Loading...
HomeMy WebLinkAboutAgenda 09-07-1993 - VII-A 1 ORANGE C O U N T Y BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 7 , 1993 Action Agenda Item # Z- SUBJECT: TRANSPORTATION IMPROVEMENT PROGRAM (TIP) DEPARTMENT: PLANNING PUBLIC HEARING Yes x No ATTACHMENT(S) : INFORMATION CONTACT: - County Objective specific to TIP Carol Carter, Ext. 2595 - Draft 8-16-93 PB Minutes Gene Bell, Ext. 2589 - Orange County 1992 TIP Request - Report on TIP TELEPHONE NUMBERS: Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 967-9251 PURPOSE: To receive a report on the N.C. Department of Transportation (NCDOT) annual Transportation Improvement Program (TIP) and assist staff in the identification of transportation needs for possible inclusion in the upcoming TIP request. BACKGROUND: The N.C. Board of Transportation adopts annually a multi-year TIP outlining needed transportation improvements and the method and schedule for funding such projects. Prior to adopting the program, a series of statewide public hearings are held in each of the state's 14 highway divisions to obtain advice from local officials and citizens. Orange County is located in Division Seven along with Alamance, Guilford, Rockingham, and Caswell counties. Historically, the County Commissioners have received a report immediately before the TIP hearings and have endorsed an Orange County statement. For many years, the County's statement was primarily an endorsement of municipal requests in the County. Passage of the Intermodal Surface Transportation Efficiency Act (ISTEA) in 1991 has prompted the County to become more active in the TIP process. The TIP request endorsed by the County Commissioners on November 2, 1992 and presented at the Division Seven hearing on November 13, 1992 represented the County's most intensive effort-to-date on a TIP request. Page 1 of 2 2 The County has made a strong commitment to transportation planning through the creation of the Transportation Planner position and the adoption of a goal (and attendant objectives) specific to transportation. An expectation for the 1993-94 fiscal year is greater involvement in the TIP process, especially in terms of identifying needs, exploring funding possibilities under ISTEA, and obtaining input from advisory boards and the public. The Planning Board received a report on the TIP process on August 16 and identified several items for consideration in the County's upcoming TIP request. These items included safety improvements at railroad crossings, the wildlife corridor at the I-85/US 70 interchange identified by UNC planning students, and intersection sight distance improvements at Efland- Cedar Grove Road and Carr Store Road. The Planning Board also identified two areas of concern inside the Durham-Chapel Hill-Carrboro (DCHC) urban area and requested that they be coordinated through the proper channels. These items were widening and safety improvements to Homestead Road and intersection improvements to Erwin Road and Dobbins Drive. In addition to the above concerns, planning staff as well as the chair of the Transportation Advisory Subcommittee feels that highway improvements within the proposed economic development districts are worthy of consideration. Staff will be meeting shortly to compile a preliminary list of such projects. TIP requests for such improvements could be made in conjunction with interchange improvements contained in the I-85 widening projects. RECOMMENDATION: Receive as information and identify, as appropriate, transportation needs for possible inclusion in the County's TIP request. DK15:TIP9-7 .DOC Page 2 of 2 3 7/8/93 TRANSPORTATION PLANNING GOAL - ESTABLISH A COMPREHENSIVE TRANSPORTATION PLANNING PROCESS FOR ORANGE COUNTY OBJECTIVE 1 Establish a planning process which presents Orange County's requests to NCDOT in a timely manner and coordinates those requests with other jurisdictions, as appropriate. PLAN OF ACTION A. Establish procedures for the preparation of Orange County's annual Transportation Improvement Program (TIP) recommendations for County jurisdiction outside the Durham-Chapel Hill-Carrboro Metropolitan Area Boundary. 1. Obtain copy of draft State TIP. July 1993 Prepare report which summarizes previous County requests, status of requests in draft TIP, and identifies possible projects for inclusion in upcoming TIP request. Coordinate preparation of report with municipalities so as to identify projects of mutual interest and support. 2 . Present report to Planning Board August 1993 and solicit possible projects for inclusion. 3. Present report to BOCC and solicit September 1993 possible projects for inclusion (BOCC may wish to conduct public hearing on possible projects during course of regular meeting) . 4. Presentation of proposed County TIP October 1993 request to BOCC for official action. 