HomeMy WebLinkAbout2017 Annual Report of the SAPFO Technical Advisory Committee (SAPFOTAC) P)OF 3- abi�
MARKDOROSIN,CHA/R Orange County Board of Commissioners u 52
PENNY R/CH,V/CE CHAIR
MIA BURROUGHS Post Office Box 8181
BARRYJACOBS
MARKMARCOPLOS 200 South Cameron Street
EARL MclL
E
RENEER R ICCE
Hillsborough, North Carolina 27278
RENEE P
PENNY RICH
March 8,2017
Pam Hemminger, Mayor Dr. Stephen H. Halkiotis, Chair
Town of Chapel Hill Orange County Board of Education
405 Martin Luther King Jr. Blvd. 200 E. King Street
Chapel Hill,NC 27514 Hillsborough,NC 27278
Lydia Lavelle,Mayor James Barrett,Chair
Town'of Carrboro Chapel Hill-Carrboro Board of Education
301 W. Main Street 750 Merritt Mill Road
Carrboro,NC 27510 Chapel Hill,NC 27516
Tom Stevens,Mayor
Town of Hillsborough
P.O. Box 429
Hillsborough,NC 27278
Subject: Schools Adequate Public Facilities Ordinance Technical Advisory Committee
(SAPFOTAC)Annual Report
Dear Sir or Madam:
This letter is to update you on the status of the 2017 Annual SAPFOTAC Report. In accordance with the
SAPFO Memoranda of Understanding(MOU),the Board of County Commissioners (BOCC) approved the
November 15, 2016 actual membership and capacity numbers for Orange County Schools and Chapel Hill—
Carrboro City Schools at its meeting on December 5,2016.
The SAPFOTAC, comprised of representatives of both school systems and the Planning Directors of the County
and Towns has produced the 2017 Annual Report. As per the SAPFO MOU,the annual technical report
contains information on Level of Service, Building Capacity, Membership Date, Capital Investment Plan,
Student Membership Projection Methodology, Student Membership Projections, Student Membership Growth
Rate, Student/Housing Generation Rate, and the SAPFO Process. Enclosed for your use are copies of the 2017
Executive Summary and the March 7, 2017 BOCC meeting agenda item abstract when the BOCC received the
draft report.
YVYVW.ORANGECOUNTYNC.GOV
PROTECTING AND PRESERVING—PEOPLE,RESOURCES, QUALITY OF LIFE
ORANGE COUNTY,NORTH CAROLINA—YOU COUNT!
(919)242130
The full draft SAPFOTAC report is available on the Orange County Planning Department website in the
Current Interest Projects section at the following link: http://www.co.oran e.nc.us/plannin /g/SpecialProiects.asp
The 2017 Annual SAPFOTAC Report is scheduled to be certified by the BOCC at a regular meeting in May
2017. Therefore, if you have any comments pertaining to the report,please forward them to Craig K Benedict,
Planning Director,no later than 5:00 p.m. on April 10,2017. Mr. Benedict can be reached by phone at(919)
245-2592 or by e-mail at cbenedict@orangecountync.gov. Any comments received will be part of our agenda
package in May.
Please share this information and the 2017 SAPFOTAC report with your respective boards.
Sincerely
s
Mark Dorosin
Chair
Enclosures
cc: Board of County Commissioners
Bonnie Hammersley, Orange County Manager
Travis Myren,Deputy Orange County Manager
Roger L. Stancil,Manager, Town of Chapel Hill
David Andrews, Manager, Town of Carrboro
Eric Peterson, Manager, Town of Hillsborough
Jim Causby, Interim Superintendent, Chapel Hill-Carrboro City Schools
Todd Wirt, Superintendent, Orange County Schools
Todd LoFrese, Assistant Superintendent for Support Services, Chapel Hill—Carrboro City Schools
Catherine Mau, Coordinator for Student Enrollment, Chapel Hill-Carrboro City Schools
Patrick Abele, Chief Operations Officer, Orange County Schools
Craig Benedict,Planning Director, Orange County
Ben Hitchings, Planning and Development Services Director, Town of Chapel Hill
Margaret Hauth, Planning Director, Town of Hillsborough
Trish McGuire,Planning Director, Town of Carrboro
WWW.ORA NGECOUNTYNC.GOV
PROTECTING AND PRESERVING-PEOPLE, RESOURCES, QUALITY OF LIFE
ORANGE COUNTY, NORTH CAROLINA- YOU COUNT!
