HomeMy WebLinkAboutAgenda - 03-13-2006-3ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 13, 2006
Action Agenda
Item No. ~~_
SUBJECT: Master Plan Process -New Hope Park at Blackwood Farm
DEPARTMENT: ERCD
PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Proposed Master Plan Process
6/10/02 Memo from HPC
4/26/05 APB Resolution
Map
INFORMATION CONTACT:
David Stancil, 245-2598
Lori Taft, 245-2660
PURPOSE: To consider a process for the creation of a master plan far the New Hope Park at
Blackwood Farm property.
BACKGROUND: At the end of 2001, Orange County acquired a 152-acre site from the late
Nannie and Mary Blackwood located near the intersection of NC 86 and New Hope Church
Road in northern Chapel Hill Township. The property was acquired because of its high
conservation values (natural area, historic property, former farm) and its suitable location for a
future County park. In acquiring the land, the Board noted that it would be land-banked far
future use, and that the eventual park design should feature low-impact design and retain some
of the agricultural, historic and scenic components of the property.
In January, the Fairview Master Plan Committee and staff completed the master plan for the
Fairview Public Campus. This plan was presented for review at the joint County/Town board
meeting on February 23. While a number of previous projects are still in various stages of
design completion/preconstruction (Northern Park, Twin Creeks) and require staff resources,
the Board may wish to consider whether to move ahead with the next scheduled park master
plan, the New Hope Park at Blackwood Farm. It is currently envisioned that preliminary staff
work for the New Hope Preserve (with Durham County, Chapel Hill and Durham City) will begin
later this spring, with a master plan committee for that effort being formed and beginning work
this fall.
The attached draft master plan process attempts tc layout a timetable, operating principles and
committee structure that recognize the unusual case and unique opportunities that this site
offers. It includes agricultural and historic components as well as the primary park and
recreation themes that are somewhat different from previous efforts.
The attached process envisions that the master plan would be created between May 2006 and
January 2007 by a Master Plan Committee of 15 persons, convened by two County
Commissioners. The Committee would also include representatives of Recreation and Parks
Advisory Council (2), the Agricultural Preservation Board (APB), Historic Preservation
Commission (HPC), Commission for the Environment and Planning Board, Four citizens at-
large (including one farmer) are also proposed, Guiding principles are offered, similar to
previous park planning efforts, to ensure environmental-sensitive design and to recognize the
important natural and cultural features of the site,
A Preliminary Concept Plan for the park, with generalized locations for groupings of uses (such
as low-impact recreation, agricultural, etc), is also needed to guide the master planning effort.
Staff proposes to bring this Preliminary Concept Plan far Board consideration at the time when
appointments are made to the committee, projected for May 4.
Funding does not presently exist for the construction of this future park, or for the necessary
surveys that are precursors to the park master plan (topographic survey with tree identification,
and cultural/archaeological survey). Staff proposes to include funds for design in the 2006-07
Capital Investment Plan (CIP), which would enable the committee to begin its work in the late
spring, receive the survey information aver the summer, and then complete its work in the fall
and winter.
FINANCIAL IMPACT: Although the land far this park has been acquired, no funding has been
identified for park construction or the pre-design surveys that are needed for master planning,
The two surveys are projected to cast approximately $50,000, and would be part of the
proposed 2006-07 CIP, Staff proposes to initiate the master plan process in the late-spring and
acquire the survey results over the summer.
RECOMMENDATION(S): The Manager recommends that the Board 1) discuss and approve
the proposed master plan process, making changes as desired, and 2) authorize the
recruitment of citizens and members to serve on the proposed committee.
Staff will prepare a draft Preliminary Concept Plan for Board consideration on May 4 (at the time
when appointments would be made), as well as an action item for a June agenda to allow for
the needed survey work to be funded in the proposed FY 2006-07 CIP to occur over the
summer, as outlined above,
3
PROPOSED NEW HOPE PARK at
BLACKWOOD FARM
Master Plan Process
Draft -February 20, 2006
To begin the planning for the proposed New Hope Park at
Blackwood Farm (working title), the following is offered as a draft
process for the Board's consideration. This draft is based on
discussions by staff and comments from the Board at the time of
acquisition in late 2001.
