ACTION AGENDA ITEM ABSTRACT
Meeting Date: OCTOBER 4 , 1993
Action Agenda
Item # ,]a-K
SUBJECT: AMENDMENT TO BOARD OF COUNTY COMMISSIONERS ' GOALS SCHEDULE
DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: Yes X No
ATTACHMENT(S) : INFORMATION CONTACT:
MANAGER'S OFFICE, EXTENSION 2300
REVISED GOALS SCHEDULE
TELEPHONE NUMBERS:
Hillsborough - 732-8181
Durham - 688-7331
Mebane - 227-2031
Chapel Hill - 967-9251/968-4501
PURPOSE: To approve amendments to the timelines for the goals
of the Rural Character Study and the Hillsborough
Cooperative Planning Zone that would allow the action
steps of these goals to follow a logical sequence
after the adoption of watershed protection measures.
BACKGROUND: Marvin Collins, Planning Director, has advised me of a
decision point which impacts on three separate but
intertwined goals - Watershed Protection, the Rural
Character Study and Hillsborough Cooperative Planning.
Specifically, citizens may be confused by/concerned
about the Rural Character options without a decision
first being made on the watershed standards.
Likewise, some Rural Character development options may
have to be revised to take into account adopted
watershed standards.
As you may recall, the adopted Rural Character Study
schedule called for township meetings in September,
1993 to present the various development options.
Staff has also been developing reports concerning the
small area planning process, development densities
needed to support public water/sewer extensions and
techniques for limiting connections to such lines.
The reports are related to both Rural Character and
Hillsborough Cooperative Planning goals and due to be
presented in September as well .
2
To avoid confusion and provide a logical sequence for
dealing with important issues, Marvin has suggested,
and I recommend, that the township meetings and report
presentations be delayed until such time as the
Commissioners adopt the watershed standards. Revised
time schedules detailing the resulting changes in
completion dates have been provided in boldface with
original completion dates shown in italics. (See
attachment)
RECOMMENDATION: To approve the timeline amendments as recommended.
3
Adopted 8/17/93
Revised 9/2/93
WATERSHED PROTECTION
NOTE: Proposed changes shown in boldface; original completion dates
shown in italics.
GOAL - IMPLEMENT WATERSHED PROTECTION STANDARDS AND CLASSIFICATIONS TO
INSURE HIGH QUALITY WATER RESOURCES IN ORANGE COUNTY
This initiative represents the continuation of an objective included
among the Commissioners' goals for FY 1992-93 , implementation of the
State-mandated watershed protection standards and classifications in
Orange County. The initiative will require the zoning of the two
northern townships - Little River and Cedar Grove. This initiative
will carry over into FY 1993-94 due to the amount of staff time
required to address issues related to the completion of rural
character strategies and economic development district proposals.
Following adoption of preliminary watershed classifications by the
Environmental Management Commission (EMC) in May, 1991, the Planning
Staff assembled a report for the Planning Board and Board of
Commissioners which identified the implications for Orange County.
Although the EMC held a public hearing on the proposed standards and
classifications in August, 1991, it held the public hearing open for
written comments until the end of October. Following a local public
hearing in August, the Board of Commissioners adopted a position
statement on the proposals and submitted it to the EMC before the
deadline. In February, 1992, the EMC adopted final watershed
standards, and in May, 1992, approved watershed classifications,
including those applicable to Orange County.
Local governments must implement the State watershed protection
measures in accordance with the following calendar:
Municipalities over 5, 000 persons - By July 1, 1993
Municipalities under 5, 000 persons - By October 1, 1993
Counties - By January 1, 1994 .
To implement this objective, local (Orange County) ordinances will be
presented for public hearing in August, 1993 . The ordinances must be
adopted and implemented by January 1, 1994 . This schedule will allow
time to conduct township meetings in Little River and Cedar Grove
townships which must be zoned in order to apply the watershed
standards.
