HomeMy WebLinkAboutAgenda - 04-24-2007-4gORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: April 24, 2007
Action Agenda
Item No. __`-~' "~
SUBJECT: Budget Amendment #11
DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No
ATTACHMENT(S):
Attachment 1. Budget as Amended
Spreadsheet.
Attachment 2. Year-To-Date Budget .
Summary
Attachment 3. Gravelly Hill Middle School
Capital Project Ordinance
Attachment 4. Carrboro High School
Capital Project Ordinance
Attachment 5. Chapel Hill Carrboro City
Schools Elementary #10
Capital Project Ordinance
Attachment 6. Commissioners
Contingency Status
Report
INFORMATION CONTACT:
Donna Coffey, (919) 245-2151
PURPOSE:. To approve budget and capital project ordinance amendments for fiscal year 2006-
07.
BACKGROUND:
Health Department
1. The Health Department's Division of Environmental Health has received notification of
additional State funds of $1,478 in Food and Lodging inspection revenues. These funds
reflect aperformance-based distribution of FY 2005-06 Food and Lodging fees based on the
County's compliance with mandated inspections of food and lodging establishments. This
budget amendment provides for the receipt of these additional funds. (See Attachment 1,
column #1)
Department on Aging
2. The Community Based Services division within the Department on Aging has .received
notification of additional State Senior Center General Purpose funds totaling $15,369 for this
fiscal year. The department plans to use these funds to cover temporary personnel costs
associated with on-going evening senior center programming, supplies for special events
and activities, and for replacement of electronic equipment, such as LCD projector, digital
camera, and audio equipment at the County's senior centers. This budget amendment
provides for the receipt of these additional funds. (See Attachment 1, column #2)
School Capital Projects
3. Historically, in accordance with NC General Statute
to receive refunds for the sales taxes that they
session, the NC General Assembly amended
administrative units (LEAs) from those governmei
refunds. Pursuant to the amendment, school distri
after fiscal year 2005-06.
164-4(c), school districts have been able
gave paid. During the 2005 legislative
the Statute and deleted local school
tal entities eligible to receive sales tax
.ts can no longer claim sales tax refunds
As a result of the legislative action, both Orange County Schools and Chapel Hill Carrboro
City Schools stood to lose hundreds of thousands of dollars per year from school capital
project sales tax reimbursements. For example, the Orange County, Schools' Gravelly Hill
Middle School construction capital project anticipated receiving $300,000 in sales tax
refunds, and the Chapel Hill Carrboro City Schools' Carrboro High School construction
capital project was relying on $450,000 in sales tax refunds.
After the General Assembly approved the amendmer
(LGC) issued a memorandum that clarified how, unc
assume responsibility for the construction of school f
and materials, and thereby be eligible for sales tax
2005, the Board of County Commissioners approved
the LGC's guidelines between the County and both
Carrboro City Schools.
t, the Local Government Commission
ler certain conditions, a county could
acilities and the purchase of supplies
reimbursements. On December 13,
interlocal agreements that adhered to
the Orange County and Chapel Hill
To properly budget the receipt of the sales tax refunds, it is necessary to amend the Gravelly
Hill Middle School and Carrboro High School Capital Project Ordinances to reflect the
refunds as County revenues passed on to each school district. The attached capital project
ordinances reflect the change. It is important to note that there was a delay between the
time the General Assembly amended the Statute and the enactment of the interlocal
agreement between the County. The delay resulted in sales tax refunds that will be about
$141,500 less than anticipated. County staff will work with Orange County Schools staff to
identify how to make up the shortfall and will report to the Board later this spring. (See
attached Gravelly Hill Middle School and Carrboro High School Capital Project Ordinances)
4. On March 13, 2007 Commissioners approved a funding plan for Chapel Hill Carrboro
Elementary School #10. The attached capital project ordinance reflects the project budget
approved by the Board. (See attached Elementary #10 School Capital Project Ordinance)
SportsPlex Enterprise Fund
5. It was the intent of the Board of County Commissioners to approve a $2,403,000 budget for
current fiscal year funding for the SportsPlex Enterprise Fund. However, in preparing the
budget ordinance, staff inadvertently omitted the SportsPlex Enterprise Fund section of the
actual budget ordinance that the Board approved on June 27, 2006. This amendment
corrects the ordinance and budgets for the revenues and expenditures associated with the
fiscal year 2006-07 SportsPlex Enterprise Fund annual operating budget. Revenues for the
Enterprise Fund consist of activity related fees charged to users as well as the $700,000
transfer from the County's General Fund (the transfer from the County's General Fund was
correctly captured in the budget ordinance adopted by the Board on .June 27) (See
Attachment 1, column #5).
