Loading...
HomeMy WebLinkAboutAgenda - 06-12-2007-4ddORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 12, 2007 Action Agenda Item No. ~~ SUBJECT: Orange County Transportation Priority List for the 2009-2015 TIP DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) ~~ ATTACHMENT(S): 1. Status of Priority Projects Endorsed for 2007-13 TIP 2. Resolution, OUTBoard Memo and Proposed Orange County Urban Priority List for 2009-2015 TIP 3. Resolution, OUTBoard Memo and Proposed Orange County Rural Priority List for 2009-2015 TIP 4. 2009-2015 STIP Development Schedule 5. Map of Proposed Priority Projects (Under Separate Cover) INFORMATION CONTACT: Craig Benedict, 245-2592 Karen Lincoln, 245-2594 PURPOSE: To consider endorsing projects and/or comments regarding priority transportation projects for inclusion in the North Carolina Department of Transportation (NCDOT) 2009-2015 Transportation Improvement Program (TIP). BACKGROUND: Biennially, the North Carolina Board of Transportation (BOT) adopts a multi- year State Transportation Improvement Program (STIP) that specifies needed transportation improvements across the state. The process starts with local jurisdictions drafting local transportation priority lists. Federal and state regulations provide for public input into the process. "The Transportation Improvement Program contains funding information and schedules for the State Transportation Divisions including Highways, Aviation, Enhancements, Public Transportation, Rail, Bicycle and Pedestrian, and the Governor's Highway Safety Program", and is the major tool for implementation of locally adopted transportation plans. Orange County submits two priority lists for the Transportation Improvement Program. • Protects within the Metropolitan Area Boundary (MAB) of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO) must be submitted by the MPO in a regionally prioritized list. The MPO is asking local jurisdictions to submit local priority lists to the MPO by June 15, 2007. • Projects within the rural areas of Orange County that are outside the MAB are submitted to NCDOT through the Triangle Area Rural Planning Organization (TARPO). Rural Planning Organizations must submit their regional list to the North Carolina Department of Transportation by August 6, 2007. The Rural Transportation Advisory Committee (RTAC) meets every other month, and must approve the regional rural priority list at its meeting June 14, 2007, in order to meet that deadline for submitting the priority list to NCDOT. 2 Attachment 5 gives the tentative schedule for development of the draft and final 2009-2015 STIP. Orange County has endorsed five planning documents that recommend options for transportation improvements to address current and future transportation needs: • A Bicycle Transportation Plan • Recommendations of the Economic Development Transportation Work Group • Access Management Awareness Project & Report for Orange Grove Road • Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC) 2030 Long Range Transportation Plan. • Efland-Mebane Small Area Plan The list of priority projects that Orange County endorsed for the 2007-2013 TIP was based on recommendations from the above listed documents that were available at that time. The Orange Unified Transportation Board has reviewed potential priority projects, and recommends that the Orange County Board of Commissioners endorse the Transportation Priority List for Areas Within the DCHC MPO Metropolitan Area Boundary and the Transportation Priority List for Areas Within the Triangle Area Rural Planning Organization that the County endorsed for the 2007-2013 TIP. The board noted scarce funding available for new projects stemming from federal transportation funding cuts and more recent rescissions that took place this year. The OUTBoard will continue to research TIP issues, and work toward developing recommendations for acquiring funding for TIP projects. FINANCIAL IMPACT: There is no financial impact associated with this item. RECOMMENDATION(S): The Manager recommends that the Board endorse the recommendations of the Orange Unified Transportation Board. Attachment 1 3 2007-2013 TIP PRIORITY LIST STATUS ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN AREA BOUNDARY FOR