Loading...
HomeMy WebLinkAboutAgenda - 09-21-1993 - VIII-C ORANGE COUNTY 1 BOARD OF COMMISSIONERS Action Agenda Item No. \/$-C ACTION AGENDA ITEM ABSTRACT Meeting Date: September 21, 1993 SUBJECT: Wastewater Treatment Oversight in Orange County DEPARTMENT: Board of Commissioners PUBLIC HEARING YES: NO: X ATTACHMENT(S) : Yes INFORMATION CONTACT: Alice Gordon & Verla Insko ext. 2130 1) Wastewater Treatment Oversight Program, 9/14/93 2) Functions of a Wastewater Treatment Oversight Program in Orange County (Chart) -9/13/93 3) Monitoring and Maintenance Assurance Program, 4/10/93 4) "Attachment 1" from a previous staff memo "Monitoring and Maintenance of Alternative Wastewater Treatment Systems" 8/12/92 (Includes 3 pages of charts outlining the types of DEH and DEM systems) TELEPHONE NUMBER Hillsborough - 732-8181 Chapel Hill - 968-5401 Durham - 688-7331 Mebane - 227-2031 PURPOSE: To present a report from Commissioners Alice Gordon and Verla Insko concerning the status of the Monitoring and Maintenance Assurance (M & MA) program and related issues. This report is a summary of their work and will be augmented by their oral report at the meeting. BACKGROUND: Orange County has been considering the implementation of a M & MA program for many months. To facilitate this program, Commissioners Gordon and Insko volunteered to study it and report back to the Board. At their initial meeting last spring, they formulated a set of four principles to guide their decisions and outlined a framework for considering the M & MA program. That information is summarized in a memo, "Monitoring & Maintenance Assurance Program" dated April 10, 1993 . This fall, meetings between the two Commissioners and between Commissioner Insko and the staff have led to the formulation of the following two documents: 1) A memo, "Wastewater Treatment Oversight Program, " dated September 14, 1993 . This comprehensive program includes the M & MA program as a subset. The memo serves three purposes: (a) explains and justifies the concept of a Wastewater Treatment Oversight Program (b) presents recommendations concerning all wastewater treatment systems in Orange County, except DEH Type I and Type II systems. (c) identifies some issues that need further clarification. 2 Board of Commissioners Meeting Date: 9/21/93 Page 2 2) A chart which summarizes the functions of the Wastewater Treatment Oversight Program. RECOMMENDATION(S) : 1. Endorse the general approach to oversight of the county's wastewater treatment systems that is outlined in the April 10 memo entitled "Monitoring and Maintenance Assurance Program" and the September 14 memo entitled "Wastewater Treatment Oversight Program" . 2 . Approve the specific recommendations and request the specific information outlined in the September 14 memo entitled "Wastewater Treatment Oversight Program" . 3 MEMORANDUM DATE: September 14, 1993 SUBJECT: Wastewater Treatment Oversight Program (WTOP) FROM: Alice Gordon & Verla Insko TO: Board of County Commissioners The purpose of this memo is to 1) ' explain and justify the concept of a Wastewater Treatment Oversight Program (WTOP) , 2) present recommendations concerning all wastewater treatment systems in Orange County, except for DEH Type I and Type II systems, and 3) identify some issues that need further clarification. WASTEWATER TREATMENT OVERSIGHT PROGRAM Prior discussions on wastewater treatment systems in Orange County centered around the Monitoring and Maintenance Assurance Program (M&MA) . This program includes only those systems the Orange County Health Department (OCHD) monitors for a fee. To understand the county's role in protecting the environment and the public health, it is necessary to review all of the health department functions related to wastewater treatment systems. We are calling the aggregate of these existing and proposed functions the Wastewater Treatment Oversight Program (WTOP) . Goal The goal of the Wastewater Treatment Oversight Program is to protect the environment and the public health. Principles to guide Board of County Commissioners decisions: 1. Fiscal