Library Services
6. At its March 27, 2007 meeting, the Board of County Commissioners approved a request for
funding from the Library Services Task Force for consultant fees totaling $4,000. The
consultant will work with the Task Force on a Service Needs Plan for Orange County Public
Libraries. This budget amendment provides for an appropriation of $4,000 from
Commissioner Contingency. Should the Board approve this appropriation, $12,333 would
remain in Commissioner Contingency for the remainder of the current fiscal year. (See
Attachment 6, Commissioner Contingency Status Report)
Orange/Chatham Justice Partnership Program
7. The Governor's Crime Commission has awarded a $209,152 multi-year grant to Orange
County.. The first year funding will total $109,358 with the second year funding totaling
$99,794. The Partnership plans to pass the monies to the Mental Health Association in
Orange County to offset costs associated with their SFP 10-14 and FAN programs. These
programs build family protective factors and reduce delinquency amount juveniles living in
Orange County. There is no county match required for the receipt of these funds. This
budget amendment provides for the receipt of first year funding in the amount of $109,358
for the above stated purpose. (See Attachment 1, column #7)
FINANCIAL IMPACT: Financial impacts are included in the background information above.
RECOMMENDATION (S): The Manager recommends that the Board of County Commissioners
approve the attached budget and capital project ordinance amendments.
0
C
E
'O 3
Q a
a ~
v °1
~ b
m m
n F
R my
N c
d .C
a0
o ..
a` ,orn
cm
o~
U ~
rnU
E ~
c
Oq
v
Eo
U N
Q ~
~ ~o om o < ~ ~m m a m~ ~~
~ „ „ ~
~o ~ ~ ~~ ~
am
me
~~
m
o~~i~
~pa 8§. °
~
d
E
~ffi mEoa~~ ~
~
E ~
~ n r
U ~ ~ yyqq
~ ~ LL
Oab:$ ONw
~5~5~~'~ ~ ~gg ~ ~ U C
V ~ m'~
g 25 ~ °
,
m
~NU~Ugg$
CNO
U p
p
'~~@ a~,~z§-,
g
~
0 ~Fi
RR
8
°~~ ~ ~~ 8~5°
~
V ~U~~jU#
~
°ES~EaS
~~~
''
o
=
~
QSQs
m = -R° m'
YYYyYYYy~~
~$yU
~
~
U
VV
~ ~ g
p ~~pop - .~
ii~
..b ~GC~K
N 1
m~N~~~ea o
`
y
g `°o
~~m°^o~
''
gg
o
~
gg
W
,a
~a~ ~r?y
U Q
~g ~ ~ ~
~ ~ ~ ~
~
~
v m
a~~.~~~ ~~~sa
~~a~p~B~r&~„~€~
bB~1S.g
E~$SB
$
~"
m
C
~
,
9
.~~v~~~`~~~°a$.EE
g, ~ .2 1n $.'~ $ ~ S ~ ~
~LL~E y~~Z'zY 7~~
~~e $~~
~~ e« eo ~ m m~ g~ ~~ x« n ~ m •
~` ~§ A r ~$ ^ am ~ ~ °a
m
2m
me
~~
;~:, ~r o~ <o ~ ~ ~ x a~ ~m <~ ~ o ~ ,
as m me m x
° s wa M~
~ „
o e
m
ysh ~ - ~ ~x ~
Y
s~h5~ a
m
C nn N n m ~ o
:
= ~ a ~
r:
u n g
S: y
g
i ~ o. . mr e33
,",E
E °
~
i ry
3 n
on
°o
~
~
~
°~n
F+ rr
:i
m e ~ °o o
0 n ~ N
~ a°
i
»
a 5
$ °
° E
° i
`~ °
~
~ v -
` o
~ a
~u ~~J cE o~ g `a c S bu c~ °c ~
°>
~~ a~
N a y
~ ~ ° c
U~ „
E ~
I- c
u. ~
F W l > c
7 U'° e E
U S a~
O.U o
W F t~
I+
Attachment 2
Year-To-Date Budget Summary
Fiscal Year 2006-07
General Fund Budget Summary
Ori final General Fund Budget $163,473,184
Additional Revenue Received Through Budget
Amendment #11 (April 24, 2007
Grant Funds $772,281
Non Grant Funds $904,774
Additional County Dollars (i.e. County
Fund Balance Appropriated to Date) to
Cover Unanticipated Expenditures
$1,406,650
Total Amended General Fund Budget $166,556,889
Dollar Change in 2006-07 Approved
General Fund Budget
$3,083,705
Change in 2006-07 Approved General
Fund Budget
1.89%
Authorized Fuii rime tquwaoent ros~t~on s
Original Approved General Fund Full Time
Equivalent Positions
773.836
Original Approved Other Funds Full Time
Equivalent Positions
69.300
Additional Positions Approved Mid-Year 0.000
Total Approved Full-Time-Equivalent
Positions for Fiscal Year 2006-07
843.136
0
includes encumbrance
carry forwards as
authorized by the annual
budget ordinance
($834,750); and carry
forwards from FY 2005-06
f~5Z1!9f1r11
A~~chmen-~ 3 Q
Gravelly Hill Middle School
Orange County Schools
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2 of
Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby adopted.
