project Number: 20034 Completion Date: 7/1/20 Renovation
Replacement
Project Description/Justification: This park project is a planned
Town of Chapel Hill/Orange County partnership using a 50-50 split-
-
funding concept, with the development of a master plan for the facility
and an interlocal agreement currently underway. The requested
funding in FY2020-21 is for design and engineering services for the •
collaborative planning effort, followed by construction in FY2021-22.
The Millhouse Road Park is a 79-acre site just north of Chapel Hill, and `rte
was acquired in 2004 (69 acres) and 2007 (10 acres) as a future park
site with discussion to date focused on a soccer field complex for
southern Orange County, with some walking trails and other amenities.
Cost estimates are based on the existing Soccer.com Soccer Center.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building 188,712 -
Professional Services - 300,000 300,000
Construction/Repairs/Renovations 106,090 - 6,400,000 6,400,000
Equipment/Furnishings -
Total Project Budget 294,802 - - - - 300,000 6,400,000 6,700,000 -
Funding Sources
Transfer from General Fund 76,090 - 150,000 150,000
Transfer from Other Projects 218,712 -
Debt Financing - 3,200,000 3,200,000
Possible Town of Chapel Hill funding - - 150,000 3,200,000 3,350,000
Operations/funding from other sources -
Total 294,802 - - - - 300,000 6,400,000 6,700,000 -
Impact on Operating Budget
Personnel Services - - - 680,000
Operations - - - 500,000
Recurring Capital
New/Addl Revenue
Total Operating Costs - - - - - - 1,180,000
Attachment 1
Northeast District Park
Project Category: County Capital Project Status: Planned Project Type
Functional Service Community Services Proposed Bid TBD New X
Area: Award Date:
Department: DEAPR Starting Date: 7/1/19 Expansion
Project Number: 20036 Completion Date: 6/30/21 Renovation
Replacement
Project Description/Justification: This future park site, the district
park for the northeast quadrant of Orange County, has been
purchased and is land-banked for future use. There is no funding
proposed for FY 2017-18. A Preliminary Concept Plan was prepared
by staff that identifies the general locations for different types of park -
activities, including a potential solid waste convenience center and • •. ^ ;:
•
possible emergency services substation and cellular tower within the
park. Northeast District Park is a 142-acre site acquired in late-2007.
The site was acquired with the potential for appropriate co-located
county facilities. The property is currently land-banked and leased to a
local farmer for cattle grazing, pending future construction. The cost
estimates are based on a district park concept of comparable size.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building
Professional Services - 350,000 350,000
Construction/Repairs/Renovations - - 7,650,000
Equipment/Furnishings
Total Project Budget - - - - 350,000 350,000 7,650,000
Funding Sources
Transfer from General Fund - - - 350,000 350,000
Debt Financing - - 7,650,000
Funding from other infrastructure partner
Total - - - - - 350,000 350,000 7,650,000
Impact on Operating Budget
Personnel Services 488,000
Operations 10,000 - 240,000
Recurring Capital
New/Addl Revenue
Total Operating Costs 10,000 - - - - - - - 728,000
Attachment 1
Detention Facility
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Asset Management Starting Date: 7/1/18 Expansion
Services
Project Number: 10051 Completion Date: 6/30/20 Renovation
Replacement X
Project Description/Justification: Funding of$500,000 in FY2016-17 "Tie „M;
is included for architectural/engineering costs. The construction, ' "!f
equipment/furnishings, and other professional services costs are
included in FY 2017-18 through FY 2019-20. This project includes a - u41 r ';
•preliminary construction estimate for a facility with an initial capacity to i ` ' ` r: •
house 144 detainees with the ability to expand to up to a 250 detainee ,:4,41 _
capacity if necessary. The jail population profile and projections for
future growth was presented to the Board in 2015, supporting the f •