responsibility - No additional cost to taxpayer 2 . Role of local government - Minimal increase in the role of government 3 . Public health - Effective implementation of the goal 4 . Growth patterns - Adherence to county policies These principles are explained more fully in the April 10 memo, 4 Wastewater Treatment Oversight Program, September 14, 1993 "Monitoring and Maintenance Assurance Program" Functions of the WTOP: Education Informing owners about inspection schedules and maintenance steps to extend the life of their system, what repairs will be needed if the system fails, and the consequences of not making repairs. No fees are charged for this service. Systems included: All Monitoring Performing basic steps necessary to determine if system is in good operating condition, ordering repairs as needed to restore faulty or failing system to full operating condition, reinspection to assure that repairs are made. Fees will cover the full cost of this service. Operations Management: Directing the ' operation of a wastewater treatment system, including responsibility for regular monitoring, handling the necessary paperwork, and making repairs. A written contract between the owner and manager required. This function will be performed by the private sector. Orange County will monitor the private certified operators and report companies with below standard performance. No fees as Orange County does not perform this function Maintenance: Making repairs necessary to faulty or failing systems. This function will be performed by the private sector. Orange County will inspect repairs as part __ of its monitoring function. No fees as Orange County does not perform this function, except that Orange County will continue to perform minor repairs for no fee. RECOMMENDATIONS We can recommend approval of the M&MA program if the first two recommendations below are acceptable to the board and if the issues needing further clarification are resolved. 1. Fees. Develop a fee structure that includes charges for all 5 Wastewater Treatment Oversight Program, September 14, 1993 monitoring activities (e.g. DEH Type III systems) . Include a provision for regular evaluation of the schedule to assure costs are covered, including the cost of all new personnel hired to implement this program. (At the May 4 , 1992 meeting, the Board of County Commissioners directed staff to develop projected costs of the M&MA program and a fee schedule that would fully fund the program) . 2 . Management Entity for Type IV Systems. Private sector companies should be the management entity for DEH Type IV systems. The OCHD should inspect these systems every 18 months (or some other justifiable period) and charge a fee to recover the cost of the inspection. The OCHD proposed that it serve as the management entity for Type IV systems. We were not persuaded that the private sector would not perform this function adequately. 3 Education. Establish an education program for all systems. Begin by summarizing the educational activities currently in place for all systems including the type of technical information given for system operation and the consequence to the owners if their systems fail. The OCHD is currently providing educational material to owners of Type II systems; i.e. , conventional single family systems >481 gpd. 4 Financial Guarantees to Insure Repairs. Develop and present to the Board of County Commissioners for their approval a plan that requires financial guarantees by owners to repair their failing systems. (Omit DEH Type I and II systems) ISSUES NEEDING FURTHER CLARIFICATION The Board of County Commissioners should discuss the following issues to determine what impact they have for Orange County and/or to give the staff direction. These items required modest staff effort. M&MA Program_Issues 1. DEM Systems. The state charges fees for some services; the county is proposing to charge for inspections. Regarding these systems: For which services does DEM charge? Do proposed Orange County services duplicate any services provided by the state? Wake and Mecklenburg Counties have reportedly encountered problems trying to collect their inspection fees. What are the problems? Have they been resolved? How? 6 Wastewater Treatment Oversight Program, September 14, 1993 2 . Private Management Entities. Private operators have been serving as private management entities for DEH Type IV and V systems for more than a year. The Board of County Commissioners should request information on the number of private management entities, whether their performance meets county standards, and any other relevant experiences with them for the period from July 1, 1992 to August 31, 1993 . 