Loading...
HomeMy WebLinkAboutAgenda - 10-04-1993 - III-K 1 O R A N G E C O U N T Y BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: OCTOBER 4 , 1993 Action Agenda Item # ,]a-K SUBJECT: AMENDMENT TO BOARD OF COUNTY COMMISSIONERS ' GOALS SCHEDULE DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: Yes X No ATTACHMENT(S) : INFORMATION CONTACT: MANAGER'S OFFICE, EXTENSION 2300 REVISED GOALS SCHEDULE TELEPHONE NUMBERS: Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 967-9251/968-4501 PURPOSE: To approve amendments to the timelines for the goals of the Rural Character Study and the Hillsborough Cooperative Planning Zone that would allow the action steps of these goals to follow a logical sequence after the adoption of watershed protection measures. BACKGROUND: Marvin Collins, Planning Director, has advised me of a decision point which impacts on three separate but intertwined goals - Watershed Protection, the Rural Character Study and Hillsborough Cooperative Planning. Specifically, citizens may be confused by/concerned about the Rural Character options without a decision first being made on the watershed standards. Likewise, some Rural Character development options may have to be revised to take into account adopted watershed standards. As you may recall, the adopted Rural Character Study schedule called for township meetings in September, 1993 to present the various development options. Staff has also been developing reports concerning the small area planning process, development densities needed to support public water/sewer extensions and techniques for limiting connections to such lines. The reports are related to both Rural Character and Hillsborough Cooperative Planning goals and due to be presented in September as well . 2 To avoid confusion and provide a logical sequence for dealing with important issues, Marvin has suggested, and I recommend, that the township meetings and report presentations be delayed until such time as the Commissioners adopt the watershed standards. Revised time schedules detailing the resulting changes in completion dates have been provided in boldface with original completion dates shown in italics. (See attachment) RECOMMENDATION: To approve the timeline amendments as recommended. 3 Adopted 8/17/93 Revised 9/2/93 WATERSHED PROTECTION NOTE: Proposed changes shown in boldface; original completion dates shown in italics. GOAL - IMPLEMENT WATERSHED PROTECTION STANDARDS AND CLASSIFICATIONS TO INSURE HIGH QUALITY WATER RESOURCES IN ORANGE COUNTY This initiative represents the continuation of an objective included among the Commissioners' goals for FY 1992-93 , implementation of the State-mandated watershed protection standards and classifications in Orange County. The initiative will require the zoning of the two northern townships - Little River and Cedar Grove. This initiative will carry over into FY 1993-94 due to the amount of staff time required to address issues related to the completion of rural character strategies and economic development district proposals. Following adoption of preliminary watershed classifications by the Environmental Management Commission (EMC) in May, 1991, the Planning Staff assembled a report for the Planning Board and Board of Commissioners which identified the implications for Orange County. Although the EMC held a public hearing on the proposed standards and classifications in August, 1991, it held the public hearing open for written comments until the end of October. Following a local public hearing in August, the Board of Commissioners adopted a position statement on the proposals and submitted it to the EMC before the deadline. In February, 1992, the EMC adopted final watershed standards, and in May, 1992, approved watershed classifications, including those applicable to Orange County. Local governments must implement the State watershed protection measures in accordance with the following calendar: Municipalities over 5, 000 persons - By July 1, 1993 Municipalities under 5, 000 persons - By October 1, 1993 Counties - By January 1, 1994 . To implement this objective, local (Orange County) ordinances will be presented for public hearing in August, 1993 . The ordinances must be adopted and implemented by January 1, 1994 . This schedule will allow time to conduct township meetings in Little River and Cedar Grove townships which must be zoned in order to apply the watershed standards. PLAN OF ACTION A. Prepare staff report on impact of September, 1992 - EMC adopted standards/classifications October, 1992 B. Draft implementation proposals May, 1993 - June, 1993 C. Township Meetings to present June, 1993 implementation proposals and obtain community response 4 D. Ordinance Review Subcommittee and July, 1993 Planning Board review E. Public hearing conducted to receive August, 1993 citizen comment on proposed local development standards and watershed classifications F. Planning Board prepares October, 1993 recommendation on proposed [September, 1993 - standards/classifications October, 1993] G. Board of Commissioners decision on November, 1993 proposed standards/classifications [October, 1993 - December, 