This draft process for a Master Plan Work Group is designed to
comprehensively integrate the many and varied components of
this 152-acre site, located near the intersection of NC 86 and New
Hope Church Road,
I. Tentative Schedule of Activities*
.
Master Plan process and charge approved .. -
March, 2006
Master Plan Work Group appointed /
Prelimina Conce t Plan a rovaled May 4, 2006
Work Grou be ins work Late-Ma ,
Surve s authorized and conducted June-Au ust
Interim report to Board of Commissioners October
Work Grou com letes Master Plan Janua 31, 2007
Board of Commissioners reviews, modifies
and a roves Master Plan February-March, 2007
Site plan approval, engineering, construction
drawin sand bid documents com leted TBA
Finalize and solicit bids, Board awards
contract TBA
Construction of ark -com leted TBA
Park O ens TBA
* subject to change
4
II. Proposed Master Plan Committee
A. Charge
1 . DEVELOP A MASTER PLAN FOR THE NEW HOPE PARK AT
BLACKWOOD FARM SITE, WITHIN THE FRAMEWORK OF THE
PRE-CONCEPT PLAN, GUIDING PRINCIPLES (PL.EASE SEE
ATTACHMENT 1) AND OTHER DIRECTION PROVIDED FROM THE
BOARD OF COMMISSIONERS.
2. THE MASTER PLAN SHOULD INCLUDE 'THE FOLLOWING
COMPONENTS:
a. A master plan map for the park. The plan map should include all proposed
buildings, playing fields, other fields, roads, parking, facilities, and
amenities, as well as vegetative cover, hydrology and other components
that are commonly included in park master plans.
b. A written report in support of the master plan map, outlining the proposed
uses, the design rationale, description of work group process, natural and
cultural features, existing and proposed land uses, means of soliciting
community input, potential future phases, and construction cast estimates.
3. THE MASTER PLAN WILL ADDRESS CO-LOCATION OF
PROPOSED FACILITIES WITH THE GOAL OF PROVIDING FOR
SYNERGIES OF USE AND APPROPRIATE TRANSITIONS BETWEEN
DIFFEREN"T COMPONENTS OF THE PARK.
4. THE BOARD OF COMMISSIONERS WILL SUBSEQUENTLY
ADDRESS PHASING, OPERATION AND MAINTENANCE
RESPONSIBILITIES OF THE PARK.
B. Product and Timeframe
A Master Plan report and map, as described above, by ,January
31, 2007**
Timeframe: May 2006 -January 2007**
" -subject to change based on actual start date of the master plan design
5
C. Proposed Makeup of the New Hope Park Master Plan
Committee
• 2 County Commissioners (also serve as Committee conveners)
• 2 Recreation and Parks Advisory Council members
• 1 Agricultural Preservation Board member
• 1 Commission for the Environment member
• 1 Historic Preservation Commission member
• 1 Economic Development Commission member
• 1 Orange County Planning Board member
• 4 citizens (at-large), including one farmer
Staff
County Manager or designee, Environment and Resource Conservation Director (project
coordinator), Recreation and Parks Management Director, Economic Development Director,
Planning Director, Open Space Design Specialist. Land Conservation Manager, Preservation
Planner, Parks Supervisor
(Assistance also to be solicited from County Engineer, Purchasing Director, District
Conservationist and Cooperative Extension Director).
III. Steps After Completion of the Master Plan
Qnce completed, the Master Plan will be submitted to the Board of
County Commissioners for approval.