CONSIDERATION OF FUNDING IN THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM 1. SR 1006, Orange Grove Road, at Interstate 40: Construct a pedestrian bridge over I- 40. New Grady Brown Elementary and newly constructed Cedar Ridge Nigh School are located on New Grady Brown School Road that has access from .Orange Grove Road south of I-40. The schools are within walking and cycling distance from residential areas north of I-40. Bicyclists and pedestrian must share the roadway with motor vehicles crossing the narrow two-lane bridge that carries Orange Grove Road aver Interstate 40. The bridge is too narrow to accommodate a pedestrian walkway. Lack of an adequate pedestrian crossing presents an unsafe environment. for students to walk to the schools. Status in Draft 2007-2013 TIP: scheduled for feasibility study (no year given) 2. U-2805, Homestead Road (SR 1777 Improvements: Improve Homestead Road from SR 1834, High School Road, to NC 86. This project should include bicycle and pedestrian facilities. There are three schools in the vicinity of Homestead Road: Chapel Hill High School, Smith Middle School and Seawell Elementary School. Many students live within walking distance and cycling distance to Chapel Hill High School and must walk or cycle along Homestead Road, and cross the road daily. Provision of sidewalks is of utmost importance for the safety of students and other pedestrians who use this corridor. Provision of bicycle facilities is, likewise, necessary for the safety of students and others. This project should also include appropriate safety improvements to the intersection of Homestead Road with High School Road. Status in Draft 2007-2013 TIP: Intersection improvements (turn lanes, traffic signal, crosswalks) and bicycle lane and sidewalk on the north side of Homestead Road and 4' paved shoulder on south side from High School Road to Rogers Road are being constructed with Moving Ahead money. The intersection improvements and bicycle lane, 4' paved shoulder, and sidewalk from High School Road to Camden Lane have been completed. Remainder of project remains unfunded. 3. R-2825, Improvements to South Churton Street: Develop congestion management, limited access, aesthetic and capacity improvements between US 70 Business and Interstate 40. The portion between Interstates 40 and 85 will conform to the design criteria of the Economic Development District Design Manual (4-lane divided section with bike and pedestrian improvements). The feasibility study completed in February 2002 recommends a 4-lane divided, with 16-foot median, curb and gutter cross section for the entire corridor from 1-40 to Eno River. Orange County stresses the need to study improvements within the current right-of-way for the segment north C:;'C'ransp;xtathn4T'I P+l. tstiv-15T iF° ~J'rirrityt. i5«~Cn~'r-~ SPrhrftg!. ~s;Sta<i;:: ;f~ a: Attachment 1 2007-2013 TIP PRIORITY LIST STATUS 4 of Interstate 85. Improved capacity through widening is not the County's first choice because of significant constraints between Interstate 85 and US 70 Business and the proximity of the historic district north of the project limits. Orange County requests that, where conditions do not prevent the addition of frontage roads, the feasibility study include the addition of frontage roads with limited access from the corridor. Draft 2007-2013 Status: Unfunded project 4. Old NC 86 (SR 1009) Bicycle Lanes: Construct bicycle lanes (4-foot paved shoulders) from Carrboro (Eubanks Road) to Hillsborough (I-40). This project, from the Carrboro Transition area (Hickory Forest Road) to Lafayette Drive, is priority 6 of the primary bicycle routes listed in the Orange.County Bicycle Transportation Plan, and would extend bicycle accommodations requested in TIP Project R-2825 to Carrboro, where its Transportation Advisory Committee has also established bicycle routes on Old NC 86 as a transportation .priority connection between proposed bicycle facilities along Old Fayetteville Road, Homestead Road and Eubanks Road. The feasibility study for TIP Project R-2825, improvements to South Churton Street, recommends afour-lane divided section for Old NC 86 (S. Churton St.) from I-40 to Lafayette Drive. That study also anticipates accommodations for bicycles (wide outside lanes) from I-40 to I-85. This project would connect bicycle facilities proposed in the South Churton Street project to Carrboro. Carrboro's Priority List for the 2006-2012 TIP included two bicycle projects on Old NC 86 that, along with this request and TIP project R-2825, would complete aHillsborough-Carrboro bicycle route: • from Old Fayetteville Road to Homestead Road; and o from Homestead Road to Eubanks Road. Draft 2007-2013 Status: Not in TIP 5. NC 86, Bicycle Lanes: Construct bicycle lanes (4-foot paved shoulders) from Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). This project will extend bicycle -lanes on Airport Road (NC86) in Chapel Hill to US 70 Business in Hillsborough. Bicycle lanes have recently. been completed along NC 86 from UNC to Whitfield Road (SR 1731) in Orange County. NC 86 from Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists using this route and there are also two .schools along this route. This route is listed as priority I of the primary bicycle routes proposed in the Orange County Bicycle Transportation Plan adopted April 6, •1999. This project is included in the Bicycle Program as an incidental need. Orange County requests that bicycle lanes be constructed as an independent project, and, if necessary, programmed in phases. Draft 2007-2013 Status: Not in TIP C:ti I"r~tneportati;nriTIPV 006__1;;1'tPtt'ilarltyt. isriLOt)'?-1 Sf'ricnltyt.~stSta*.uaa~ ~c Attachment 1 2007-2013 TIP PRIORITY LIST STATUS 5 6. NC 86 (North of Hillsborough) Improvements: Widen NC 86, from US 70 Bypass north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also being the intersection area. of the planned connector between NC 86 and NC 57), to four lanes with intersection improvements at US 70 Bypass to include extending the queuing lane for traffic turning east onto US 70 Bypass from northbound Churton Street/NC 86. NC 86 is the major north-south route through Orange County. NC 57 converges into US 86 just north of US 70 Bypass. The segment of NC 86 between NC 57 and US 70 is congested, rendering a high accident location at the intersection of US 70 Bypass at NC 86. Draft 2007-2013 Status: Not in TIP. 7. US 70 Bypass Widening: Widen, from the Orange/Durham County Line to the US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane divided section with bike and pedestrian improvements. This project should be phased to address traffic counts and existing congestion. Orange County requests that this project be identified as a need and included in the 2006-2012 STIP. Draft 2007-2013 Status: Not in TIP. 8. U=3436 SR 1148 (Eno Mountain Road) and SR 1192 (Mayo Street) at SR 1006 Orange Grove Road): realign intersection and make safety improvements. This project is listed in the 2004 - 2010 TIP as an unfunded project. It was a "first priority project" in the Town of Hillsborough Thoroughfare Plan for 1989 but the Hillsborough Town Board removed the realignment from the Hillsborough Transportation Plan in 1997. More recently, Hillsborough Commissioners and Orange County Commissioners have endorsed the project, in two joint studies that included commissioners from both jurisdictions, the Economic Development District (EDD) Transportation Work Group and the Joint Orange Grove Road Transportation Group (JOGRTG). Both the "EDD Transportation Work Group Recommendations" and the "Access Management and Awareness Project and Report for Orange Grove Road" recommend this project for improved traffic flow and safety. Draft 2007-2013 Status: Unfunded project. 9. Extend Orange Grove Road east to US 70 business. The "EDD Transportation Work Group Recommendations" and the "Access Management. and Awareness Project and Report for Orange Grove Road" recommend this project as an alternative access to the US 70 Business/NC 86 corridor to alleviate congestion on Churton Street. Draft 2007-2013 Status: Not in TIP. G a~ i'<~nspnr4,~~n1 i'li'~2(>U v-15Ti F;I'rlrn'I tyt.lsri?_007-13I'tlat7tyi.