_`
capacity decision and providing context for the ongoing analysis l
� •
related to current and estimated operational costs for jail operations. .� " ; - .�i' ,,=F
The architect will conduct staffing and operating cost analysis for °rang,C° Ty5t
different detention facility configurations and bring to the Board for the
schematic design of the facility. The current land lease with the State would not allow the County to use the
facility as collateral. As a result, the County is working with the designer to conduct a master planning and
feasibility study exercise contemplating the new Detention Center on the existing Jail site or adjacent to the
Justice Facility in downtown Hillsborough. Results of this study will be presented to the Board in the fall of 2017.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building -
Professional Services 750,000 500,000 622,114 622,114
Construction/Repairs/Renovations 12,500,000 7,112,624 19,612,624
Equipment/Furnishings 356,593 356,593
Total Project Budget 750,000 500,000 622,114 12,500,000 7,469,217 - - 20,591,331 -
Funding Sources
Transfer from General Fund -
Transfer from Other Projects
Debt Financing 750,000 500,000 622,114 12,500,000 7,469,217 - 20,591,331
Total 750,000 500,000 622,114 12,500,000 7,469,217 - - 20,591,331 -
Impact on Operating Budget
Personnel Services
Operations
Recurring Capital
New/Add'I Revenue -
Total Operating Costs - - - - - - -
Attachment 1
Environment and Agriculture Center
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Asset Management Starting Date: 7/1/17 Expansion X
Services
Project Number: 10028 Completion Date: 6/30/18 Renovation X
Replacement
Project Description/Justification: FY 2017-18 funding reflects a
renovated Environment and Agriculture Center(EAC)on Revere
Road. The architect has completed a comprehensive visioning study
of the facility including a structural report finding the facility structurally �-
sound. A completed report has been provided to the BOCC. This
report builds on a study conducted in 2006 by the Agricultural Center
Work Group which evaluated the need and justification for an Orange �+
County Agricultural Center. In addition to this renovation option the I H
report outlines new construction options either at the Revere road site
or in a similar area on the northern periphery of Hillsborough. The
funding for the roof renovation has been included in this CIP project; if
funds are not appropriated for this project the roof coating cost will be
added into the Roof& Building Façade project for FY2018-19. Following the visioning study, the Board of
Commissioners requested that staff also investigate potential sites along the Cornelius Street corridor in
Hillsborough, potential mixed use development options to include affordable residential development, and
options to increase day lighting in the facility. The results of these investigations will be reported to the Board in
the fall/winter of 2017.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building
Professional Services 300,000 -
Construction/Repairs/Renovations 3,282,000 3,282,000
Equipment/Furnishings 102,500 102,500
Total Project Budget: 300,000 - 3,384,500 - - - - 3,384,500 -
Funding Sources
Transfer from General Fund -
Transfer from Other Projects
Debt Financing 300,000 - 3,384,500 - - 3,384,500
Total 300,000 - 3,384,500 - - - - 3,384,500 -
Impact on Operating Budget
Personnel Services
Operations
Recurring Capital
New/Add'I Revenue -
Total Operating Costs - - - - - -
Attachment 1
Orange County Southern Branch Library
Project Category: County Capital Project Status: Active Project Type
Functional Service Support Services Proposed Bid TBD New X
Area: Award Date:
Department: Asset Management Starting Date: 7/1/18 Expansion
Services
Project Number: 10050 Completion Date: 6/30/20 Renovation
Replacement
Project Description/Justification: Planned funding of$5,625,000 in FY2018-
19 is for design and construction costs to replace the Cybrary and McDougle e;q -1 3•r
library branches for a new Orange County Southern Branch library. The BOCC "...=°—s;"
