HomeMy WebLinkAboutAgenda - 01-24-2006-5pORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 24, 2006
Action Agenda
Item No.
SUBJECT: Contract for Roof Asset Management Program Update
DEPARTMENT: Public Works/ Purchasing PUBLIC NEARING: (YIN) No
ATTACHMENT(S):
Proposal for Roof Condition Survey and
Asset Management Program
INFORMATION CONTACT:
Pam Jones, Purchasing Director,
919-245-2652
Wayne Fenton, Acting Public Works
Director, 919-245-2628
PURPOSE: To consider approval of a contract for the assessment of the condition of roofs on
all County buildings, and preparation of roof asset management software for those roofs.
BACKGROUND: Beginning in 1997, Orange County contracted with CTL Engineers for
completion of a Roof Asset Management Program (RAMP). This program included collection of
relevant data for the roofing on all County buildings, including a professional assessment of the
condition of each roof sector at the time, and cost estimates for repairs and/or replacements for
a five-year period. Assessments and data collection were completed early in 1998. CTL used
these data to prepare a five-year recommended repair and replacement schedule with cost
estimates. The Board of Commissioners received the report in spring 1999. Staff has used the
RAMP recommendations for roof replacements as a guideline each year in prioritizing roof
replacement projects to be included in the County's annual Capital Investment Plan update.
The original Roof Asset Management information and database was updated in 2000. No
updates have been performed since that time. The evaluation of roof conditions should be
updated periodically to verify conditions and repair and/or replacement priorities. The database
also needs to be updated periodically to include buildings added since previous updates,
Several buildings have been added to the County's inventory since the last update in 2000, with
several more to be added in upcoming months.
CTL is no longer offering roofing related consulting services, Jeff Spady, the project manager
for the excellent work performed by CTL in the past for Orange County, is now with MACTEC
Engineering and Consulting, Inc, Mr. Spady has provided the accompanying proposal at a
quotation of $13,900 for performing the condition assessment, repair and replacement
estimates, and needed software updating work,
FINANCIAL IMPACT: The County's Capital Investment Plan includes monies to complete this
project during 2005-06, at a cost of $13,900.
2
RECOMMENDATION(S): The Manager recommends that the Board of County Commissioners:
1) authorize the Purchasing Director to develop a contract, subject to final review by staff and
the County Attorney, in the amount of $13,900 and based on the accompanying proposal from
MACTEC Engineering and Consulting, Inc. for performing updated roof asset condition
assessments and updating the County's roof asset management system; and
2) authorize the Chair to sign the contract.
$ I//I
MACTEC
January 19, 2006
Mr. Wayne Fenton
Acting Director, Public Works, Orange County
Highway 86 North
Hillsborough, NC 27278
RE: Roof Condition Survey and Asset Management Program
Orange County
MACTEC Proposal No- 06RAIL030
Dear Mr. Fenton:
We are pleased to provide this proposal for performing a roof condition survey of County-owned
facilities- We understand that the County is interested in gaining insight into the current
condition of existing roof systems as well as updating an existing database for roof asset
management. We understand that approximately 33 facilities are to be included in the survey
including but not necessarily limited to the following:
New Court House
Northern Human Services
Southern Human Services (Old)
Sheriff Administration
Government Services
Animal Control Office
503 West Franklin
Animal Shelter
Homestead Community Center
Dickerson House
Old Court House
Planning & Agriculture Center
Old Motor Pool Facility
Whitted Human Services
Southern Human Services
Recreation and Parks
Jail
Court Street Annex
501 West Franklin
EMS-911
Public Works Administration
Government Services Annex
Ef'land Community Center
Orange Enterprises
Public Works Storage
Scope of Services
Our services will include:
Conducting a thorough visual examination of the roof systems. The examination will
note deficiencies in the roof systems including field membrane, baseflashings, roof
penetrations, perimeters and other roof related items. All physical features will also be
noted including drainage.
2. Taking record photographs of each roof area and typical deficiencies.
Mr Wayne Penton
Roof Condition Survey and Asset Management Program
NIACTEC Proposal No 06RAIL030
January 19. 2006
Page 2
Updating existing plans of each roof showing major roof top equipment and features.
4. Providing a Roof Asset Management Program database utilizing Vertex to include all
data noted herein for use by Orange County. We will set up the program, input all data
initially, then provide training to Orange County personnel regarding retrieval and input
of information.