~s.Sla.u;;.Urr„ Attachment 1 6 2007-2013 TIP PRIORITY LIST STATUS ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR AREAS WITHIN THE TRIANGLE AREA RURAL PLANNING ORGANIZATION FOR CONSIDERATION. OF FUNDING IN THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM 1) Buckhorn Road ~R 1114) Widening: Widen from US 70 to West Ten Road (SR 1144) to a multilane facility with bicycle and pedestrian facilities. This stretch of roadway borders the western boundary of the I-85/Buckhorn Road Economic Development District EDD). This area is the focus of a growing problem of traffic backing up on the northbound exit ramps of I-85 caused by northbound traffic exiting I-85 onto southbound Buckhorn Road and turning left into a nonconforming business use just south of the interchange. With increased interest in extending water and sewer, and reconsidering proposed uses within the EDD, improvements to the transportation system to support plans for that district are necessary to attract the desired development. Improvements are also needed for the safety of increasing pedestrian travel in this corridor. The improvements will especially be needed with increased traffic related to 'the new middle school and soccer fields on the north side of West Ten Road. Draft 2007-2013 Status: Not in TIP. 2. Efland Cedar Grove Road (SR 1004, SR 1357 : straighten and make turn lane improvements make more direct connection to Interstate 85. Traffic has increased approximately 170% over the past ten years on Efland-Cedar Grove Road just north of US 70, with the greatest increase between 1997 and 1999 when average annual daily traffic (AADT) increased from 2000 to 4200, a 110% increase over the two year period. The most recent AADT counts show a 14% over the period from 1999 to 2001. Much of that traffic "dog-legs" through Efland on Forrest Avenue to Mt. Willing Road to access Interstate 85. Mt. Willing Road provides an at grade crossing of the North Carolina Railroad corridor, the only access across the railroad tracks between Hillsborough and Buckhorn Road. (The I-85/US 70 Connector just east of Efland is not accessible to traffic on eastbound US 70.) Draft 2007-2013 Status: Not in TIP.. 3. Dairvland Road/Orange Grove Road/Buckhorn Road bicycle lanes: construct 4-ft. paved shoulders along the fopow%ng route from Carrboro to West Ten Road to provide a connection with proposed routes fio Mebane and Efland. • Dairyland Road (SR 1112 - SR 1113 - SR 1177) from Union Grove Church Road to Orange Grove Road (SR 1006); ® Orange Grove Road (SR 1006) from Dairyfand Road (SR 1177) to Buckhorn Road SR 1114; and ® Buckhorn Road. (SR 111.4) to West Ten Road (SR 1144). Draft 2007-2013 Status: Not in TIP. :+.'f'ran~trx;it:aBoniTll'~L6Dv-?511PU°dorltyL.isY•?007-1SI"iloiityLi tS4~rirs.uc~; Attachment 1 2007-2013 TIP PRIORITY LIST STATUS 7 4. Oran e Grove RoadfDodson's Crossroad bic cle lanes: construct 4-ft. axed shoulders along Orange Grove Road (SR 1006) from Interstate 40 to Dodson's Crossroads (SR 1102) and along Dodson's Crossroads. to Daityland. Road (SR. 1177. This route would provide bicycle lanes to the Grady Brawn Elementary School and Cedar Ridge High School from the area south of the schools and connect to a proposed bicycle facility on Orange Grove Road into Hillsborough. Draft 2007-2013 Status: Not in TIP. 5. Park and Ride Lot in the Buckhorn Economic Development District: Orange County requests funding for a park and ride facility (from the adopted Orange County Economic Development District Design Manual) to be located in the I-85/Buckhorn Road Economic Development District. This project would provide an opportunity for coordination of public transportation efforts between two growing regions in North Carolina, the Triad and Triangle. Draft 2007-2013 Status: Not in TIP. G:1T rr~nsuorlt~,lani't'IP~'LO[16-15 TiPlhrior(tyt. ist'?_C~7-1:iPdariirt ~s.SUrii; ;1,'.~c Attachment 2 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS FOR THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION REGIONAL PRIORITY LIST FOR THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board- of Transportation, every two years, prepares a Transportation Improvement Program that identifies transportation projects scheduled, for State and Federal funding over the next seven years; and WHEREAS, the North Carolina Board of Transportation solicits input for identifying transportation projects of local and regional importance to be included in the FY 2009-2015 Transportation Improvement Program; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to other transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and 8 WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that: The Board of County Commissioners endorses the attached project priority list of transportation projects to be considered for inclusion in the FY 2009-2015 Transportation Improvement Program. Upon motion of Commissioner ,seconded by Commissioner , the foregoing resolution was adopted this the day of , 2007 1, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on June 12, 2007„ as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2007. Clerk to the Board of Commissioners 9 ,_~*e ...... ... 