Loading...
HomeMy WebLinkAboutAgenda - 02-07-2017-13-5 - Information Item - Memorandum - DCHC MPO Projects Flow Chart INFORMATION ITEM 1 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Comprehensive Planning 131 W. Margaret Lane (919) 245-2575 Suite 201 (-)ROVI4GE 1,11 11.1d J Y(919) 644-3002 (FAX) P. O. Box 8181 lt tti I i www.orangecountync.gov Hillsborough, NC 27278 ti ri ulVla 7��������11/�177NIIOY>:. ,may 1 pp" ��r ✓1/// //%i ?� rJ,1 nor �'rA u.� ii TP r..,i*,: +�. a � tl �1 '� � w,fi!!/'r�� fw rt h/ ' ; -1pi + is ® ® ,„ 11Fil i,,,; luW dm II"..a;. ;,'�',,a;, ' ,� 'r, y� ,,:a 77iI/i1 .1011 ° w 1111P'r ,;„,.�,� I �3� a, i� �� �° II�IV6�ar�w r� u a ar ,�f ,^,� 7 aU,� uuuuoouu �momo! b ���� ��� '� 1 tau wu� ` ���l��, MEMORANDUM TO: Board of County Commissioners FROM: Max Bushell, Orange County Transportation Planner DATE: February 7, 2017 SUBJECT: INFORMATION ITEM - State Transportation Improvement Program Draft Document and Orange County Funded Projects ATTACHMENT 1: DCHC MPO Projects Flow Chart The North Carolina Department of Transportation (NCDOT) Strategic Planning Office of Transportation (SPOT) recently released the draft 2017-2027 State Transportation Improvement Program (STIP), the schedule for transportation project funding. The draft document can be found at this link: https://connect.ncdot.gov/projects/planning/STIP Documentsl/Draft%202017-2027%2OSTIP.pdf. This action represents the penultimate step in the SPOT Prioritization 4.0 (P4.0) process. Orange County Division Needs Tier Projects The Durham Chapel Hill Carrboro Metropolitan Planning Organization (DCHC MPO), the Triangle Area Rural Planning Organization (TARPO), and the Burlington-Graham Metropolitan Planning Organization (B-G MPO) project priority lists all included projects eligible for funding in the Division Needs funding tier of the SPOT prioritization process P4.0. Of these projects, the Orange Grove Road Extension Project from Orange Grove Road to US 70A project in Hillsborough and the NC 54 Operational Improvements Project from Orange Grove Road to Old Fayetteville Road project west of Carrboro were selected for inclusion in the 2017-2027 STIP. Attachment 1 provides a complete overview of projects in Orange County. Projects receiving funding have been noted with red shading in the flow chart. Overall, a total of five projects (the improvements at NC 54 and Orange Grove Road project was folded into the NC 54 operational improvements project in the draft 2017-2027 STIP) out of 28 proposed projects were funded in Orange County. Next Steps The NCDOT will continue to make revisions to the draft 2017-2027 STIP before final adoption by the NCDOT Board of Transportation in summer 2017. This concludes the P4.0 process. The P5.0 process will begin in summer 2017 with a public process to create a base list of projects for submittal to the MPO and ultimately to the next prioritization process for the 2019-2029 STIP. 100%Data Driven 70%Data Driven,15%MPO/RPO Input,15%Division Input 50%Data Drip P-015 Apr1VMay 2016 August/September 2016 11111 De, NC 86 from I- � JK 0=4 Ivements 35 interc ange _ 1-40 Widening from 1-40/1-85 interchange to NC 86 to U.S. 15-501 (7�-40 \Aridening from NC 86 to U.S. 15-501 change FUNDED! I-40/NC 86 Interchange Improvements s iouth Churton FUNDED! 1-85/01d NC 86 (SR-1009 - South irovements ✓ Churton Street) Interchange Improvements nprovements = 86 Interchange Improvements North of NC 86 Improvements North of Hillsborough yo Street at Dad :onnector 'IF U.S. 70 East/1-85/1-40 Connector — Lanes and He Lanes Not Carried Forward _ NC 54 and Neville Road Intersection Extent Improvements ✓ e Pe estrian Not Carried Forward 1-85 from Mt. Herman Church to FUND s 0 Durham County Line Widening Darold Latta (,L-85 from 1-85/1-40 Split to east of the NC vements Not Carried Forward 86 Interchange Widening Pedestrian Dimmock's Mill Road Rail Crossing Not Carried Forward Improvement and Bellvue Street Closure NC5 Shoulder Not Carried Forward G' EUNDI 100%Data Driven 70%Data Driven,15%M PO/RPO Input,15%Division Input 50%Data Drip P-015 Apr1VMay 2016 August/September 2016 Improvements FUNDED! ad - originally lie )ads -to Old Road) Inge Grove Road NC 54 Widening (Orange Grove Road Ren ville Road) to Old Fayetteville Road)t -114) Widening: Included as part of the B-G MPO Project List Road Paved ers rove Road cents: 'Buckhorn Road ulders paved Shoulders NC 54 Widening (NC 119 in ur Minnis Road) Not Carried Forward - Alamance County to Orange Grove Rei Road)t ved Shoulders `� Not Carried Forward V v 100%Data Driven 70%Data Driven,15%MPO/RPO Input,15%Division Input 50%Data Drip P-015 Apr1VMay 2016 August/September 2016 De, lattress :o ry Road - �rchange attress ory Road msion to 1 .S. 70 horn Road R 1114 denin *Initially not carried forward, but added back to proposed TIP projects as a result of additional revenue from House Bill 97. The B-G MPO Transportation Advisory Committee amended the