HomeMy WebLinkAboutAgenda - 01-04-1993 - VIII-E 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No itzm g
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 4, 1993
SUBJECT: Bridges Across North Carolina Railroad - Durham East-West
Expressway Extension
DEPARTMENT County Commissioners PUBLIC HEARING YES NO X
ATTACHMENT(S) INFORMATION CONTACT
Draft Resolution Moses Carey, Jr.
12/18/92 TTA Letter TELEPHONE NUMBER
12/11/92 TTA Memo Hillsborough 732-8181
12/17/92 TTA Resolution Chapel Hill 968-4501
Map of Area Mebane 227-2031
Durham 688-7331
PURPOSE: To consider a request from the Triangle Transit Authority to
support its request that the North Carolina Department of
Transportation (NCDOT) redesign bridge plans for the extension of the
Durham East-West Expressway. -
BACKGROUND: The Triangle Transit Authority (TTA) has asked that Orange
County request NCDOT to redesign the bridges planned across the North
Carolina Railroad for the extension of the Durham East-West Expressway.
Current DOT plans for these bridges would span only one railroad track.
The TTA is conducting a study of fixed guideway alternatives in the
Triangle, and would like to preserve options for using the North
Carolina Railroad corridor for this purpose. TTA feels that NCDOT
should redesign the railroad bridge plans to accommodate four sets of
tracks for future uses.
The attached correspondence from TTA provides additional background on
this matter. The draft resolution, patterned after the resolution
adopted by the TTA Board of Trustees on December 17, 1992, can be
considered should the Board of Commissioners decide to support the TTA
request to the Department of Transportation.
RECOMMENDATION: As the Board decides.
, I
2
ORANGE COUNTY BOARD OF COMMISSIONERS
RESOLUTION REQUESTING THE NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION REDESIGN THE EAST-WEST EXPRESSWAY HIGHWAY BRIDGES
ACROSS THE NORTH CAROLINA RAILROAD
WHEREAS, the North Carolina Department of Transportation is extending
the Durham East-West Expressway from 15-501 to I-85: and,
WHEREAS, the planned Expressway will cross over the North Carolina
Railroad near the intersection with I-85; and,
WHEREAS, the NCDOT current plans are for the highway bridge to permit
only one set of railroad tracks; and,
WHEREAS, the highway bridge life span is designed to be fifty years;
and,
WHEREAS, the North Carolina Railroad believes that they will need two
sets of tracks for freight railroad and Amtrak passenger service; and,
WHEREAS, the Research Triangle Regional Public Transportation Authority
is conducting a study of fixed guideway alternatives in the Triangle
area; and,
WHEREAS, the North Carolina Railroad corridor from east Wake County to
Hillsborough is a possible corridor for a fixed guideway; and,
WHEREAS, the construction of the highway bridge as planned will
preclude future rail service to Hillsborough and Northern Orange
County.
NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of
Commissioners that the North Carolina Department of Transportation is
requested to redesign the highway bridges to permit four sets of
tracks.
Adopted this, the 4th day of January, 1993.
)-Y_ 93
DEC 21
TRIANGLE TRANSIT AUTHORITY V I))
December 18, 1992
The Honorable Moses Carey, Chair
Orange County Board of Commissioners
•
344 Warren Way
Chapel Hill. NC 27516
Re: Durham East-West Expressway Extension Bridges across the North Carolina Railroad
Dear Chairperson Carey:
At a regular meeting of the Triangle Transit Authority Board of Trustees, held on Thursday, December
17, 1992, the Board approved the attached resolution requesting that Durham East-West Expressway
Extension bridges, crossing the North Carolina Railroad tracks, be redesigned to accommodate four (4)
sets of railroad tracks. The roadway project will extend the Durham East-West Expressway from 1'5-5o1
to I-85. You are encouraged to join the Triangle Transit Authority in calling for this change in the design
for this project.
The primary issue to be addressed by this design change is to assure that the bridge design does not rule
out future use of the existing corridor for both freight and passenger rail service. In particular, while
corridors for future passenger rail service have not been studied yet, restricting the length of the bridges
will preclude the extension of passenger rail service to Hillsborough and northern Orange County. If the
corridor is to be used for future passenger rail service, more than one set of tracks as currently designed
will need to be accommodated.
In the opinion of the Triangle Transit Authority and the North Carolina Railroad future use of the corridor
will require four sets of tracks. Currently, the North Carolina Railroad operates freight service on one set
of tracks. Future freight and Amtrak use of the corridor will require two sets of tracks. Use of the
corridor for future passenger rail service to Hillsborough and northern Orange County would require an
additional two sets of tracks. In view of this possible need for four sets of tracks, it seems prudent to
design bridge structures to accommodate them.
