HomeMy WebLinkAboutAgenda - 06-26-2007-4qACTION AGENDA ITEM ABSTRACT Meeting Date: June 26, 2007 Action Agenda Item No. SUBJECT: Contract with Corley Redfoot Zack for-Engineering and Design Services for Fairview Communitv Park DEPARTMENT: Purchasing, ERCD, Recreation PUBLIC HEARING: (Y /N) No ATTACHMENT (S): 1) Cost Proposal 2) Fairview Park Master Plan INFORMATION CONTACT: Pam Jones, 245 -2652 Lori Taft, 245 -2660 David Stancil, 245 -2590 Marabeth Carr, 960 -3880 PURPOSE: To consider authorizing the Chair to execute a contract with Corley Redfoot Zack for park pre- construction design and engineering services to secure permits, conduct engineering work, and create construction drawings and. specifications for bid documents for Fairview Community Park. BACKGROUND: In 2004, the County and the Town of Hillsborough agreed to work together to create a master plan for the entire 92 -acre site by adopting a Memorandum of Agreement along these lines, reflecting both the existing and planned uses on the Public Works site and potential future uses for a park. In October 2005, an appointed Fairview Public Campus Master Plan Committee began work to develop a proposed Master Plan. Over the next four months, the Committee met on four occasions to create this report and plan. (See attached Master Plan). In 2001, Orange County voters approved a Parks and Open Space bond that earmarked $850,000 for this park. The Board may recall that, at the January 23, 2007 BOCC meeting, an expenditure of up to $40,000 was approved for the purchase of playground equipment. That purchase of the playground equipment along with site surveys and a survey of cultural and archeological surveys of the site have left a balance of $803,103.90 available for the design and construction of the park. In April 2007, a Request for Proposal was conveyed to professional engineering and design firms to solicit interest. Eight firms responded with proposals, and a Project Design Team was convened to interview three firms. The Project Design Team included staff members David Cannell, Lori Taft and Marabeth Carr as well as Stephanie Trueblood from the Town of Hillsborough. The three firms invited to interview were; • Corley Redfoot Zack/Susan Hatchell Landscape Architecture of Chapel .Hill /Raleigh Lappas + Havener/HH Architecture/Mulkey Engineers of Durham/Raleigh/Cary Rivers and Associates/Dibble & Pledger, PA/Dixon Associates, Greenville, NC After interviewing the three firms, the Project Team recommended that Corley Redfoot Zack and Susan Hatchell Landscape Architecture be selected to conduct the project. ERCD's Marabeth Carr, who is also a licensed landscape architect, would provide primary project management to ensure this phase of development is carried out in a timely and quality manner. Experience with similar projects by both CRZ and Susan Hatchell was a strong consideration in the selection recommendation. The team also recognized CRZ's experience in designing athletic fields, attention to sustainability and construction administration when making the recommendation. The Team also felt that Susan Hatchell's landscape expertise, innovative thinking and attention to sustainability added tremendous value to CRTs proposal. Assuming a June 26, 2007 approval date, the contract work would begin during the summer. FINANCIAL IMPACT: The negotiated price of the services to be conducted for Fairview Park is a not to exceed amount of $108,000. A cost proposal outlining more specifically the services to be provided is attached to this abstract. Funding from the 2001 Parks and Open Space Bond is appropriated in previous budgets in the amount of $803,103.90 for this work. RECOMMENDATION (S): The Manager recommends that the Board approve the contract with Corley Redfoot Zack as cited herein; and authorize the Chair to sign on behalf of the Board, subject to final review by staff and the County Attorney. I , 1 CORLEY REDFOOT ZACK11,41C. GLENN D. CORLEY, AIA President, CEO KENNETH E. REDFOOT, AIA Vice President MARK ZACK, AIA Vice President MICHAEL L. HAMMERSLEY, PE Principal LAURENCE W. BUNCH, AIA Associate ANDREW R. CRUICKSHANK, AIA Associate CHARLENE E. HANLEY, AIA Associate DAVID M. TAYLOR, AIA' Associate HARRY M. JENSEN .Associate KENNETH E. SMITH Associate PO Box 2368 Chapel Hill, NC 27515 -2368 222 Cloister Court Chapel Hill, NC 275142212 1965 -2005 (919) 401 -8586 Telephone (919) 493 -7306 Fax www.corleyredfootzack.com ARCHITECTS • ENGINEERS • PLANNERS June 11, 2007 David Cannell Orange County Purchasing Office County of Orange P. O. sox 8181 Hillsborough, NC 27278 RE: Fairview Park Fee Proposal Dear Mr. Cannell, I am enclosing for your review, a design fee proposal of $108,000 and a projected schedule for the above - referenced project. We look forward to another successful project with the Orange County Recreation and Parks Department. Please give me 'a call if you have any additional questions. Sincerely, (Michael L.radini4sley, PE Principal / t! ENCLOSURE MLH/jll- Fairview Proposal I CORLEY REDFOOT ZACKINC. ARCHITECTS • ENGINEERS - PLANNERS RE: Fairview Park June 11, 2007 Fee Proposal /Timeline TIMELINE• September 2007 — Schematic Design Submittal December 2007 — Design Development Submittal March 2008 — Construction Document Submittal June 2008 - Bid Opening July 2008 — Bid Approval by Board of County Commissioners August 2008 — Construction Contracts Review and Approval September 2008 — Begin Construction June 2009 — Complete Construction FEE PROPOSAL: Schematic Design - $ 14,400.OQ Design Development - $ 19,200.00 Construction Documents - $ 43,200.00 Bidding - $ 4,800.00 Construction Administration- $ 14,400.00 Total $ 96,000.00 Town of Hillsborough Approval Process - $ 10,000.00 NCDOT, NCDENR, Piedmont Electric Orange County Permits - $ 2,000.00 Total $ 12,000.00 TOTAL $108,000.00 PO Box 2368 • Chapel Hill, NC 27515 -2368 • (919) 942 -8586 'telephone • (919) 929 -4802 Fax av Existing "Meadow i Storm Debris of I Dreams' j Typ. Stream Butler I _ Future Community Center Loplion (Not in Contract) - t. Dixie aye. EdupBonal Signage New Playground (Not In Contract) Existing Parking Area r ,''t - Orange Coun _ i Work' Existing Police Station yn aroo,s avE -r Open =j Area 1 2 Basketball Cou Typ. Treiis _ _ \, 61 _ Future \ -- earnEMOeravE. Perking.. = Facility 3 Tennis Courts_ -f1= Area to be Reserved for I Volleyball Court `= ,Future Use —\ HaayEe ao. - Connector Drive to Hwy 86 _ — =1_ 0 � _ -� Hillsborough o Public Works LSile- _ = a = Ball Field - -tmb _resenm �- J 41IIIlr;�ir ,i`• == Parking Playground Area (20) Picnic Shelter / Concesion Stand / Rest Rm. Location N Fairview Park Adopted Master Plan t _ Orange CoDunun ty 0 100 200 300 12/11/2006 Environment & Resource Conservation Department