3 . Inspection. Staff base their recommendations concerning the frequency of inspections on the "best professional judgment of staff. " The program has a significant impact on citizens. The Board of County Commissioners should request better justification and documentation. 4. Definition of Minor Repairs. During routine inspections, OCHD staff sometimes make minor repairs for no fee. What is a minor repair?-- 5. Conventional Septic Systems <481 gpd (DEH Type. TI Systems) The OCHD initialy recommended an inspection schedule for these systems. The Board of County Commissioners directed staff to implement an education program as a first step. That has been implemented. Although we have no recommendations to make at this time about an inspection program for DEH Type II systems, this issue could be raised again by a Commissioner or a staff person. Large Complex Systems (DEM and DEH) These issues will require considerable staff work and Board of County Commissioners discussions, but they should be addressed within the next several months. 1. Location of Large Complex DEM systems. The memorandum of agreement with the state outlines the County's inspection role with regard to these large systems. In addition, it may be advisable to develop guidelines to regulate- where these DEM systems are placed in the county. Staff should prepare a report on the feasibility of implementing provisions in our zoning ordinance or elsewhere for governing the location and use of these systems. DEH systems should also be considered for this kind of regulation. 2 . Public Management Entities for large DEH systems. (See item 5 on the second page of the April 10 memo) We have not found a financially viable plan for creating a public management entity (PME) in Orange County. This question needs further study. Note that no DEH Type Vc, Vd. or VI systems currently exist in Orange County. One alternative is to take some kind of action that would discourage their use here. FUNCTIONS OF A WASTEWATER TREATMENT OVERSIGHT PROGRAM IN ORANGE COUNTY Alice Gordon and Verla Insko, September 13, 1993 Below is a chart summarizing functions related to the operation of wastewater treatment systems, along with corresponding recommendations by Commissioners Gordon and Insko. SHOULD FINANCIAL CONTRIBUTIONS FROM OWNER AND /OR OPERATOR BE FUNCTION SHOULD ORANGE COUNTY PERFORM THE FEES PERFORMANCE FUNCTION? GUARANTEES * ** EDUCATION YES ** NO ** - - - -- MONITORING YES YES Inspections Sample Testing YES YES or Other When Appropriate Services OPERATION NO * N/A * YES ** Management Maintenance NO N/A YES ** * Staff recommendation is different from above ** Staff made no recommendation or provided a set of alternatives. * ** Examples of performance guarantees are performance bonds, and one -time lump suln payments. J 8 MEMORANDUM TO: Board of Commissioners and Manager FROM: Alice Gordon DATE: April 10, 1993 SUBJECT: Monitoring and Maintenance Assurance Program (M&MA Program) Moses has asked me to write down the results of the meeting on the M&MA program which Verla and -I had not long ago. This memorandum is written for that purpose. At our meeting Verla and I agreed that four principles should guide our decisions on the M&MA program. We also agreed that we needed to have certain questions answered before we could make our decisions. After the meeting I thought a little more about the program and concluded that the decisions could be grouped into five different areas, so I have used those five areas