3 ~~~.+~a-~~,~.~~a Orange Unified Tr~ns~portation BOar~ ~,. ;. w_.~. ~ r~ f,~~~~z PO Box 8181 ~~~ ~ ~ ~ 3~~ ~~i-~ Hillsborough, NC 27278 fin. ,,,~ ~_-~._ I-~lemorandum Date: May 16, 2007 To: Orange County Board of County Commissioners From; Robert Peterson, Chair Orange Unified Transportation Board Subject: Orange County Recommended Priority Projects Within the Metropolitan Area Boundary for the 2009-2015 Transportation Improvement Program (TIP) At its meeting on May 16, 2007, the Orange Unified Transportation Board reviewed transportation projects in the areas of Orange County within the Metropolitan Area Boundary (MAB) of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO), and approved the attached -list of transportation priority projects to recommend to the Board of County Commissioners for submittal to the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization to be included in the Regional Priority List of Transprotation Projects for the 2009-205 Metropolitan Transportation Tmprovement Program. Attachment 2 10 ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN AREA BOUNDARY FOR CONSIDERATION OF FUNDING IN THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM 1. SR 1006, Orange Grove Road, at Interstate 40: Construct a pedestrian bridge over I- 40. New Grady Brown Elementary and newly constructed Cedar Ridge High School are located on New Grady Brown School Road that has access from Orange Grove Road south of I-40. The schools are within walking and cycling distance from residential areas north of I-40. Bicyclists and pedestrian must share the roadway with motor vehicles crossing the narrow two-lane bridge that carries Orange Grove Road over Interstate 40. The bridge is too narrow to accommodate a pedestrian walkway. Lack of an adequate pedestrian crossing presents an unsafe environment for students to walk to the schools. 2. U-2805, Homestead Road (SR 1777) Improvements: Improve Homestead Road from SR 1834, High School Road, to NC 86. This project should include bicycle and pedestrian facilities. There are three schools in the vicinity of Homestead Road: Chapel Hill High School, Smith Middle School and Seawell Elementary School. Many students live within walking distance and cycling distance to Chapel Hill High School and must walk or cycle along Homestead Road, and cross the road daily. Provision of sidewalks is of utmost importance for the safety of students and other pedestrians who use this corridor. Provision of bicycle facilities is, likewise, necessary for the safety of students and others. This project should also include appropriate safety improvements to the intersection of Homestead Road with High School Road. 3. R-2825, Improvements to South Churton Street: .Develop congestion management, limited access, aesthetic and capacity improvements between US 70 Business and Interstate 40. The portion between Interstates 40 and 85 will conform to the design criteria of the Economic Development District Design Manual (4-lane divided section with bike and pedestrian improvements).. The feasibility study completed in February 2002 recommends a 4-lane divided, with 16-foot median, curb and gutter cross section for the entire corridor from I-40 to Eno River. Orange County stresses the need to study improvements within the current right-of-way for the segment north of Interstate 85. Improved capacity through widening is not the County's first choice because of significant constraints between Interstate 85 and US 70 Business and the proximity of the historic district north of the project limits. Orange County requests that, where conditions do not prevent the addition of frontage roads, the feasibility study include the addition of frontage roads with limited access from the corridor. G:171ansporleUprd'ilF't?UL6.15t1Ptr'rltslllW ISta.Or,.lnQG2u(?P-9ft-1f'CJI'Ilorityl~,tdG: Attachment 2 11 ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN AREA BOUNDARY FOR CONSIDERATION OF FUNDING IN THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM 4. Old NC 86 (SR 1009) Bicycle Lanes: Construct bicycle lanes (4-foot paved shoulders) from Carrboro .