A RESOLUTION AUTHORIZING THE MANAGER TO CONTRACT FOR
PROFESSIONAL SERVICES ASSOCIATED WITH CONDUCTING A SURVEY
TO DETERMINE FEASIBILITY OF LOCATING A SEWER LINE TO THE
GREENE TRACT
WHEREAS the Greene Tract Work Group has indicated an interest in extending
the sewer line constructed by Habitat for Humanity and OWASA to the Greene
Tract; and
WHEREAS the Greene Tract Work Group has stated a preference that the sewer
line be routed from the existing line off the north end of the cul-de-sac on Jubilee
Drive, to Purefoy Road, then east along Purefoy Road to the Greene Tract;and
WHEREAS the terrain of the proposed route calls into question the feasibility of
constructing the sewer line in the requested location; and
WHEREAS an elevation profile of the proposed route must be prepared by a
surveyor in order to determine the feasibility of the proposed route.
NOW, THEREFORE, BE IT RESOLVED THAT the Orange County
Commissioners authorize the County Manager to contract for services necessary
to produce the elevation profile of the proposed sewer line route to determine the
feasibility of the proposed route;and
BE IT FURTHER RESOLVED THAT County exempt itself from the selection
requirements for surveyors as cited in GS 143 Article 3D in order to expedite the
timetable by which the survey results are produced; and
BE IT FURTHER RESOLVED THAT the County Manager be authorized to fund
the survey work from available Solid Waste funds as he deems appropriate.
This, the 3'd day of April, 2002. ....:Ns.,„•‘.,..°e0i
Barry Jacobs, Chair
Orange County Commissioners
•
Memorandum
To: Board of Commissioners
From: John Link, County Manager
Date: April 3, 2002
Re: Greene Tract Sewer Feasibility Survey
During the past several months, the Greene Tract Work Group has continued
to work toward development of a conceptual plan map for the remaining
jointly-owned portion of the Greene Tract. The Work Group has made great
progress toward this end, as a resolution from the Work Group (to be shared
with the Board next week) will show.
•
As the Work Group completes discussion of final issues, one important piece
of information is needed - a survey to determine sewer feasibility for a
potential corridor, from the terminus of existing OWASA sewer lines to a
portion of the Greene Tract which would be proposed for future affordable
housing. This survey will enable the Work Group to make a more-
knowledgeable recommendation on which portions of the site can be served.
To accomplish this task in a timely fashion, we would ask the Board to
authorize staff to contract for professional services for the sewer survey,
consistent with the attached resolution.