5. Presentation of County request at November 1993 DOT Division Seven public hearing. B. Establish procedures to coordinate Orange County efforts to improve secondary roads with those of NCDOT, including the scheduling and presentation of the annual Secondary Roads Improvements Program at public hearing. DRAFT 8-16-93 Planning Board Minutes 4 14 includes information paragraphs on the State mandate for watershed protection and Orange County's approach for implementing that mandate. Land Use Element maps recognizing the new watersheds are also proposed for amendment. The complete information and sections of the Land Use Element proposed for amendment are on file in the Planning Department. b. Zoning Atlas ( 1) Little River and Cedar-Grove Townships c. Zoning Ordinance Text Amendments ( 1) Article 4 .2 .27 (2) Article 6.23 ( 3) Article 22 (4 ) Appendix d. Subdivision Regulations Text Amendments ( 1) Section IV-B-9 (2) Section V-C ( 3 ) Section V-D ( Items 8 b, c, d were presented at 7/1993 meeting) AGENDA ITEM #10: PLANNING BOARD ITEMS a. Transportation Improvement Program (TIP) Gene Bell noted that the Commissioners ' Goals and Objectives for FY 1993-94 contain many transportation items. With one of those items being for the County to become more involved in the State's Transportation Improvements Program, the Transportation Planner position was approved by the Commissioners. This item is to inform the Planning Board of the process and give opportunity for comments, recommendations and questions. Bell introduced Transportation Planner, Carol Carter who made the presentation. (The abstract information, Transportation Planning Goal and Objective and Plan of Action, and memorandum from Carol Carter explaining the process and the TIP for Orange County are attachments to these minutes on pages . ) Carter began by explaining the TIP program and the 5 15 process. She summarized the material included in the agenda information. She noted that Orange County is a member of the Durham-Chapel Hill- Carrboro (DCHC) Metropolitan Planning Organization (MPO) . This is an urban area delineated by the Federal Highway Administration, Members of the urban area are mandated to participate in the federal transportation planning process in order to receive federal funding for transportation improvements . The urban fringes of Orange County surrounding Hillsborough, Chapel Hill and Carrboro are included in this designated area. As a goal to better inform and involve the Planning Board of transportation activities in the County, the Comprehensive Planning staff has elected to update the members of the 1992 Orange County requests as well as solicit input for projects which may be appropriate for inclusion in the 1993 Priority Request List. Carter reviewed the priority list for 1992 beginning with Homestead Road. In conjunction with requests from Chapel Hill and Carrboro, Orange County requested widening and bicycle facilities improvements for Homestead Road from High School Road to NC 86. This request includes shoulder widening improvements, the installation of turn lanes where appropriate and sight distance improvements. Carter continued that the only section of Homestead Road that was funded was the section from High School Road to Seawell School Road which is only . 6 miles. The second request was the paving of rural roads. Orange County requested funding to be appropriated to speed up the Secondary Roads Improvement Program. NCDOT's position remains that the Secondary Roads Improvements Program receives its funding only from Highway Trust Fund revenues. The third request made by Orange County was two-fold dealing with I-85 Corridor projects. One of the requests was that NCDOT allocate funding for best management practices during and after the I-85 widening. It is not listed in the TIP and it is unlikely that separate funding can be allocated for that. The second part of this request was for a bicycle/pedestrian facility along I-85 crossings. The 1994-2000 TIP includes provisions for bicycle safety improvements at the Churton Street interchange with I-85 in the Bicycle Program. 6 16 The recommendations by the Planning Staff for this year's TIP Priority List are: • Homestead Road Paving of Rural Roads Projects in the I-85 Corridor Improvements to various railroad crossings intersection improvements Carter reviewed and summarized those items. The NCDOT Board of Transportation will be holding public hearings in November to accept the priority lists for jurisdictions throughout the State. Orange County will need to identify and forward such a list. If coordinated efforts are needed with jurisdictions within the DCHC MPO, this will need to be accomplished during the next month. Any recommendations the Planning Board may have in regard to this issue will be analyzed and forwarded to the Board of County Commissioners. Cantrell asked when the paving of the . 