directed county staff to coordinate with the Town of Carrboro on locating the >'•
library on the Town owned 203 S. Greensboro property where the Town of ,.. „t ■IT
Carrboro would colocate various Town functions with the County's libraryBased -, i .i,;.:
on this colocation, space needs will be reevaluated to take advantage of t
s
potential space efficiencies. The operational costs include staffing of 12.25 FTE - ,x wr
of which 2.375 FTE will be reassigned from existing Carrboro library operations
into the new Orange County Southern Branch. Updated cost estimates are _ ^` ',--t-
based on the actual schematic, and market based cost exercises in a
collaboration with local engineering and construction estimation firms. . • T .1
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building 700,000 -
Professional Services 472,500 -
Construction/Repairs/Renovations 5,625,000 5,625,000
Equipment/Furnishings 750,000 750,000
Total Project Budget 1,172,500 - - 5,625,000 750,000 - - 6,375,000 -
Funding Sources
Transfer from General Fund -
Available Project Balances 264,000 -
Debt Financing 908,500 - - 5,625,000 750,000 - 6,375,000
Total 1,172,500 - - 5,625,000 750,000 - - 6,375,000 -
Impact on Operating Budget
Personnel Services 455,000 455,000 455,000 1,365,000 2,275,000
Operations 165,000 165,000 165,000 495,000 825,000
Recurring Capital - - -
New/Add'I Revenue -
Total Operating Costs - - - 620,000 620,000 620,000 1,860,000 3,100,000
Attachment 1
Blackwood Farm Park
Project Category: County Capital Project Status: Active Project Type
Functional Service Community Services Proposed Bid 5/1/18 New X
Area: Award Date:
Department: DEAPR Starting Date: 7/1/18 Expansion X
Project Number: 20037 Completion Date: 6/30/20 Renovation
Replacement
Project Description/Justification: Funding for park design and
construction of new turn lanes, entryway and parking was included in
FY 2016-17. Mowing equipment is recommended as part of the
$100,000 in FY2017-18. Staff is researching the potential of animal
grazing on the property to reduce the amount of mowing required.
Main park construction of$1,795,000 is proposed for FY2018-19, in
keeping with the adopted master plan for a low-impact park with
agricultural and historic themes and components of the farm's -
agricultural past, including interpretive signage, picnic areas,
community garden, agricultural demonstration areas and exhibits. The
planned park construction also includes three new picnic shelters, ,
restrooms, amphitheater, repairs and renovations to the farmstead, "(
fishing station, trails and open play fields with a potential new addition
of a disc golf course. It is anticipated that the park will open full-time in 2018 once construction is complete. The
funding for$2,572,500 in Years 6-10is for the permanent Parks Operations Base, which is proposed for
construction in the northeast corner of the site. A feasibility analysis is underway for this facility and other County
facility needs, The New Hope Church Road park facilities are shown for funding in Year 7. Blackwood Farm Park
is a 152-acre park midway between Chapel Hill and Hillsborough on NC 86 and New Hope Church Road. The
park opened on a limited facilities and operations basis in June 2015 and is currently open Friday-Sunday.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Land/Building
Professional Services 210,000 - 70,000 70,000 150,000
Construction/Repairs/Renovations 148,000 1,050,000 1,795,000 - 1,795,000 2,687,000
Equipment/Furnishings 49,400 100,000 - 100,000 265,000
Total Project Budget 197,400 1,260,000 100,000 1,795,000 - - 70,000 1,965,000 3,102,000
Funding Sources
Transfer from General Fund 50,000 90,000 90,000 27,500
Transfer from Other Capital Funds 147,400 I 120,000 -
Grants(PARTF),User Fees,Donations - 10,000 - - 10,000
Debt Financing 1,140,000 - 1,795,000 - 70,000 1,865,000 3,074,500
Total 197,400 1,260,000 100,000 1,795,000 - - 70,000 1,965,000 3,102,000
Impact on Operating Budget
Personnel Services 125,635 77,738 77,738 138,000 138,000 138,000 138,000 629,738 690,000