and the four principles as a framework for this memorandum. FOUR PRINCIPLES TO GUIDE OUR DECISIONS 1. Fiscal responsibility. The program should be implemented in a fiscally responsible way. For example, fees collected should pay for county services rendered. The role of performance bonds should be considered where appropriate. Questions to be asked for each of the five decision areas given below: What does the inspection fee cover (employees, materials, other) ? Why are the same fees charged for all kinds of systems? Can we really recover all of our own costs? If we do not recover all costs, when does that occur and what is the reason? What are the broader fiscal impacts of the M&MA program? (e.g. Does it encourage residential growth? If so, what is the fiscal impact?) 2 . Role of local Government. The role of local government should be minimized. For example, when the county considers new programs, there should be minimal bureaucracy created. Also, there should be minimal conflict of interest in internal county functions. Finally, the county should not take on functions which could be effectively handled by private enterprise or the state. Questions to be asked for each of the five decision areas given below: What is the justification for the inspection frequency? 3 . Public health. The county should take the steps necessary to protect the public health. Questions to be asked for each of the five decision areas given below: Is the proposed effort necessary for the protection of the public health? Could the collection of more systematic information about groundwater in Orange County, such as that being proposed by the Water Resources Committee, help address these questions concerning the steps necessary to protect groundwater? 4 . Growth patterns. To the extent that the M&MA program affects county growth patterns, it should be implemented to promote county policies, or at least to be neutral. Questions to be asked for each of the five decision areas given below: What existing or proposed county policies are impacted by the M&MA program? Does the proposed M&MA program carry out those county policies? FIVE AREAS IN WHICH DECISIONS ARE TO BE MADE Each of these five areas of the M&MA program should be judged by the four general principles stated above. In addition, the following specific questions -need to be answered. 1. Inspection of mobile home parks. • Specific questions to be answered for this area: Not much information is given. What is involved in these annual inspections? 2 . Monitoring of DEH-regulated systems. (Types I and II excluded. ) The monitoring proposed in this area is the most similar to ongoing county programs. Note: The M&MA program "Report of Costs and Fees" (June 29, 1992) excludes Type III as a component of the program, but the August 1992 documents include Type III. 3 . Monitoring of DEM-regulated systems. (New and existing systems handled together. ) Currently the state does inspections for these systems. To undertake monitoring in this area a memorandum of agreement with the state must be executed. Specific questions to be asked for this area: Is it necessary to monitor these systems, or can the state do an adequate job? If we enter into a_ memorandum of agreement with the State of North Carolina, will the state still collect fees? If they do, can the county still collect any fees for this service? Will these fees duplicate the state fees? 4 . Management entities for DEH systems for which a private certified operator is sufficient: Type IV and Type Va and Vb. (New systems handled separately from existing systems. ) In the M&MA program it is proposed that the Health Department be the management entity for Type IV systems. Specific questions to be asked for this area: It appears that there is a conflict of interest if the Health Department both 10 monitors and manages. How can this conflict be resolved? Can private enterprise effectively handle this management function? Who certifies the local operators? Can the county license operators for Orange County? Should a performance bond be required? In what circumstances? 