PLAN OF ACTION
A. Prepare staff report on impact of September, 1992 -
EMC adopted standards/classifications October, 1992
B. Draft implementation proposals May, 1993 - June, 1993
C. Township Meetings to present June, 1993
implementation proposals and
obtain community response
4
D. Ordinance Review Subcommittee and July, 1993
Planning Board review
E. Public hearing conducted to receive August, 1993
citizen comment on proposed local
development standards and watershed
classifications
F. Planning Board prepares October, 1993
recommendation on proposed [September, 1993 -
standards/classifications October, 1993]
G. Board of Commissioners decision on November, 1993
proposed standards/classifications [October, 1993 -
December, 1993]
H. EMC deadline for municipalities October, 1993
(under 5, 000 population) to implement
standards/classifications
I. EMC deadline for counties to January, 1994
implement standards/classifications
Proposed effective date for Orange
County amendments.
RESOURCE REQUIREMENTS:
Implementation of the State-Mandated Watershed Protection Standards
and Classifications has involved/will involve the following commitment
of staff and financial resources:
a. Existing Staff Hours: 80
(Effort expended by existing staff)
b. Existing Staff Cost: $1, 600
(Expenses covered by existing budget)
c. Additional Staff Hours: 540
(Additional effort by existing staff)
d. Additional Staff Cost: $10,780
(Additional expenses from existing budget)
e. Additional Operating/Capital (Non-Staff) Cost: None
f. Estimated Additional Cost (d+e) : $10, 780
g. Estimated Total Cost (b+f) : 12 , 380
93WATER2 .WPS
5
ALTERNATIVE COMPLETION SCHEDULES FOR RURAL CHARACTER STUDY GOAL
8/17/93 Proposed Schedule Revision
Adopted Based on 11/1/93 Adoption of
Plan of Action Schedule Watershed Standards
OBJECTIVE 2 - Develop Conceptual Guidelines for the remainder of the county.
M. Staff preparation of issue papers and/or 3/93 3/93
reports regarding: 9/93 12/93
1. Refinement of small area planning
process;
2. Minimum development density required
for water/sewer extensions to "open
space developments" to be
economically feasible; and
3. Legal ramifications of limiting
connections to water/sewer lines
extended to serve "open space
developments".
M.2. to include preparation of site
specific designs/water & sewer service
plans to compare density results and
economic fesibility.
N. Presentation of issue papers and/or 9/93 12/93
reports to joint planning board/
governing board work session.
0. Presentation of alternative strategies 9/93 12/93
at township meetings, including
hypothetical development plans
illustrating application of current
cluster provisions and "open space
development" options.
P. Planning Board recommendation on 11/93 2/94
proposed strategies.
Q. Board of Commissioners decision on 12/93 3/94
proposed strategies.
OBJECTIVE 3 - Prepare Comprehensive Plan and ordinance amendments, and rural design
guidelines for implementing rural character strategies.
A. Draft ordinance/Comprehensive Plan 1/94 4/94
amendments, and rural design guidelines 4/94 7/94
based on adopted strategies.
B. Draft proposal sent to advisory boards 5/94 8/94
and interest groups for review and 8/94 11/94
comments.
C. Review comments compiled/revised draft 9/94 12/94
prepared.
D. Revised draft presented to Ordinance 10/94 1/95
Review Subcommittee for review and 11/94 2/95
preparation of final draft.
E. Final draft presented to Planning 12/94 3/95
Board, TACs, and advisory boards and 1/95 4/95
interest groups.
F. Public hearing notice approved, notice 2/95 5/95
advertised, and public hearing held.
G. Planning Board recommendation. 3/95 6/95
H. Board of Commissioners decision. 4/95 8/95
6
Adopted 8/17/93
Revised 9/2/93
NOTE: Proposed changes shown in boldface; original completion dates
shown in italics.
RURAL CHARACTER STUDY
GOAL - PREPARE/RESOLVE STRATEGIES AND ORDINANCES TO PRESERVE
RURAL CHARACTER
OBJECTIVE 1
Pursue mutual adoption, by Orange County, Chapel Hill, and Carrboro, of
Options A [2-Acre Lots] , B [5-Acre Lots] , and C [1-Acre Clusters] of the
Rural Buffer Conceptual Guidelines.