(979)245-2 130
9
2017 SAPFOTAC Executive Summary
I. Base Memorandum of Understanding
A. Level of Service....................................................................(No Change)........pg. l
Chapel HilUCarrboro Orange County
School District School District
Eleme 105% 105%
Middle 107% 107%
High 110% 110%
B. Building Capacity and Membership..................................(Change)..............Pg. 2
Chapel HNICarrboro Orange County
School District School District
Capacity Membership Increase from Capacity Membership Increase from
Prior Year Prior Year
Elementary 5829 5567 66 3694 3293 (25
Middle 2944 2829 15 2166 1724 15
High 3875 3762 61 1 2439 2446 23)
C. Membership Date—November 15.......................................(No Change)........Pg.17
II. Annual Update to SAPFO System
A. Capital Investment Plan (CIP) ...........................................(No Change)........Pg. 18
B. Student Membership Projection Methodology.................(No Change)........Pg. 19
The average of 3,S,and 10 year history/cohort surviva4 linear and arithmetic projection models.
C. Student Membership Projections.......................................(Change)..............Pg. 29
Analysis of 5 Years of Projections for 2016-17 School Year—Chapel Hill/Carrboro City Schools
(The fast column for each year includes the student membership projection made for 2016-2017 in that given year.The second column for each year
includes the number of students the projection was off compared to actual membership.An"L"indicates the projection was low compared to the
actual whereas an"H"indicates the projection was high compared to the actual.
Year Projection Made for 2016-17 Membership
Actual 2016 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016
Membership
Elementary 5567 6026 H459 5837 H270 5845 H278 5662 H95 5552 1 L15
Middle 2829 2987 H158 3004 H175 2962 H133 2928 1 H99 2830 1 H1
High 3762 4018 1 H256 4016 H254 3893 1 H131 3798 1 H36 3757 1 LS
i
10
Analysis of 5 Years of Projections for 2016-17 School Year-Orange County Schools
(The first column for each year includes the student membership projection made for 2016-2017 in that given year.The second column for each
year includes the number of students the projection was off compared to actual membership.An"L"indicates the projection was low compared to
the actual,whereas an"H"indicates the projection was high compared to the actual.
Year Projection Made for 2016-17 Membership
Actual 2016 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016
Membership
F-Elementary 3293 3699 H406 3622 H329 3567 1 H274 3274 1 L19 3325 H32
Middle 1724 1853 H129 1785 H61 1824 11100 1746 1 H22 1743 H19
High 2446 1 2449 H3 2429 1 L17 2468 I H22 2540 1 H94 2504 1 1158
D. Student Membership Growth Rate....................................(Change)..............Pg. 39
Projected Average Annual Growth Rate over Next 10 Years
Chapel HiMICarrboro Orange County
School District School District
Year
Projection 2012-13 2013-14 2014-15 2015-16 2016-17 2012-13 2013-14 2014-15 2015-16 2016-17
Made-
Elementary 1.18% 1.44% 1.11% 0.92% 0.91% 1.31% 1.30% 0.55% 0.80% 0.51%
Muddle 1.59% 1.58% 1.15% 0.82% 0.95% 1.64% 1.42% 0.09% 0.67% 0.36%
High 1 1.60% 1 1.27% 1 1.22% 0.93% 0.72% 1 1.43% 1 1.35% 1 0.39% 0.56% 0.22%
E. Student/Housing Generation Rate ..................................(No Change)........Pg. 42
SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS
(based on future year Student Membership Projections)
CHAPEL HILL/CARRBORO SCHOOL DISTRICT
Elementary School Level
A. Does not currently exceed 105% LOS standard(current LOS is 95.5%).
B. The projected growth rate at this level is expected to decrease over the next 10 years,
but remain positive(average-0.91%per year compared to 1.24% over the past 10
years).