Section 1. The project authorized provides funds for the Orange County Schools to purchase property
and design, construction, and equipping of a new middle school facility. Anticipated
revenues for the project consist of pay-as-you-go funding (transfer from General Fund and
Sales Tax Reimbursements), 2001 voter approved bond funds, a private placement loan,
and a transfer from the County Capital Fund.
Section 2. The officers of the County are hereby directed to proceed with the project within the budget
contained herein.
Section 3. The following County revenue is anticipated to complete this project:
Through FY
2005-06 -
07 Through FY
2005-06
ay- s- ou- o raps er
from General Fund
$0
$802,000
$802,000
raps er rom oun y
Capital Fund
$60,000
$0
$60,000
a es ax
Reimbursements
$0
$300,000
$300,000
2001 Bonds $18,500,000 $0 $18,500,000
Private Placement Loan $3,500,000 $0 $0
Total Coun Fundin $22,120,000. $1,102,000 $23,222,000
Section 4. The following amount is appropriated for this project:
Through FY
2005-06
FY ZOOG-07 Through FY
ZOOG-07
Construction $15,889,393 $300,000 $16,189,393
Site Acquisition $775,005 $0 $775,005
Site Acquisition
(Sals/Materials Testing,
Surveys
$20,000
$0
$20,000
Site Development $2,605,602 $0 $2,605,602
Fees Arch/Eng/Design $1,115,000 $0 $1,115,000
Nbveable Equipment $600,000 $0 $600,000
Technology $650,000 $0 $650,000
ru ton
Contingency
$465,000
$0
$465,000
Cane-Time Start Up Costs $0 $802,000 $802,000
Total $22,120,000 $1,102,000 $23,2?2,000
Section 5. In addition, the Orange County Board of Education plans to appropriate the following
revenues to the project to cover construction costs.
Through FY
2005-06
FY 2006-07 Through FY
2006-07
Sales Tax Refunds $300,000 $300,000 $0
NCDOT Grant $50,000 $0 $50,000
i Iona are o
Electrical Service
$60,000
$0
$60,000
o a oar o
Education Fundin
$410,000
($300,000)
$110,000
Section 6. The cost to site and construct Gravelly Hill Middle School totals $24,009,525.
Through FY Through FY
2005-06 FY 2006-07 2006-07
oun y i e c o0
#3 Borid Funds $18,500,000 $0 $18,500,000
County 2001 Soccer Super Fund
Bonds (to cover site development
costs for West 10 Soccer Complex
co-located at the Middle School #3
site $237,525 $0 $237,525
Pay-As-You-Go Funds (Transfer
from General Fund $0 $802,000 $802,000
Transfer from Count Capital Fund $60,000 $0 $60,000
range oun y nva a acemen
Funding $4,000,000 $0 $4,000,000
School Board Funds $410,000 $0 $410,000
o a oar o uca ion
Fundin $23,207,525 $802,000 $24,009,525
Section 7. This ordinance supersedes all previous Gravelly Hill Middle School capital project
ordinances.
Section 8: This capital project ordinance, originally adopted March 4, 2005, shall remain in effect
through June 30, 2007.
Adopted this 24th day of April 2007.
.R-I-~achrn~-Er ~- (~
Carrboro High School (0=ormerly High School #3)
Chapel Hill-Carrboro City Schools
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section
13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is
hereby adopted.
Section 1.The project authorized provides funds for the Chapel Hill-Carrboro City Schools to
acquire property for, and to design, construct, and equip a new high school facility
to be located on Rock Haven Road, in the vicinity of the intersection of Smith Level
Road and Culbreth Road. Anticipated revenues for the project consist of 2001 voter
approved bond funds, school construction impact fees, pay-as-you-go funding,
sales tax reimbursements, and alternative financing through a private placement
loan or similar debt instruments.