PLAN OF ACTION
The Plan of Action below includes only a list of events which must await
adoption of a proposed monitoring and maintenance program for wastewater
disposal systems. Until such a program is adopted and/or operational,
consideration of final adoption of the Rural Buffer Conceptual
Guidelines is not likely.
A. Intergovernmental Work Group meeting to review
strategies, discuss adopted wastewater disposal
options, and reach concensus on issues
B. Chapel Hill adoption
[Carrboro adopted all options - October 1990]
C. Planning Board recommendation
D. Board of Commissioners adoption
OBJECTIVE 2
Develop Conceptual Guidelines for the remainder of Orange County.
PLAN OF ACTION
The Plan of Action below reflects the schedule of events as they have
occurred or are proposed. Items A through L have been completed. Items M
through Q represent activities which will be undertaken during FY 1993-
94 .
A. Identify existing land use/environmental June, 1990
conditions/issues in townships - November, 1990
B. Township Meetings/Community Assessment December, 1990
- January, 1991
C. Define goals/identify and evaluate February, 1991
draft alternative strategies July, 1991
7
D. Township Meetings/Community Response August, 1991
E. Revise strategies September, 1991
F. Conduct buildout/carrying capacity analyses October, 1991
of townships/apply strategies to specific - April, 1992
sites/conduct economic feasibility studies/
identify additional incentives
G. Rural Character Study Committee revises May, 1992
strategies/prepares final recommendations - November, 1992
H. Conduct public hearing to receive citizen November, 1992
comment on proposed strategies
I. Rural Character Study Committee recommendation January, 1993
on proposed strategies
J. Planning Board recommendation on proposed January, 1993
strategies
K. Board of Commissioners referral of proposed February, 1993
strategies back to Planning Board for further
consideration
L. Planning Board Work Session on proposed March, 1993
strategies
M. Staff preparation of issue papers and/or March, 1993
reports regarding: - December, 1993
[- September, 1993]
a. Refinement of Small Area Planning
Process;
b. Minimum development density required
for water/sewer extensions to "open
space developments" to be economically
feasible; and
c. Legal ramifications of limiting
connections to water/sewer lines
extended to serve "open space
developments" .
M.2. to include preparation of site specific designs/water &
sewer service plans to compare density results and economic
feasibility.
N. Presentation of issue papers and/or December, 1993
reports to joint planning board/governing [September, 1993]
body work session
8
O. Presentation of alternative strategies at December, 1993
Township meetings, including hypothetical - January, 1994
development plans illustrating application [September, 1993]
of current cluster provisions and "open
space development" options
P. Planning Board recommendation on proposed February, 1994
strategies [November, 1994]
Q. Board of Commissioners decision on proposed March, 1994
strategies [December, 1993]
Items M and N are also related to the goal of preparing a Land Use Plan
for the Hillsborough Cooperative Planning Area.
OBJECTIVE 3
Prepare Comprehensive Plan and ordinance amendments, and rural design
guidelines for implementing rural character strategies.
PLAN OF ACTION
The Plan of Action below reflects a schedule of events proposed by staff
and supported by the Rural Character Study Committee, Planning Board,
Agricultural Districts Advisory Board, and Historic Preservation
Commission.