Operations 35,010 26,000 26,000 52,000 52,000 52,000 52,000 234,000 260,000
Recurring Capital
New/Addl Revenue
Total Operating Costs 160,645 103,738 103,738 190,000 190,000 190,000 190,000 863,738 950,000
Attachment 1
Durham Technical Community College — Orange County Campus
New Facilities
Project Category: School Capital Project Status: Planned Project Type
Functional Service Education Proposed Bid TBD New X
Area: Award Date:
Department: DTCC Starting Date: TBD Expansion
Project Number: New Completion Date: TBD Renovation
Replacement
Project Description/Justification: Includes $547,911 in FY - 4 .—
2018-19 for planning funds towards a new Health Technology
Buiilding on the Orange County Campus. This represents the
County match requirement for the use of$1,000,0000 in voter `, I
approved March 2016 State Connect Bond funds towards this N ,•
new building. A total of$20,000,000 is budgeted in Years 6-10
for the construction of this building, consisting of 56,000 square _ III ' 11111IF 1111
feet and surface parking of 250 spaces. I I 'i1' 1
_ ,_.___, 11■111111111140-p
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Appropriation
Land/Building -
Professional Services 547,911 - - 547,911 1,800,000
Construction/Repairs/Renovations - - - 18,200,000
Equipment/Furnishings -
Total Project Budget: - - - 547,911 - - - 547,911 20,000,000
Revenues/Funding Source
From General Fund(PAYG) - -
Debt Financing 547,911 - - - 547,911 20,000,000
Grant Funds -
Total - - - 547,911 - - - 547,911 20,000,000
Education Related Operating Costs
Personnel Services - 560,000
Operations - 540,000
Recurring Capital
New/Addl Revenue
Total Operating Costs - - - - - - - 1,100,000
Attachment 1
Buckhorn EDD - Efland Sewer to Mebane, Phase 2 Extension
Project Category: Water and Sewer Project Status: Active Project Type
Functional Service Community Services Proposed Bid 05/01/17 New
Area: Award Date:
Department: Planning and Starting Date: 07/01/17 Expansion X
Inspections
Project Number: 30044 Completion Date: 10/31/18 Renovation
Replacement
Project Description/Justification: Funding was in prior years.There was no funding in FY2016-17 for the
Buckhorn Economic Development District (EDD)
Efland Sewer to Mebane, Phase 2 Extension project. j-
This project is included to reflect ongoing debt - •
:A j
I A=
service associated with this project. Currently, the {:.
L.
wastewater collected by the Efland sewer system is r) , -..
pumped 3 1/2 miles east to the Town of Hillsborough w. ;= I,1_ ;r ,
via a 10" force main. This project would construct
the infrastructure necessary to send the wastewater PROJELT LOCATION
collected by the existing system. The strategy for
operation and maintenance of the system will comply
with the Interlocal Agreement with the City of 1 1
Mebane. This project would also construct the force main between the existing Gravelly Hill Pump station and
Rock Quarry road, which will eventually allow the Gravelly Hill PS (Buckhorn EDD)to be upgraded. The cost
estimate has been revised based on preliminary design data and recent bid prices on similar projects.
Operational Impacts: Orange County currently operates the Efland Sewer System. Upon completeion of this
project, the infrastrucutre ownership and maintenance responsibilities will be transferred to the City of Mebane
per Interlocal Agreement; thereby relieving Orange County of the associated expenditures.
FINANCIAL SUMMARY
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Total Year 10
Expenses
Professional Design Services 403,000 -
Land/Building 40,000 -
Construction/Repairs/Renovations 4,300,000 - -
Project Management 230,000 -
Equipmen t/Furnishings
Total Project Budget 4,973,000 - - - - - - - -
Funding Sources
Transfer from General Fund 151,600 -
Transfer from Other Projects - - - - - -
Article 46 Sales Tax Proceeds 240,000 -
Debt Financing-Article 46 Sales Tax 4,581,400 - -
Total 4,973,000 - - - - - - - -
Impact on Operating Budget
Personnel Services
Operations -
Recurring Capital
New/Addt'l Revenue -
Total Operating Costs - - - - - - - -