Vertex is specifically designed for multi-facility Owners such as Orange County and can
be accessed via internet connection for easy review of data, reporting, costing analysis,
etc. Vertex provides the ability to:
0
• Quantify distresses and defects per asset
• Calculate a condition index for all assets
• Forecast assets' remaining useful service life based on Engineering standards NOT
subjective opinion
• Predict the future condition of an asset
• Three levels of survey for appropriate & efficient modeling of all assets (detail,
sample & general)
• Track warranties & estimates repair costs
• Update assets' condition following repair or replacement activities
• Track actual repair costs
Vertex provides financial modeling of assets to include:
• Prioritizing projects based on Return on Investment (ROI)
• Modeling Owner's planning methods, strategic goals and Maintenance, Repair, and
Replacement (MR&R) triggers
• Development of optimized 1 to n year capital & expense budgets for maintenance,
repair and replacement projects
• Supporting unlimited "what if" modeling for developing funding scenarios
• Quantifying deferred maintenance costs
• Prioritizing spending across departments, sites, facilities and asset components
Results of utilizing Vertex include:
• Reducing annual Cap/Ex MR&R costs 10 - 20%
• Extending asset useful service life
• Improving facility condition - reduced maintenance tickets
• Increasing operational reliability
• Quantifying deferred maintenance costs
• Developing defendable budget business cases
• Providing auditable stewardship metrics (Saibanes-Oxley, etc )
• Establishing a baseline to evaluate the effectiveness of planned MR&R activities
• Providing an ongoing facility management program, not a snap shot
MACTEC Engineering and Consulting, Inc
3301 Atlantic Avenue Raleigh, NC 27604
919.876-0416 Pax: 919-831 8136
Mr. Wayne Fenton O
Roof Condition Survey and Asset Management Program
MACTEC Proposal No 06RAIL.030
January 19, 2006
Page 3
Assistance Requested of Orange County Public Works
We request your assistance in performing the requested services as follows:
Arranging for safe access to each roof by way of ladders, a roof hatch, or stairway.
I Arranging for access to the interior of each facility to allow examination of the underside
of the roof deck and observe for possible areas of leakage and water damage.
3. Providing copies of plans, specifications, reports, etc for our use in performing the
requested services.
4. Granting permission to take record photographs.
Granting permission to make and repair test cores. Please note that test cores involve
cutting through the membrane, insulation and vapor retarder down to the roof deck for
the purpose of extracting samples and making observations. We will make repairs using
generally accepted roofing materials and practices, however, clue to anticipated
deterioration and the otherwise unknown physical condition of existing materials, we
cannot assume responsibility for the watertight integrity of the roof system not any
resulting damages. Additionally, should a roof be under warranty please arrange for and
authorized roofing contractor to witness and repair the test cut or provide written
documentation to the effect that our actions will not invalidate the warranty
6. Advising us of your representative with whom we should contact with regard to
performance of the requested services.
Pees
We propose to charge for the services outlined herein a lump sum fee of $13,900.
Schedule
We propose to begin the requested services upon receiving your written authorization to proceed
and will complete the work within a mutually agreed upon time frame.
Authorization
Should you accept our proposal, please execute the attached Proposal/Work Acceptance Sheet
and return it to our office for countersigning, after which we will return it to you. To expedite
our commencement of this project, you may fax the signed proposal to us at (919) 831-8136.
Please note that our invoice is payable on receipt.
MACTEC Engineering mnl Consulting, Inc
3301 Atlantic Avenue. Raleigh. NC 27604
919-876-0416 Fax; 919-831-8136
Mr. Wayne Penton ?../
Roof Condition Survey and Asset Management Program
MACTEC Proposal No 06RAIL030
January 19,2006
Page 4
We appreciate the opportunity to submit this proposal and look forward to working with you on
this project, Should you have any questions or need additional information, please advise,
Sincerely,
MACTEC Engineering and Consulting, Inc.
Jeffrey L. SpE
Director, Faci
Group
Dan D- Blair, Jr- PE
Principal Engineer
17,E ??,Nith ?tYnisttlcy?
MACK lingineering and Consulting, Inc
3301 Atlantic Avenue, Raleigh, NC 27604
919-376-0416 Fnx: 919-931-3136