C. Similar to last year,projections are not showing a need for an additional Elementary
School in the 10-year projection period.
Middle School Level
A. Does not currently exceed 107%LOS standard(current LOS is 96.1%).
B. The projected growth rate at this level is expected to decrease over the next 10 years,
but remain positive(average-0.95% compared to an average of 1.28%over the past
10 years).
C. Similar to last year,projections are not showing a need for an additional Middle
School in the 10-year projection period.
ii
11
High School Level
A. Does not currently exceed the 110%LOS standard(current LOS is 97.1%).
B. The projected growth rate at this level is expected to increase over the next 10 years
(average—0.72%compared to 0.45%over the past 10 years).
C. Similar to last year,projections are not showing a need to expand Carrboro High
School from the initial capacity of 800 students to the ultimate capacity of 1,200
students in the 10-year projection period.
ORANGE COUNTY SCHOOL DISTRICT
Elementary School Level
A. Does not currently exceed 105%LOS standard(current LOS is 89.1%).
B. The projected growth rate at this level is expected to decrease,but remain positive over
the next 10 years (average—0.51%compared to 1.02%over the past 10 years).
C. Similar to last year,projections are not showing a need for an additional Elementary
School in the 10-year projection period.
Middle School Level
A. Does not currently exceed 107%LOS standard(current LOS is 79.6%).
B. The projected growth rate at this level is expected to decrease,but remain positive over
the next 10 years (average—0.36%compared to 0.92%over the past 10 years).
C. Similar to last year,projections are not showing a need for an additional Middle School
in the 10-year projection period.
High School Level
A. Does not currently exceed 110%LOS standard(current LOS is 100.3%).
B. The projected growth rate at this level is expected to decrease,but remain positive over
the next 10 years (average--0.22%compared to 1.53%over the past 10 years).
C. Similar to last year,projections are not showing a need to expand Cedar Ridge High
School from the initial capacity of 1,000 students to 1,500 students in the 10-year
projection period.
ADDITIONAL INFORMATION
The Schools Adequate Public Facilities Ordinance(SAPFO)student projections illustrate when
the adopted level of service capacities are forecasted to be met and/or exceeded in anticipation of
CIP planning and the construction of a new school. However, as is being identified by both
school districts, a new trend is emerging to renovate and expand existing facilities to address
school capacity needs in a more feasible way. As this trend continues, additional capacity
resulting from school renovations and expansions will be added to the projection models in
stages, once funding is approved,versus the addition of greater capacity when a new school is
constructed and completed. The renovation and expansion to existing facilities may delay
construction of new schools further into the future. This process will pose some challenges to
SAPFO compared to the existing process which indicates in advance when a completely new
school is needed. Decisions on the timing of reconstruction funding would be indirectly linked to
the SAPFO model.
iii
12
SAPFO student projections for this year are not showing a need for new school construction or
expansion in the 10-year projection period for both school districts due to slowing student
growth rates. However,planned residential development in the near future may increase student
membership and accelerate school construction and expansion needs into the 10-year projection
period. Although capacity and construction needs are not identified this year,both school
districts face a large backlog of school capital projects that need to be addressed. Given that
student projections are not showing an immediate need for school construction in the 10-year
period, this may provide the time for both school districts to commence and/or complete these
projects in order to address ongoing needs.
The State of North Carolina passed legislation in 2015 resulting in a decrease in class size
averages for kindergarten to third grade for the 2017-18 school year. Based on legislation,the
class size averages may be reduced from 1:21 to 1:17. Due to significant statewide ramifications
as a result of the reduced class size averages,the North Carolina General Assembly is reviewing
a second bill to modify and increase the 1:17 class size averages in time for the 2017-18 school
year. If legislative action is not taken,the 1:17 class size averages will remain and result in a
decrease in capacity of approximately 444 students for OCS and 660 students for CHCCS. This
will have significant impacts for both school districts,resulting in over capacity situations and
requiring additional mobile units at the elementary school level. The SAPFO Technical Advisory
Committee will continue monitoring this issue.
iv