5. Management entities for DEH systems for which a public management entity is required: Type Vc and Vd, and Type VI. (New systems handled separately from existing systems. ) The question of how this area should be handled remains unresolved. Specific questions to be asked for this area: What public management entities are available for this task? Should the county get involved if no pubic management entity is available? This memorandum gives my understanding of the principles Verla and I believe should be followed, and of the questions which she and I believe should be answered. However, there are two disclaimers: (1) Due to the pressure of time, I had to submit this memorandum before Verla could review it. Therefore, she will have an opportunity to offer her comments later. (2) Due to the complicated nature of the subject matter and the fact that the contents of several documents were reviewed, it is possible that something has been overlooked- or misunderstood. In that case, the memorandum will have served to facilitate communication and the staff is invited to make any corrections that are necessary. • 11 DEH (GROUND ABSORPTION) SYSTEMS DEH SYSTEM JULY 1992 JULY 1992 CLASSIFICATION DEH REQUIRED DEH REQUIRED PROPOSED NUMBER FEES FOR (SECTION, 1961) REVIEW FREQ. REVIEW FREQ. OCHD M&MA OF EXISTING M&MA FOR OCHD ME OPTIONS REVIEW FREQ. SYSTEMS PROGRAM TYPE I PRIVY, GREASE TRAP, N/A N/A N/A UNKNOWN N/A COMPOSTING, CHEMICAL, AND INCINERATING TOILETS TYPE II* CONVENTIONAL, SINGLE FAMILY N/A N/A N/A 12,000 N/A DWELLING OR LESS THAN 481 GPD TYPE III CONVENTIONAL, NON-SINGLE FAMILY DWELLING, OR 1/5 YRS. N/A 1/5 YRS. 2,050 + GREATER THAN 480 GPD TYPE III - PUMP CONVENTIONAL WITH 1/5 YRS. N/A 1/5 YRS. 950 + A SINGLE PUMP • TYPE IV 2/YR. • LOW PRESSURE PIPE 1/3 YRS. OCHD, PME 2/YR.# 550 $200 SYSTEMS WITH A SINGLE OR PCO PUMP TYPE IV CME WITH SYSTEMS WITH MORE THAN 1/3 YRS. 2/YR. 2/YR.# 10 $200 ONE PUMP; LESS THAN OCHD 3,001 GPD PCO OR PME N/A-NOT APPLICABLE GPD-GALLONS PER DAY OF WASTE FLOW(480 GPD=4 BEDROOMS) DEH-DIVISION OF ENVIRONMENTAL HEALTH-DEHNR * -WILL NOT BE INCLUDED AT IMPLEMENTATION # - ONLY IF OCHD IS SPECIFICALLY AUTHORIZED AND FUNDED AS THE PME M&MA-MONITORING AND MAINTENANCE ASSURANCE PROGRAM CME-COUNTY MANAGEMENT ENTITY + THIS IS AN UNFUNDED STATE MANDATE 12 DEH (GROUND ABSORPTION) SYSTEMS (continued) DEH SYSTEM JULY '92 JULY '92 CLASSIFICATION DEH REQUIRED DEH REQUIRED PROPOSED NUMBER FEES FOR (SECTION. 1961) REVIEW FREQ. REVIEW FREQ. OCHD M&MA OF EXISTING M&MA FOR OCHD FOR ME OPTIONS REVIEW FREQ. SYSTEMS PROGRAM TYPE V(a&b) 2-52/YR. GREATER THAN 3000 GPD OR SAND 1 YR. PME OR 2/YR. 6 $200 FILTER PRE-TREATMENT SYSTEMS PCO TYPE V (c&d) LESS THAN 3001 GPD WITH 4-12/YR. MECHANICAL, BIOLOGICAL, OR 1 YR. PME 2/YR. 0 $200 CHEMICAL PRE-TREATMENT REQUIRED TYPE VI GREATER THAN 3000 GPD WITH 52-260/YR. MECHANICAL, BIOLOGICAL, 6 MOS. PME 12/YR. 0 $1,200 OR CHEMICAL PRE-TREATMENT REQUIRED OCHD-COUNTY HEALTH DEPARTMENT _ PCO-PRIVATE CERTIFIED OPERATOR PME-PUBLIC MANAGEMENT ENTITY GPD-GALLONS PER DAY OF WASTE FLOW DEH-DIVISION OF ENVIRONMENTAL HEALTH-DEHNR M&MA-MONITORING AND MAINTENANCE ASSURANCE PROGRAM CME-COUNTY MANAGEMENT PROGRAM 13 DEM (NON GROUND ABSORPTION AND NPDES) SYSTEMS DEM SYSTEM INSPECTION OPERATOR PROPOSED NUMBER FEES FOR CLASSIFICATION BY DEM MAINTENANCE OCHD M&MA OF EXISTING M&MA (NOT IN SECTION .1961) (ROUTINE) FREQUENCY REVIEW FREQ. SYSTEMS PROGRAM SPRAY IRRIGATION SFD * NONE 2/YR. 10 $200 (OCHD CLASS III) SPRAY IRRIGATION NON SFD * 1/WK. 4/YR. 5 $400 (OCHD CLASS III) SAND FILTER SFD * NONE 2/YR. 16 $200 (OCHD CLASS III) SAND FILTER NON SFD * 1/WK. 4/YR. 6 $400 (OCHD CLASS III) PACKAGE PLANT (OCHD CLASS VI) 2/YR. DAILY 4/YR. 9 $400 (EXCLUDING OWASA AND HILLS.) SLUDGE APPLICATION SITE NONE DURING 1/YR. 23 $100 (OCHD CLASS VII) APPLICATION NPDES-NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM DEM-DIVISION OF ENVIRONMENTAL MANAGEMENT-DEHNR SFD-SINGLE FAMILY DWELLING *-COMPLAINT RESPONSE ONLY OCHD-ORANGE COUNTY HEALTH DEPARTMENT M&MA-MONITORING AND.MAITENANCE ASSURANCE PROGRAM CME-COUNTY MANAGEMENT PROGRAM