6 mile segment of Homestead Road is scheduled to begin. Carter responded that it is scheduled on the TIP to begin in 1998 and noted that there is sufficient time to expand the scope of the project. Waddell asked if Staff had considered taking the information and questions to the Township Advisory Councils. Carter responded that the time factor is such that next year would be the time to get the Township Advisory Councils involved. Waddell agreed. Bell noted that the State schedule would be back "on track" next year and that would allow sufficient time to solicit input from the TAC's. Eidenier asked, regarding the paving of rural roads, if there is a list and, how does an alternative to requesting general funding for unpaved roads affect the list. Carter responded that there is a list prepared by the State annually based on a rating system. If the county felt there are roads/ improvements on the list of higher significance or priority than as rated by NCDOT, then those questions must be considered before asking for alternative funding. Eidenier expressed concern that identifying several roads needing paving and improvement might change the priorities and those citizens who had been on the waiting list for paving would be further delayed. Carter responded that NCDOT brings the list to the Board.of Commissioners indicating the number of projects that can be funded. However, 7 17 NCDOT is the agency that determines which roads to pave, the County can only make requests/ recommendations. Eidenier referred to the "bottoming out" sign at the railroad crossing on Buckhorn Road that Carter had mentioned. She noted that there are several more such signs in the County. She also noted that the funding for railroad crossings comes from a different allocation than that of paving rural roads. There is also a fund for bridges and another for improving intersections in urban areas. She felt that all of these requests should be presented to NCDOT, particularly, since these are different requests and would not be included in the same funding. Carter agreed that the list could be as long as the County wanted it to be and NCDOT prefers that it be as detailed as possible. The Secondary Roads Program is a separate fund from ISTEA funding. Barrows asked about the reference to congestion management and clean air conformance included in intersection improvements. Carter responded that one of the highest contributors to pollution is backup at intersections. There are several options to alleviate backup or standstill at intersections. The entire facilities could be widened and right and left turn lanes could be added. This would funnel the traffic through much faster. Questions were asked regarding the work on the widening of I-85/I-40. Carter explained that this project was not a single project, but three. Bell note that there will be more opportunity for County involvement in the portion of the widening to the east. Carter indicated that this item is to be presented at the Board of Commissioners meeting on September 7 , 1993 and asked for input/concerns from the Planning Board. Reid noted that the Chapel Hill Township Advisory Council is very concerned about the Homestead Road project and indicated he would like them to receive and comment on this information. Bell responded that the time frame was very tight, but that he would see what he could do. Jobsis asked that the intersection of Erwin Road and Dobbins Drive be added to the list. Bell responded that is in Chapel Hill's jurisdiction, but that he would make them aware of the problem. 8 18 Boland noted that the intersection of Efland Cedar Grove Road and Carr Store Road is an intersection that should be added to the list. • 9 ORANGE COUNTY COMMISSIONERS P.O, Box 8181 HILLSBOROUGH, N.C. 27278 Moses Carey,Jr. 732-8181 Alice M. Gordon 968-4501 Stephen H. Halkiotis 688-7331 Verla I. Insko Don Willhoit 227-2031 644-3004 (Fax) STATEMENT TO THE N.C. BOARD OF TRANSPORTATION PRESENTED BY ORANGE COUNTY ON NOVEMBER 13 , 1992 Orange County's transportation requests are specific to two areas; the paving of rural secondary roads and widening projects in the I-85 corridor. The County also wishes to endorse previous requests , as presented in April 1991 . I . Paving of Rural Roads A program very important to the citizens of Orange County and one which the County Commissioners have actively supported •is the State's Secondary Road Improvement Program. There are currently about 150 miles of unpaved rural roads in Orange County on the State's Priority Paving Schedule. Over the last four years the State has averaged. paving slightly over 10 miles per year of rural unpaved roads . The County recognizes that the Secondary Roads Paving Program is independent of the TIP process and thus , not an item normally requested through the TIP. However, a highly touted feature of the Intermodal Surface Transportation Efficiency Act (ISTEA) is funding flexibility. In this regard, the County requests that the State consider freeing up all, or a portion of the $10 ,775, 000 of Highway Trust Fund money allocated to project I-304 (eight laning I-85 in western Orange County) and allocating it to the expedited paving of rural roads in the County. A worthy goal would be to double the average mileage of secondary road paving to 20 miles per year. At this rate, practically all eligible rural roads would be paved by the year 2000 . Under ISTEA flexibility provisions, the Trust Fund money allocated to secondary roads would be replaced with ISTEA Interstate and National Highway System funds . II . I-85 Widening Projects A. Project I-305 Project I-305 , widening I-85 to six lanes and reconstructing interchanges and structures from Orange Grove Road to the Durham County line is a project in the State 's 1992-98 TIP. The portion of 1 YOU COUNT IN ORANGE COUNTY ! 