Loading...
HomeMy WebLinkAboutAgenda - 06-29-1993 - VIII-C 1 O R A N G E C O U N T Y BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: 6/29/93 Action Agenda Item f VIII-C� SUBJECT: Draft Scope of Work and Process for Developing A Solid Waste Management Plan DEPARTMENT: Public Works PUBLIC HEARING: Yes X No ATTACHMENT(S) : INFORMATION CONTACT:Wilbert McAdoo Memorandum-Alan Rimer Ext . 2627 Proposed Scope of Work Integrated Solid Waste TELEPHONE NUMBERS: Management Plan Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 967-9251 /968-4501 PURPOSE: To consider the proposed scope of work and process for development of an integrated Solid Waste Plan. BACKGROUND: In November 1991 , the Landfill Owners ' Group began work on developing a Solid Waste Management Plan for Orange County. This work followed the dissolution of the Durham-Orange Regional Solid Waste Task Force. During the winter and spring of 1991 -92 , the Landfill Owners ' Group developed a scope of work for a series of studies intended to lead to the creation of an integrated plan for solid waste management . The scope of work was forwarded to the three Governing Bodies , who made changes to the document and returned it to the Landfill Owners ' Group for additional work . A public input meeting was also held, at which time citizens ' comments on the proposed action plan were received by the Landfill Owners ' Group. In the summer and fall of 1992 , the three Governing Bodies began discussions about solid waste management goals and objectives , which resulted in the three Boards producing respective sets of goals . In light of ' discussions about goals and objectives and followup work by the Landfill Owners ' Group and staff revealed the need for revisions in the scope of work. The attached draft of the scope of work reflects those revisions . RECOMMENDATION: The Manager recommends that the Board of Commissioners consider the proposed scope of work and process for development of an integrated Solid Waste Management Plan and provide feedback. 2 AGENDA # MEMORANDUM TO: Mayor and Council FROM: Council Member Alan Rimer SUBJECT: Draft Scope of Work and Process for Developing a Solid Waste Management Plan DATE: June 14, 1993 The attached scope of work describes work to be done in developing an integrated solid waste management plan for Orange County. This memorandum also proposes a process for proceeding with the study. The staff presented the proposed scope of work and process to the Landfill Owners ' Group at the May 20 meeting. The Owners ' Group agreed to present the information to the governing bodies, asking that they consider the scope of work and process, and provide feedback in order for the Owners ' group to continue with the process of engaging a consultant to work with the Owners ' Group on the study. Background In November, 1991, the Landfill Owners ' Group began work on developing a solid waste management plan for Orange County. This work followed the dissolution of the Durham-Orange Regional Solid Waste Task Force, and a request from the Chapel Hill Town Council for a report on future solid waste management activities. During the winter and spring of 1991-92 , the Owners ' Group developed a scope of work for a series of studies intended to lead to the creation of an integrated plan for solid waste management. The scope of work was forwarded to the three governing bodies, who made changes to the document and returned it to the Owners ' Group for additional work. A public input meeting was also held, at which time citizens ' comments on the proposed action plan were received by the Owners ' Group. In the summer and fall of 1992 , the three governing bodies began discussions about solid waste management goals and objectives, which resulted in the three boards producing respective sets of goals. In light of discussions about goals and objectives and follow up work by the Owners' Group and staff revealed the need for revisions in the scope of work. We believe the attached draft of the scope of work reflects those revisions. Discussion The proposed scope of work includes the following: 3 2 * Evaluation of waste reduction methods; * Evaluation of collection methods for solid waste, including recycling; * Evaluation of composting methods; and • Comparison of shipping waste out of county versus processing and disposing of materials within Orange County. The Owners ' s Group believes this work should be performed by a consulting firm. The staff would be responsible for providing recommendations on organization, legal issues and financing options, rather than having the consultant do so. In addition, we recommend that the staff conduct a study on handling and management of construction and demolition waste. The Duke University School of the Environment is completing its work on a market study for compost. We recommend that the results of that study be provided to the consultant for incorporation into the proposed larger study. We also recommend that we contract with Duke University to conduct a market study for refuse derived fuel (RDF) . If the market study shows that there are potential markets for RDF, the Owners ' Group may wish to recommend to the governing bodies that additional study of that process be performed by the consultant. We do not recommend the inclusion of RDF in the basic scope of work absent positive findings of accessible markets for the product. The attached scope is intended to. be a description of the work to be performed in the study. It is not intended to constitute a detailed basis for agreement with a consultant, nor is it intended as a prescriptive request for proposals. Rather, it will permit the consultant the maximum flexibility in responding to how they would study the project. Selection of a Consultant We recommend the following process for selection of a qualified consulting firm to perform the proposed study: 1. We propose that the staff prepare a request for qualifications (RFQ) and advertise it regionally and possibly nationally. The RFQ would solicit expressions of interest on the part of consulting firms, and statements of their qualifications to perform this work. 2 . The staff would review responses to the RFQ, and prepare a list of firms to receive requests for proposals (RFP) . 