It is our understanding that construction documents are complete on this project and that the Department
of Transportation intends to solicit bids and proceed with the work in early 1993. The Triangle Transit
Authority Board of Trustees therefore requests that Orange County adopt a resolution requesting redesign
of the bridges for this project as soon as possible. Please contact me if you need additional information.
Sincerely,
•
James M. Ritchey, Jr.r.
•
General Manager
Copy: 4ohn Link, Orange County Manager
Enclosure: Resolution, Memorandum from the Planning Committee & Plan
Suite 206,50 Park Offices
P.O.Box 13787,Research Triangle Park,NC 27709 (919)549-9999
TRIANGLE TRANSIT AUTHORITY
Memorandum
Date: December 11, 1992
To: Board of Trustees
Triangle Transit Authority
From: Planning Committee
Subject: Report from the Planning Committee Concerning the Durham Freeway (East- West
Expressway) Extension Bridge Across the N.C. Railroad
On December 10, 1992, the Planning Committee received a report from Bob Grabarek and Neat Salmon
of the North Carolina Department of Transportation concerning the highway bridges planned for the
extension of the Durham East-West Expressway across the North Carolina Railroad.
•
The road project will complete the Durham East-West Expressway from its current terminus at 15-501 to
I-85. The freeway will cross over the North Carolina Railroad just east of the intersection with I-85. The
NCDOT staff has designed the bridge over the railroad for one set of tracks only. The NCDOT reported
that any change from the current bridge design will delay the project by at least one year.
With the attorney for the North Carolina Railroad, the General Manager encouraged NCDOT staff to
consider constructing the bridge for four sets of tracks. Such a configuration would allow two tracks for
heavy rail and two tracks for light rail. The NCDOT Public Transportation and Rail Division staff has
recommended that two tracks would adequate, but the project is currently proceeding without any change
in the design.
NCDOT staff estimates that an extension in the bridge for two tracks will cost an additional $157,100,
and an extension in the bridge for four tracks will cost an additional $659,600.
The Planning Committee discussed the issue and requested that the Board as a whole hear the. report
before making a recommendation concerning bridge design to the NCDOT.
Suite 206,50 Park Offices
P.O.Box 13787,Research Triangle Park,NC 27709 (919)549-9999
RESOLUTION REQUESTING THE NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION REDESIGN THE EAST-WEST EXPRESSWAY HIGHWAY BRIDGES
ACROSS THE NORTH CAROLINA RAILROAD
WHEREAS, the North Carolina Department of Transportation is extending the Durham East-West
Expressway from 15-501 to I-85; and,
WHEREAS, the planned Expressway will cross over the North Carolina Railroad near the intersection
with I-85; and,
WHEREAS, the NCDOT current plans are for the highway bridge to permit only one set of railroad
tracks; and,
WHEREAS, the highway bridge life span is designed to be fifty years; and,
WHEREAS, the North Carolina Railroad believes that they will need two sets of tracks for freight
railroad and Amtrak passenger service; and,
WHEREAS, the Research Triangle Regional Public Transportation Authority is conducting a study of
fixed guideway alternatives in the Triangle area; and,
WHEREAS, the North Carolina Railroad corridor from east Wake County to Hillsborough is a possible
corridor for a fixed guideway; and,
WHEREAS, the construction of the highway bridge as planned will preclude future rail service to
Hillsborough and northern Orange County.
NOW, THEREFORE, BE IT RESOLVED by the Research Triangle Regional Public Transportation
Authority Board of Trustees that:
1. The North Carolina Department of Transportation is requested to redesign the highway
bridges to permit four (4) sets of tracks.
2. The General Manager shall communicate this request to the North Carolina Department
of Transportation,the Durham-Chapel Hill-Carrboro Transportation Advisory Committee,
and the North Carolina Railroad.
3. The General Manager shall continue to work with the North Carolina Railroad to preserve
the full North Carolina Railroad right-of-way throughout the Triangle area.
Passed and adopted December 17, 1992
II,
o w �iJ Q40°1->
z �L3
w j
z '` ." y J co m u ® i.
1 Y 6 y Cl. R =
�\ C a o LL m O 1•
J . 3 k' -0
> a -) p{I1 .
• c o 3 c c o < `o ° c N 3 o r O N r
• p C J G ,p a' 0 n C O p -� n• 4 H c y 'O V Ct I' f
>, i- ii a J :