10 this project from just west of University Station Road to the Durham County line is in the Durham- Chapel Hill-Carrboro (DCHC) Urban Area. The DCHC Transportation Advisory Committee has requested that this project include bicycle and pedestrian facilities on streets that cross I-85 and design for bikeways/greenways that cross I-85 . The potential funding source for this is Interstate and National Highway System funds. Orange County requests that the same facilities be considered for the portion of I-305 west of the DCHC Urban Area. B. Project I-304 The eight-laning of I-85 through the Sevenmile Creek basin (project I-304 ) in Orange County has been a long-standing concern. The County wishes to request that "transportation enhancement funds" provided under the Surface Transportation Program of the Intermodal Surface Transportation- Efficiency Act (ISTEA) be allocated to address two areas of particular concern; continued access under I-85 and the provision of best management practices (BMPs) to address highway run-off. 1. Continued Access Under I-85 and Related Concerns A component of eight-laning I-85 is the construction of a multi-directional interchange east of Efland at the US 70 connector. Existing overpasses to the east will be removed and access between West Ten Road and Ben Johnson Road will be severed. To offset this disruption, Ben Johnson Road is to be extended to the US 70 connector. The connector will be extended through the new interchange to tie in with West Ten Road to the south. Continued access under I-85 between Ben Johnson Road and West Ten Road is a recommendation in the Regional Bicycle Plan for Durham and Orange Counties. The Town of Hillsborough has also passed a resolution requesting ISTEA enhancement funds to maintain non-motorized access under I-85 through the provision of a culvert. Orange County concurs with the Town and requests that enhancement funds be allocated for continued access under I-85. If the provision of a culvert is not deemed feasible, the provision of wider lanes for bicycles on the extended US 70 connector between Ben Johnson Road extension and West Ten Road is requested. Previous discussions between DOT and 2 11 County officials indicate two foot bike lanes would be provided on this road. Lanes a minimum of four feet wide as recommended in the Regional Bicycle Plan are requested since they would provide greater safety for cyclists traversing the 1 ,500 feet of US 70 connector between Ben Johnson Road and West Ten Road. 2 . Best Management Practices for the Sevenmile Creek Basin Widening I-85 to eight lanes through the Sevenmile Creek basin has raised concerns about the degradation of water quality due to run-off from additional pavement as well as possible spills. The Sevenmile Creek basin has been identified as a possible future water supply and Orange County desires that the strongest protective measures possible be implemented. The Upper Eno Watershed, of which Sevenmile Creek is a sub-basin, has been designated WS-II. In that " . . .mitigation of water pollution due to highway runoff. . . " ' is a purpose for which enhancement funds can be allocated, Orange County requests that structural BMPs, as necessary, be provided on the tributaries of Sevenmile Creek affected by I-85 widening. III . Endorsement of Previously Requested Projects Orange County would like to give priority to identified safety needs on existing roads and bridges and to other transportation projects which foster alternatives to automobile travel. A. Safety Improvements to Dangerous Intersections Based on the number and severity of accidents during the period January 1986 - June 1989, the County recommends that the following intersections be improved. 1. I-85 / SR 1120 (Mt. Willing Road) 2 . I-85 / NC 86 3 . US 70 / SR 1002 (St. Mary's Road) 4 . NC 57 / NC 86 5. US 15 / SR 1008 (Mt. Carmel Church Road) 6 . I-85 / SR 1009 (South Churton Street) B. Improvements to Deficient Bridges (the County endorses the following projects listed in the 1992-98 TIP) 1. B-2598 (North Fork Little River; replace Bridge #54 ) 3 12 2 . B-2100 (Haw River; replace Bridge #101) 3 . B-2599 (Eno River; replace Bridge #185 ) C. Orange County Department on Aging In support of its Human Services Transportation programs, Orange County endorses the requests of the Department on Aging as contained on pages PTR-19, PTR-23, and PTR-29 of the 1992-98 TIP. D. Funding for the Triangle Transit Authority Orange County wholeheartedly endorses the concept and mission of the Triangle Transit Authority and requests a continued State commitment for this purpose. The Board feels that these projects will address pressing needs in Orange County. Since the Durham-Chapel Hill-Carrboro TAC is still preparing its TIP requests for the coming year, The County at this time is working cooperatively with that group to develop a coordinated request for the part of Orange County that lies in the urbanized area. Submitted this 13th day of November, 1992 ORANGE COUNTY BOARD OF COMMISSIONERS By: i/&aeo p Moses Carey,y, r. , 'air 4 13 M E M O R A N D U M T0: Orange County Board of Commissioners FROM: Carol Carter, Transportation Planner II RE: TRANSPORTATION IMPROVEMENT PROGRAM (TIP) DATE: August 25, 1993 There are two events during the year which play an integral role in the North Carolina transportation funding process for jurisdictions throughout the state. They are: 1) the release of the 1994-2000 North Carolina Transportation Improvement Program Update, and;. 