1993] H. EMC deadline for municipalities October, 1993 (under 5, 000 population) to implement standards/classifications I. EMC deadline for counties to January, 1994 implement standards/classifications Proposed effective date for Orange County amendments. RESOURCE REQUIREMENTS: Implementation of the State-Mandated Watershed Protection Standards and Classifications has involved/will involve the following commitment of staff and financial resources: a. Existing Staff Hours: 80 (Effort expended by existing staff) b. Existing Staff Cost: $1, 600 (Expenses covered by existing budget) c. Additional Staff Hours: 540 (Additional effort by existing staff) d. Additional Staff Cost: $10,780 (Additional expenses from existing budget) e. Additional Operating/Capital (Non-Staff) Cost: None f. Estimated Additional Cost (d+e) : $10, 780 g. Estimated Total Cost (b+f) : 12 , 380 93WATER2 .WPS 5 ALTERNATIVE COMPLETION SCHEDULES FOR RURAL CHARACTER STUDY GOAL 8/17/93 Proposed Schedule Revision Adopted Based on 11/1/93 Adoption of Plan of Action Schedule Watershed Standards OBJECTIVE 2 - Develop Conceptual Guidelines for the remainder of the county. M. Staff preparation of issue papers and/or 3/93 3/93 reports regarding: 9/93 12/93 1. Refinement of small area planning process; 2. Minimum development density required for water/sewer extensions to "open space developments" to be economically feasible; and 3. Legal ramifications of limiting connections to water/sewer lines extended to serve "open space developments". M.2. to include preparation of site specific designs/water & sewer service plans to compare density results and economic fesibility. N. Presentation of issue papers and/or 9/93 12/93 reports to joint planning board/ governing board work session. 0. Presentation of alternative strategies 9/93 12/93 at township meetings, including hypothetical development plans illustrating application of current cluster provisions and "open space development" options. P. Planning Board recommendation on 11/93 2/94 proposed strategies. Q. Board of Commissioners decision on 12/93 3/94 proposed strategies. OBJECTIVE 3 - Prepare Comprehensive Plan and ordinance amendments, and rural design guidelines for implementing rural character strategies. A. Draft ordinance/Comprehensive Plan 1/94 4/94 amendments, and rural design guidelines 4/94 7/94 based on adopted strategies. B. Draft proposal sent to advisory boards 5/94 8/94 and interest groups for review and 8/94 11/94 comments. C. Review comments compiled/revised draft 9/94 12/94 prepared. D. Revised draft presented to Ordinance 10/94 1/95 Review Subcommittee for review and 11/94 2/95 preparation of final draft. E. Final draft presented to Planning 12/94 3/95 Board, TACs, and advisory boards and 1/95 4/95 interest groups. F. Public hearing notice approved, notice 2/95 5/95 advertised, and public hearing held. G. Planning Board recommendation. 3/95 6/95 H. Board of Commissioners decision. 4/95 8/95 6 Adopted 8/17/93 Revised 9/2/93 NOTE: Proposed changes shown in boldface; original completion dates shown in italics. RURAL CHARACTER STUDY GOAL - PREPARE/RESOLVE STRATEGIES AND ORDINANCES TO PRESERVE RURAL CHARACTER OBJECTIVE 1 Pursue mutual adoption, by Orange County, Chapel Hill, and Carrboro, of Options A [2-Acre Lots] , B [5-Acre Lots] , and C [1-Acre Clusters] of the Rural Buffer Conceptual Guidelines. PLAN OF ACTION The Plan of Action below includes only a list of events which must await adoption of a proposed monitoring and maintenance program for wastewater disposal systems. Until such a program is adopted and/or operational, consideration of final adoption of the Rural Buffer Conceptual Guidelines is not likely. A. Intergovernmental Work Group meeting to review strategies, discuss adopted wastewater disposal options, and reach concensus on issues B. Chapel Hill adoption [Carrboro adopted all options - October 1990] C. Planning Board recommendation D. Board of Commissioners adoption OBJECTIVE 2 Develop Conceptual Guidelines for the remainder of Orange County. PLAN OF ACTION The Plan of Action below reflects the schedule of events as they have occurred or are proposed. Items A through L have been completed. Items M through Q represent activities which will be undertaken during FY 1993- 94 . A. Identify existing land use/environmental June, 1990 conditions/issues in townships - November, 1990 B. Township Meetings/Community Assessment December, 1990 - January, 1991 C. Define goals/identify and evaluate February, 1991 draft alternative strategies July, 1991 7 D. Township Meetings/Community Response August, 1991 E. Revise strategies September, 1991 F. Conduct buildout/carrying capacity analyses October, 1991 of townships/apply strategies to specific - April, 1992 sites/conduct economic feasibility studies/ identify additional incentives G. Rural Character Study Committee revises May, 1992 strategies/prepares final recommendations - November, 1992 H. Conduct public hearing to receive citizen November, 1992 comment on proposed strategies I. Rural Character Study Committee recommendation January, 1993 on proposed strategies J. Planning Board recommendation on proposed