(Eubanks Road) to Hillsborough (I-40). This project, from the Carrboro Transition area (Hickory Forest Road) to Lafayette Drive, is priority 6 of the primary bicycle routes listed in the Orange County Bicycle Transportation Plan, and would extend bicycle accommodations requested in TIP Project R-2825 to Carrboro, where its Transportation Advisory Committee has also established bicycle routes on Old NC 86 as a transportation priority connection between proposed bicycle facilities along Old Fayetteville Road, Homestead Road and Eubanks Road. The feasibility study for TIP Project R-2825, improvements to South Churton Street, recommends afour-lane divided section for Old NC 86 (S. Churton St.) from I-40 to Lafayette Drive. That study also anticipates accommodations for bicycles (wide outside lanes) from I-40 to I-85. This project would connect bicycle facilities proposed in the South Churton Street project to Carrboro. Carrboro's Priority List for the 2006-2012 TIP included two bicycle projects on Old NC 86 that, along with this request and TIP project R-2825, would complete aHillsborough-Carrboro bicycle route: ® from Old Fayetteville Road to Homestead Road; and ® from Homestead Road to Eubanks Road. 5. NC 86, Bicycle Lanes: Construct bicycle lanes (4-foot paved shoulders) from Chapel Hill (Whitfield Road) to Hillsborough (US 70 Business). This project will extend bicycle lanes on Airport Road (NG86) in Chapel Hill to US 70 Business in Hillsborough. Bicycle lanes have recently been completed along NC 86 from UNC to Whitfield Road (SR 1731) in Orange County. NC 86 from Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists using this route and there are also two schools along this route. This route is listed as priority I of the ,primary bicycle routes proposed in the Orange County Bicycle Transportation Plan adopted April 6, 1999. This project is included in the' Bicycle Program as an incidental need. Orange County requests that bicycle lanes be constructed as an independent project, and, if necessary, programmed in phases. G';Traani>EFrel<itionl'i'1P120(i6-Ic~TIpl4•'rlCdtyl.lSE'.teran4ca20t?5..1;itril'O(a11o11t?rt ~,_t.dnC: Attachment 2 12 ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN AREA BOUNDARY FOR CONSIDERATION OF FUNDING IN THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM 6. NC 86 (North of Hillsborough) Improvements: Widen NC 86, from US 70 Bypass north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also being the intersection area of the planned connector between NC 86 and NC 57), to four lanes with intersection improvements at US 70 Bypass to include extending the queuing lane far traffic turning east onto US 70 Bypass from northbound Churton Street/NC 86. NC 86 is the major north-south route through Orange County. NC 57 converges into US 86 just north of US 70 Bypass. The segment of NC 86 between NC 57 and US 70 is congested, rendering a high accident location at the intersection of US 70 Bypass at NC 86. 7. US 70 Bypass Widening: Widen, from the Orange/Durham County Line to the US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane divided section with bike and pedestrian improvements. This project should be phased to address traffic counts and existing congestion. Orange County requests that this project be identified as a need and included in the 2006-2012 STIP. 8. U-3436, SR 1148 (Eno Mountain Road) and SR 1192 (Mayo Street) at SR 1006 (Orange Grove Road): realign intersection and make safety improvements. This project is listed in the 2004 - 2010 TIP as an unfunded project. It was a "first priority project" in the Town of Hillsborough Thoroughfare Plan for 1989 but the Hillsborough Town Board removed the realignment from the Hillsborough Transportation Plan in 1997. More recently, Hillsborough Commissioners and Orange County Commissioners have endorsed the project in two joint studies that included commissioners from both jurisdictions, the Economic Development District (EDD) Transportation Work Group and the Joint Orange Grove Road Transportation Group (JOGRTG). Both the "EDD Transportation Work Group Recommendations" and the "Access Management and Awareness Project and Report for Orange Grove Road" recommend this project for improved traffic flow and safety. 