2) the annual North Carolina Transportation Improvement Program • Public Hearing Process. Although typically spaced six months apart, this year both events are occurring during the July - November portion of the year. This is due to several factors, including the adoption and conformance process of the North Carolina Department of Transportation to the 1991 Highway Bill, titled the Intermodal Surface Transportation Efficiency Act (ISTEA) , a new North Carolina Board of Transportation membership, and a slight time-lag in the determination from federal levels of available funding for transportation projects over the next several years. The Transportation Improvement Program is an eight year planning and budgeting program for all transportation projects in the State of North Carolina. It is multi-modal in scope and is based on transportation needs voiced by leaders of various jurisdictions . It is prepared by the N.C. Board of Transportation and is subject to a public review and comment process. Historically, the County Commissioners have received a report immediately before the TIP hearings and have endorsed an Orange County statement. For many years, the County's statement was primarily an endorsement of municipal requests in the County. Passage of the ISTEA in 1991 has prompted the County to become more active in the TIP process. The TIP request endorsed by the County Commissioners on November 2 , 1992 and presented at the Division Seven Public Hearing on November 13 , 1992 represented the County's most intensive effort-to-date on a TIP request. 14 Orange County is unique in its opportunities to participate in this program simply due to its population distribution. The County has opportunities to evaluate its transportation priorities both independently and through a formal transportation planning process. Orange County is a member of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO) . This is an urban area delineated by the Federal Highway Administration. Members of the urban area are mandated to participate in the federal transportation planning process in order to receive federal funding for transportation improvements. The urban fringes of Orange County surrounding Hillsborough, Chapel Hill and Carrboro are included in this designated area. The DCHC is governed by the Transportation Advisory Committee (TAC) . This committee is made up of elected officials appointed by the governing boards of each member jurisdiction. Orange County is represented by a County Commissioner. This representative participates in a coordinated, comprehensive, and continuous process which evaluates transportation needs for all jurisdictions in the urban area. Orange County also must evaluate its transportation needs for the areas outside the DCHC MPO. Through the TIP process, the County is able to request transportation improvements for areas not supported by the multijurisdictional process. As a goal to better inform and involve the Planning Board and County Commissioners of transportation activities in the County, the Comprehensive Planning staff has elected to update the members • of the 1992 Orange County requests as well as solicit input for projects which may be appropriate for inclusion in the 1993 Priority Request List. Last year there were three major requests made by the Orange County Commissioners for inclusion in the TIP. A brief description and update of each follows. If necessary, a suggested strategy for additional funding measures is included. Planning Board Comments from the August 16, 1993 meeting are provided in italics. Homestead Road In conjunction with requests from both Chapel Hill and Carrboro, Orange County requested widening and bicycle facilities improvements for this roadway from High School Road to NC 86. The scope of this request includes shoulder widening improvements, the installation of turn lanes where appropriate and sight distance improvements. A background of this project indicates safety problems associated with turning movements along the entire facility limits. Left turns into driveways of large traffic generators such as the Duke Power Building and the Brookstone residential development, as well as at major intersections with Airport Road and High School Road 15 prove dangerous due to sight-distance problems in the existing pavement design. Substantial future traffic increases are expected on Homestead Road. Several residential developments are under construction in the vicinity of the Brookstone subdivision and the Southern Human Services Complex. This project was listed in the 1992-98 (project U-2805) TIP in a "feasibility study and right-of-way protection" category. This meant the project had been recognized by NCDOT, however, no funding was available in that budget period. The project continues to be listed in the 1994-2000 TIP, however the project limits and exact funding allocation are still under debate. The project description now indicates improvements only for the section from High School Road (SR 1834) to Seawell School Road (SR 1834) . This is only 0. 