Section 2.The officers of the County are hereby directed to proceed with the project within the
budget contained herein.
Section 3.The following revenue is anticipated to complete this project:
2005-06 FY 2006-07 2006-07
Sales Tax $4,342,000 $0 $4,342,000
School Construction
Impact Fees
$9,300,000
$0
$9,300,000
.Alternative Financing $9,000,000 $0 $9,000,000
2001 Bonds $12,800,000 $0 $12,800,000
Sales Tax
Reimburserr~nts
$0
$450,000
$450,000
Total Funding $35,442,000 $450,000 $35,892,000
Section 4.The following amount is appropriated for this project:
Through FY
2005-06
FY 2006-07 Through FY
2006-07
Conslruc~ion $26,697,803 $450,000 $27,147,803
Site Acquisition $3,531,697 $0 $3,531,697
Site DevelopmeLlt $0 $0 $0
Fees $2,162,500 $0 . $2,162,500
Furnishings $800,000 $0 $800,000
Technology $1,000,000 $0 $1,000,000
Construction Contingency $750,000 $0 $750,000
One-Tirrie Start Up Costs $500,000 $0 $500,000
Total Costs $35,442,000 $450,000 $35,892,000
Section 5. Although not a part of the County appropriation for the CHCCS High School #3
project, it is noted here for reference purposes that the Chapel Hill-Carrboro Board
of Education intends to appropriate an additional $50,000 in North Carolina
Department of Transportation funds from its own funding sources, bringing the
project total to $35,942,000.
Section 6. This ordinance supersedes the interlocal agreement dated August 7, 2003 (with
subsequent Addendum "A" and Addendum "B") as the controlling instrument
regarding Phase I (generally as described and defined in Addendum "A" of the
August 7, 2003 interlocal agreement) of High School #3 project budget, scope, and
timing. The following provisions of the previously existing interlocal agreement and
addenda remain expectations of the Orange County Board of Commissioners
regarding smart-growth promoting standards that the Chapel Hill-Carrboro Board of
Education will incorporate into the project scope, design, and plans for Phase I and
Phase II of CHCCS high school #3:
1. Transportation Standards. The building shall be located within '/z mile of an
existing or planned trail, greenway, bikeway or bus line. The design of CHCCS
high school #3 and its facilities shall provide bike racks and storage for 10% of the
building occupants, provide preferred parking for carpools and alternative vehicles
and reduce parking lot size and its associated impervious surfaces by at least 35%
from Orange County School Construction Standards by providing no more than
420 spaces for Phase I and Phase II student/teacher/staff/ visitor motor vehicle
parking, all to be constructed with Phase I.
2. Site Standards. The design of CHCCS high school #3 and its facilities shall (1)
preserve a minimum of 30% of the site in undeveloped space; and (2) provide
shade on at least 30% of non-roof impervious surface on the site within 5 years or
use an open grid pavement system, with less than 50% impervious surface, for
50% of the parking area. The site shall comply with the Town of Carrboro's new
stream protection plan and implement a storm management plan that does not
increase the rate or quality of runoff from the site.
3. Building Standards. The building design shall stress compact design features
including multi-story construction. The physical education and athletic facilities
shall be designed to minimize land disturbance.
4. Water Use Standards. Design standards shall have a goal of aggregate water
reduction of 20% of the base, not including irrigation, after meeting EPA 1992
fixture performance requirements with respect to irrigation and reflect xeriscaping
principles.
5. Shared Use Standards. Design standards shall provide the public with non-
school hour access to exterior spaces, including a vita track, cross country course
designed and maintained to increase environmental awareness and interior spaces
for community use including common areas, auditoria and meeting rooms.
io
6. CHCCS High Performance Standards. Design standards shall comply with the
high performance building design criteria in School Board Policy 9040.
7. Public Road Improvement Standards. Endorse the timely construction of road
improvements to Smith Level Road and intersection improvements to the
intersection of Rock Haven Road and Smith Level Road which improvements have
been endorsed by Carrboro and Orange County and which improvements, if timely
constructed, will reduce by as much as.$250,000 the offsite road improvement cost
to CHCCS in its construction of CHCCS high school #3.