4 3 3 . After review of the scope of work by the governing bodies (see below) , an RFP would. be produced and sent to the firms selected as a result of the RFQ. The staff would review the resulting proposals, and select no more than four consulting firms for interviews. The interviews would be conducted by the Owners ' Group and staff, with the Owners ' Group selecting the firm to conduct the study. Process for Developing the Scope of Work The Owners ' Group agreed upon and recommends the following process for finalizing the scope of work: 1. The Owners ' Group reviewed the draft scope at the May 20 Owners ' Group meeting. Changes requested at that meeting have been incorporated into this report. The scope has been forwarded to the three governing bodies for their consideration. 2 . The three governing bodies will review the scope of work during meetings in June. This allows time for the Owners ' Group to receive comments from the governing body and complete any revisions based on those comments consistent with a reasonable schedule for issuance of an RFP. Public Input We recommend that the Owners ' Group sponsor two public input meetings as part of the study process. The first could occur near the beginning of the study, after the consultants have gathered information on existing solid waste systems. The second could occur after the consultants have performed analysis on potential options and have prepared a report of their interim findings. Comments received from the public could then be included in the analysis of options by the consultant for their final report to the Owners ' Group. Final Report • We recommend that the report from the consultant not recommend a "best" option or group of options for managing solid waste in the County. Instead, we suggest that the consultant should present a range of options, and provide a comparative analysis of the options. We believe that the Owners ' Group may wish to decide what constitutes the "best" option or set of options to be recommended to the governing bodies. We recommend that the consultants' report to the Owners ' Group be forwarded to the governing bodies as part of a report from the Owners' Group. The Owners ' Group' s report might recommend an option or options from the consultants ' report to pursue, and it 5 4 could suggest possible next steps for the local governments to follow by way of implementation. Recommendation The Owners ' Group requests that the Council review the attached scope of work and the process for proceeding with development of a solid waste management plan as herein described. We ask for your comments and suggestions. Attachment: Scope of work for integrated solid waste management plan • • • 6 5 Proposed Scope of Work Integrated Solid Waste Management Plan The purpose of the study is to produce a plan for solid waste management for the towns of Carrboro, Chapel Hill and Hillsborough, and the unincorporated areas of Orange County. I . Study Criteria The final report should provide information on options for the various aspects of solid waste management which meet the following criteria: A. Comprehensiveness--the study should fully address current and potential future handling and management of solid . waste in Orange County. The following pages address which handling options must be addressed, and which should not be addressed. B. Integration--the study should provide options for handling waste which are complementary of one another. For example, the type, size and cost of collection and possible volume reduction techniques should assume aggressive waste reduction and recycling programs. C. Environmental protection--the program options resulting from the study should not degrade air quality, water quality and other areas of the natural environment to the extent practicable. D. Consistency with solid waste management goals and objectives--the analysis and results of the study should take into account and be guided by the goals and objectives as adopted by three of the participating local governments. These goals and objectives are attached. E. Economic feasibility--the program options should be cost effective approaches to solid waste management. Cost analyses should include capital and operating expenses, where appropriate. Financing options are not required as part of this study. F. Practicality--the study should produce options which could logically be implemented. The local governments involved with the study do not desire to pursue experimental options which are not proven to be successful . Examples of currently operating program options should be provided in each instance where such options are recommended for further consideration. 7 6 II. Study Process We anticipate the following steps in the conduct of the development of the plan: A. Data Collection--existing information will be provided to the consultant by the staffs of the local governments as required by the scope of the study and as available. Additional information may be gathered by the consultants. B. Public Input Meetinq--the Landfill Owners ' Group will sponsor a public input meeting for the consultant to obtain information from citizens regarding solid waste management issues to be 'addressed in the plan. This meeting is intended to take place early in the study process, after collection of data. C. Presentation of Interim Findings--the consultant will provide to the Landfill Owners ' Group interim findings of their analysis. _ D. Public Input Meetinq--the Landfill Owners ' Group will sponsor a public input meeting to obtain citizen comments on the interim findings of the consultant. E. Final Report--the consultant will make a final report to the Landfill Owners ' Group. F. Report to the Governing Bodies--the Landfill Owners ' Group will report to the governing bodies regarding the consultants' report, and other relevant information, along with the Owners ' Group' s conclusions and recommendations. Note: deliverable products for the steps above cited are discussed in a section, below. III . Major Study Elements The following should be addressed in the study: A. Waste Reduction This study element should address methods of waste reduction, including but not limited to disincentives such as bans and fees. An aggressive waste reduction strategy should be assumed as a cornerstone of an integrated plan. 8 7 Waste reduction strategies to be investigated should include: 1. Landfill bans (e. g. , corrugated cardboard ban) . 