6 miles of the proposed project request. However, the project funding is for $ 8 , 700, 000, which would fund the entire project as requested by the County and DCHC. A recent update from NCDOT indicates that the area Board Member intends only to fund the 0. 6 miles of the project and the funding allocation will be adjusted downward to correspond. The Update of the STIP indicates funding of $ 1.25 million for the 0.6 mile project. Recent land use decisions in Chapel Hill have required a review of the proposed request of a three lane improvement. The Chapel Hill and Carrboro staffs are currently investigating the possibility of upgrading potential improvements to the facility. Once a decision is made they will inform the County staff of a final decision so that all efforts for coordination can be made in the development of the 1993 Priority List. In the meantime, there is a serious issue regarding the funding of this project in the present TIP. The project limits are apparently going to be considerably reduced and a large portion of the funding is going to be removed. A strategy to save this project with the full amount of funding is to communicate that desire to the Board of Transportation. A united message from Chapel Hill, Carrboro, and Orange County, similar to last year's request may also prove beneficial to this project. Finally, since this project is within the Durham-Chapel Hill-Carrboro (DCHC) Urban Area, Orange County could request the TAC continue to support this complete project. Paving of Rural Roads A program very important to the citizens of Orange County and one which the County Commissioners have actively supported is the State's Secondary Road Improvement Program. There are currently just over 140 miles of unpaved rural roads in Orange County on the State's Priority Paving Schedule. Over the last four years the State has averaged paving slightly over 10 miles per year of rural unpaved roads. The Program is funded from North Carolina Highway 16 Trust Fund revenues and the mileage paved varies according to the revenues generated from year to year. The 1993-94 program proposes paving 12 miles of rural roads at a cost of $ 1. 2 million. Assuming a continuing rate of 10-12 miles per year, it will take almost 15 years complete the County' s paving needs . A highly touted feature of the ISTEA legislation is the flexibility of funding. Previous highway legislation has fixed funding for roadway improvements according to federal road classification, however, ISTEA allows for the funding of roads or other transportation modes to be derived from one of many sources. Last year Orange County requested the NC Board of Transportation look at innovative ways to fund the Secondary Roads Paving Program through the flexible funding process. The Program is independent of the TIP process, however the need for completion is so great that the County has felt it appropriate to request NCDOT look at alternative funding formats. Although the legislation prohibits the allocation of funds to local roads such as those on the pavement schedule, the County requested NCDOT investigate alternatives to reallocate ISTEA money in order to free up Highway Trust Fund dollars. The recommended alternative was to request NCDOT allocate some or all of the Trust Fund money allocated to the I-85 widening project to the Orange County Secondary Paving program. Under ISTEA flexibility provisions, the I-85 Trust Fund money could be replaced with Interstate or National Highway System funds . This alternative could provide a possible completion of the rural road paving program by the year 2000. The 1994-2000 TIP has not addressed this proposal. The 1993-94 NCDOT Secondary Road Improvement Program continues to receive its funding from Highway Trust Fund revenues at the same rate. There have been no reallocation efforts. I-85 Corridor Projects Project I-305 , widening I-85 to six lanes and reconstructing interchanges and structures from Orange Grove Road to the Durham County line is a project in the State' s 1992-98 TIP. The portion of this project from just west of University Station Road to the Durham County line is in the DCHC Urban Area. The TAC requested in 1992 that this project include bicycle and pedestrian facilities on roads that cross the Interstate and design for bikeways/greenways that cross I-85. The County recommended funding for this proposal come from National Highway System funds. The 1994-2000 TIP includes provisions for bicycle safety improvements at the Churton Street interchange with Interstate 85 in the Bicycle Program. One problem with this is that the NCDOT Bicycle Program is not always coordinated well with roadway projects which are already under construction or design. It is recommended that Orange " County continue