January, 1993 strategies K. Board of Commissioners referral of proposed February, 1993 strategies back to Planning Board for further consideration L. Planning Board Work Session on proposed March, 1993 strategies M. Staff preparation of issue papers and/or March, 1993 reports regarding: - December, 1993 [- September, 1993] a. Refinement of Small Area Planning Process; b. Minimum development density required for water/sewer extensions to "open space developments" to be economically feasible; and c. Legal ramifications of limiting connections to water/sewer lines extended to serve "open space developments" . M.2. to include preparation of site specific designs/water & sewer service plans to compare density results and economic feasibility. N. Presentation of issue papers and/or December, 1993 reports to joint planning board/governing [September, 1993] body work session 8 O. Presentation of alternative strategies at December, 1993 Township meetings, including hypothetical - January, 1994 development plans illustrating application [September, 1993] of current cluster provisions and "open space development" options P. Planning Board recommendation on proposed February, 1994 strategies [November, 1994] Q. Board of Commissioners decision on proposed March, 1994 strategies [December, 1993] Items M and N are also related to the goal of preparing a Land Use Plan for the Hillsborough Cooperative Planning Area. OBJECTIVE 3 Prepare Comprehensive Plan and ordinance amendments, and rural design guidelines for implementing rural character strategies. PLAN OF ACTION The Plan of Action below reflects a schedule of events proposed by staff and supported by the Rural Character Study Committee, Planning Board, Agricultural Districts Advisory Board, and Historic Preservation Commission. A. Draft ordinance and Comprehensive Plan April, 1994 amendments, and rural design guidelines - July, 1994 based on adopted strategies [January - April, 1994] B. Draft proposals sent to advisory boards August, 1994 and interest groups for review and comment - November, 1994 Boards and groups include but not limited to: /-May - August, 1994] -Agricultural Districts Advisory Board -Historic Preservation Commission -Recreation & Parks Advisory Council -Economic Development Commission -Transportation Advisory Subcommittee -Township Advsiory Councils -Design Council of Chapel Hill/Carrboro -Duke Forest Advisory Council -Eno River State Park -Municipalities >Chapel Hill >Carrboro >Hillsborough >Mebane >Durham -Utility Providers >OWASA >OA -Triangle Land Conservancy -Sierra Club/Triangle Chapter -CAUS 9 C. Review comments compiled/revised draft December, 1994 prepared [September, 1994] D. Revised draft presented to Ordinance Review January, 1995 Subcommittee for review and preparation of - February, 1995 final draft [October-November, 1994] E. Final draft presented to Planning Board, March, 1995 Township Advisory Councils, and boards and - April, 1995 interest groups [December, 1994 - January, 1995] F. Public hearing notice approved, notice May, 1995 advertised, and public hearing conducted [February, 1994] G. Planning Board recommendation July, 1995 [March, 1994] H. Board of Commissioners decision August, 1995 [April, 1994] RESOURCE REQUIREMENTS: Development of Rural Character strategies and implementing ordinances has involved/will involve the following commitment of staff and financial resources: A. Existing Staff Hours: 1, 920 (Effort expended by existing staff) B. Existing Staff Cost: $31, 910 (Expenses covered by existing budget) C. Additional Staff Hours: 1, 080 (Additional effort required of existing staff) D. Additional Staff Cost: $17,950 (Additional expenses required from existing budget) E. Additional Operating/Capital (Non-Staff) Cost: None F. Estimated Additional Cost (D+E) : $17 , 950 G. Estimated Total Cost (B+F) : $49 , 860 93RURAL2 .WPS 10 ALTERNATIVE COMPLETION SCHEDULES FOR HILLSBOROUGH COOPERATIVE PLANNING GOAL 8/17/93 Proposed Schedule Revision Adopted Based on 11/1/93 Ad Plan of Action Schedule Watershed Stand 11/1/93 OBJECTIVE - Implementation of the Orange County-Hillsborough Cooperative Planning Agreement, including preparation of a Land Use Plan and implementing ordinances. F. Staff preparation of issue papers and/or 3/93 3/93 reports regarding: 9/93 12/93 1. Refinement of small area planning process; 2. Minimum development density required for water/sewer extensions to "open space developments" to be economically feasible; and 3. Legal ramifications of limiting connections to water/sewer lines extended to serve "open space developments". F.2. to include preparation of site specific designs/water & sewer service plans to compare density results and economic fesibility. G. Presentation of issue papers and/or 9/93 12/93 reports to joint planning board/ governing board work session, including decision/concensus by governing boards regarding strategy for completion of Cooperative Land Use Plan. H. Small Area/TAC meetings to discuss 10/93 1/94 structure of current plan, draft goals and objectives, and format for proposed Plan. I. Joint public hearing to present 11/93 2/94 recommended goals & objectives and Plan format. J. Planning Boards recommendations. 