2 . Collection bans (e. g. , yard waste ban) . 3 . Fee-based collection systems, (e. g. , variable volume and weight-based systems. 4 . Assessment of impact of education programs (e. g. , "smart shopper" programs, office waste reduction efforts, etc. ) . 5. Assessment of impact of policies or legislation (e. g. , local government purchasing regulations which require the use of returnable packaging) . Issues to be addressed with regard to waste reduction include the following: (1) measurement of impact of source reduction efforts ' (2) analysis of alternatives ,(3) financial implications of alternatives (4.) results of existing Orange County and Chapel Hill Committees on waste reduction B. Collections 1. Mixed solid waste (MSW) , including residential, commercial, multi-family, both urban and rural. 2 . Recycling, including residential, commercial and multi-family, both urban and rural. 3 . Reduction incentives, including but not limited to fee-based systems. 4 . Integration of MSW and recycling collections. Issues to be addressed with regard to Collections include the following: (1) cost of current systems of collection (2) analysis of available alternatives (3) financial implications of alternatives NOTE: Orange County' s Solid Waste Committee has presented recommendations to the County Commissioners for solid waste collection in unincorporated areas. The recommendations of the Committee should be made a part of the study of collection options. 9 8 C. Composting 1. Large-scale source separated, including: a. green waste b. waste paper c. wastewater sludge d. food waste 2 . Large-scale end separated, including: a. wet/dry collection and handling • b. materials recovery facilities (MRF' s) 3 . "Low technology" approaches, including: a. backyard and neighborhood-based b. use of chipped wood waste (Note: chipped wood waste could be utilized with any composting option and should be addressed with all options) 4 . Integration with other components of a potential plan.' Compost issues to be addressed include the following: (1) analysis of available methods (2) environmental impact of different methods (3) financial implications' of different methods (4) regulatory implications of different methods NOTE: A study of potential markets for products of composting operations has been conducted by Duke University. The results of this study will be made available to the consultant, and should be integrated into the study of compost options. D. Refuse Derived Fuel (RDF) A study of potential markets for RDF will be conducted by Duke University. The results of this study will be made available to the consultant. Should the market study determine that there are potential markets for RDF, the consultant may be asked to add an analysis of RDF to the basic scope of work. Issues which could be addressed include the following: (1) analysis of alternative methods (2) regulatory implications of different methods (3) environmental impact of different methods 10 9 (4) financial implications of alternatives (5) integration with other components of a potential plan Should the RDF work be added, it will be an additional study element, and should not be considered a part of the basic scope of work. The consultant should, though, demonstrate the ability and experience to perform the additional work should it be required. E. Disposal Alternatives There may be options for disposal of wastes other than placement in an Orange County landfill for that material not recycled, composted, or otherwise handled. It may be feasible to have this material disposed of outside of Orange County. Some alternatives have recently been suggested, and should be considered. The following points of analysis should be addressed: (1) identification and analysis of alternatives (2) regulatory implications of alternatives (3) financial implications of alternatives (4) environmental implications of alternatives (5) integration with other components of a potential plan IV. Elements Which Are NOT To Be Considered ' The following are not to considered as part of this scope of work: A. Incineration, with or without energy recovery. B. Large-scale, mixed solid waste composting. C. . Organizational and related legal issues (these will be addressed by the Landfill Owners ' Group) . D. Construction and demolition waste (these will be addressed by the staff) . V. Deliverables The consultant should provide the following: 1. Monthly status reports. These may be by letter report to the Project Manager. These reports may be waived when there is a lack of activity which would justify their omission. Waiver of the reports shall• be by mutual agreement between the consultant and the Project Manager. 11 • 10 2 . Report of interim findings. This report shall be made to the Landfill Owners ' Group at such time as the consultant has completed the initial review of the elements of the study, and can report the results of that review. Following this report, a public input meeting will be held, at which time the consultant will be able to receive feedback from citizens concerning the findings. The report of interim findings should include a listing of options for the various study elements. For example, there may be three potential options for rural collection of mixed solid waste. These options should be noted, with a comparative analysis of them. The comparative analysis should be based on the criteria noted in the first section of the Scope of Work. No recommendations are sought as part of this report. 3 . Final report. The final report shall be made to the Landfill Owners ' Group after the public input meeting regarding the interim findings, and upon completion of the consultant ' s review of comments from the Landfill Owners ' Group and public regarding the interim findings. The final report should include a comparative analysis of integrated solid waste management scenarios. The comparative criteria should include those noted at the beginning of the Scope of Work, plus public response. There is no maximum number of scenarios required, but there should be a minimum of three. No recommendation fora "best". scenario is sought as part of this report. •