to request this 17 element be incorporated in the design plans for the I-85 project. Because this project is within the Hillsborough Corporate Limits, it may benefit from joint support. Project I-304 , the eight-laning of I-85 through the Sevenmile Creek basin, has been a long-standing concern to Orange County. Funds allocated for "transportation enhancement activities" under ISTEA may provide a means to address two areas of particular concern; continued access under I-85 and the provision of best management practices (BMPs) to address highway run-off. A component of project 1-304 is the construction of a multi- directional interchange east of Efland at the US 70 connector. Existing overpasses to the east will be removed and access between West Ten Road and Ben Johnson Road will be severed. To offset this disruption, Ben Johnson Road will be extended through the new interchange to tie in with West Ten Road to the south. Last year Orange County requested that the access between West Ten Road and Ben Johnson Road remain and that a bicycle facility be constructed in the connection. After much meeting and discussion with NCDOT, a compromise has been reached. Bike lanes will be constructed on the 70 Connector Roadway being constructed in conjunction with the project. Again, it is recommended that close contact with NCDOT officials remain through to completion of this project to ensure the construction of bike lanes. Widening of I-85 to eight lanes has also raised concerns about the degradation of water quality due to run-off from additional pavement as well as possible spill. The County has consistently requested NCDOT make provisions for BMPs in conjunction with the project. To date no funding response has been offered by NCDOT. It is again recommended that the County request enhancement funds for the proper design and safeguard of erosion control during and after the construction of improvements to I-85 . Given the status of projects requested last year by the Orange County Board of Commissioners for inclusion in the North Carolina Transportation Improvement Program, staff makes the following recommendations for this year's TIP Priority List. 1) Homestead Road - As was the case last year, this project is recommended for additional discussion by appropriate County and Town officials and ultimate referral to the DCHC for action. The issue of the project limits and scope should be determined as soon as possible to facilitate a unified request. 2) Paving of Rural Roads - It is recommended that the County continue to request additional funding for paving of rural roads. An alternative to requesting general funding for unpaved roads may be to identify several rural roads in need of not only paving improvements but also grade and cross-section improvements. By targeting individual projects, NCDOT may be better able to allocate TIP dollars to this type of effort. 18 The Planning Board had concerns over any disruption to the NCDOT priority road paving list for fear that the priorities may be changed due to the choosing of one or two needed improvements. Preferred at this time to "stick to the schedule. " 3) Projects in the I-85 Corridor - It is recommended that the County continue to request for better coordination efforts through both the funding of enhancements to the I-85 corridor as well as through staff involvement in the design and review process for the projects. An additional enhancement project which qualifies for funding is that of landscaping and beautification efforts at interchanges. Because the I-85 interchanges in Orange County are located in various jurisdictions, this would involve a multijurisdictional effort. Additional projects which could be considered in the Orange County TIP Priority List are as follows: * improvements to various railroad crossings. There are several at grade crossings which are in need of improvement, from track crossing to grade work on the roadway facilities. An example is Buckhorn Road. Buckhorn Road has an interchange with I-85, therefore several trucks travel over the Southern Railway crossing between US 70 and I-85 . The existing grade of the tracks can cause many safety problems for trucks as well as cars. Recommended improvements involve better signalization and gradework to the road. Funding for this type of improvement comes from money allocated especially for rail improvements or could come from STP dollars. The Planning Board agreed that there are several railroad crossings in the county which warrant grade improvements. They requested all crossings with the main Southern Railroad line be addressed for the priority list. Further investigation by staff indicates two rail crossing projects with significant grade problems that also carry a large amount of traffic. They are the crossing at Buckhorn Road and the crossing at Mt. Herman Church Road. Both of these crossings are also in the county's proposed Economic Development Districts. They are also both in MPO jurisdic- tions. The Mt. Herman Church Road crossing is in the DCHC MPO, and the Buckhorn Road crossing is in the Alamance County MPO. These may require some coordination