9. Extend Orange Grove Road east to US 70 business. The "EDD Transportation Work Group Recommendations" and the "Access Management and Awareness Project and Report for Orange Grove Road" recommend this project as an alternative access to the US 70 BusinesslNC 86 corridor to alleviate congestion on Churton Street. G ~TPrirS~u)ft?~tlp~t;T'lI'tlt7(;G••157tPiPrirrlryt.IsY.Orannc~:'L6!?;+..16t.IPC~Prlorlty~~~:;t.dor. Attachment 3 ~ 13 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS FOR THE TRIANGLE AREA RURAL PLANNING ORGANIZATION (TARPO) REGIONAL PRIORITY LIST FOR THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation, every two years, prepares a Transportation Improvement Program that identifies transportation projects scheduled for State and Federal funding over the next seven years; and WHEREAS, the North Carolina Board of Transportation solicits input for identifying transportation projects of local and regional importance to be included in the FY 2009-2015 Transportation Improvement Program; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to other transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that: The Board of County Commissioners endorses the attached project priority list of transportation . projects to be considered for inclusion in the FY 2009-2015 Transportation, Improvement Program. Upon motion of Commissioner ,seconded by Commissioner , the foregoing resolution was adopted this the day of , 2007 I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on March 15, 2005, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2007. Clerk to the Board of Commissioners ~~~,. ~~:~•~,~~~.~_~ Qtzjo ~,~~~ is ~"~ ~ ~;, ~~- ~ ~ ~~~ ~ti A. ,~,.,. Or~n~e Unified Tr~ns~portation Bo~r~ PO Box 8181 Hillsborough, NC 27278 14 Memorandum Date: April 26, 2007 To: Orange County Board of County Commissioners From: Robert Peterson, Chair ~ 1~ Orange Unified Transportation Board Subject: Orange County Recommended Priority Projects Outside the Metropolitan Area Boundary for the 2009-2015 State Transportation Improvement Program (STIP) At its meeting on March 21, 2007, the Orange Unified Transportation Board reviewed transportation projects in the areas of Orange County outside of the Metropolitan Area Boundary (MAB) of the Durham-Chapel Hill-Carrboro (DCHC) Metropolitan Planning Organization (MPO). The board voted to recommend the list of priority projects adopted by the Board of County Commissioners for the 2007-2013 State Transportation Improvement Program (STIP) for Orange County for the following reasons: 1. None of the projects is currently funded in the TIP and these are still top priorities; and 2. Given the rescissions in federal funding to the states that has already caused multiple delays in projects already programmed in the TIP, it is not likely that any new projects will be funded in the 2009-2015 TIP. Attachment 3 15 ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR AREAS WITHIN THE TRIANGLE AREA RURAL PLANNING ORGANIZATION FOR CONSIDERATION OF FUNDING IN THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM 1) Buckhorn Road (SR 1114) Widening: Widen from US 70 to West Ten Road (SR 1144) to a multilane facility with bicycle and pedestrian facilities. This stretch of roadway borders the western boundary of the I-85/Buckhorn Road Economic Development District EDD). This area is the focus of a growing problem of traffic backing up on the northbound exit ramps of I-85 caused by northbound traffic exiting I-85 onto southbound Buckhorn Road and turning left into a nonconforming business use just south of the interchange. With increased interest in extending water and sewer; and reconsidering proposed uses. within the EDD, improvements to the transportation system to support plans