12/93 3/94 K. Decision by governing boards. 1/94 4/94 L. Small Area/TAC meetings to present 2/94 5/94 first draft of Plan. M. Prepare public hearing draft of Plan 3/94 6/94 and implementing ordinances. 4/94 7/94 N. Joint public hearing on Draft Plan. 5/94 8/94 0. Neighborhood meetings to discuss 6/94 9/94 concerns/develop Plan alternatives. P. Planning Boards recommendations. 7/94 10/94 O. Decision by governing boards. 8/94 11/94 11 Adopted 8/17/93 Revised 9/2/93 HILLSBOROUGH COOPERATIVE PLANNING NOTE: Proposed changes shown in boldface; original completion dates shown in italics. GOAL - IMPLEMENT THE ORANGE COUNTY-HILLSBOROUGH COOPERATIVE PLANNING AGREEMENT, INCLUDING THE PREPARATION OF A LAND USE PLAN AND IMPLEMENTING ORDINANCES FOR THE COOPERATIVE PLANNING ZONE OBJECTIVE This initiative represents the continuation of an objective included among the Commissioners' goals for FY 1992-93 . The objective involves the implementation of the Orange County- Hillsborough Cooperative Planning Agreement signed by both jurisdictions in October of 1991. The objective specifically involves the preparation of a Land Use Plan and implementing ordinances for the Cooperative Planning Area. PLAN OF ACTION The Plan of Action below reflects the schedule of events as they have occurred or are proposed. Items A through D have been completed. Items E-G represent activities which will be undertaken prior to a joint planning board/governing body work session in September, 1993 . Completion of items H-Q are dependent on a decision/concensus of the governing boards at/following the proposed joint work session in September. A. Define workplan/schedule and Work Group November, 1991 - membership, and report to governing January, 1992 boards B. Produce base map of study area for November, 1991 - public display and produce press January, 1992 release to announce C. Compile and produce environmental/ January, 1992 - socioeconomic analyses to include: August, 1992 1. Existing land uses 2 . Natural Environment 3 . Transportation system 4 . Water & Sewer 5. Population D. Public meeting to present overview of August, 1992 agreement, plan process/schedule, and study area profile E. Joint Governing Board meeting to discuss March, 1993 status of Cooperative Planning Agreement 12 F. Staff preparation of issue papers and/or March, 1993 - reports regarding: December, 1993 [September, 1993] a. Refinement of Small Area Planning Process; b. Minimum development density required for water/sewer extensions to "open space developments" to be economically feasible; and c. Legal ramifications of limiting connections to water/sewer lines extended to serve "open space developments" . F.2. to include preparation of site specific designs/water & sewer service plans to compare density results and economic feasibility. G. Presentation of issue papers and/or December, 1993 reports to joint planning board/governing [September, 1993] body work session, including decision/concensus by governing boards regarding strategy for completion of Cooperative Land Use Plan. If governing boards decide to proceed with preparation of Cooperative Land Use Plan for entire area rather a series of "small area plans" , the following schedule would apply: H. Small Area/TAC meetings to discuss January, 1994 structure of current plan, draft goals [October, 1993] and objectives, and format for proposed Plan I. Joint public hearing to present February, 1994 reommended goals & objectives [November, 1993] and Plan format J. Planning Boards recommendations March, 1994 [December, 1993] K. Decision by Governing Boards April, 1994 [January, 1994] L. Small Area/TAC meetings to present May, 1994 first draft of Plan [February, 1994] M. Prepare public hearing draft of Plan June-July, 1994 and implementing ordinances [March-April, 1994] N. Joint Public Hearing on Draft Plan August, 1994 [May, 1994] 13 O. Neighborhood meetings to discuss September, 1994 concerns/develop plan alternatives [June, 1994] P. Planning Board recommendations October, 1994 [July, 1994] Q. Decision by Governing Boards November, 1994 [August, 1994] The above strategy is the original approach revised to incorporate "small area" meetings as a means of obtaining citizen input before public hearings. Neighborhood meetings following the final public hearing are also included to resolve citizen concerns. If the governing boards elect to pursue a series of Small Area Plans rather than the above approach, a new time schedule must be developed. RESOURCE REQUIREMENTS Preparation of Orange County-Hillsborough Cooperative Planning Area Land Use Plan has involved/will involve the following commitment of staff and financial resources: A. Existing Staff Hours: 470 (Effort expended by existing staff) B. Existing Staff Cost: $7, 429 (Expenses covered by existing budget) C. Additional Staff Hours: 648 (Additional effort by existing staff) D. Additional Staff Cost: $14, 811 (Additional expenses from existing budget) E. Additional Operating/Capital (Non-Staff) Cost: None F. Estimated Additional Cost (D+E) : $14, 811 G. Estimated Total Cost (B+F) : $22 , 240 93HILL2 .WPS