efforts. Other rail crossings for consideration include: Mt. Willing Road in Efland University Station Road 19 * intersection improvements - Intersection improvements provide immediate safety improvements without the environmental impact of full road improvements. Justification for these projects include safety, congestion management and clean air conformance. Funding for such improvements can come from a variety of the ISTEA sources as well as some State sources. Intersections along high-volume roads such as NC 86, NC 54, NC 57, and US 70 should be studied and high accident locations identified. Staff is in the process of working with NCDOT to determine high accident locations in the County. It is recommended that a list of individual intersections be targeted for funding. The Planning Board recommended two intersections to be analyzed: 1) Efland Cedar Grove Road / Carr Store Rd - sight distance improvements 2) Erwin Road / Dobbins Road - This is in Chapel Hill jurisdiction. This should be relayed to the Town for further analysis. Finally, the Planning Board requested staff review the New Hope Corridor Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park, a study prepared by the Planning Department and ZINC-Chapel Hill . The request specifically noted investigation of a wildlife corridor in the vicinity of the US 70/ • 1-85 interchange. Summary The North Carolina Board of Transportation will be holding public hearings in November to accept the priority lists for jurisdictions throughout the State. Orange County will need to identify and forward such a list. If coordinated efforts are needed with jurisdiction within the DCHC MPO, this will need to be accomplished during the next month. • �A6--- 9 74-3 ORANGE COUNTY PLANNING DEPARTMENT 306F REVERE ROAD HILLSBOROUGH, NORTH CAROLINA 27278 zn MEMORANDUM - To: Or ge County Board of Commissioners From: Ca rter, Transportation Planner II Subject: Additional Information for Transportation Improvement Program Consideration Date: September 7, 1993 As a result of discussions with the Planning Director, staff has investigated additional projects for possible inclusion in the Orange County Transportation Improvement Program priority list. Staff has investigated transportation improvement needs in the three proposed Economic Development Districts. It has been determined that some improvements are desirable in each district in order that they may efficiently serve targeted development and the surrounding community transportation needs. Also, these districts will serve as "entrance-ways" and the recommended improvements will enhance both the scenic and functional capacities of the roadways. I-85/Buckhorn Road Economic Development District 1) Buckhorn Road from I-85 project terminus to US 70 - widening improvements to same standards as I-85 portion of project (24 ' pavement on 120 ' right-of-way) which would provide for easy installation of future turn lanes, grade improvements at Southern i Railroad Crossing, intersection improvements including turn lanes and improved turn radii for easier and safer truck turn movements at US70 . Old NC 86/I-40 Economic Development District 1) Old NC 86 - widen to a four lane divided facility from I-40 to 1-85 . Recommended cross-section would be four 12 ' travel lanes with a landscaped median. Access should be limited with additional controls placed on median openings. Bicycle facilities (4 ' paved shoulders and signage) should also be incorporated with this project as recommended in the Draft Regional Bicycle Plan. US 7O/I-85 Economic Development District 1) US 70 from University Station Road to the Proposed Eno Drive - widen to a four lane divided facility. Recommended cross-section would be four 12 ' travel lanes. 2 ) Mt. Herman Church Road - shoulder and grade improvements from the US 70 intersection to Old NC 10 3 ) Wildlife Corridor crossing under I-85 - request a culvert crossing under I-85 as proposed in report prepared by UNC-CH Department of City and Regional Planning study titled "New Hope Corridor Open Space Master Plan: Proposals for Linking Duke Forest and Eno River State Park. " (should be coordinated quickly so it can be incorporated in I-85 widening project) 4 ) Pedestrian crossing linking residential development south of site to Eno River State Park - request a feasibility study addressing all possible alternatives including a) culvert under I-85 b) replace/rehab existing bridge at Mt. Herman Church Road c) pedestrian/sidewalk facilities along relocated Mt. Herman Church Road 5) Old NC 10 - Provide 4 ' paved shoulders throughout study area limits. It should be noted that all three of the Economic Development Districts are located in adjacent MPO's. The Buckhorn district is located in the Alamance County MPO, and the other two are located in the DCHC MPO. Any recommendations should be coordinated with each MPO accordingly. Coordination with the Town of Hillsborough will also be necessary since portions of Old NC 86 recommended for possible widening are in the Town's jurisdiction. Copies : John Link, County Manager Marvin Collins, Planning Director Gene Bell, Planner III, Comprehensive