8. Transportation Enhancement Standards. Reduce dependency on the
automobile for school functions and to reduce vehicle miles traveled related to
school functions by committing at least $300,000 of capital from the amount
appropriated to the Construction line item of Section 4 to:
a. the purchase of buses or shuttles to be owned by CHCCS or otherwise, in
tandem.with the development of an enhanced transportation system, for
school uses and functions, including student, staff and teacher transportation
to and from school and student, staff, teacher and visitor transportation to and
from preschool and afterschool programs;
b. contributions of funds and expertise to the evaluation and development of
the use of Chapel Hill Area Transit and/or Orange Public Transportation to
provide non-automobile alternatives for transportation of students, staff,
teachers and visitors to and from school, preschool and afterschool programs;
c. the purchase of transit software to be used to reduce vehicle miles traveled
in future redistricting decisions;
d. promote walking to and from school and pre and after school programs by
funding with matching grants the construction of sidewalks in Carrboro and
Chapel Hill located within 1.5 miles of CHCCS high school #3 (the school "walk
zone") which sidewalks are likely to be constructed by Carrboro and Chapel
Hill only in response to matching grants;
e. promote bike riding to and from school and pre and after school programs
by funding with matching grants the construction of bike lanes in Carrboro and
Chapel Hill within the attendance district of CHCCS high school #3 which bike
lanes are likely to be constructed by or at the request of Carrboro and Chapel
Hill only in response to matching grants;
f. promote bus and other transit transportation to and from school and pre
and after school programs by funding the construction of weatherproof shelters
(considering climate controlling them) at locations within the attendance district
of CHCCS high school #3 adjacent to or conveniently close to park and ride
locations established by Carrboro, Chapel Hill and the University of North
Carolina.
ri
Section 7. This ordinance is effective June 7, 2005, supersedes all previous High School #3
Capital Project Ordinances, and will remain in effect through June 30, 2008, unless
sooner amended or closed out.
Adopted this 24th day of April, 2007.
~o,GNI (Y-~2n -~ ~j I a
Elementary #10
Chapel HiII~Carrboro City Schools
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section
13.2 of Chapter 159 of the General Statutes of North Carolina, the following capital project is
hereby adopted.
Section 1.The project authorized provides funds for the Chapel Hill-Carrboro City Schools to
plan and design a new 585-student elementary school facility to be located on at the
Twin Creeks Park and Educational Campus (formerly known as Chapel Hill
Township District Park). Also included in this project is funding for infrastructure
(water and sewer) to the County's Twin Creeks Park site. Anticipated revenues for
the school project consist of alternative financing through third party financing.
Section 2:The officers of the County are hereby directed to proceed with the project within the
budget contained herein.
Section 3.The following County revenue is anticipated to complete this project:
2005-06 FY 2006-07 2006-07
Pay- -You
Funding (planned for
fiscal year 2008-09)
$0
$500,000
$500,000
Alternative Financing $0 $23,282,751 $23,282,751
Sales Tax
Reimbursements
$0
$350,000
$350,000
Total Fundin $0 $24,132,751 $24,132,751
Section 4.The following amount is appropriated for this project within the County's capital
project ordinance:
Ti?mough FY
ZOOS~~06
FY2006-07 Ti?~rougli FY
2006-07
Consttuction $0 $19,057,004 $19,057,004
Site ' ition $0 $0 $0
Site Devel $0 $1,235,000 $1,235,000
Fees $0 $1,432,598 $1,432,598
$0 $540,000 $540,000
Teclnlol $0 $744,389 $744,389
Coi~tnx~ion $0 $623,760 $623,760
Costs $0 $500,000 $500,000
Total $0 $2A~132,751 $2A~132,751
~3'
Section 5. In addition, the Chapel Hill Carrboro City Schools Board of Education plans to
appropriate $500,000 from the District's fund balance in fiscal year 2006-07 to be
used to complete construction of Elementary #10 bringing the total cost of
Elementary #10 to $24,632,751.
Section 6. Planning and funding of Elementary #10 shall be in accordance with the Orange
County Board of County Commissioners adopted Policy on Planning and Funding
School Capital Commissioner Foushee is hereby designated to serve as the
Board's liaison with CHCCS as project plans develop.
Section 7. This ordinance is effective June 27; 2006 and will remain in effect through June 30,
2008, unless sooner amended or closed out.
Adopted this 24th day of April, 2007.
Status of Commissioners Contingency Account
Fiscal Year 2006-07
Attachment 6
i~
Comments
$35,000 Approved 7/01/06
($15,000) (BOA #3 for BOCC District Elections Education
Process)
($1,917) (BOA # 6 for Contribution to Upper Neuse River
Basin Association)
($1,750) (BOA #7 for recognition celebration of the
volunteer fire and rescue departments and ham
radio operators)
($4,000) (BOA #11 to cover consultant costs related to
developing a Service Needs Plan for Orange
County Public Libraries)
Remaining Contingency $12,333