for that district are necessary to attract the desired development. Improvements are also needed for the safety of increasing pedestrian travel in this corridor. The improvements will especially be needed with increased traffic related to the new middle school and soccer fields on the north side of West Ten Road. 2. Efland Cedar Grove Road (SR 1004, SR 1357: straighten and make turn lane improvements; make more direct connection to Interstate 85. Traffic has increased approximately 170% over the past ten years on Efland-Cedar Grove Road just north of US 70, with the greatest increase between 1997 and 1999 when average annual daily traffic (AADT) increased from 2000 to 4200, a 110% increase over the two year period. The most recent AADT counts show a 14% over the period from 1999 to 2001. Much of that traffic "dog-legs" through Efland on Forrest Avenue to Mt. Willing Road to access Interstate 85. Mt. Willing Road provides an at grade crossing of the North Carolina Railroad corridor, the only access across the railroad tracks between Hillsborough and Buckhorn Road. (The I-85/US 70 Connector just east of Efland is not accessible to traffic on eastbound US 70.) 3. Dairyland Road/Orange Grove Road/Buckhorn Raad bicycle lanes: construct 4-ft. paved shoulders along the following route from Carrboro to West Ten Road fio provide a connection with proposed routes to Mebane and. Effand. • Dairyland Road (SR 1112 - SR 1113 - SR 1177) from Union Grove Church Road to Orange Grove Raad. (SR 1006); • Orange Grove Raad (SR 1006) from Dairyfand Raad (SR 1177) to Buckhorn. Road (SR 1114); and • Buckhorn Road (SR 1114) to West Ten. Road (SR 1144). (;;t'i't'i3n5:~Dl't31101ti ill•'~?iHi ~-151'IFril.>rlul'IIVLIs::OPL~b1CtCi CCH1H1"Y P?F'Ci hPil(.iR1'iY LIST.rc~ Attachment 3 16 ORANGE COUNTY TRANSPORTATION PRIORITY LIST FOR AREAS WITHIN THE TRIANGLE AREA RURAL PLANNING ORGANIZATION FOR CONSIDERATION OF FUNDING IN THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM 4. Orange Grove Road/Dodson"s Crossroad bicycle lanes: construct 4-ft, paved _~_._s~___ _s_.__ ~__~__ r.__.._ r~__~ fnr^i Annn~ r-_.Y 1._1_.__1_1_ An i_ r~_~___s_ 1177. This route would provide bicycle lanes to the Grady Brown Elementary School and Cedar Ridge High School from the area. south of the schools and connect to a proposed bicycle facility an Orange Grove Road into Hillsborough. 5. Park and Ride Lot in the Buckhorn Economic Development District: Orange County requests funding for spark -and. ride facility (from the adopted Orange County Economic Development District Design Manual) to be located in the I-85/Buckhorn Road Economic Development District. This project would provide an opportunity for coordination of public transportation efforts between two growing regions in North Carolina, the Triad and Triangle. G;ITratnspcrka*.iornTlPlOp~-iF`I"P11'dgdtyl.iSt'.GI?F,h!(itt_ CGUt41`Y RYC} PRICIf'ITl' L (.~l'.dtx Attachment 4 ~ 7 TENTATIVE DATES FOR THE DRAFT AND FINAL 2009-2015 STIP MARCH 1, 2007 • FINAL 2007-2013 STIP PRESENTED TO BOARD OF TRANSPORTATION • 2007-2013 STIP APPROVED BY NCBOT AND RELEASED TO PUBLIC • FINAL 2007-2013 STIP PRESENTED TO FHWA AND FTA~ FOR FEDERAL APPROVAL MARCH 2, 2007 -AUGUST 6, 2007 • MPO/RPO AND PUBLIC TO PROVIDE PRIORITIZED REQUESTS FOR CONSIDERATION IN DRAFT 2009-2015 STIP • IF PRIORITIZED REQUESTS ARE NOT AVAILABLE FOR DRAFT CONSIDERATION, PLEASE PROVIDE INFORMATION BY NOVEMBER 30, 2007, FOR FINAL 2009-2015 STIP CONSIDERATION JUNE -AUGUST, 2007 • REVIEW PROPOSED DRAFT STIP WITH BOT MEMBERS AND DIVISION ENGINEERS OCTOBER 3, 2007 • DRAFT STIP PRESENTED TO THE NCBOT AND PUBLIC FOR REVIEW/COMMENT • DRAFT STIP WILL BE ON LINE • MPO/RPO DRAFT DOCUMENTS WILL BE RELEASED NOVEMBER, 2007 -JANUARY, 2008 • PUBLIC MEETINGS IN EACH OF THE HIGHWAY DIVISIONS TO SOLICIT COMMENTS ON THE DRAFT 2009-2015 STIP RELEASED IN SEPTEMBER FEBRUARY -MARCH -APRIL, 2008 • REVIEW PROPOSED FINAL STIP WITH BOT MEMBERS AND DIVISION ENGINEERS • REVIEW PROPOSED FINAL 2009-2015 STIP WITH MPO'S JUNE, 2008 • FINAL 2009-2015 STIP PRESENTED TO.BOARD OF TRANSPORTATION FOR APPROVAL • 2009-2015 STIP APPROVED BY NCBOT AND RELEASED TO MPO'S/RPO'S AND PUBLIC • FINAL 2009-2015 STIP PRESENTED TO FHWA AND FTA FOR FEDERAL APPROVAL -- SCHEDULE SUBJECT TO CHANGE --