The Board may approve the Plan, remand it back for further work,
modify the Plan, or decide not to pursue the Plan,
6
ATTACHMENT 1
Guiding Principles
In addition to the charge, the Committee shall use the following Guiding
Principles in developing a Master Plan for the site,•
• The park design should conform to the Pre-Concept Plan approved by the
Board of Commissioners on , 2QQ6
• The site should promote apedestrian-friendly environment and work to
discourage automobile traffic within the site
• The protection of important stream corridors and natural areas should be a
foremost consideration, and recreation and other facilities should be designed
in concert with the natural surroundings wherever passible, Grading and
alteration of the natural landscape should be minimized,
• The master plan should address the site primarily as aloes-impact recreation
park that reflects and features the agricultural and environmental heritage,
historic stnactures and scenic and natural resources present
• Generally, all portions of the site not used for recreation or other facilities
should adhere to "Qlmsteadian" park and open space design principles,
promoting open spaces, meadows, and fields that may flexibly be used for a
variety of purposes
• Efficiency opportunities in grouping of fields, facilities and infrastructure
should be explored
• The master plan should promote xeriscaping (native vegetation and minimal
water use) within the entire site
• The master plan should address incorporating the farmstead structures into
the overall park design
• The master plan should include the protection of scenic vistas within and
adjacent to the site
• The master plan should be designed with sensitivity to adjoining landowners
• The master plan should ensure that facilities location are based on access
and commonality of use
Additional basic operating principles may be developed by the Board of
Commissioners
HISTORIC PRESERVATION COMMISSION
Memorandum
Ta: Barry Jacobs, Chair, Orange County Board of Commissicners
From: Betsy Underwood, Chair, Historic Preservation Commission
Date: June 10, 2002
Subject: Blackwood Farm
On behalf of the Orange County Historic Preservation Commission (HPC) I would like to
thank the Board of Commissioners for recognizing the importance of the Blackwood Farm
as an irreplaceable local resource, and including it among the County's recent
acquisitions. Few other sites provide such a Zink to our architectural and agricultural
heritage within such a scenic setting, and we share the Agricultural Preservation Board's
assessment that the Blackwood Farm is a special place worthy of preservation. While our
appreciation of the site extends to its agricultural legacy our focus is on preserving the
house and supporting building complex within its rural context.
While the Blackwood farmhouse does not retain the integrity of the house at the Cate
property, it exemplifies the common evolution of many Orange County houses. Built with
local materials, the original core dwelling was a log structure with a sturdy stone chimney.
The house was enlarged two-to-three more times with a series of additions to the rear.
Finally during the Blackwood period of ownership, entire house was updated to reflect the
popular side-gable bungalow form with the addition of a large front dormer.
The "period of significance" for the Blackwood house is around 1920-1940 because the
existing building reflects the Blackwood ownership and expansion; the character of the
original sections of the house, which date to the 1820s and 1840s, are no longer visible
except for the dates in the chimneys. The early twentieth-century character of the house
and its outbuildings does not reduce its importance to the architectural history of Orange
County, however. The house tells an important story in its existing condition, in that it
documents the success of one local family to undertake a substantial renovation project to
update an older house to reflect current architectural trends.
The Historic Preservation Commission discussed many potential uses for the building
complex at theirjoint site visit in April with the Agricultural Preservation Board and the
Planning Board and at their May and June meetings., The HPC shared many of the APB's
ideas for using the property for agricultural education and rural heritage purposes, while
Blackwood Farm P~esen~ation P/an
Page 2~
retaining the historic character of the house and building complex (which will require some
restoration and long-term maintenance). The HPC also focused on the importance of
preserving the historic roadways, and other components of the traditional landscape.
We assume that the Board of Commissioners will establish a planning committee to
develop program for the Blackwood property, and would like the opportunity to participate
in this process and have a seat on the committee. Our role as the Historic Preservation
Commission is not only to identify important cultural resources but also to advise the
Board on strategies to protect them. We are grateful for the purchase of this significant
tract and would like to volunteer to participate in the planning process as appropriate,
9
RESOLUTION
Inclusion of Agricultural and Historic Components in Future Master Plan for the
Proposed New Hope Park at Blackwood Farm
WHEREAS, the County acquired the historic Blackwood Farm on New Hope Church
Road and NC 86 in 2001, and
WHEREAS, at the time of acquisition staff and the Board of Commissioners stated the
intent to create a future park oriented toward low-impact recreation and the preservation
of areas of scenic, agricultural and historic value within the site, and
WHEREAS, the Agricultural Preservation Board has discussed on several occasions the
many opportunities for agricultural functions within the future park:
NOW, THEREFORE, BE IT RESOLVED
That the Agricultural Preservation Board requests that staff and the Board of
Commissioners include an agricultural and historic preservation component in the future
master plan for this site, tentatively planned to take place in 2006.
This, the 26`h day of April, 2005
Noah Ranells, Chair
Agricultural Preservation Board
WITNESS:
Carol Melton, staff
n~---. ~ ~--- - ^--~- -.~ ~-.~- -~----- - -~ ~-----
N
A 200 0 200 400 Feet
~®~,