HomeMy WebLinkAboutAgenda - 02-07-2017-13-5 - Information Item - Memorandum - DCHC MPO Projects Flow Chart INFORMATION ITEM 1
PLANNING & INSPECTIONS DEPARTMENT
Craig N. Benedict, AICP, Director
Comprehensive Planning 131 W. Margaret Lane
(919) 245-2575 Suite 201
(-)ROVI4GE 1,11 11.1d J Y(919) 644-3002 (FAX)
P. O. Box 8181
lt tti I i www.orangecountync.gov Hillsborough, NC 27278
ti ri ulVla 7��������11/�177NIIOY>:. ,may 1 pp" ��r
✓1/// //%i ?� rJ,1 nor �'rA u.� ii TP r..,i*,: +�. a � tl �1 '�
� w,fi!!/'r�� fw
rt h/
' ; -1pi + is ® ® ,„ 11Fil i,,,; luW dm II"..a;. ;,'�',,a;, ' ,� 'r, y� ,,:a 77iI/i1 .1011
° w 1111P'r
,;„,.�,� I �3� a, i� �� �° II�IV6�ar�w r� u a ar ,�f
,^,� 7 aU,� uuuuoouu �momo! b ���� ��� '� 1 tau wu� ` ���l��,
MEMORANDUM
TO: Board of County Commissioners
FROM: Max Bushell, Orange County Transportation Planner
DATE: February 7, 2017
SUBJECT: INFORMATION ITEM - State Transportation Improvement
Program Draft Document and Orange County Funded Projects
ATTACHMENT 1: DCHC MPO Projects Flow Chart
The North Carolina Department of Transportation (NCDOT) Strategic Planning Office of
Transportation (SPOT) recently released the draft 2017-2027 State Transportation
Improvement Program (STIP), the schedule for transportation project funding. The draft
document can be found at this link: https://connect.ncdot.gov/projects/planning/STIP
Documentsl/Draft%202017-2027%2OSTIP.pdf. This action represents the penultimate
step in the SPOT Prioritization 4.0 (P4.0) process.
Orange County Division Needs Tier Projects
The Durham Chapel Hill Carrboro Metropolitan Planning Organization (DCHC MPO), the
Triangle Area Rural Planning Organization (TARPO), and the Burlington-Graham
Metropolitan Planning Organization (B-G MPO) project priority lists all included projects
eligible for funding in the Division Needs funding tier of the SPOT prioritization process
P4.0. Of these projects, the Orange Grove Road Extension Project from Orange Grove
Road to US 70A project in Hillsborough and the NC 54 Operational Improvements
Project from Orange Grove Road to Old Fayetteville Road project west of Carrboro
were selected for inclusion in the 2017-2027 STIP. Attachment 1 provides a complete
overview of projects in Orange County. Projects receiving funding have been noted with red
shading in the flow chart. Overall, a total of five projects (the improvements at NC 54 and
Orange Grove Road project was folded into the NC 54 operational improvements project in
the draft 2017-2027 STIP) out of 28 proposed projects were funded in Orange County.
Next Steps
The NCDOT will continue to make revisions to the draft 2017-2027 STIP before final
adoption by the NCDOT Board of Transportation in summer 2017. This concludes the P4.0
process. The P5.0 process will begin in summer 2017 with a public process to create a
base list of projects for submittal to the MPO and ultimately to the next prioritization process
for the 2019-2029 STIP.
100%Data Driven 70%Data Driven,15%MPO/RPO Input,15%Division Input 50%Data Drip
P-015 Apr1VMay 2016
August/September 2016 11111 De,
NC 86 from I- � JK 0=4
Ivements
35 interc ange _ 1-40 Widening from 1-40/1-85
interchange to NC 86
to U.S. 15-501 (7�-40 \Aridening from NC 86 to U.S. 15-501
change FUNDED!
I-40/NC 86 Interchange Improvements
s
iouth Churton FUNDED! 1-85/01d NC 86 (SR-1009 - South
irovements ✓ Churton Street) Interchange
Improvements
nprovements = 86 Interchange Improvements
North of NC 86 Improvements North of
Hillsborough
yo Street at
Dad
:onnector 'IF U.S. 70 East/1-85/1-40 Connector —
Lanes and He
Lanes Not Carried Forward _ NC 54 and Neville Road Intersection Extent
Improvements ✓
e Pe estrian Not Carried Forward 1-85 from Mt. Herman Church to FUND
s 0 Durham County Line Widening
Darold Latta (,L-85 from 1-85/1-40 Split to east of the NC
vements Not Carried Forward 86 Interchange Widening
Pedestrian Dimmock's Mill Road Rail Crossing
Not Carried Forward Improvement and Bellvue Street Closure
NC5
Shoulder Not Carried Forward G'
EUNDI
100%Data Driven 70%Data Driven,15%M PO/RPO Input,15%Division Input 50%Data Drip
P-015 Apr1VMay 2016 August/September 2016
Improvements FUNDED!
ad - originally lie
)ads -to Old
Road)
Inge Grove Road NC 54 Widening (Orange Grove Road Ren
ville Road) to Old Fayetteville Road)t
-114) Widening: Included as part of the B-G MPO Project List
Road Paved
ers
rove Road
cents:
'Buckhorn Road
ulders
paved Shoulders NC 54 Widening (NC 119 in
ur Minnis Road) Not Carried Forward - Alamance County to Orange Grove Rei
Road)t
ved Shoulders `� Not Carried Forward V
v
100%Data Driven 70%Data Driven,15%MPO/RPO Input,15%Division Input 50%Data Drip
P-015 Apr1VMay 2016 August/September 2016 De,
lattress
:o ry Road -
�rchange
attress
ory Road
msion to
1 .S. 70
horn Road
R 1114
denin
*Initially not carried forward, but added back to proposed TIP projects as a result of additional
revenue from House Bill 97. The B-G MPO Transportation Advisory Committee amended the