A. Draft ordinance and Comprehensive Plan April, 1994
amendments, and rural design guidelines - July, 1994
based on adopted strategies [January - April, 1994]
B. Draft proposals sent to advisory boards August, 1994
and interest groups for review and comment - November, 1994
Boards and groups include but not limited to: /-May - August, 1994]
-Agricultural Districts Advisory Board
-Historic Preservation Commission
-Recreation & Parks Advisory Council
-Economic Development Commission
-Transportation Advisory Subcommittee
-Township Advsiory Councils
-Design Council of Chapel Hill/Carrboro
-Duke Forest Advisory Council
-Eno River State Park
-Municipalities >Chapel Hill
>Carrboro
>Hillsborough
>Mebane
>Durham
-Utility Providers >OWASA
>OA
-Triangle Land Conservancy
-Sierra Club/Triangle Chapter
-CAUS
9
C. Review comments compiled/revised draft December, 1994
prepared [September, 1994]
D. Revised draft presented to Ordinance Review January, 1995
Subcommittee for review and preparation of - February, 1995
final draft [October-November, 1994]
E. Final draft presented to Planning Board, March, 1995
Township Advisory Councils, and boards and - April, 1995
interest groups [December, 1994 - January, 1995]
F. Public hearing notice approved, notice May, 1995
advertised, and public hearing conducted [February, 1994]
G. Planning Board recommendation July, 1995
[March, 1994]
H. Board of Commissioners decision August, 1995
[April, 1994]
RESOURCE REQUIREMENTS:
Development of Rural Character strategies and implementing ordinances
has involved/will involve the following commitment of staff and
financial resources:
A. Existing Staff Hours: 1, 920
(Effort expended by existing staff)
B. Existing Staff Cost: $31, 910
(Expenses covered by existing budget)
C. Additional Staff Hours: 1, 080
(Additional effort required of existing staff)
D. Additional Staff Cost: $17,950
(Additional expenses required from existing budget)
E. Additional Operating/Capital (Non-Staff) Cost: None
F. Estimated Additional Cost (D+E) : $17 , 950
G. Estimated Total Cost (B+F) : $49 , 860
93RURAL2 .WPS
10
ALTERNATIVE COMPLETION SCHEDULES FOR HILLSBOROUGH COOPERATIVE PLANNING GOAL
8/17/93 Proposed Schedule Revision
Adopted Based on 11/1/93 Ad
Plan of Action Schedule Watershed Stand 11/1/93
OBJECTIVE - Implementation of the Orange County-Hillsborough Cooperative Planning
Agreement, including preparation of a Land Use Plan and implementing
ordinances.
F. Staff preparation of issue papers and/or 3/93 3/93
reports regarding: 9/93 12/93
1. Refinement of small area planning
process;
2. Minimum development density required
for water/sewer extensions to "open
space developments" to be
economically feasible; and
3. Legal ramifications of limiting
connections to water/sewer lines
extended to serve "open space
developments".
F.2. to include preparation of site
specific designs/water & sewer service
plans to compare density results and
economic fesibility.
G. Presentation of issue papers and/or 9/93 12/93
reports to joint planning board/
governing board work session, including
decision/concensus by governing boards
regarding strategy for completion of
Cooperative Land Use Plan.
H. Small Area/TAC meetings to discuss 10/93 1/94
structure of current plan, draft goals
and objectives, and format for proposed
Plan.
I. Joint public hearing to present 11/93 2/94
recommended goals & objectives and
Plan format.
J. Planning Boards recommendations. 12/93 3/94
K. Decision by governing boards. 1/94 4/94
L. Small Area/TAC meetings to present 2/94 5/94
first draft of Plan.
M. Prepare public hearing draft of Plan 3/94 6/94
and implementing ordinances. 4/94 7/94
N. Joint public hearing on Draft Plan. 5/94 8/94
0. Neighborhood meetings to discuss 6/94 9/94
concerns/develop Plan alternatives.
P. Planning Boards recommendations. 7/94 10/94
O. Decision by governing boards. 8/94 11/94
11
Adopted 8/17/93
Revised 9/2/93
HILLSBOROUGH COOPERATIVE PLANNING
NOTE: Proposed changes shown in boldface; original completion dates
shown in italics.
GOAL - IMPLEMENT THE ORANGE COUNTY-HILLSBOROUGH COOPERATIVE
PLANNING AGREEMENT, INCLUDING THE PREPARATION OF A LAND USE
PLAN AND IMPLEMENTING ORDINANCES FOR THE COOPERATIVE
PLANNING ZONE
OBJECTIVE
This initiative represents the continuation of an objective
included among the Commissioners' goals for FY 1992-93 . The
objective involves the implementation of the Orange County-
Hillsborough Cooperative Planning Agreement signed by both
jurisdictions in October of 1991. The objective specifically
involves the preparation of a Land Use Plan and implementing
ordinances for the Cooperative Planning Area.
PLAN OF ACTION
The Plan of Action below reflects the schedule of events as they
have occurred or are proposed. Items A through D have been
completed. Items E-G represent activities which will be undertaken
prior to a joint planning board/governing body work session in
September, 1993 . Completion of items H-Q are dependent on a
decision/concensus of the governing boards at/following the
proposed joint work session in September.
A. Define workplan/schedule and Work Group November, 1991 -
membership, and report to governing January, 1992
boards
B. Produce base map of study area for November, 1991 -
public display and produce press January, 1992
release to announce
C. Compile and produce environmental/ January, 1992 -
socioeconomic analyses to include: August, 1992
1. Existing land uses
2 . Natural Environment
3 . Transportation system
4 . Water & Sewer
5. Population
D. Public meeting to present overview of August, 1992
agreement, plan process/schedule, and
study area profile
E. Joint Governing Board meeting to discuss March, 1993
status of Cooperative Planning Agreement
12
F. Staff preparation of issue papers and/or March, 1993 -
reports regarding: December, 1993
[September, 1993]
a. Refinement of Small Area Planning
Process;
b. Minimum development density required
for water/sewer extensions to "open
space developments" to be economically
feasible; and
c. Legal ramifications of limiting
connections to water/sewer lines
extended to serve "open space
developments" .
F.2. to include preparation of site specific designs/water &
sewer service plans to compare density results and economic
feasibility.
G. Presentation of issue papers and/or December, 1993
reports to joint planning board/governing [September, 1993]
body work session, including
decision/concensus by governing boards
regarding strategy for completion of
Cooperative Land Use Plan.
If governing boards decide to proceed with preparation of
Cooperative Land Use Plan for entire area rather a series of "small
area plans" , the following schedule would apply:
H. Small Area/TAC meetings to discuss January, 1994
structure of current plan, draft goals [October, 1993]
and objectives, and format for proposed
Plan
I. Joint public hearing to present February, 1994
reommended goals & objectives [November, 1993]
and Plan format
J. Planning Boards recommendations March, 1994
[December, 1993]
K. Decision by Governing Boards April, 1994
[January, 1994]
L. Small Area/TAC meetings to present May, 1994
first draft of Plan [February, 1994]
M. Prepare public hearing draft of Plan June-July, 1994
and implementing ordinances [March-April, 1994]
N. Joint Public Hearing on Draft Plan August, 1994
[May, 1994]
13
O. Neighborhood meetings to discuss September, 1994
concerns/develop plan alternatives [June, 1994]
P. Planning Board recommendations October, 1994
[July, 1994]
Q. Decision by Governing Boards November, 1994
[August, 1994]
The above strategy is the original approach revised to incorporate
"small area" meetings as a means of obtaining citizen input before
public hearings. Neighborhood meetings following the final public
hearing are also included to resolve citizen concerns. If the
governing boards elect to pursue a series of Small Area Plans
rather than the above approach, a new time schedule must be
developed.
RESOURCE REQUIREMENTS
Preparation of Orange County-Hillsborough Cooperative Planning Area
Land Use Plan has involved/will involve the following commitment of
staff and financial resources:
A. Existing Staff Hours: 470
(Effort expended by existing staff)
B. Existing Staff Cost: $7, 429
(Expenses covered by existing budget)
C. Additional Staff Hours: 648
(Additional effort by existing staff)
D. Additional Staff Cost: $14, 811
(Additional expenses from existing budget)
E. Additional Operating/Capital (Non-Staff) Cost: None
F. Estimated Additional Cost (D+E) : $14, 811
G. Estimated Total Cost (B+F) : $22 , 240